University Project Management Report: MBFSA Project
VerifiedAdded on 2022/11/26
|24
|2178
|207
Project
AI Summary
This project management report details the Mobile Based Farmer Support Application (MBFSA) project, developed for Globex and executed by Virtucon. The report begins with an introduction and project description, followed by an analysis of the Measurable Organizational Value (MOV), including impact areas, project value, stakeholder expectations, and a timeline. Part 2 outlines the scope management plan, defining project scope and resources. Part 3 focuses on the Work Breakdown Structure (WBS), deliverables, milestones, resource assignments, and the project budget. Part 4 addresses project risk analysis, including assumptions and a risk mitigation plan. Part 5 presents the quality management plan, outlining team objectives, verification, and validation activities. Finally, Part 6 covers project closure and evaluation, including a checklist and MOV evaluation. The report incorporates figures, tables, and appendices, including an annotated bibliography, to provide a comprehensive overview of the project management process.

Running head: PROJECT MANAGEMENT
Project Management
Name of Student
Name of University
Author Note
PROJECT MANAGEMENT
Project Management
Name of Student
Name of University
Author Note
PROJECT MANAGEMENT
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
Table of Contents
Introduction..........................................................................................................................3
MBFSA Project Description................................................................................................3
Part 1: Measurable Organisational Value............................................................................3
1.1. Impact Area..............................................................................................................3
1.2. Project Value............................................................................................................4
1.3. Stakeholders’ Expectations and Target metrics........................................................4
1.4. Timeline for MOV....................................................................................................5
1.5. MOV Summary........................................................................................................5
Part 2: Scope Management Plan for MBFSA..................................................................6
2.1. Project Scope............................................................................................................6
2.2. Resource List............................................................................................................6
Part 3: Work Breakdown Structure (WBS).........................................................................7
3.1. WBS for MBFSA.....................................................................................................7
3.2. Deliverable and Milestone........................................................................................9
3.3. Resource Assignment.............................................................................................13
3.4. Project Budget........................................................................................................15
Part 4: Project Risk Analysis.............................................................................................17
4.1. Project Assumptions...............................................................................................17
4.2. Risk and Risk Mitigation Plan (five risks).............................................................17
Table of Contents
Introduction..........................................................................................................................3
MBFSA Project Description................................................................................................3
Part 1: Measurable Organisational Value............................................................................3
1.1. Impact Area..............................................................................................................3
1.2. Project Value............................................................................................................4
1.3. Stakeholders’ Expectations and Target metrics........................................................4
1.4. Timeline for MOV....................................................................................................5
1.5. MOV Summary........................................................................................................5
Part 2: Scope Management Plan for MBFSA..................................................................6
2.1. Project Scope............................................................................................................6
2.2. Resource List............................................................................................................6
Part 3: Work Breakdown Structure (WBS).........................................................................7
3.1. WBS for MBFSA.....................................................................................................7
3.2. Deliverable and Milestone........................................................................................9
3.3. Resource Assignment.............................................................................................13
3.4. Project Budget........................................................................................................15
Part 4: Project Risk Analysis.............................................................................................17
4.1. Project Assumptions...............................................................................................17
4.2. Risk and Risk Mitigation Plan (five risks).............................................................17

2
Part 5: Quality Management Plan......................................................................................18
5.1. Team’s Objective....................................................................................................18
5.2. Verification Activities............................................................................................19
5.3. Validation Activities...............................................................................................19
Part 6: Closure and Evaluation..........................................................................................19
6.3. Project Closure Checklist.......................................................................................19
6.4. Evaluation of Project MOV....................................................................................20
Bibliography......................................................................................................................21
Appendix............................................................................................................................22
Annotated Bibliography.................................................................................................22
Part 5: Quality Management Plan......................................................................................18
5.1. Team’s Objective....................................................................................................18
5.2. Verification Activities............................................................................................19
5.3. Validation Activities...............................................................................................19
Part 6: Closure and Evaluation..........................................................................................19
6.3. Project Closure Checklist.......................................................................................19
6.4. Evaluation of Project MOV....................................................................................20
Bibliography......................................................................................................................21
Appendix............................................................................................................................22
Annotated Bibliography.................................................................................................22
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
Introduction
The aim of the project charter is to identify the impact and justifying the need of
executing the chosen project. The charter specifies the stakeholders, resources need and the
scheduling details of the project. The measurable organizational value linked with the project is
discussed and the significant risks are identified. The description of the project is provided in the
paragraphs below.
MBFSA Project Description
Lack of knowledge about which crops to grow in a particular season results in huge loses
of the farmers. In order to reduce the loss, Globex proposed an application which will provide
the farmer with the accurate knowledge of weather and the crops to be grown. The data about the
weather will be collected from local government. The project will be completed by Virtucon.
Part 1: Measurable Organisational Value
1.1. Impact Area
Impact Area Description Rank
Strategy An efficient business management strategy is involved in
designing this application
1
Customer This application is more of a customer-based application
which will benefit the local farmers and wholesalers
2
Financial The loses, that farmers face will be reduced by an
significant manner
3
Operational Since the local government supports this intervention, the 4
Introduction
The aim of the project charter is to identify the impact and justifying the need of
executing the chosen project. The charter specifies the stakeholders, resources need and the
scheduling details of the project. The measurable organizational value linked with the project is
discussed and the significant risks are identified. The description of the project is provided in the
paragraphs below.
MBFSA Project Description
Lack of knowledge about which crops to grow in a particular season results in huge loses
of the farmers. In order to reduce the loss, Globex proposed an application which will provide
the farmer with the accurate knowledge of weather and the crops to be grown. The data about the
weather will be collected from local government. The project will be completed by Virtucon.
Part 1: Measurable Organisational Value
1.1. Impact Area
Impact Area Description Rank
Strategy An efficient business management strategy is involved in
designing this application
1
Customer This application is more of a customer-based application
which will benefit the local farmers and wholesalers
2
Financial The loses, that farmers face will be reduced by an
significant manner
3
Operational Since the local government supports this intervention, the 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
application is expected to provide high operational value
Social The application will have a great social benefit 5
1.2. Project Value
Value
Impact
Area
Better Faster Cheaper Do More
Strategy 5 3 3 5
Customer 4 5 2 1
Financial 4 5 4 2
Operational 2 3 4 5
Social 1 2 3 4
Total 16 18 16 17
Note: The value is measured on a scale of 1 to 5
The table identifies the two most prominent values to be Faster and Do More.
1.3. Stakeholders’ Expectations and Target metrics
Identified Stakeholders Expectations Target Metric (Need to
Improve)
Globex Will support Virtucon in project
execution
High (5)
application is expected to provide high operational value
Social The application will have a great social benefit 5
1.2. Project Value
Value
Impact
Area
Better Faster Cheaper Do More
Strategy 5 3 3 5
Customer 4 5 2 1
Financial 4 5 4 2
Operational 2 3 4 5
Social 1 2 3 4
Total 16 18 16 17
Note: The value is measured on a scale of 1 to 5
The table identifies the two most prominent values to be Faster and Do More.
1.3. Stakeholders’ Expectations and Target metrics
Identified Stakeholders Expectations Target Metric (Need to
Improve)
Globex Will support Virtucon in project
execution
High (5)

5
Virtucon Will deliver a project in a low
cost
Medium (3)
Farmers and Wholesaler Will lend support whenever
required
Low (2)
Government Will supervise the project Medium (3)
Note: The target metrics is measured on a scale of 1to 5 where 1 is the lowest and 5 is the highest
1.4. Timeline for MOV
The MOV will be achieved only after project completion and timeline of project
completed in expressed in the image below-
Figure 1: The MOV Timeline
1.5. MOV Summary
MOV Description
Project Overview The application is being built for the benefits of the
farmers
Impact Area The impact area is examined and ranked
Virtucon Will deliver a project in a low
cost
Medium (3)
Farmers and Wholesaler Will lend support whenever
required
Low (2)
Government Will supervise the project Medium (3)
Note: The target metrics is measured on a scale of 1to 5 where 1 is the lowest and 5 is the highest
1.4. Timeline for MOV
The MOV will be achieved only after project completion and timeline of project
completed in expressed in the image below-
Figure 1: The MOV Timeline
1.5. MOV Summary
MOV Description
Project Overview The application is being built for the benefits of the
farmers
Impact Area The impact area is examined and ranked
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
Project Value The project value is identified
Stakeholder Target Metrics The target for the stakeholders is set
Timeframe 6 months
Part 2: Scope Management Plan for MBFSA
2.1. Project Scope
In-scope-
The application will be able to collect information that includes weather
conditions and market demands
The application will be developed in a low cost
Out-Scope
Training and application maintenance
Application Installation
2.2. Resource List
Project Value The project value is identified
Stakeholder Target Metrics The target for the stakeholders is set
Timeframe 6 months
Part 2: Scope Management Plan for MBFSA
2.1. Project Scope
In-scope-
The application will be able to collect information that includes weather
conditions and market demands
The application will be developed in a low cost
Out-Scope
Training and application maintenance
Application Installation
2.2. Resource List
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
Figure 2: The Resource Sheet from MS Project
Part 3: Work Breakdown Structure (WBS)
3.1. WBS for MBFSA
Figure 2: The Resource Sheet from MS Project
Part 3: Work Breakdown Structure (WBS)
3.1. WBS for MBFSA

8
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9
Figure 3: The WBS
Figure 4: The WBS Chart
The assumption linked with development of the WBS and the budget is that it is possible
to complete the project in a duration of 6 months. The estimates are accurate for completion of
the project within the timeline.
3.2. Deliverable and Milestone
Figure 3: The WBS
Figure 4: The WBS Chart
The assumption linked with development of the WBS and the budget is that it is possible
to complete the project in a duration of 6 months. The estimates are accurate for completion of
the project within the timeline.
3.2. Deliverable and Milestone
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10

11
Figure 5: The Deliverables and Milestone
The Schedule Gantt chart of the MBFSA project is indicated in following figure-
Figure 5: The Deliverables and Milestone
The Schedule Gantt chart of the MBFSA project is indicated in following figure-
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 24
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.