PPMP20008: Lessons Learnt Presentation Assessment 3 - 2018 Term 1

Verified

Added on  2023/06/11

|17
|836
|255
Presentation
AI Summary
This presentation reflects on the PPMP20008 course, focusing on project management principles and personal learning experiences. The student details the lessons learned through the course, including the planning, development, and execution phases. The presentation outlines the framework used to gather and document lessons, analyzing what went well and the challenges faced, such as complex case studies and client demands for changes. The student provides detailed reflections, identifying common issues like the absence of a structured lessons-learned process and library. The presentation also includes improvement strategies for each lesson, outlining how the strategies would be measured, why they are achievable, and their relevance. The student uses the project case study to illustrate scope alignment and the implementation of change management plans. Finally, the presentation concludes with a summary of key takeaways and references relevant project management literature.
Document Page
PPMP20008
Lessons Learnt Presentation
Assessment 3 - 2018 Term1
Student name:
Student number:
Campus:
Tutor name:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Introduction
PMP20008 deals with study of implementing the knowledge of the
project management
Project Planning, Developing, and Executing are the factors that I
would study through out the course
Project Case Study is also developed for easing the analysis of the
operations
Document Page
Lessons Learnt Framework
How I planned to gather and document lessons learnt
When I planned to
identify and collect
lessons learnt
Who I planned to
involve in the process
of gathering lessons
How I planned to
document lessons
After the completion of
the resources and study
literatures I planned to
get on the implication of
the effective processes
The various literature
surveys and the
improvement operations
I used the proper
documentation aligning
the effective document
template can be used for
documenting the
Document Page
Lessons Learnt Framework
What actually happened
When I identified and
collected lessons
learnt
Who I involved in the
process of gathering
lessons
How I documented
lessons
I realized the implication
of the successive project
integration development
using project planning
scope, objectives,
SMART objectives, and
SWOT analysis
My tutor helped me in
easing the deployment of
the improved project
alignment methodology
The documentation
would be done for
forming the alignment of
the successive
development
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
No Lessons Learnt
Process
No Lessons Learnt
Library
I was able to understand the implication
of the improved functional development
and the significant development of the
project completion process. The
process of learning via the study
materials
The study helped me in forming the
allowance of the improved functional
development for forming the utilization of
the improved functional development
model
Reflections on my actual lessons learnt process
and the common issues of:
Document Page
Change management plan
Document Page
Lesson 1
Situation The situation made me
feel…
What I learnt from
reflecting on the
situation
I had to face the major
problems for the very
complex and influential
project case study
It was very exhausting
and the supply would
result in easing the
profound development of
the activities
I studied the implication
development for using
the allowance of the
case study development
for forming the
successive integration
method
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Improvement strategy for lesson 1
Improvement
strategy
How to
measure if
the strategy
works
Why the
strategy is
achievable
Relevance of
strategy to
address the
lesson
When the
strategy will
be
implemented
Project case
study had
resulted in
forming the
scope
alignment
development
methods
The study
helped me to
develop an
understanding
of the
complete
project
execution
model.
I would be
easy to break
down the
project case
study in scope
management
and objectives
The case
study had
provided the
simplicity of
the activities
forming the
utilization
management
Completion of
the activities
for forming
the utilization
of the
successive
development
models.
Document Page
Lesson 2
Situation The situation made me
feel…
What I learnt from
reflecting on the
situation
Client demanded the
changes to be
implemented in the
project
It resulted in forming
major problems for the
alignment of the
improved functional
development
The study helped me in
forming the significant
deployment of the
activities for
understanding of the
processes
Document Page
Improvement strategy for lesson 2
Improvement
strategy
How to
measure if
the strategy
works
Why the
strategy is
achievable
Relevance of
strategy to
address the
lesson
When the
strategy will
be
implemented
Change
Management
Plan was
introduced
Client would
approve the
completion of
the effective
project
I can use the
various
documentatio
n process for
developing
the final
alignment
methods
Plan
implementatio
n would be
assisted for
the analysis of
the effective
implication
model
Before the
final
testing/inspect
ion phase
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Budget Estimation
Document Page
Risk Analysis Process
chevron_up_icon
1 out of 17
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]