Project Literature Analysis: MCQ Software Evaluation for IT Interns

Verified

Added on  2021/05/31

|12
|2855
|46
Project
AI Summary
This project literature analysis focuses on the development of a MCQ-based Software Evaluation Process for hosting post-graduate interns in the IT industry. The project begins with a client background and stakeholder analysis, identifying key roles and responsibilities. The core of the analysis involves a review of relevant literature, exploring tools, methodologies (such as agile development), and standards essential for software development. The articles examined cover topics like agile software development methodologies, legal implications, system requirements, and various software tools like Wrike, JIRA, and Asana. The project emphasizes the importance of industry processes, quality standards (like idiosyncrasy, repeatability, and cross-specialization), and the lifecycle of software development. The analysis aims to provide a comprehensive understanding of the best practices and approaches for the successful implementation of the MCQ-based software evaluation system, with a focus on how it can benefit both the client and the interns.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT LITERATURE ANALYSIS
Project Literature Analysis
MCQ-based Software Evaluation Process for Hosting Post-Graduate Interns in IT industry
Name of the Student:
Student ID:
Name of the University:
Author’s note:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1PROJECT LITERATURE ANALYSIS
Table of Contents
1. Project Background.....................................................................................................................2
2. Stakeholder Analysis...................................................................................................................3
3. Content of Articles.......................................................................................................................6
4. Article Summary..........................................................................................................................8
References......................................................................................................................................10
Document Page
2PROJECT LITERATURE ANALYSIS
1. Project Background
Client Background: The project is developed for the analysis of the improved
operational development for aligning with the implication of the operations and development of
the activities favouring the utilization of the successive operations. The project is based on the
development of a MCQ based Software Evaluation Process that would be helpful for the hosting
the IT industry based post graduate interns. The client of the project is Dr Ron Beckett of The
Reinvention Network and the client firm has been based on the researching and consulting
activities. They work for both small and large companies allowing them with most effective
services since the last 15 years.
Company Business: The Company had provided effective learning processes and
systems for the companies for providing them with competitive advantage with its rivals. The
educational institutions have realized the importance of engaging the students with industry
works. The universities have decided to bring about the deployment of the activities favouring
the utilization of the activities for improving their actions. The organization would deploy
effective methods for forming the utilization of the activities favouring the implication of the
operations. The analysis had also resulted in forming the analysis of the activities for forming the
utilization of the operations depicting the use of effective information processing.
Mission Statement Analysis: The mission statement of the project would be based on
the implication of the successive operation development. The small scale organizations do not
have any specific internship program favourable for the development of the activities. The
organization wants to deploy effective learning and understanding of the operations. The
Document Page
3PROJECT LITERATURE ANALYSIS
deployment of the activities would also result in listing the effective learning and study in the
organization.
Vision Statement Analysis: The successful implication of the operations for aligning the
internship programs would be supported by the vision for implementing effective internship
management programs in the organization. The alignment of the activities had also helped in
easing the deployment of the operations so that the organization can be supported by the use of
the successive operation development. The vision of the organization would form the impact on
the alignment of the activities favouring the utilization of the activities for developing improved
operational development.
Role of Project in Client’s Business: The project is based on the development of a
MCQ based Software Evaluation Process that would be helpful for the hosting the IT industry
based post graduate interns. The universities have decided to bring about the deployment of the
activities favouring the utilization of the activities for improving their actions. The organization
would deploy effective methods for forming the utilization of the activities favouring the
implication of the operations. The analysis had also resulted in forming the analysis of the
activities for forming the utilization of the operations depicting the use of effective information
processing.
2. Stakeholder Analysis
The stakeholder analysis is based on the development of the activities favouring the
implication of the activities supporting the deployment of the operations. The analysis of the
stakeholders would be based on the deployment of the operations and listing the implication of
the successive alignment development. The stakeholder analysis is based on the utilization of the
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4PROJECT LITERATURE ANALYSIS
operations favouring the management of the project stakeholders. The stakeholder analysis
would result in identifying the implication of the operations for aligning the specific implication
of the activities. The various stakeholders of the project of MCQ-based Software Evaluation
Process for Hosting Post-Graduate Interns in IT industry are pointed out below,
a. Client
b. Investors
c. Project Manager
d. Project Team
e. Interns
f. University Board
g. State Government
These are the stakeholders of the project assigned with specific roles and responsibilities
that would be required for the project of MCQ-based Software Evaluation Process for Hosting
Post-Graduate Interns in IT industry. The overall project responsibilities would include the
deployment of the operations for listing the management of the activities. The following table
would show the analysis of the various roles and responsibilities of the project stakeholders,
Stakeholder Roles and Responsibilities
Client The client is responsible for the project requirement development and he would
be able to approve the project. The client is the most crucial decision maker of
the project responsible for the approval for deployment of the activities summing
completion of the project. Many crucial and significant decisions of the project
is required to be taken and the client approval is required for the activities
Document Page
5PROJECT LITERATURE ANALYSIS
favouring the alignment of the operations.
Investors The investors are the figurative individual or person responsible for the
execution of the project activities. The investors are responsible for the supply of
resources for the project activities and would also play a part in involvement of
the operation’s key decision making in the project for completion. The investors
would form the modification for the operations for forming the successive
modifications in project.
Project Team The project team forms the operational development of the activities and it
would involve the management of the operations favouring the utilization of the
activities for the project. The project team is responsible for forming the
completion of the activities of project.
University
Board
The University Board are responsible for the development of the activities that
would be helpful for forming the implication of the activity development and
alignment. The board would allow the integration for the system development
favouring the implication of the successive activity development. The University
boards would form the role in supporting the modification for the operations for
forming the successive modifications in project.
Interns The interns are the end users of the system responsible for the utilization of the
MCQ based software system utilization. The interns would be using the system
for forming the effective studying and learning process related to the IT industry
sector. The acceptance and refusal of the MCQ based learning software system
would be based on the feedbacks by the interns studying in the university.
State The state government would also play a significant role for the approval of the
Document Page
6PROJECT LITERATURE ANALYSIS
Government activities favouring the utilization of the activities forming the implication of the
operations. The government are responsible for the final inspection of the system
and permitting the organization for the utilization of the system. The state
government would propel the activities in case of quality standards not being
met.
Project
Manager
The project manager had the most number of responsibilities in the project as
they would ensure that the activities of the project can be completed
successfully. The managers play a crucial role for the alignment of the activities
of managing, communicating, developing, planning, and executing the project.
The project managers would lead the project team in due course of action
favouring the implication of the operations aligning the modification of the
project when required.
3. Content of Articles
The project of MCQ-based Software Evaluation Process for Hosting Post-Graduate
Interns in IT industry is based on the implication of the effective standards and evolution of the
operations for favouring the implication of the operations. Ferreira, Gutierrez-Artacho and
Bernardino (2018) have pointed that the tools and processes that would be required for the agile
software development are Wrike, JIRA, Planbox, Assembla, and Asana. The various software
development methodologies that can be useful for the alignment of the software are agile,
crystal, dynamic system development methods, extreme programming, feature driven, lean
development, and rapid development. On the contrary Braude and Bernstein (2016) have pointed
that the legal implications of the software development methodologies play a crucial role for the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT LITERATURE ANALYSIS
implication of the specific standard setting in projects. The sensitive information must be kept
protected and implied with duty of care for the software developed. According to Mc Hugh et al.
(2017), the specific techniques useful for the implication of the software development are life
cycle model, system requirement analysis, and IEEE standards of lifecycle models. The study of
various literature and articles would allow imply the industry process favouring the utilization of
the activities for the project development by analysing the applicable methodologies, tools used,
applicable standards, and techniques. Yilmaz et al. (2016) have explained that the lifecycle of the
system development would include production, conversion, testing, programming, and system
analytics. Some standards for the execution of the software development include prevention of
idiosyncrasy, repeatability, consensus wisdom, cross specialization, customer protection, and
professional discipline.
According to Benner et al. (2014), the MCQ based Software Evaluation Process would
allow the implication of the activities favoring the utilization of the improved operation
development. The Agile software development methodologies would be helpful for the based on
the specific list of activities and the final output of the system. The use of Wrike tools and
techniques would be helpful for the implication of the effective development of the activities.
Idiosyncrasy quality standards must be met for ensuring that the activities are aligned to the
project successfully. It would allow the completed system development while considering the
software development. IEEE standard of lifecycle model technique is required for the
deployment of the activities for forming the implication of the activities favouring the utilization
of the operations.
As per the study by Clarke, O’Connor and Leavy (2016), the agile development
methodology is the most effective methodology that can be used for the implication of the
Document Page
8PROJECT LITERATURE ANALYSIS
effective operation development. The agile is an iterative model for the software development
capable of aligning the implication of the activities favoring the utilization of the operations and
deploying the improved operation development for developing MCQ based Software Evaluation
Process. Repeatability quality standards must be met for ensuring that the activities are aligned to
the project successfully. JIRA would be helpful for the deployment of the project successfully
and it would assist to develop the project plan, organize it, sharing the plan, and finally tracking
the project progress.
Abrahamsson et al. (2017) have pointed that the agile development methodology would
allow the use of the daily review and monitoring process and it would achieve it by the use of the
feedbacks from the end users. Planbox is available for the development of the final software
tools that can be aligned for the agile software development. The use of Wrike tools and
techniques would be helpful for the implication of the effective development of the activities.
Idiosyncrasy quality standards must be met for ensuring that the activities are aligned to the
project successfully.
According to Krahn, Rumpe and Volkel (2014), agile software development
methodologies would be helpful for the development of MCQ based Software Evaluation
Process. The complete agile method can be divided into 3 forms of the requirement development,
collaborative system development, and feedback. Assembla tool would allow the users for
managing the tasks and activities in the project. Cross specialization quality standards must be
met for ensuring that the activities are aligned to the project successfully. system requirement
analysis specific techniques required for the deployment of the activities for forming the
implication of the activities favouring the utilization of the operations.
Document Page
9PROJECT LITERATURE ANALYSIS
Ferreira, Gutierrez-Artacho and Bernardino (2018) have pointed that agile development
methodology would allow the use of the daily review and monitoring process which would be
helpful for the development of MCQ based Software Evaluation Process. The complete agile
method can be divided into 3 forms of the requirement development, collaborative system
development, and feedback. Asana is one of the most crucial software project development tool.
It would assist to develop the project plan, organize it, sharing the plan, and finally tracking the
project progress. The activity would allow the users for managing the tasks and activities in the
project. Customer protection quality standards must be met for ensuring that the activities are
aligned to the project successfully.
4. Article Summary
The study of various literature and articles had helped us in understanding the industry
process favouring the utilization of the activities for the project development by analysing the
applicable methodologies, tools used, applicable standards, and techniques. The project was
based on the development of a MCQ based Software Evaluation Process that would be helpful
for the hosting the IT industry based post graduate interns. The client of the project was Dr Ron
Beckett of The Reinvention Network and the client firm had been based on the researching and
consulting activities. The agile development methodology had been the most effective
methodology that can be used for the implication of the effective operation development as it is
an iterative model capable of aligning the implication of the activities of daily review and
monitoring process along with feedbacks from the end users. The tools and processes required
for the agile software development are Wrike, JIRA, Planbox, Assembla, and Asana had been
explained in the literature properly. The prevention of idiosyncrasy, repeatability, consensus
wisdom, cross specialization, customer protection, and professional discipline were the quality
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10PROJECT LITERATURE ANALYSIS
standards that must be met for ensuring that the activities are aligned to the project successfully.
The life cycle model, system requirement analysis, and IEEE standards of lifecycle models
would include production, conversion, testing, programming, and system analytics for the
software development process.
Document Page
11PROJECT LITERATURE ANALYSIS
References
Abrahamsson, P., Salo, O., Ronkainen, J., & Warsta, J. (2017). Agile software development
methods: Review and analysis. arXiv preprint arXiv:1709.08439.
Benner, K. M., Feather, M. S., Johnson, W. L., & Zorman, L. A. (2014). Utilizing scenarios in
the software development process. Information system development process, 30, 117-134.
Braude, E. J., & Bernstein, M. E. (2016). Software engineering: modern approaches. Waveland
Press.
Clarke, P., O’Connor, R. V., & Leavy, B. (2016, May). A complexity theory viewpoint on the
software development process and situational context. In Software and System Processes
(ICSSP), 2016 IEEE/ACM International Conference on (pp. 86-90). IEEE.
Ferreira, T., Gutiérrez-Artacho, J., & Bernardino, J. (2018, March). Freemium Project
Management Tools: Asana, Freedcamp and Ace Project. In World Conference on
Information Systems and Technologies (pp. 1026-1037). Springer, Cham.
Krahn, H., Rumpe, B., & Völkel, S. (2014). Roles in software development using domain
specific modeling languages. arXiv preprint arXiv:1409.6618.
Liu, J., Zhang, S., Kato, N., Ujikawa, H., & Suzuki, K. (2015). Device-to-device
communications for enhancing quality of experience in software defined multi-tier LTE-
A networks. IEEE Network, 29(4), 46-52.
Mc Hugh, M., McCaffery, F., Casey, V., & Pikkarainen, M. (2017). Integrating agile practices
with a medical device software development lifecycle.
chevron_up_icon
1 out of 12
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]