This project report focuses on the influence of modular construction on project sustainability. The student explores the construction of a building using a modular construction theme, addressing issues like waste generation, high costs, and environmental impact. The report includes project identification, research methods, feasibility studies, and a detailed project management plan. It identifies required resources (human, materials, and financial), costs, personnel, and timescales. Techniques for cost planning, including Gantt charts and the critical path method (CPM), are discussed. The student evaluates potential project management solutions using CPM, selects a preferred solution, and compares planned resources, timescales, and costs. The report culminates in a project report detailing each stage of the project, with an evaluation of project management performance.
Document Page
Running head: PROJECT MANAGEMENT
The influence of modular construction method on project sustainability
Name of the Student
Name of the University
Author’s Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
PROJECT MANAGEMENT
Table of Contents
Task 1...............................................................................................................................................3
1a) Project identification..............................................................................................................3
1b) Research methods..................................................................................................................3
1c) Feasibility studies..................................................................................................................4
1d) Brief and specification...........................................................................................................5
Task 2...............................................................................................................................................5
2a) Identification of potential resources needed, costs, personnel as well as timescales............5
2b) Techniques for potential solutions for indicating the cost planning...................................10
2c) Project management plan with standard system of time and resources..............................10
Task 3.............................................................................................................................................13
3a) Evaluation of potential project management using CPM....................................................13
3b) Selection of preferred project solution................................................................................13
3c) Comparison of the outcomes of your planned resources, timescales and costs..................14
Task 4.............................................................................................................................................15
4a) Report for stating each stage of the project.........................................................................15
4e) Evaluation and appraise performance for project management..........................................16
References......................................................................................................................................17
Document Page
2
PROJECT MANAGEMENT
Task 1
1a) Project identification
The paper mainly reflects on construction of a building with modular construction
theme. It is found that the construction of a building on on-site creates a number of problems as
well as challenges including generation of waste material, high expenditure as well as creation of
huge impact on the business of the organization. In order to reduce the problems as well as issues
which are linked with construction of the building, modular construction theme is selected.
According to Bazhanov Yudin and Porkhalo (2018), modular construction is one of the
procedures of constructing a building and then transporting it in small pieces to various location
where assembly generally takes place. It is found that due to utilization of modular construction
theme selection, a number of benefits can be achieved including speedy built, off site
construction, low impact on the business, eco-friendly, cost effective as well as helps in
providing proper quality of construction.
1b) Research methods
After researching a number of journal articles as well as scholar papers, it is identified
that proper research on the background is done in order to determine ideas that are helpful in
tackling similar types of problems and the ways that are used to resolve the problems. According
to Abdelghany (2017) the problem that is associated with the generation of waste material can be
resolved with the adoption of sustainable approach for managing the construction waste as one of
the practices. In addition to this, it is found that the concept of green building can also be utilized
in order to reduce the waste that is generated while construction (Hornstein 2015). It is found
that the programs that are associated with green building are generally helpful in promoting the
entire resource conversation facility with the help of attention to water conservation
Document Page
3
PROJECT MANAGEMENT
opportunities as well as minimizing the waste that is generated during construction. On the other
hand, it is stated by Rausch et al. (2016) that the expenditure on the project can be managed by
controlling the cost that is linked with the specific processes and by properly tracking the cost
that is needed for executing each of the activities of the project quite accurately. Moreover, the
procedure of controlling over-expenditure is one of the important ways that is mainly utilized for
managing the project budget effectively.
1c) Feasibility studies
It is found that utilization of green building concept in order to minimize the generation
of waste during the construction of the building is one of the advantageous methods but it
generally creates a number of risks as well as challenges including performance risk and risks
related to business codes. It is found that there are evolving risks related with mandates, business
codes as well as other types of rules that are mainly associated with green building that could
mainly related with liabilities (Shan et al. 2019). Lawsuits can also stem due to the failure of the
building in meeting the LEED related requirements. In addition to this, performance risk
including uncertainty related with longevity as well as warranty of new products and untested
materials can be a source of a number of risks and challenges and thus it is found that depending
on the concept of green building is not feasible at all. On the other hand, it is stated by Svejvig
and Andersen (2015) that the method or technique that are utilized for managing the project
expenditure is helpful in managing the project budget however a number of problems can arise if
the project managers are unable to manage the project expenses. If the managers of the project
are inexperienced and they are unable to manage the expenses then the chances of overbudgeting
will occur (Kaiser, El Arbi and Ahlemann, 2015). In addition to this, if project plan is not tracked
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
PROJECT MANAGEMENT
on regular basis then it is quite difficult to manage the project expenditure which further
increases the project budget.
1d) Brief and specification
The paper focuses on construction of a building by utilizing a modular construction
theme in context to sustainability. It is found that for constructing of the building, proper scope
of the project plays an important role. According to Ramazani and Jergeas (2015) scope of the
project enables the managers to properly allocate the labour, costs as well as necessary resources
which are required for finishing the work of the project. It is found that with the help of proper
pre-defined scope of the project, everyone can be capable of understanding the future life-cycle
and helps in avoiding issues like requirement change, improper final outcome, overrunning of
budget as well as delay in the project (Martens and Carvalho 2017). In addition to this, it is found
that if the scope is well-defined then the financial commitment of the entire project is generally
dependent on a number of variables including cost and labour and thus the entire project gets
completed within the budget and time that is defined during the initial project phase. Moreover,
creation of document that generally outlines the deadlines as well as goals of the project are
helpful in shaping the project which is known as the scope statement including proper elements
within the document that is generally helpful in minimizing the challenges which are linked with
changes as well as disruptions.
Task 2
2a) Identification of potential resources needed, costs, personnel as well as timescales
Resources required
Document Page
5
PROJECT MANAGEMENT
The resources that are generally required in order to construct the building by using
sustainable modular theme are generally elaborated below:
Human resources: The human resources that are needed for the project are listed below:
Resource Name Type Std. Rate Ovt. Rate Base Calendar
Project manager Work £40.00/hr £0.00/hr Standard
Sponsor Work £0.00/hr £0.00/hr Standard
Finance manager Work £50.00/hr £0.00/hr Standard
Site supervisor Work £60.00/hr £0.00/hr Standard
Contractor Work £50.00/hr £0.00/hr Standard
Plumber Work £30.00/hr £0.00/hr Standard
Sub-contractor Work £37.00/hr £0.00/hr Standard
Risk manager Work £40.00/hr £0.00/hr Standard
Project planner Work £35.00/hr £0.00/hr Standard
Materials: The materials that are needed for the construction of a building with the help
of a sustainable modular theme are mainly listed below:
Wood
Steel
Concrete
Other materials
Financial resources: It is analyzed that around £117,472 is required in order to
construct the building as per the sustainable modular theme
Costs for the project
The budget that is needed for constructing the building with the help of modular
construction theme is generally reflected in the given table:
Document Page
6
PROJECT MANAGEMENT
WBS Task Name Duration Cost
0
Construction of building using
modular theme
5 mons £117,472.00
1 Project planning phase 0.75 mons £4,960.00
1.1 Requirement analysis 0.15 mons £920.00
1.1.1 Analyzing the requirement 2 days £640.00
1.1.2 Analysis of the project nature 1 day £280.00
1.2 Resource estimation 2 days £800.00
1.3 Estimation of project schedule 3 days £960.00
1.4 Budget estimation 2 days £800.00
1.5 Manpower estimation 2 days £640.00
1.6 Resource analysis 3 days £840.00
1.7
Milestone 1: Completion of
planning phase
0 days £0.00
2 Project initiation phase 1.2 mons £8,832.00
2.1 Fund procurement 3 days £0.00
2.2 Stakeholders appointment 3 days £960.00
2.3 Proper meeting arrangement 4 days £1,280.00
2.4 Arrangement of project finance 3 days £1,200.00
2.5 Appointment of workers 2 days £560.00
2.6 Preparation of blueprint 3 days £1,440.00
2.7 Budget allocation 2 days £800.00
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
PROJECT MANAGEMENT
2.8 Resource procurement 2 days £1,392.00
2.9 Analysis of risk 2 days £1,200.00
2.10
Milestone 2: Completion of
project initiation phase
0 days £0.00
3 Project execution phase 2.9 mons £102,760.00
3.1
Creation of the building with
modular construction theme
8 days £9,280.00
3.2 Transfer of the building theme 7 days £14,760.00
3.3
Construction over the modular
theme framework
10 days £7,760.00
3.4 Application of materials 8 days £9,408.00
3.5 Plumbing 7 days £5,992.00
3.6 Application of electric circuit 6 days £4,656.00
3.7 Application of concrete 7 days £2,800.00
3.8 Application of colour 5 days £3,000.00
3.9 Needed system implementation 4 days £2,464.00
3.10 Application of tiles 3 days £42,640.00
3.11
Milestone 3:Completion of
execution phase
0 days £0.00
4 Project closure phase 0.15 mons £920.00
4.1 Sign off stakeholder 2 days £640.00
4.2 Review of post project 1 day £280.00
Document Page
8
PROJECT MANAGEMENT
4.3
Milestone 4: Completion of
closure phase
0 days £0.00
Timescales for the project
The timescales for the construction of the building is reflected with the help of the figure
that is given below:
Figure 1: Timescale
(Source: Created by Author)
Document Page
9
PROJECT MANAGEMENT
2b) Techniques for potential solutions for indicating the cost planning
It is found that sustainable modular theme is utilized as one of the potential solutions in
order to resolve the issues that the workers faces while constructing the building. It is identified
that the modular theme construction is mainly used in the form of off-site construction that
mainly consists of building components as well as modules that are generally constructed within
the factory setting that is mainly transported to the site for assembling (Badewi 2016). The
construction of modular buildings has generally surged its popularity in the recent years due to
its advantages. The advantages include proper speedy construction, minim impact on the
business, utilization of eco-friendly materials, cost effective, attractive design as well as quality-
based construction (Sánchez 2015). It is found that the project manager generally plays an
important role in properly planning the cost of the project though the expenditure within the
modular theme based is quite less. Proper planning of project budget helps in finishing the
budget of the project within the budget that is expected in the initial project phase.
2c) Project management plan with standard system of time and resources
A project management plan is one of the planned as well as approved document that
helps in defining how the entire project gets executed, monitored as well as controlled. The
project management plan with proper system of resource and time generally include Gantt chart
as well as project evaluation and review technique.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
PROJECT MANAGEMENT
Gantt chart
Figure 2: Gantt chart
(Source: Created by Author)
Document Page
11
PROJECT MANAGEMENT
Critical path method
Figure 3: Critical path method
(Source: Created by Author)