BM522 Project Management 1 Report: Music Concert Analysis

Verified

Added on  2023/01/05

|18
|2175
|84
Report
AI Summary
This report, focusing on project management, details the organization of a music concert. It encompasses key elements such as network diagrams, stakeholder analysis, organizational structure, and work breakdown structure. The report also includes a comprehensive risk analysis, identifying and evaluating potential challenges. Furthermore, it addresses quality specifications, acceptance criteria, and project methodologies like the critical path method to ensure efficient project execution and successful outcomes. The report emphasizes the importance of effective project management in achieving objectives and highlights the need for strategic decision-making, stakeholder engagement, and proactive risk mitigation to ensure the concert's success. The report concludes by reiterating the value of project management in achieving organizational goals and fostering growth.
Document Page
BM522 Project Management
1
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Executive Summary
A project involves different type of functions and activities that are required to be fulfil in
order to assure positive outcomes. In this project management plays important role through
which all the activities can be fulfilled with higher efficiency. In this report a music concert is
going to be organised for which project management risk analysis, stakeholder analysis and other
important aspects is being covered.
2
Document Page
INTRODUCTION...........................................................................................................................5
MAIN BODY...................................................................................................................................5
TASK 1............................................................................................................................................5
Network diagram....................................................................................................................5
TASK 2............................................................................................................................................9
Stakeholder analysis...............................................................................................................9
TASK 3..........................................................................................................................................11
Organisational structure and Work break down structure....................................................11
TASK 4..........................................................................................................................................13
Risk analysis for 20 different risks.......................................................................................13
TASK 5..........................................................................................................................................15
Quality specification, Acceptance criteria, Quality expectation and measure in order to control
project quality.......................................................................................................................15
TASK 6..........................................................................................................................................16
Appropriate methodology for the project.............................................................................16
CONCLUSION..............................................................................................................................17
REFERENCES..............................................................................................................................18
3
Document Page
4
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
INTRODUCTION
Project management is termed as a process in which entity implement various methods,
skills, experience and processes with an aim to accomplish objectives and goals of a project in a
well defined and effective manner (Lannon and Walsh, 2020). With the help of efficient project
management company can underline time scale and budget through which all the activities and
functions can be fulfilled while assuring higher growth and success. Project management provide
a strategic direction through which an organisation can execute a project and can fulfill its goal
and objectives in a more unified and effective manner and can further fulfill desirable objectives
at higher efficiency.
Present report involves discussion upon certain form of activities that are required to be
undertaken by a project management in order to accomplish project objectives with more
effectiveness. Project revolves around a music concert which is required to be organised by
Camden Sickle Cell and Thalassaemia Service group in a collaborative manner. In addition to
this report include stakeholder analysis, work breakdown structure, network work diagram and
organisational structure through which project is subjected to be done in a systematic way. Risk
analysis is also included in this report in order to identify can overcome them as a pre-
determined result.
MAIN BODY
TASK 1
Network diagram
Network diagram is acts as a picture of various activities and functions of a project that
duly develops relationship among different activities which is going to be accomplished during
the project diagram. It increases efficiency to accomplish project with more effectiveness.
Further it has been underlined by taking assistance of network diagram visual representation can
be undertaken. This allows in making connection among different activities. In context with
5
Document Page
present scenario network diagram of music event in a more systematic and efficient manner is
being defined:
6
Document Page
Illustration 1: Self generated. 2020
(Source: Self generated. 2020)
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Illustration 1: Self generated. 2020
(Source: Self generated. 2020)
The above diagram is prepared through underneath basis
Early Start Activity Number Early finish
Slack
time
ACTIVITY NAME
Late Start Duration Late Finish
8
Document Page
TASK 2
Stakeholder analysis
Stakeholder Analysis:
Within these Framework activities of a project can be done in most unified and efficient
manner while emphasizing upon need and interest of stakeholders. In addition to this, it has been
evaluated with the help of stakeholder analysis stakeholder expectations can be monitored in a
closed manner.
9
Document Page
Illustration 1: Self created. 2020
High power and high interest:
In this, those investors are included those who invested in funds to accomplish project
activities. These stakeholders have high interest as well as powers and further are required to be
managed and monitor in effective manner.
Low power and low interest:
In this, segment audience are mainly thoughtful but are required to be monitor.
Furthermore, in this project manager must be sure to avoid any form of energy and waste of
communication (Caramia, 2020).
High power and low interest:
In this, town community is underlined it has been identified that these groups have
interest from project but are only require to change so that important and necessary information
on regular basis.
Low power and high interest:
In this category participant and organisers falls, both of these parties are having high rate of
interest in project success that makes project manager to effectively make balance of providing
information to these groups on timely manner.
10
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
TASK 3
Organisational structure and Work break down structure
Work breakdown structure is a structural tool that allows to break down complex activities
of project in the easily and manageable manner. With the help of breakdown structure all the
activities can be done with more effective manner in a perfect time frame. By taking assistance
of work breakdown structure all the activities of music event can be done in more effective
manner. With the assistance of WBS all the activities can be undertaken in a manageable
manner. In addition to this, it has been identified that work break structure allows entity to
effectively break down complex activities and manage then in a well define and effective
manner.
11
Document Page
Organisational structure is termed as a system that duly underlines way in which activities of
a project can be done by taking a proper direction. In context with present scenario an
organisational structure is being duly designed by emphasizing upon all the essential activities of
to assure success of a project. By taking assistance of organisational structure event manager can
allot roles and responsibilities to individual as per according to their interest and specialisation.
12
chevron_up_icon
1 out of 18
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]