Networking Project: Infrastructure Implementation and Review

Verified

Added on  2023/01/12

|15
|1126
|83
Project
AI Summary
This project report details a networking project undertaken for Diamond Video Rentals. The project encompasses multiple tasks, including hardware evaluation of laptops from various suppliers, evaluation of methodologies, and the creation of an infrastructure implementation plan with a Gantt chart outlining the project timeline. The report includes a data flow diagram, data dictionary, and work breakdown structure. It also presents identified control structures and a project review, confirming the project's completion within the allocated timeframe and budget. Furthermore, the project incorporates a feedback gathering process through a survey and an evaluation of the collected responses to assess user satisfaction and identify areas for improvement, such as the implementation of wireless access.
Document Page
Running head: NETWORKING PROJECT
Networking Project
Name of the Student:
Name of the University:
Author Note
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
NETWORKING PROJECT
Task 8: Hardware Evaluation
Hardware Evaluation Sheet
Evaluation Date:
Document Version
Control
Evaluated By: Dated:
General Description
of Item
Descriptons Supplier 1 Supplier 2 Supplier 3
Supplier Name Hp Lenovo Dell
Website Amazaon Amzaon Amazon
Equipment Name /
Model
Laptops HP Stream 14-
inch Laptop,
Intel Celeron
N4000
Processor, 4
GB RAM, 64
GB eMMC,
Windows 10 S
with Office
365 Personal
Lenovo
Chromebook
C330 2-in-1
Convertible
Laptop, 11.6-
Inch HD (1366
x 768) IPS
Display,
MediaTek
MT8173C
2017 Dell Inspiron 7000
13.3" 2-in-1 Full HD
Touchscreen Convertible
Laptop, 7th Intel Core i5-
7200u, 8GB DDR4 RAM,
256GB SSD, Backlit
Keyboard, Bluetooth, HDMI,
802.11AC, Windows 10-
Silver
Document Page
2
NETWORKING PROJECT
for one Year
(14-cb190nr,
Gray)
Processor,
4GB LPDDR3,
64 GB eMMC,
Chrome OS,
81HY0000US,
Blizzard White
Criterion / Features
Mandato
ry /
Rating
Guide
Relative
Importan
ce
Comme
nt
Scor
e
(0 to
10)
Comme
nt
Scor
e
(0 to
10)
Comment Scor
e
(0 to
10)
Cost
Cost of
the
device 10 More 7.00 Cheap 8.00 Costly 2.00
Delivery 5 Free 9.00
Not
Free 5.00 free 9.00
Efficiency 20 High 9.00
Modera
te 8.00 High
10.0
0
Maintainance 15 High 5.00 Low 8.00 low 9.00
Total 50 30 29 30
Document Page
3
NETWORKING PROJECT
Task 9: Evaluate Methodology
The purpose of the research is to evaluate a wide range of traditional and nontraditional
methodologies. This can be used for the purpose of developing the new computerized system
that will help in the working of company and will ensure proper way of maintaining the
documents. Moreover with the use of evaluation and requirements methodology the project
specification can be done efficiently.
Task 10: Infrastructure Implementation Plan
Network Installation Plan
Task Days Start Date Finish Date Predecessor
Network Installation for Diamond
Video rentals 41 days
6/3/2019
8:00
7/29/2019
17:00
Initiation Phase 13 days
6/3/2019
8:00
6/19/2019
17:00
Client Meeting 1 day
6/3/2019
8:00
6/3/2019
17:00
Budget Allocations 2 days
6/4/2019
8:00
6/5/2019
17:00 3
Requirement Gathering 10 days
6/6/2019
8:00
6/19/2019
17:00
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4
NETWORKING PROJECT
Current Network Analysis 4 days
6/6/2019
8:00
6/11/2019
17:00 4
Hardware Requirement
Identification 4 days
6/12/2019
8:00
6/17/2019
17:00 6
Supplier Identification 2 days
6/18/2019
8:00
6/19/2019
17:00 7
Planning Phase 7 days
6/20/2019
8:00
6/28/2019
17:00
Requirement Specification 2 days
6/20/2019
8:00
6/21/2019
17:00 8
System Design 3 days
6/24/2019
8:00
6/26/2019
17:00 10
Network Design 2 days
6/27/2019
8:00
6/28/2019
17:00 11
Implementation Phase 21 days
7/1/2019
8:00
7/29/2019
17:00
Hardware procurement 7 days
7/1/2019
8:00
7/9/2019
17:00 12
Network Setup 7 days 7/10/2019 7/18/2019 14
Document Page
5
NETWORKING PROJECT
8:00 17:00
Network Configuration 7 days
7/19/2019
8:00
7/29/2019
17:00 15
Data Flow Diagram
Document Page
6
NETWORKING PROJECT
Data Dictionary
Customer
Attribute Data Type Size Key field
CustomerID int Primary Key
CustomerName String 30
CustomerAddress String 50
CustomerContact Number 10
Video
Attribute Data Type Size Key field
VideoID int Primary Key
TitleID int Foreign Key
NumberOfCopies Number 10
Rate Number 10
Stock Boolean
Titles
Attribute Data Type Size Key field
TitleID int Primary Key
Author String 40
Rent
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
NETWORKING PROJECT
Attribute Data Type Size Key field
RentID int Primary Key
CustomerID int Foreign Key
VideoID int Foreign Key
Charge Number 10
Payment
Attribute Data Type Size Key field
PaymentD int Primary Key
RentID int Foreign Key
Amount Number 10
Task 11: Project Planning
Work breakdown Structure
Network Installtion for
Daimond Video rentals
Initiation Phase
Client Meeting Budget Allocations Requirement Gathering
Current Network Analysis Hardware Requirement
Identification
Supplier Identification
Planning Phase
Requirement
Specification
System Design Network Design
Implementation Phase
Hardw are procurement Network Setup Network Configuration
Document Page
8
NETWORKING PROJECT
Gantt chart
Task 12: Identified Control Structures
Task Input Output
Network Installation for Diamond Video rentals
Initiation Phase
Client Meeting Fix Meeting Project Approval
Budget Allocations Propose budget Budget Approval
Requirement Gathering
Current Network Analysis Visit Site
Requirements
identified
Hardware Requirement Identification Visit Site Hardware identified
Document Page
9
NETWORKING PROJECT
Supplier Identification Search Suppliers Select Suppliers
Planning Phase
Requirement Specification Analyze System
Specify
Requirements
System Design Develop Design Finalize Design
Network Design Develop Design Finalize Design
Implementation Phase
Hardware procurement Collect materials Make payments
Network Setup Set up network
Ready for
configurations
Network Configuration
Configure
network Ready for use
Task 13: Project Review
The project has been completed within the allocated time. The project was completed in
41 days. In addition to this the budget specified at the start of the project as sufficient enough to
complete the project in time.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10
NETWORKING PROJECT
Task 15: Gather Feedback
For gathering the feedback the survey done below was performed:
The survey questions are:
Are the communication facility efficient enough in the network?
Are the file management functionalities working properly in the network?
Does the network provide an wireless access
Is the there is lack in the security feature of the network?
Does the network hamper your Privacy?
The link for the form is provided below:
https://forms.gle/Ttcc4nE6nYgydDHb9
Task 16: Evaluate Feedback
The responses were collected from 5 users in the network. The evaluation of the
feedbacks is provided below:
Document Page
11
NETWORKING PROJECT
Document Page
12
NETWORKING PROJECT
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13
NETWORKING PROJECT
Thus from the above results it can be inferred that the network which has been developed
is pretty useful for the users, however the implementation of the wireless access in the network
would enhance the network immensely.
Document Page
14
NETWORKING PROJECT
Bibliography
Brown, K.A., Domke, J. and Matsuoka, S., 2015, December. Hardware-centric analysis of
network performance for MPI applications. In 2015 IEEE 21st International Conference on
Parallel and Distributed Systems (ICPADS) (pp. 692-699). IEEE.
Trevisan, M., Finamore, A., Mellia, M., Munafò, M. and Rossi, D., 2016. DPD-KStat: 40Gbps
statistical traffic analysis with off-the-shelf hardware. Technical report.
Vega, C., Roquero, P. and Aracil, J., 2017. Multi-Gbps HTTP traffic analysis in commodity
hardware based on local knowledge of TCP streams. Computer Networks, 113, pp.258-268.
Ventura, D., Gómez-Goiri, A., Catania, V., López-de-Ipiña, D., Naranjo, J.A.M. and Casado,
L.G., 2015. Security analysis and resource requirements of group-oriented user access control for
hardware-constrained wireless network services.
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]