This project proposal details the development of a mobile application software for Uber, aimed at addressing the company's deteriorating image and internal challenges stemming from poor communication. The project outlines the background of Uber, its current issues, and how a dedicated mobile app can improve stakeholder communication, reduce organizational costs, promote competitive advantage, expand global revenue, and enhance the company's brand image. Key objectives include improving internal and external communication, cost reduction through efficient information dissemination, gaining a competitive edge in the market, expanding global revenue streams, and enhancing the overall brand image of Uber. The project plan includes a timeline with specific tasks, start and completion dates, and identifies key stakeholders and their roles. The proposal also covers initial risk identification, resource allocation, budgeting, and expected outcomes, all geared towards restoring Uber's market position and achieving its long-term goals.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

THE DEVELOPMENT OF A MOBILE APPLICATION SOFTWARE FOR UBER
COMPANY
Student’s name
Name of institution
Email
1
COMPANY
Student’s name
Name of institution
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
Background Of The Company...............................................................................................................1
PROJECT AIMS AND OBJECTIVES..................................................................................................2
START DATE AND COMPLETION DATE.......................................................................................4
STAKEHOLDERS OF THE PROJECT................................................................................................6
PROJECT BENEFITS...........................................................................................................................8
PROJECT TEAM..................................................................................................................................9
INNITIAL RISK IDENTIFICATION...................................................................................................9
RESOURCES AND BUDGETING.....................................................................................................10
EXPECTED OUTCOMES..................................................................................................................10
References...........................................................................................................................................11
2
Background Of The Company...............................................................................................................1
PROJECT AIMS AND OBJECTIVES..................................................................................................2
START DATE AND COMPLETION DATE.......................................................................................4
STAKEHOLDERS OF THE PROJECT................................................................................................6
PROJECT BENEFITS...........................................................................................................................8
PROJECT TEAM..................................................................................................................................9
INNITIAL RISK IDENTIFICATION...................................................................................................9
RESOURCES AND BUDGETING.....................................................................................................10
EXPECTED OUTCOMES..................................................................................................................10
References...........................................................................................................................................11
2

Introduction of A Mobile Application Software for Uber Company
Background of the company
UBER is a transportation technology company headquartered in San Francisco, California,
the united states. It’s a private delivery transportation company that was formed in March 2009 by
Travis Kalanick and Garrett Camp and it operates globally. The company operates under an umbrella
of the intelligent minds such as chairman Ronald Sugar, Dara Khosrosrowshai chief executive officer
among others. it provides an array of services including tax cab, transportation, ridesharing, food
delivery, taxi cab among others [11:405].
From the time of its establishment, this company was seen as a solution to challenges that
people faced in terms of transportation means but the questions arising now has been its prospectus
future plans to continue its operations. Uber has had a good reputation as compared to other related
companies for the last six years but reports show that in the last two years, the company’s image is
gradually deteriorating [1:1508]. This has been evidenced by the reduction in the number of
customers ordering for taxi’s, low sales, increasing employees’ turnover and a fall in the salaries of
the employees. Additionally, it has also been noted that there is internal competition of opportunities,
poor conflict management and handling techniques among others.
According to the research report compiled in march 2017, UBER has had a lot of protests due
to issues concerning the manner in which its services and activities have been conducted without prior
knowledge of the stakeholders due to poor communication, both internal and external. The state of
emergency regarding the economic, social and reputation of the organization as it was before has
arose with a lot of speculation about its closure
Therefore, this project proposal is intended to critically analyse, evaluate and identify the
mess that has been happening in the company which have hindered its’ development. Based on the
analysis and evaluation, it was identified that one of the core factors causing the company’s
deterioration is poor communication among the stakeholders. The management has therefore reached
3
Background of the company
UBER is a transportation technology company headquartered in San Francisco, California,
the united states. It’s a private delivery transportation company that was formed in March 2009 by
Travis Kalanick and Garrett Camp and it operates globally. The company operates under an umbrella
of the intelligent minds such as chairman Ronald Sugar, Dara Khosrosrowshai chief executive officer
among others. it provides an array of services including tax cab, transportation, ridesharing, food
delivery, taxi cab among others [11:405].
From the time of its establishment, this company was seen as a solution to challenges that
people faced in terms of transportation means but the questions arising now has been its prospectus
future plans to continue its operations. Uber has had a good reputation as compared to other related
companies for the last six years but reports show that in the last two years, the company’s image is
gradually deteriorating [1:1508]. This has been evidenced by the reduction in the number of
customers ordering for taxi’s, low sales, increasing employees’ turnover and a fall in the salaries of
the employees. Additionally, it has also been noted that there is internal competition of opportunities,
poor conflict management and handling techniques among others.
According to the research report compiled in march 2017, UBER has had a lot of protests due
to issues concerning the manner in which its services and activities have been conducted without prior
knowledge of the stakeholders due to poor communication, both internal and external. The state of
emergency regarding the economic, social and reputation of the organization as it was before has
arose with a lot of speculation about its closure
Therefore, this project proposal is intended to critically analyse, evaluate and identify the
mess that has been happening in the company which have hindered its’ development. Based on the
analysis and evaluation, it was identified that one of the core factors causing the company’s
deterioration is poor communication among the stakeholders. The management has therefore reached
3

a decision of developing a mobile communication app as a remedy to the prevalent problem of the
company. This mobile application software will help the company to disseminate all the relevant
information to its stakeholders including customers, employees, the community, the government
among others [2:10]. As it was noted, communication is the key to success of every organization in
the business world. as a point of reference, related mobile application software have been used by a
galaxy of companies across the globe and solved the same dilemma as it is happening in the company.
For example, this software will be designed to ensure that every information, technological changes,
business development strategies, marketing strategies, and promotion strategies among others are
distributed to the entire organization. This will help to ensure that the image, economic backbone and
corporate social responsibility mechanisms are achieved. As a result of this tool benchmarking
mechanisms shall be adopted, which will help the company to regain its glory back in the business
environment. In addition, this software is also intended to ensure that transparency and proper
accountability principles are adhered to, and this shall help to increase market share of the company.
The software will also be designed to ensure that all hackers to the company’s confidential
information are detected by the central monitoring unit. Furthermore, the decision to come up with
this software was reached at when the company realised that there was a need to enhance competitive
advantage over other companies [3:25].
Project aims and objectives
Objectives can be defined as concrete statements which a company intends to achieve in a
certain period of time as a result of executing the intended and planned activities. Objectives can be
written at a lower level when the project manager is trying to initiate the project.
According to Tom Mochal, project objectives should not be vague and he referred them as
deliverables of the project. In this case therefor, the objectives of the project are to upgrade the UBER
telecommunication system by introducing a software application in the company. The following are
thus, the objectives that the software application intends to address include the following;
4
company. This mobile application software will help the company to disseminate all the relevant
information to its stakeholders including customers, employees, the community, the government
among others [2:10]. As it was noted, communication is the key to success of every organization in
the business world. as a point of reference, related mobile application software have been used by a
galaxy of companies across the globe and solved the same dilemma as it is happening in the company.
For example, this software will be designed to ensure that every information, technological changes,
business development strategies, marketing strategies, and promotion strategies among others are
distributed to the entire organization. This will help to ensure that the image, economic backbone and
corporate social responsibility mechanisms are achieved. As a result of this tool benchmarking
mechanisms shall be adopted, which will help the company to regain its glory back in the business
environment. In addition, this software is also intended to ensure that transparency and proper
accountability principles are adhered to, and this shall help to increase market share of the company.
The software will also be designed to ensure that all hackers to the company’s confidential
information are detected by the central monitoring unit. Furthermore, the decision to come up with
this software was reached at when the company realised that there was a need to enhance competitive
advantage over other companies [3:25].
Project aims and objectives
Objectives can be defined as concrete statements which a company intends to achieve in a
certain period of time as a result of executing the intended and planned activities. Objectives can be
written at a lower level when the project manager is trying to initiate the project.
According to Tom Mochal, project objectives should not be vague and he referred them as
deliverables of the project. In this case therefor, the objectives of the project are to upgrade the UBER
telecommunication system by introducing a software application in the company. The following are
thus, the objectives that the software application intends to address include the following;
4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

To promote effective communication: as it was noted in the introduction section, the
company has persistently been affected by poor communication systems whereby information has not
been properly disseminated to the relevant stakeholders. Poor communication hinders the company’s
development both internally and externally. For instance, internally the employees within the
company cannot know the dos and don’ts when the communication channels are not properly set and
externally, customers can be misled about the company’s products and services. This software will
help to ensure that communication is effectively spread among the stakeholders of the organization
[2:9].
To reduce organizational costs; Due to poor communication systems, too much revenue for
the company has been lost. Through this software, the company’s revenue will be saved.
To promote competitive advantage: UBER as a company faces stiff competition from other
related companies like OLA. Introduction of this software will effectively help the company to
outcompete or else favourably compete with other related companies in the market.
To expand its revenue globally; The company is operating almost all over the world.
Through this software system, it is likely to expand its global revenue base in other countries where it
has not reached and improving its operational base in the countries where it is already operating in.
According to research, there has been strong market for UBER in many countries but due to poor
communication system, the software will be designed to address this mess.
To improve the brand image of the company; Since technology has advanced almost all
over the world, this project is aimed at improving on the brand image of the company in the world as
compared to other companies. This means, with this software, everything will be monitored from the
central monitoring unit. Keeping in mind that UBER is a transportation company, risks like accidents
and robbery will highly be reduced in the company. This is can be achieved in a shortest time period
by ensuring that the company properly communicates to its stakeholders all over the world on safety
precautions [5:80].
5
company has persistently been affected by poor communication systems whereby information has not
been properly disseminated to the relevant stakeholders. Poor communication hinders the company’s
development both internally and externally. For instance, internally the employees within the
company cannot know the dos and don’ts when the communication channels are not properly set and
externally, customers can be misled about the company’s products and services. This software will
help to ensure that communication is effectively spread among the stakeholders of the organization
[2:9].
To reduce organizational costs; Due to poor communication systems, too much revenue for
the company has been lost. Through this software, the company’s revenue will be saved.
To promote competitive advantage: UBER as a company faces stiff competition from other
related companies like OLA. Introduction of this software will effectively help the company to
outcompete or else favourably compete with other related companies in the market.
To expand its revenue globally; The company is operating almost all over the world.
Through this software system, it is likely to expand its global revenue base in other countries where it
has not reached and improving its operational base in the countries where it is already operating in.
According to research, there has been strong market for UBER in many countries but due to poor
communication system, the software will be designed to address this mess.
To improve the brand image of the company; Since technology has advanced almost all
over the world, this project is aimed at improving on the brand image of the company in the world as
compared to other companies. This means, with this software, everything will be monitored from the
central monitoring unit. Keeping in mind that UBER is a transportation company, risks like accidents
and robbery will highly be reduced in the company. This is can be achieved in a shortest time period
by ensuring that the company properly communicates to its stakeholders all over the world on safety
precautions [5:80].
5

Accordingly, to the current economic situation of the company, this project will strictly run
for three months to ensure that the company regains its glory and achieve the objectives that were
initially formed to achieve since a clear view is seen that looking way back on its formation in 2009, it
had succeeded in extending its operation in over 170 countries in the world. The project shall also
help the company to achieve its dream of becoming the premier global transportation and
technological company all over the world.
Start date and completion date
By definition, start date is the expected date for the commencement of the project while
completion date is the expected date/period in which the project will be completed.
As a good project manager, it is always prudent to ensure that the project is completed in the
proposed project timeline because project delays lead to extra costs and encroaches on the extra
expenses to the company. Delayed projects are always due to a series of factors which include poor
planning, and uncertain happenings. the project will be undertaken as shown in the subsequent
timeline [4]
Task Name Duratio
n Start Finish Predecessors
project initiation 63 days Sun 9/23/ 18 Tue 12/18/
18
identifying and proposing the software
application 15 days Sun 9/23/ 18 Thu 10/11/
18
submission for review and approval by top
management 8 days Wed 10/24/ 18 Fri 11/2/ 18 2
identification and compilation of the project
requirements and resources 12 days Mon 11/5/ 18 Tue 11/20/
18 3
submission of project requirement forms to
the project sponsor 4 days Tue 11/20/ 18 Fri 11/23/ 18 4
identification, evaluation and shortlisting of
the project team members 10 days Thu 11/8/ 18 Wed 11/21/
18 5
training of the shortlisted project team
members 8 days Tue 12/4/ 18 Thu 12/13/
18 6
responsibility assigning 4 days Tue 12/18/ 18 Fri 12/21/ 18 7
0 days Sun 9/23/ 18 Sun 9/23/ 18
project execution 85 days Wed 12/19/18 Tue 4/16/ 19 1
Environment for development 7 days Mon 9/24/ 18 Tue 10/2/ 18 9
project kickstart 3 days Thu 1/10/ 19 Mon 1/14/ 19 11
phase testing 25 days Wed 1/16/ 19 Tue 2/19/ 19 12
6
for three months to ensure that the company regains its glory and achieve the objectives that were
initially formed to achieve since a clear view is seen that looking way back on its formation in 2009, it
had succeeded in extending its operation in over 170 countries in the world. The project shall also
help the company to achieve its dream of becoming the premier global transportation and
technological company all over the world.
Start date and completion date
By definition, start date is the expected date for the commencement of the project while
completion date is the expected date/period in which the project will be completed.
As a good project manager, it is always prudent to ensure that the project is completed in the
proposed project timeline because project delays lead to extra costs and encroaches on the extra
expenses to the company. Delayed projects are always due to a series of factors which include poor
planning, and uncertain happenings. the project will be undertaken as shown in the subsequent
timeline [4]
Task Name Duratio
n Start Finish Predecessors
project initiation 63 days Sun 9/23/ 18 Tue 12/18/
18
identifying and proposing the software
application 15 days Sun 9/23/ 18 Thu 10/11/
18
submission for review and approval by top
management 8 days Wed 10/24/ 18 Fri 11/2/ 18 2
identification and compilation of the project
requirements and resources 12 days Mon 11/5/ 18 Tue 11/20/
18 3
submission of project requirement forms to
the project sponsor 4 days Tue 11/20/ 18 Fri 11/23/ 18 4
identification, evaluation and shortlisting of
the project team members 10 days Thu 11/8/ 18 Wed 11/21/
18 5
training of the shortlisted project team
members 8 days Tue 12/4/ 18 Thu 12/13/
18 6
responsibility assigning 4 days Tue 12/18/ 18 Fri 12/21/ 18 7
0 days Sun 9/23/ 18 Sun 9/23/ 18
project execution 85 days Wed 12/19/18 Tue 4/16/ 19 1
Environment for development 7 days Mon 9/24/ 18 Tue 10/2/ 18 9
project kickstart 3 days Thu 1/10/ 19 Mon 1/14/ 19 11
phase testing 25 days Wed 1/16/ 19 Tue 2/19/ 19 12
6

risk management 16 days Thu 2/21/ 19 Thu 3/14/ 19 13
management of subcontracts 9 days Wed 3/13/ 19 Mon 3/25/ 19 14
quality evaluation and management 10 days Fri 3/22/ 19 Thu 4/4/ 19 15
configuration and change management 8 days Fri 4/5/ 19 Tue 4/16/ 19 16
communication and reporting 11 days Wed 4/17/ 19 Wed 5/1/ 19 17
software review 35 days Mon 4/29/ 19 Fri 6/14/ 19 11
testing the loopholes of the project 15 days Thu 5/2/ 19 Wed 5/22/ 19 18
making of adjustments 20 days Fri 5/24/ 19 Thu 6/20/ 19 21
0 days Fri 6/21/ 19 Fri 6/21/ 19 22
final handover of the application to UBER 5 days Fri 6/21/ 19 Thu 6/27/ 19 20,23
3.1 Project Gantt chart
7
management of subcontracts 9 days Wed 3/13/ 19 Mon 3/25/ 19 14
quality evaluation and management 10 days Fri 3/22/ 19 Thu 4/4/ 19 15
configuration and change management 8 days Fri 4/5/ 19 Tue 4/16/ 19 16
communication and reporting 11 days Wed 4/17/ 19 Wed 5/1/ 19 17
software review 35 days Mon 4/29/ 19 Fri 6/14/ 19 11
testing the loopholes of the project 15 days Thu 5/2/ 19 Wed 5/22/ 19 18
making of adjustments 20 days Fri 5/24/ 19 Thu 6/20/ 19 21
0 days Fri 6/21/ 19 Fri 6/21/ 19 22
final handover of the application to UBER 5 days Fri 6/21/ 19 Thu 6/27/ 19 20,23
3.1 Project Gantt chart
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Stakeholders of the project
Firstly, a stakeholder is an organization, a group or a person that has got interest in the
organization. Stakeholders can affect or support the development of the organizational objectives and
goals. They can be both external and internal.
Internal stakeholders are referred to as people who work within the organization. They
internally influence the activities of the organization that is, they can affect or be affected by the
actions of the organization. Internal stakeholders include employees working in the organization.
External stakeholders. These are stakeholders whom the activities of the organization affect
externally. They include the following, the government, the community, Clients, Opinion leaders
extra. In any case, for the company to succeed in business arena, there should be clear stakeholders,
management. Stakeholder management is all about ensuring effective co-operation between the
company and the organization through effective communication, customer response whenever there
are complaints, quality management, compliance especially to the government policies and guidelines
among others. Therefor this project is aimed at ensuring that there is clear relationship between UBER
and its stakeholders. Taking way back in 2009, UBER company was formed to ensure that people
enjoy their services like ridding, delivery among others. However, due to poor communication, the
8
Firstly, a stakeholder is an organization, a group or a person that has got interest in the
organization. Stakeholders can affect or support the development of the organizational objectives and
goals. They can be both external and internal.
Internal stakeholders are referred to as people who work within the organization. They
internally influence the activities of the organization that is, they can affect or be affected by the
actions of the organization. Internal stakeholders include employees working in the organization.
External stakeholders. These are stakeholders whom the activities of the organization affect
externally. They include the following, the government, the community, Clients, Opinion leaders
extra. In any case, for the company to succeed in business arena, there should be clear stakeholders,
management. Stakeholder management is all about ensuring effective co-operation between the
company and the organization through effective communication, customer response whenever there
are complaints, quality management, compliance especially to the government policies and guidelines
among others. Therefor this project is aimed at ensuring that there is clear relationship between UBER
and its stakeholders. Taking way back in 2009, UBER company was formed to ensure that people
enjoy their services like ridding, delivery among others. However, due to poor communication, the
8

aims and objectives have not been fully attained but the project will ensure their revival in a shortest
period of time [6].
In this case, the project team shall briefly look at stakeholder analysis of UBER company and
how their powers and interest affect or influence the organization
STAKEHOLDERS
POWERS, RESIPONSIBILITIES, AND INTEREST
Project owner -Project owner takes full decision regarding the project.
-Planning; A project owner ensures that all the project plans are met.
-Appointments; Is responsible for any project appointments to ensure that the project
is completed in time.
-Conflict handling; Ensures that all conflicting issue regarding the project are solved
to reduce losses and promote good relationships.
-Funding; He ensures that the funds to run the project are properly negotiated for and
made available.
-Evaluation; He is responsible for success evaluation of the project.
- Visibility; He makes the project visible within the organization
Project manager Responsible for running the project.
-Supervision; Is responsible for ensuring that the project team players do what it takes
to ensure that the project is completed.
-Risk management; A project manager is responsible for ensuring that risks are
managed before they affect the organization
Project players These includes employees /workers
-They ensure that the project is completed in time under the supervision of the project
manager
Governments These include respective governments where UBER is operating from.
They ensure that the company operates in a manner that does not compromise the
policies of the government.
Project board These are responsible for ensuring that the project meets its aims and objectives.
-Decision making; Responsible for proper decisions regarding the performance of the
project
-Quality control; The board is responsible for ensuring that quality is met in order to
achieve the aims and objectives of the project.
-Time management; Time is a very important resource that should be utilised
properly. The board members are responsible for ensuring that the time frame
designed for the project to be completed is met.
Software
implementers
Here the organization will have to hire some experts to do this work under the
supervision of the project managers.
Clients/Customers These are referred to as end users of the product. In this case, the software is intended
to ensure that customers become but of the initiative whereby all the required
information can be accessed
9
period of time [6].
In this case, the project team shall briefly look at stakeholder analysis of UBER company and
how their powers and interest affect or influence the organization
STAKEHOLDERS
POWERS, RESIPONSIBILITIES, AND INTEREST
Project owner -Project owner takes full decision regarding the project.
-Planning; A project owner ensures that all the project plans are met.
-Appointments; Is responsible for any project appointments to ensure that the project
is completed in time.
-Conflict handling; Ensures that all conflicting issue regarding the project are solved
to reduce losses and promote good relationships.
-Funding; He ensures that the funds to run the project are properly negotiated for and
made available.
-Evaluation; He is responsible for success evaluation of the project.
- Visibility; He makes the project visible within the organization
Project manager Responsible for running the project.
-Supervision; Is responsible for ensuring that the project team players do what it takes
to ensure that the project is completed.
-Risk management; A project manager is responsible for ensuring that risks are
managed before they affect the organization
Project players These includes employees /workers
-They ensure that the project is completed in time under the supervision of the project
manager
Governments These include respective governments where UBER is operating from.
They ensure that the company operates in a manner that does not compromise the
policies of the government.
Project board These are responsible for ensuring that the project meets its aims and objectives.
-Decision making; Responsible for proper decisions regarding the performance of the
project
-Quality control; The board is responsible for ensuring that quality is met in order to
achieve the aims and objectives of the project.
-Time management; Time is a very important resource that should be utilised
properly. The board members are responsible for ensuring that the time frame
designed for the project to be completed is met.
Software
implementers
Here the organization will have to hire some experts to do this work under the
supervision of the project managers.
Clients/Customers These are referred to as end users of the product. In this case, the software is intended
to ensure that customers become but of the initiative whereby all the required
information can be accessed
9

Project benefits
These are the advantages that will accrue to the organization as a result of successful
implementation of the software project. Since the project team has looked at the trending challenges
that the company has faced due to its poor communication mechanisms, it is expected that the
company will improve on its operation and competitiveness as a result of successfully executing the
project as explained subsequently [8:810].
Advancement in communication; Since the main challenge for the company has been poor
communication, the project is aimed at ensuring that communication is advanced through wired and
wireless networks. This be installed in both phones and computers for all the stakeholders.
Improved Collaboration; Communication is a very powerful tool in promoting
collaboration among the people, this tool is aimed at ensuring that all the stakeholders collaborate for
the success of the organization.
Customer service improvement; Using this software, clear and required information will be
disseminated to all the customers and this will help to ensure transparency and openness between the
customers and the UBER company.
Improved Flexibility; Technology has increased all over the globe, the software will help to
promote flexibility whereby information can be shared in far between/ among people. For instance, a
customer can be able to order for a driver at his/her place of work to take him home. This can be so
convenient than moving long distances looking for the driver [7].
Saves time; This software is all intended to solve time loss among the stakeholders. If all the
information is put in the website where every subscribed member can access it.
Research enhancement; Through using this software, research will be enhanced whereby
the company is able to improve on its benchmarking mechanisms. This project will be designed to
ensure that the existing challenges in the organization are solved and make the organization to become
the best global company in both service and product advancement.
10
These are the advantages that will accrue to the organization as a result of successful
implementation of the software project. Since the project team has looked at the trending challenges
that the company has faced due to its poor communication mechanisms, it is expected that the
company will improve on its operation and competitiveness as a result of successfully executing the
project as explained subsequently [8:810].
Advancement in communication; Since the main challenge for the company has been poor
communication, the project is aimed at ensuring that communication is advanced through wired and
wireless networks. This be installed in both phones and computers for all the stakeholders.
Improved Collaboration; Communication is a very powerful tool in promoting
collaboration among the people, this tool is aimed at ensuring that all the stakeholders collaborate for
the success of the organization.
Customer service improvement; Using this software, clear and required information will be
disseminated to all the customers and this will help to ensure transparency and openness between the
customers and the UBER company.
Improved Flexibility; Technology has increased all over the globe, the software will help to
promote flexibility whereby information can be shared in far between/ among people. For instance, a
customer can be able to order for a driver at his/her place of work to take him home. This can be so
convenient than moving long distances looking for the driver [7].
Saves time; This software is all intended to solve time loss among the stakeholders. If all the
information is put in the website where every subscribed member can access it.
Research enhancement; Through using this software, research will be enhanced whereby
the company is able to improve on its benchmarking mechanisms. This project will be designed to
ensure that the existing challenges in the organization are solved and make the organization to become
the best global company in both service and product advancement.
10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Project team
A project team is a group of people whom the organization has entrusted to run the project on
its behalf. They act as agents in a sense that they execute activities on behalf of the organization. The
project team will properly be selected in order to avoid challenges that may follow later when the
project fails to meet the aims and objectives of its design. The project team will also include people of
high profile and who have got an independent mind to do their work without being influenced and
who are also technical and have a lot of expertise in driving project to its destination [9].
NOTE; The success and failure of the project is dependent on the efforts of the project team.
For that matter therefor, a project team should be very careful in ensuring that the resources of an
organization are efficiently and effectively used.
TITTLE QUALIFICATION ROLES/RESPONSIBILITIES
Project
manager
Telecommunicatio
n engineer
-To ensure that the project meets the expected completion date
-To carryout monitoring and supervision roles of the project.
-To update the organization on the progress of the project.
-To ensure that the project achieves its aims and objectives.
- It’s a full responsibility of the project manager to ensure that
budgets are drawn well and followed properly.
-Time and design of the project and ensuring that they are met.
-Planning. He will ensure that planning is made appropriately
and putting in mind the resources available at his disposal.
Ensures effective documentation of all the project information.
Project
owner
Business
Administrator
-Providing the necessary resources needed by a project team in
order to perform their duties.
- Over all supervisor of the project.
Evaluation
team
members
(5)
Lawyers -To ensure that the legal framework is followed
-Follow clear conflict handling strategies
-Ensures that software follows clear international
communication guidelines.
-Ensures that proper evidence can be created in case of any
conflicting issue.
Initial risk identification
A risk can be defined simply as a situation that may lead to danger in the operations of the
business/ company. Risk identification is a very smart way in business operations this is because it
helps the company/organization to save the would have been lost money during the project
11
A project team is a group of people whom the organization has entrusted to run the project on
its behalf. They act as agents in a sense that they execute activities on behalf of the organization. The
project team will properly be selected in order to avoid challenges that may follow later when the
project fails to meet the aims and objectives of its design. The project team will also include people of
high profile and who have got an independent mind to do their work without being influenced and
who are also technical and have a lot of expertise in driving project to its destination [9].
NOTE; The success and failure of the project is dependent on the efforts of the project team.
For that matter therefor, a project team should be very careful in ensuring that the resources of an
organization are efficiently and effectively used.
TITTLE QUALIFICATION ROLES/RESPONSIBILITIES
Project
manager
Telecommunicatio
n engineer
-To ensure that the project meets the expected completion date
-To carryout monitoring and supervision roles of the project.
-To update the organization on the progress of the project.
-To ensure that the project achieves its aims and objectives.
- It’s a full responsibility of the project manager to ensure that
budgets are drawn well and followed properly.
-Time and design of the project and ensuring that they are met.
-Planning. He will ensure that planning is made appropriately
and putting in mind the resources available at his disposal.
Ensures effective documentation of all the project information.
Project
owner
Business
Administrator
-Providing the necessary resources needed by a project team in
order to perform their duties.
- Over all supervisor of the project.
Evaluation
team
members
(5)
Lawyers -To ensure that the legal framework is followed
-Follow clear conflict handling strategies
-Ensures that software follows clear international
communication guidelines.
-Ensures that proper evidence can be created in case of any
conflicting issue.
Initial risk identification
A risk can be defined simply as a situation that may lead to danger in the operations of the
business/ company. Risk identification is a very smart way in business operations this is because it
helps the company/organization to save the would have been lost money during the project
11

performance. This project has been designed to ensure that all the possible risks are identified before
their occurrence. Vigilance has also been clearly made on the risk response mechanisms such as,
Risk transfer
Risk avoidance
Risk acceptance
Risk reduction and risk contingency that is, actions to stop the risks will be put in
place to ensure that such risks are mitigated.
Still a risk register has also been made to record every risk occurrence.
UBER company as a way of advancing its technology all over the world, 70000 dollars have
been set aside and budgeted to develop this software application system to solve the its
communication challenges [10]
Resources and budgeting
Task Name Expected costs
software identification and evaluation $ 1000
the internal human resource $ 10000
the external human resource $ 6000
total costs of purchases $ 20000
the required equipment for the software development $ 8000
cost of premises in which the development will take place $ 1500
the extra tools and resources needed $ 2000
the cost of travels among the stakeholders $ 2500
training of the project team members $ 5000
reviewing of project activities $ 6000
other unplanned activities $ 8000
Total expected cost $ 70000
12
their occurrence. Vigilance has also been clearly made on the risk response mechanisms such as,
Risk transfer
Risk avoidance
Risk acceptance
Risk reduction and risk contingency that is, actions to stop the risks will be put in
place to ensure that such risks are mitigated.
Still a risk register has also been made to record every risk occurrence.
UBER company as a way of advancing its technology all over the world, 70000 dollars have
been set aside and budgeted to develop this software application system to solve the its
communication challenges [10]
Resources and budgeting
Task Name Expected costs
software identification and evaluation $ 1000
the internal human resource $ 10000
the external human resource $ 6000
total costs of purchases $ 20000
the required equipment for the software development $ 8000
cost of premises in which the development will take place $ 1500
the extra tools and resources needed $ 2000
the cost of travels among the stakeholders $ 2500
training of the project team members $ 5000
reviewing of project activities $ 6000
other unplanned activities $ 8000
Total expected cost $ 70000
12

Expected outcomes
All projects proposals are initiated with the major aim of ending challenges that affect the
success of the company. Application of software system in the UBER company will bring out the
following outcomes to the company.
Expanded customer base; This project is expected to expand customer base all over the
world by clearly spreading information. It will be designed in a way that every message available in
the company will be easily reaching its customers. This will eventually lead to customer satisfaction.
Enhance transparency; The project will help to enhance clear among the stakeholders and
the company that is every information and development taking place within the company will be
clearly known to every member. Transparency will also help to promote trust of customers since
everything will be known by the customers.
Improving effective communication; The project is expected to enhance effective
communication in the organization. Since it has been found out that the main challenge that the
company has been facing is poor communication, this software application will ensure that
communication is properly spread. With effective communication, all aims and objectives of the
project will be achieved [11]
Improved brand image; due to poor communication, the image of the organization had been
tarnished. This project is expected to ensure that everything is fixed. This will be through information
sharing, quick customer response, quick deliveries among others. The company is also expected to
earn competitive advantage over other related companies like OLA. Every successful project should
meet the expected outcomes of its formation provide a long-lasting solution to the problems that have
existed in the organization. The project evaluation team will play this key role of ensuring that that
resources are properly utilised and yield outputs [5].
13
All projects proposals are initiated with the major aim of ending challenges that affect the
success of the company. Application of software system in the UBER company will bring out the
following outcomes to the company.
Expanded customer base; This project is expected to expand customer base all over the
world by clearly spreading information. It will be designed in a way that every message available in
the company will be easily reaching its customers. This will eventually lead to customer satisfaction.
Enhance transparency; The project will help to enhance clear among the stakeholders and
the company that is every information and development taking place within the company will be
clearly known to every member. Transparency will also help to promote trust of customers since
everything will be known by the customers.
Improving effective communication; The project is expected to enhance effective
communication in the organization. Since it has been found out that the main challenge that the
company has been facing is poor communication, this software application will ensure that
communication is properly spread. With effective communication, all aims and objectives of the
project will be achieved [11]
Improved brand image; due to poor communication, the image of the organization had been
tarnished. This project is expected to ensure that everything is fixed. This will be through information
sharing, quick customer response, quick deliveries among others. The company is also expected to
earn competitive advantage over other related companies like OLA. Every successful project should
meet the expected outcomes of its formation provide a long-lasting solution to the problems that have
existed in the organization. The project evaluation team will play this key role of ensuring that that
resources are properly utilised and yield outputs [5].
13
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

List of References
1. P. Abrahamsson,, O., Salo, Ronkainen, J., & Warsta, J. (2017). Agile software development
methods: Review and analysis. arXiv preprint arXiv:1709.08439.
2. T. M., Ahmed, C. P., Bezemer, T. H., Chen, A. E., Hassan, & W. Shang, (2016, May).
Studying the effectiveness of application performance management (APM) tools for detecting
performance regressions for web applications: an experience report. In Proceedings of the
13th International Conference on Mining Software Repositories (pp. 1-12). ACM.
3. M., Braglia, & M. Frosolini, (2014). An integrated approach to implement project
management information systems within the extended enterprise. International Journal of
Project Management, 32(1), 18-29.
4. A., Calderón, & M. Ruiz, (2015). A systematic literature review on serious games evaluation:
An application to software project management. Computers & Education, 87, 396-422.
5. F., Ferrucci, M., Harman, & Sarro, F. (2014). Search-based software project management.
In Software Project Management in a Changing World (pp. 373-399). Springer, Berlin,
Heidelberg.
14
1. P. Abrahamsson,, O., Salo, Ronkainen, J., & Warsta, J. (2017). Agile software development
methods: Review and analysis. arXiv preprint arXiv:1709.08439.
2. T. M., Ahmed, C. P., Bezemer, T. H., Chen, A. E., Hassan, & W. Shang, (2016, May).
Studying the effectiveness of application performance management (APM) tools for detecting
performance regressions for web applications: an experience report. In Proceedings of the
13th International Conference on Mining Software Repositories (pp. 1-12). ACM.
3. M., Braglia, & M. Frosolini, (2014). An integrated approach to implement project
management information systems within the extended enterprise. International Journal of
Project Management, 32(1), 18-29.
4. A., Calderón, & M. Ruiz, (2015). A systematic literature review on serious games evaluation:
An application to software project management. Computers & Education, 87, 396-422.
5. F., Ferrucci, M., Harman, & Sarro, F. (2014). Search-based software project management.
In Software Project Management in a Changing World (pp. 373-399). Springer, Berlin,
Heidelberg.
14

6. A. H., Ghapanchi, Wohlin, C., & A. Aurum, (2014). Resources contributing to gaining
competitive advantage for open source software projects: An application of resource-based
theory. International Journal of Project Management, 32(1), 139-152.
7. D. R., Hayes, Snow, C., & S. Altuwayjiri, (2017). Geolocation Tracking and Privacy Issues
Associated with the Uber Mobile Application. In Proceedings of the Conference on
Information Systems Applied Research ISSN (Vol. 2167, p. 1508).
8. Ö., Hazır, (2015). A review of analytical models, approaches and decision support tools in
project monitoring and control. International Journal of Project Management, 33(4), 808-
815.
9. R., Joslin, & R., Müller (2015). Relationships between a project management methodology
and project success in different project governance contexts. International Journal of Project
Management, 33(6), 1377-1392.
10. O., Pedreira, García, F., Brisaboa, N., & Piattini, M. (2015). Gamification in software
engineering–A systematic mapping. Information and Software Technology, 57, 157-168.
11. A. K., Rai, S., Agrawal, & E., KHALIQ (2017). Identification of Agile Software Risk
Indicators and Evaluation of Agile Software Development Project Risk Occurrence
Probability. International Journal of Engineering Technology, Management and Applied
Sciences, 5(7), 403-408.
15
competitive advantage for open source software projects: An application of resource-based
theory. International Journal of Project Management, 32(1), 139-152.
7. D. R., Hayes, Snow, C., & S. Altuwayjiri, (2017). Geolocation Tracking and Privacy Issues
Associated with the Uber Mobile Application. In Proceedings of the Conference on
Information Systems Applied Research ISSN (Vol. 2167, p. 1508).
8. Ö., Hazır, (2015). A review of analytical models, approaches and decision support tools in
project monitoring and control. International Journal of Project Management, 33(4), 808-
815.
9. R., Joslin, & R., Müller (2015). Relationships between a project management methodology
and project success in different project governance contexts. International Journal of Project
Management, 33(6), 1377-1392.
10. O., Pedreira, García, F., Brisaboa, N., & Piattini, M. (2015). Gamification in software
engineering–A systematic mapping. Information and Software Technology, 57, 157-168.
11. A. K., Rai, S., Agrawal, & E., KHALIQ (2017). Identification of Agile Software Risk
Indicators and Evaluation of Agile Software Development Project Risk Occurrence
Probability. International Journal of Engineering Technology, Management and Applied
Sciences, 5(7), 403-408.
15
1 out of 15
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.