This project is a comprehensive literature review focused on the management of quality in mechanical engineering projects. It outlines the project's background, objectives, and scope, including the context of James Martin & Co., a company delivering railway locomotives. The project details the benefits of quality management, such as cost reduction, enhanced customer satisfaction, and improved employee safety. Deliverables include an education program, risk assessment, and schedule management. The project also includes a risk plan, work breakdown structure, and a detailed communication plan outlining stakeholder interactions. The project culminates in recommendations for enhancing quality management and overall revenue, alongside a timeline and milestones for completion. The project aims to enhance the productivity and output of mechanical engineering projects by 15% through enhancing the quality of the project. The literature review identifies gaps in current practices and proposes strategies for improvement, culminating in a final project closure phase, including proofreading, grammar checking, and submission of the literature review.
Document Page
Project Plan Template
PROJECT BACKGROUND
Project Title: Management of Quality in Mechanical Engineering Projects
Project Aim: Identify four scholarly articles, review those articles, and analyse and report on the
information from a Project Management perspective
Project
Background:
I have experience in mechanical engineering and an interest in quality management. I am
unemployed and therefore cannot do an employer-based project. The university has
accepted my request to perform a literature review of the management of quality in
mechanical engineering projects. Quality Management has been always a considerable
factor for the successful and efficient delivery of the mechanical engineering projects.
There are many theories presented by scholarly researchers in this context however, the
researchers have not provide higher concentration on the quality management in the
quality sectors. Very few papers available on the context of the quality management in the
mechanical engineering projects and thus, various aspects of the quality and its
management in the context of the mechanical engineering.
Project
Benefits:
This Project will result in the following outcomes:
Quality Management focuses on delivery of the project within expected time and
accomplishing the high quality output
It is helpful in limiting the costs of the resources and the overall project
It results in the enhancement of the customer satisfaction and quality
improvement
Limiting and eliminating the injuries of the employees
Project
Objectives:
The overarching project objectives are:
To identify the current practices and results of the total quality management in
mechanical engineering projects
To enhance the productivity and output of the mechanical engineering projects by
15% through enhancing the quality of the project
To analyse the literatures presented by different authors in the context of the
quality management in mechanical projects
The expected time for driving the project would be for a week
PROJECT SCOPE
Insert organisation name here: James Martin & Co
Organisational
Context
The company has been delivering the railway locomotives in Australia and it is the
aim of the company to provide and deliver the best wagon and locomotive
productions. The quality management will be helpful in enhancing and implementing
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Plan Template
the objectives as mentioned above. There are mechanical services those need proper
consideration in the context of the quality of the production and safety of the
individuals. The company had been continuously evolving and thus, raising its
competitors and the quality needs to be maintained considering the internal and
external environment of the organization.
This project will
include:
This project will not include:
This project will be
including safety of the
employees, resources
being utilized, quality of
the resources, production
rate, and output quality.
The wagons and locos
should be of very high
quality for ensuring the
safety and speed for the
local community. Recent
development in the
quality management,
construction quality,
need of the change, and
implementing new
quality management
strategies.
Cost spending on the implementation, market analysis, and primary research
Project
Deliverables:
Education program, risk assessment & management pathway, improved awareness
levels, schedule management, cost management, roles and responsibilities of the
stakeholders, total quality management processes.
Success Criteria: The Gaps will be identified through the literature review and thus, a survey can be
driven for the identification of the customers’ perspective on the same context.
Resources: Human Resources including manager, supervisor, employees staffs, people, space to
meet and access to a computer & internet, database management system, on site
protective dresses.
Linkages: There are the opportunities for this project for gaining the advantage of providing
high quality materials, locos, and wagons to the society and enhancing the awareness
of safety among the staffs working in the same environment. This project will be
helpful in driving opportunities for the project through linking the key performance
indicator, safety of the staffs and employees working on-site, enhancing the
awareness, securing the local community, and providing the high quality product and
services.
RISK PLAN
Consider the risks early?
Document Page
Project Plan Template
Assumptions Constraints
High quality resources
will be available
Proper and regular data
will be collected in
response to the previous
and future executions
Project will proceed as
per the planning
Legal restriction will be
passed through proper
documentation
The production will be
increased by 15% and
costs will be reduced by
10%
Proper planning and risk
register can be an
effective measure for
mitigating the risks
Following are the considerable constraints of the project
Scope: enhance the overall revenue and production of the company through
establishing effective and efficient quality management technique
Cost: the cost will be reduced by 10% through limiting the value of the
resources, utilizing them in efficient and effective manner, and limiting the
accidental ratios of the employees within the organization during the
accomplishment of the mechanical works
Schedule: The research will be carried out for a week that will be focusing on
the long term goal of the organization, which is two years
Quality: The skills and resource availability will be helpful in delivering the
enhanced quality of the locos, wagons, and wheels, produced by James and Co.
There are the possibilities that the project facing escalation in the budget and
schedule and thus, consideration of the risk based on their priority is an
important concern
Work Breakdown: 0. Quality Management in Mechanical Engineering Projects
1. Selection of the organization
1.1 James and Co.’s organizational structure identification
1.2 Identification of the Problem
1.3 Identification of the Feasibility of Quality Management
1.4 Scope, budget and schedule identification
2. Literature Review
2.1 Identification of the scholarly articles on the same topic
2.2 Collecting data and important comments
2.3 Noting Down relevant information
2.4 Identifying the Gaps
2.5 Mitigating the identified Gaps
2.6 Reaching at a Conclusion
3. Recommendation of better options for James and CO
3.1 Quality Management enhancement
3.2 Overall revenue
4. Project Closure
Document Page
Project Plan Template
4.1 Proof reading
4.2 Grammar Checking
4.3 Submission of the Literature review
Search for and select four suitable articles/case studies/texts for review.
Analyse the literature to identify topics within the articles on which to
report.
Time Frame &
Milestones:
0. Quality Management in Mechanical Engineering
Projects Tue 7/17/18
1. Selection of the organization Tue 5/22/18
1.1 James and Co.’s organizational structure identification Thu 5/3/18
1.2 Identification of the Problem Wed 5/9/18
1.3 Identification of the Feasibility of Quality Management Wed 5/16/18
1.4 Scope, budget and schedule identification Tue 5/22/18
Mile stone 1: Identification of organization completed 5/22/18
2. Literature Review Thu 6/21/18
2.1 Identification of the scholarly articles on the same topic Tue 5/29/18
2.2 Collecting data and important comments Fri 6/1/18
2.3 Noting Down relevant information Thu 6/7/18
2.4 Identifying the Gaps Tue 6/12/18
2.5 Mitigating the identified Gaps Mon 6/18/18
2.6 Reaching at a Conclusion Thu 6/21/18
Milestone 2: literature review Completed 6/21/18
3. Recommendation of better options for James and CO Fri 7/6/18
3.1 Quality Management enhancement Thu 6/28/18
3.2 Overall revenue Fri 7/6/18
Milestone 3: Overall enhancement completed 7/6/18
4. Project Closure Tue 7/17/18
4.1 Proof reading Tue 7/10/18
4.2 Grammar Checking Fri 7/13/18
4.3 Submission of the Literature review Tue 7/17/18
Milestone 4: Completed 7/17/18
COMMUNICATION PLAN
Who is important to make this project successful?
Stakeholders Who What are their information needs How & when will we provide
them information about the
pain management initiative
Subject
Facilitator
Lynto
n
Irelan
d
Regular communication Via weekly Zoom meetings or
when necessary to progress my
review.
New and Junior - The developed literature review and After the completion and
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Plan Template
Students outcomes of the literature will be provided
to them through library
submission of the literature
review, the report will be
uploaded and saved in the library
University - This will be helpful in enhancing the scope
of the library and enlist one more research
fort he university
Approval and announcement will
be made at the same instance and
thus, the University will be
informed about the research
Student Society - Better application and information on the
quality management aspects that can
enhance the productivity an d output of the
organization
They will be informed by online
librarian or search engine of the
University library
James and CO James
and
CO
Research will be analysing the
organizational operational activities and
thus, recommendations will be made
accordingly
They will be informed through
email after the completion of the
research
PROJECT TEAM ROLES
Are the team members clear about their roles?
Executive
Sponsor:
[Please fill a Name]
Role of the Executive Sponsor: The major role of the executive sponsor will be to
provide necessary fund in manner to execute the research and develop the necessary
output from the project.
Project Key
Contacts:
Site Project Leader
Name: [Please fill a Name]
Email [Please fill an email]
Phone[Please fill a Phone no.]
Review
Process:
Regular weekly meetings will be delivered as per the growth and development of the
project; brainstorming process will be delivered followed by the suggestions and
problems queries. Every stakeholder will be asked to join the meeting and ensure his or
her presence to speak and listen among every other stakeholder. Necessary data related to
previous meeting, present meeting will be recorded in paper, and review will be done
accordingly through estimating the quality and delivery of the project.
Start Date: Completion Date:
Executive
Sponsor
I have read
and reviewed
this project
plan and agree
to support the
implementatio
n project.
Name
:
Signature & Date:
Document Page
Project Plan Template
HIGH LEVEL TIMELINE
GANTT CHART
Project Name: Project Manager: Date Prepared:
Phase, activity,
task
Work
effort
Description 1 2 3 4 5 6 7 8
1.1 James
and Co.’s
organizational
structure
identification
100 %
1.2
Identification
of the Problem
100 %
1.3
Identification
of the
Feasibility of
Quality
Management
100 %
1.4 Scope,
budget and
schedule
identification
100 %
2.1
Identification
of the
scholarly
articles on the
same topic
100 %
2.2
Collecting data
and important
comments
100 %
2.3 Noting
Down relevant
information
100 %
2.4
Identifying the
Gaps
100 %
2.5
Mitigating the
identified Gaps
100 %
2.6 Reaching 100 %
Document Page
Project Plan Template
at a
Conclusion
3.1 Quality
Management
enhancement
100 %
3.2 Overall
revenue
100 %
4.1 Proof
reading
100 %
4.2 Grammar
Checking
100 %
4.3
Submission of
the Literature
review
100 %
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Plan Template
Bibliography
Chapman, W., 2018. Engineering modeling and design. Routledge.
Doi, T., Uhlmann, E. and Marinescu, I.D. eds., 2015. Handbook of ceramics grinding and polishing.
William Andrew.
Kalpakjian, S. and Schmid, S.R., 2014. Manufacturing engineering and technology (p. 913). Upper
Saddle River, NJ, USA: Pearson.
Mujumdar, A.S. ed., 2014. Handbook of industrial drying. CRC press.
Osten, W. ed., 2016. Optical inspection of Microsystems. CRC press.
Park, R., 2017. Value engineering: a plan for invention. Routledge.
Schleich, B., Anwer, N., Mathieu, L. and Wartzack, S., 2014. Skin model shapes: A new paradigm
shift for geometric variations modelling in mechanical engineering. Computer-Aided Design, 50,
pp.1-15.
Sun, D.W. ed., 2016. Handbook of frozen food processing and packaging. CRC Press.
chevron_up_icon
1 out of 8
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]