Project Engineering: Terminal 4 Changi Airport - Mech Power Generator
VerifiedAdded on  2023/04/22
|8
|1769
|346
Report
AI Summary
This report details a project engineer's involvement in the Terminal 4 Changi Airport project while working at Mech Power Generator PTE LTD. The project involved the installation of eight indoor synchronizing generators with power grid supply and five underground storage tanks. The engineer was responsible for scheduling, manpower control, equipment tracking, and ensuring compliance with Singapore standards, particularly SS535:2007 and SS 532:2007. Key activities included coordinating with consultants, managing the installation of generators and underground tanks, and conducting site acceptance tests. The report also highlights technical difficulties faced during site acceptance testing of underground storage tanks and generator synchronization, along with the solutions implemented, such as performing tank tightness tests and attending training on generator operation. The project provided valuable experience in synchronization with power grid supply and standby supervision of critical changeover testing, contributing to the engineer's familiarity with airport regulations and safety procedures.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
1 out of 8