Project Execution and Control PROJ6003: Change Management Reply Post

Verified

Added on  2022/08/12

|3
|366
|17
Discussion Board Post
AI Summary
This discussion post addresses the importance of change management in project execution, referencing the provided assignment brief for PROJ6003. The student agrees with the necessity of a project manager's skills in managing specifications and project changes, emphasizing the role of effective change management in project success. The post critiques the Blue Spider project, identifying key issues such as an inexperienced project manager, flawed planning, and the need for material changes. The student highlights the importance of planned change management to realize benefits, while ineffective change management leads to project failure. The student's response effectively identifies key changes needed in the Blue Spider project, including changes in the material of the product. The post references Hayes (2018) and Pollack (2016) to support the arguments.
Document Page
Managing Project Changes: Part A- Reply Post
Name of Student
Name of University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Managing Project Changes: Part A- Reply Post
Yes, I agree with your comment at it is necessary for the project manager to possess
and show their skills and experiences related to management of a project. It is the duty of a
project manager to manage the specifications, functionalities and the changes needed in a
project. Change management is another important requirement of project management that
ensure delivery of a successful project (Hayes, 2018). However, you are partially correct in
stating that change management gives huge benefits to the organization. Benefits can only be
realized if the change management is executed in a planned and in a successful manner.
Ineffective change management often leads to project failure (Pollack, 2016).
You have quite effectively identified the key changes needed in the Blue Spider
project. The project manager was inexperienced and spent maximum time in R&D activities.
Apart from that there were issues with planning and scheduling the entire project, which was
needed to be changed as well. The entire project execution approach was wrong that lead to
delay in certain crucial activities if the project. Along with that changes you have highlighted,
one key change that was needed in the Blue Spider project was the need of changing the
material of the product to be developed. This was a significant change that was needed in the
Blue spider project and this particular change was needed to be managed in an effective
manner. The presence of these issues in the project was one key reason behind the failure of
the Blue Spider project.
Document Page
References
Hayes, J. (2018). The theory and practice of change management. Palgrave.
Pollack, J. (2016, December). The need for integration between organizational project
management and change management. In 2016 IEEE International Conference on
Industrial Engineering and Engineering Management (IEEM) (pp. 1245-1249). IEEE.