BM522 Project Management: LMAC Music Event Risk & Quality Analysis
VerifiedAdded on 2023/06/05
|10
|2121
|372
Report
AI Summary
This report provides a comprehensive project management plan for LMAC's music event, aimed at promoting their 'better city for all' campaign. It utilizes the waterfall methodology for systematic execution, detailing each phase and activity. The report includes a network diagram and Gantt chart for timeline management, a stakeholder analysis matrix for effective communication strategies, and a work breakdown structure for task delegation. Furthermore, it addresses potential risks with mitigation strategies and outlines quality management expectations, acceptance criteria, and specifications. Tools such as risk matrix, work breakdown structure and Gantt chart are utilized. The analysis provides insights into budget considerations, marketing strategies, team management, and venue selection, ensuring a well-organized and successful event.

BM522 Project
Management
Management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Contents
Introduction................................................................................................................................4
Main Body..................................................................................................................................4
Task-1.........................................................................................................................................4
About project case-................................................................................................................4
Types of methodology............................................................................................................4
Task-2.........................................................................................................................................5
Network Diagram-.................................................................................................................5
Gantt Chart-............................................................................................................................5
Task-3.........................................................................................................................................6
Stakeholder Analysis-............................................................................................................6
Stakeholder management matrix-..........................................................................................7
Communication Strategies-....................................................................................................7
Task-4.........................................................................................................................................8
Work Break Down Structure-................................................................................................8
Task-5.........................................................................................................................................8
Risk Analysis and mitigation strategies.................................................................................8
Task-6.......................................................................................................................................10
Quality Management............................................................................................................10
Conclusion................................................................................................................................11
References................................................................................................................................11
Introduction................................................................................................................................4
Main Body..................................................................................................................................4
Task-1.........................................................................................................................................4
About project case-................................................................................................................4
Types of methodology............................................................................................................4
Task-2.........................................................................................................................................5
Network Diagram-.................................................................................................................5
Gantt Chart-............................................................................................................................5
Task-3.........................................................................................................................................6
Stakeholder Analysis-............................................................................................................6
Stakeholder management matrix-..........................................................................................7
Communication Strategies-....................................................................................................7
Task-4.........................................................................................................................................8
Work Break Down Structure-................................................................................................8
Task-5.........................................................................................................................................8
Risk Analysis and mitigation strategies.................................................................................8
Task-6.......................................................................................................................................10
Quality Management............................................................................................................10
Conclusion................................................................................................................................11
References................................................................................................................................11

Introduction
A project management is a complete process which will help an organization to
analyses the different aspects and component’s which has their own value for the completion
of a given goal. It gives a proper plan with which a manager can form a budget for the
execution and hiring of the personnel who will help in this proves. Other than this, project
management also tell the time line in which all the activities can be completed by the team
who are involved in such functions. This given report is based on such project management
planning where a music event is going to organize by LMAC.
Main Body
Task-1
About project case-
LMAC a charitable organization is planning to organize a musical event. The main
aim of this event is to convey the idea of the organization among the people. LMAC wants to
promote the better city for all campaign, which is also assist by Samaritans, a key associate of
this program. For the same, LMAC organization wants to develop a project management
report which will give a brief detail to them about the various aspect which might play a great
role in the overall working of the program.
Types of methodology
For the purpose of project management there are numbers of structures have been
followed by the managers which will support in giving the right way by which an
organization can attain its objective. For LMAC musical event, waterfall methodology would
be perfect as it will help in maintaining each activity of the program in a systematic manner.
Every phase of the project management will ensure a successful program, when this
methodology is being used by the manager. In some of previous events or projects this
methodology has helped in distinct ways. This focuses on declining any complex framework
for the execution of any activity of music event. Moreover, waterfall methodology supports
in identifying the goals prior to the implementation of project activities, by which LMAC can
analyze the amount money should be invested in this event. As the name clear the procedure
of this framework, it helps in distribution from one person to another who are involved in this
project in a very well manner. This will reduce any kind of miscommunication and poor
A project management is a complete process which will help an organization to
analyses the different aspects and component’s which has their own value for the completion
of a given goal. It gives a proper plan with which a manager can form a budget for the
execution and hiring of the personnel who will help in this proves. Other than this, project
management also tell the time line in which all the activities can be completed by the team
who are involved in such functions. This given report is based on such project management
planning where a music event is going to organize by LMAC.
Main Body
Task-1
About project case-
LMAC a charitable organization is planning to organize a musical event. The main
aim of this event is to convey the idea of the organization among the people. LMAC wants to
promote the better city for all campaign, which is also assist by Samaritans, a key associate of
this program. For the same, LMAC organization wants to develop a project management
report which will give a brief detail to them about the various aspect which might play a great
role in the overall working of the program.
Types of methodology
For the purpose of project management there are numbers of structures have been
followed by the managers which will support in giving the right way by which an
organization can attain its objective. For LMAC musical event, waterfall methodology would
be perfect as it will help in maintaining each activity of the program in a systematic manner.
Every phase of the project management will ensure a successful program, when this
methodology is being used by the manager. In some of previous events or projects this
methodology has helped in distinct ways. This focuses on declining any complex framework
for the execution of any activity of music event. Moreover, waterfall methodology supports
in identifying the goals prior to the implementation of project activities, by which LMAC can
analyze the amount money should be invested in this event. As the name clear the procedure
of this framework, it helps in distribution from one person to another who are involved in this
project in a very well manner. This will reduce any kind of miscommunication and poor
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

management of team in the implementation of assigned duties to them. So, project manager
can utilize this methodology for the music even of LMAC organization.
Task-2
Network Diagram-
The network diagram of LMAC music event shows a methodical connection among
the different activities of the project management. It will provide brief detailing about the
starting time and finish tie of all the activities of the event. It will help in identifying the time
or the path with which LMAC can finish its music event in very less time. Basically with the
help of network diagram, a project manager evaluate the shortest and longest way of
accomplishing the task of the event.
Like, in the given diagram if the project manager go along with the red arrows then it
will be the less time taken procedure to complete this event, but if LMAC follows all the
activities in a systematic order then it will take so many days to complete this task.
Gantt Chart-
In the project management of music event, Gantt chart will give a detailing about the
times which is needed for the completion of all the activities. In this chart, activities are
divided into different phases and specific time has been allotted to all. By this summation of
all these timelines, project manager will get to know about the actual time requirement for the
completion of the event.
Gantt Chart for the event
can utilize this methodology for the music even of LMAC organization.
Task-2
Network Diagram-
The network diagram of LMAC music event shows a methodical connection among
the different activities of the project management. It will provide brief detailing about the
starting time and finish tie of all the activities of the event. It will help in identifying the time
or the path with which LMAC can finish its music event in very less time. Basically with the
help of network diagram, a project manager evaluate the shortest and longest way of
accomplishing the task of the event.
Like, in the given diagram if the project manager go along with the red arrows then it
will be the less time taken procedure to complete this event, but if LMAC follows all the
activities in a systematic order then it will take so many days to complete this task.
Gantt Chart-
In the project management of music event, Gantt chart will give a detailing about the
times which is needed for the completion of all the activities. In this chart, activities are
divided into different phases and specific time has been allotted to all. By this summation of
all these timelines, project manager will get to know about the actual time requirement for the
completion of the event.
Gantt Chart for the event
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Task-3
Stakeholder Analysis-
In general stakeholders are those people who show their interest in the functioning of
any business or event which is organized by an organization. To sustain the growth of the
business functions it is necessary to work on managing the good relationship with all the
stakeholders, as they will also help in ensuring the victory of the management as well.
Stakeholders will get gratify with the company when administration accomplish all their
needs and wants.
Internal stakeholders- People who belongs to the inner management of the
establishment and also contributes in the prosperity of the project. They effect the
operational area of the business directly with their activities as these are the one who
hired by the company itself.
External stakeholders- When the working of any project gets affected by the outside
people or forces, then they are termed as the external stakeholders. The activities
which are conducted inside the management have direct impact on the interest and
interventions of these individuals.
Stakeholder management matrix-
It is an important tool of project management by which the project manager can find
out the interest and involvement of the stakeholders in the given project. In this way, LMAC
can utilize the influence of their stakeholders on their music events-
For LMAC music event, stakeholders who needs to be monitor are the music or
orchestra team. Consumers or audience, news media are the one who should be keep
High
Low
Low High
Keep
Satisfied
Manage
Closely
Monitor Keep
informed
Interest
Power
Stakeholder Analysis-
In general stakeholders are those people who show their interest in the functioning of
any business or event which is organized by an organization. To sustain the growth of the
business functions it is necessary to work on managing the good relationship with all the
stakeholders, as they will also help in ensuring the victory of the management as well.
Stakeholders will get gratify with the company when administration accomplish all their
needs and wants.
Internal stakeholders- People who belongs to the inner management of the
establishment and also contributes in the prosperity of the project. They effect the
operational area of the business directly with their activities as these are the one who
hired by the company itself.
External stakeholders- When the working of any project gets affected by the outside
people or forces, then they are termed as the external stakeholders. The activities
which are conducted inside the management have direct impact on the interest and
interventions of these individuals.
Stakeholder management matrix-
It is an important tool of project management by which the project manager can find
out the interest and involvement of the stakeholders in the given project. In this way, LMAC
can utilize the influence of their stakeholders on their music events-
For LMAC music event, stakeholders who needs to be monitor are the music or
orchestra team. Consumers or audience, news media are the one who should be keep
High
Low
Low High
Keep
Satisfied
Manage
Closely
Monitor Keep
informed
Interest
Power

informed regarding the occurrence of the event. The one who needs to stay satisfied during
this event are local government bodies, apart from it, project manager and Samaritans of the
event should be managed closely.
Communication Strategies-
Stakeholder Interest Power Communication
medium
Frequency
Orchestra team Low Low Calls and face to face Two times a
week
Audience High Low Through social media Everyday
Media and reporters High Low Calls Once a week
Local authorities Low High Face to face Once a week
Project Manager High High Face to face Regular
Samaritans High High Calls 2 times a day
Task-4
Work Break Down Structure-
It represents the working of a project in different phases which is sub divided as per
the preferences during the implementation of task.
Music Event by LMAC
Initiation
Budget approval
Hire Publicity Director
Hire set designer
Hire place for
auditions
Advertising to
hire crew and
cast
Planning
Hire production
and publicity crew
Set design and
built
Train
production
crew
Auditions to
hire cast
Execution
Cast rehearsal
Hire Orchestra
Music
Photograph cast &
crew and collect
biographies
Enter information
into computer
Monitoring
Develop an advertising
plan
Printing develop an
advertising plan
Advertising
media
Orchestra
rehearsal
Order costumes
Closure
Costume parade and
alterations
Dress rehearsal
Performance
this event are local government bodies, apart from it, project manager and Samaritans of the
event should be managed closely.
Communication Strategies-
Stakeholder Interest Power Communication
medium
Frequency
Orchestra team Low Low Calls and face to face Two times a
week
Audience High Low Through social media Everyday
Media and reporters High Low Calls Once a week
Local authorities Low High Face to face Once a week
Project Manager High High Face to face Regular
Samaritans High High Calls 2 times a day
Task-4
Work Break Down Structure-
It represents the working of a project in different phases which is sub divided as per
the preferences during the implementation of task.
Music Event by LMAC
Initiation
Budget approval
Hire Publicity Director
Hire set designer
Hire place for
auditions
Advertising to
hire crew and
cast
Planning
Hire production
and publicity crew
Set design and
built
Train
production
crew
Auditions to
hire cast
Execution
Cast rehearsal
Hire Orchestra
Music
Photograph cast &
crew and collect
biographies
Enter information
into computer
Monitoring
Develop an advertising
plan
Printing develop an
advertising plan
Advertising
media
Orchestra
rehearsal
Order costumes
Closure
Costume parade and
alterations
Dress rehearsal
Performance
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Task-5
Risk Analysis and mitigation strategies
Risk Description Risk
magnitude
Risk mitigation
Budget issue Excess of expenditure or
wastage may lead to over
budgeting.
2 Spend according to the
money collected by the
team.
Poor marketing Inefficiency to reach the
right audience and inform
them about the event.
1 Utilize new and innovative
marketing tools
Unskilled team Poor presentation of work
and delays which leads to
time extension of the
project.
2 Provide proper training
Unavailability of
professionals
Lack of knowledge about
the occurrence of proper
planning and execution.
1 Select the best candidate
for the given task
Climate issue It can spoil the arrangement
of the overall events and
lead to the failure as well.
1 Selection of venue by
considering this
Resources scarcity Obstruct the proper
arrangement of the event.
4 Optimum utilization of
given resources
Technical problem It may interrupt the musical
event and lighting as well.
4 Continuous monitoring
Risk of conflicts Reduce the efficiency in
completing the duties
6 Development of healthy
and friendly environment.
Food and safety threat Poor hygiene in preparation
of foods and snacks
4 Hiring professional chefs
for the kitchen
Threat of quality Sound system not good and
other resources which are
used in the preparation.
4 Prior examination of all the
musical instruments.
Improper management It can increase the chaos a
burden of work.
3 Hiring of an even manager.
Clothing risk Such as poor fittings and
quality of fabric is bad
2 Fit checks and hiring the
designers.
Risk Analysis and mitigation strategies
Risk Description Risk
magnitude
Risk mitigation
Budget issue Excess of expenditure or
wastage may lead to over
budgeting.
2 Spend according to the
money collected by the
team.
Poor marketing Inefficiency to reach the
right audience and inform
them about the event.
1 Utilize new and innovative
marketing tools
Unskilled team Poor presentation of work
and delays which leads to
time extension of the
project.
2 Provide proper training
Unavailability of
professionals
Lack of knowledge about
the occurrence of proper
planning and execution.
1 Select the best candidate
for the given task
Climate issue It can spoil the arrangement
of the overall events and
lead to the failure as well.
1 Selection of venue by
considering this
Resources scarcity Obstruct the proper
arrangement of the event.
4 Optimum utilization of
given resources
Technical problem It may interrupt the musical
event and lighting as well.
4 Continuous monitoring
Risk of conflicts Reduce the efficiency in
completing the duties
6 Development of healthy
and friendly environment.
Food and safety threat Poor hygiene in preparation
of foods and snacks
4 Hiring professional chefs
for the kitchen
Threat of quality Sound system not good and
other resources which are
used in the preparation.
4 Prior examination of all the
musical instruments.
Improper management It can increase the chaos a
burden of work.
3 Hiring of an even manager.
Clothing risk Such as poor fittings and
quality of fabric is bad
2 Fit checks and hiring the
designers.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Dispute among the
sponsors
If organization fails to fulfil
the demands.
4 Speak them about their
expectations.
Lack of communication Misunderstanding in
organizing the tasks.
2 Continuous meetings.
Improper arrangement of
seats.
Guests will get disappointed
and can leave the show.
1 Placing additional seat
after the guest list.
Decoration problems Lack of decorative item and
outdated product used.
2 Hiring of professional
decorator
Less rehearsal Absence of participants at
that time.
2 Strict and disciplined time
schedule
Photography Poor camera quality 4 Embracing the advanced
technique.
Venue problem It can hamper the all an all
occurrence of event.
3 By considering the
additional options for the
event venue.
With the help of this matrix LMAC can evaluate each risk which is associated with the music
event and can check out it magnitude or impact of the project as well.
1 2 3
1 Low
-1-
Low
-2-
Medium
-3-
2 Low
-2-
Medium
-4-
High
-6-
3 Medium
-3-
High
-6-
High
-9-
Task-6
Quality Management
Quality expectations- The project manager of music event wants to bring the best
possible wat by which LMAC can experience the hosting of a successful event. Along
Likelihood
Severity
sponsors
If organization fails to fulfil
the demands.
4 Speak them about their
expectations.
Lack of communication Misunderstanding in
organizing the tasks.
2 Continuous meetings.
Improper arrangement of
seats.
Guests will get disappointed
and can leave the show.
1 Placing additional seat
after the guest list.
Decoration problems Lack of decorative item and
outdated product used.
2 Hiring of professional
decorator
Less rehearsal Absence of participants at
that time.
2 Strict and disciplined time
schedule
Photography Poor camera quality 4 Embracing the advanced
technique.
Venue problem It can hamper the all an all
occurrence of event.
3 By considering the
additional options for the
event venue.
With the help of this matrix LMAC can evaluate each risk which is associated with the music
event and can check out it magnitude or impact of the project as well.
1 2 3
1 Low
-1-
Low
-2-
Medium
-3-
2 Low
-2-
Medium
-4-
High
-6-
3 Medium
-3-
High
-6-
High
-9-
Task-6
Quality Management
Quality expectations- The project manager of music event wants to bring the best
possible wat by which LMAC can experience the hosting of a successful event. Along
Likelihood
Severity

with this, he should involve and examine the risk and other threat which might affect
the operations.
Acceptance criteria- Some basic rules has been set by the head and all the team is
going according to the orders which have been given by the manager for the
successful implementation of the strategy which have been constructed by the
manager.
Quality specification criteria- It is important to decide the areas which are playing
the significant role in overall execution of the task which has been formulated for this
particular music event.
Conclusion
In the conclusion of above given report it ha been observed that project management
needs different types of activities which will explain the suitable tactic and ascertain the
success of the tasks. It has explained about the types of methodology which is used by a
project manager before starting the project and after this he build a suitable plan of action and
move according to that. Different types of tools has been utilized by the project manager in
the overall duration of this project such as Gantt chart, work breakdown structure, risk
matrix, etc.
the operations.
Acceptance criteria- Some basic rules has been set by the head and all the team is
going according to the orders which have been given by the manager for the
successful implementation of the strategy which have been constructed by the
manager.
Quality specification criteria- It is important to decide the areas which are playing
the significant role in overall execution of the task which has been formulated for this
particular music event.
Conclusion
In the conclusion of above given report it ha been observed that project management
needs different types of activities which will explain the suitable tactic and ascertain the
success of the tasks. It has explained about the types of methodology which is used by a
project manager before starting the project and after this he build a suitable plan of action and
move according to that. Different types of tools has been utilized by the project manager in
the overall duration of this project such as Gantt chart, work breakdown structure, risk
matrix, etc.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

References
Books and journals-
Furlong, S., 2019. Project Management in Government. In Advanced Methodologies and
Technologies in Government and Society (pp. 254-270). IGI Global.
Hermano, V. and Martín-Cruz, N., 2019. Expanding the knowledge on project management
standards: a look into the PMBOK® with dynamic lenses. In Project management and engineering
research (pp. 19-34). Springer, Cham.
Anthony, S.G. and Antony, J., 2022. A Survey on the Current Status of Operational Excellence
Methodologies in the UK Higher Education Sector: Results of a Survey. In Lean Six Sigma in Higher
Education Institutions (pp. 45-74). Emerald Publishing Limited.
Zuidema-Tempel, E., Effing, R. and van Hillegersberg, J., 2022. Bridging the Gap Between Process
Mining Methodologies and Process Mining Practices. In International Conference on Business
Process Management (pp. 70-86). Springer, Cham.
Sandu, P., Tudisca, V. and Valente, A., 2021. Lessons Learned from Educational Methodologies
Using Art and Science. In Co-creating in Schools Through Art and Science (pp. 71-73). Springer,
Cham.
Saxena, M.M., 2021. Six Sigma Methodologies and its Application in Manufacturing
Firms. International Journal Of Engineering And Management Research, 11(4), pp.79-85.
Books and journals-
Furlong, S., 2019. Project Management in Government. In Advanced Methodologies and
Technologies in Government and Society (pp. 254-270). IGI Global.
Hermano, V. and Martín-Cruz, N., 2019. Expanding the knowledge on project management
standards: a look into the PMBOK® with dynamic lenses. In Project management and engineering
research (pp. 19-34). Springer, Cham.
Anthony, S.G. and Antony, J., 2022. A Survey on the Current Status of Operational Excellence
Methodologies in the UK Higher Education Sector: Results of a Survey. In Lean Six Sigma in Higher
Education Institutions (pp. 45-74). Emerald Publishing Limited.
Zuidema-Tempel, E., Effing, R. and van Hillegersberg, J., 2022. Bridging the Gap Between Process
Mining Methodologies and Process Mining Practices. In International Conference on Business
Process Management (pp. 70-86). Springer, Cham.
Sandu, P., Tudisca, V. and Valente, A., 2021. Lessons Learned from Educational Methodologies
Using Art and Science. In Co-creating in Schools Through Art and Science (pp. 71-73). Springer,
Cham.
Saxena, M.M., 2021. Six Sigma Methodologies and its Application in Manufacturing
Firms. International Journal Of Engineering And Management Research, 11(4), pp.79-85.
1 out of 10
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.