This report delves into the project selection methods for developing a new Uber application. It begins by outlining various techniques, including Net Present Value (NPV), Discounted Cash Flow (DCF), Strategic Fit, and the 80/20 rule, to aid in making informed decisions regarding project viability and sustainability. The report then transitions to the initial process group within the PMBOK framework, emphasizing the importance of the project charter and stakeholder register. It details the input processes, such as scope management, requirement management, and stakeholder management plans, as well as the tools and techniques necessary for gathering comprehensive inputs. The document highlights the importance of these steps in ensuring the successful development and launch of the new Uber application, demonstrating a comprehensive understanding of project management principles.
Document Page
Running head: UBER NEW APPLICATION
UBER NEW APPLICATION
Name of the Student
Name of the University
Author note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
UBER NEW APPLICATION
Table of Contents
Background......................................................................................................................................2
PART 1............................................................................................................................................2
PART 2............................................................................................................................................5
Initial process group....................................................................................................................5
Input process................................................................................................................................6
Reference.........................................................................................................................................8
Document Page
2
UBER NEW APPLICATION
Background
Uber is a thriving organization that is based on the audience base that it has created with
the help of improving the communication standard around the globe. The business organization
is highly dependent on the drivers and workers. There are a total of 3 million drivers of Uber
located across the globe. This proves the intensity of business making that Uber is doing.
Business of Uber is completely based on the application that is used by the drivers. This
application is the driving force of the business organization. The drivers follow the commands
that are provided by the application. Hence the application that I used by the driver must be easy
to use. Hence complexity must be reduced. Despite reducing of the complexity of the application
thee main concern that is taken into consideration is that depth of the application must not be
reduced.
PART 1
Project Selection methods that can be used for developing the new Uber application
The methods that will be implemented in making proper decisions regarding decision
making of project selection are calculation of the Net Present Value, calculation of the discount
cash flow, Strategic fit rule can also be performed in order to make the decisions regarding
choosing of the project, Usage of 80/20 rule can also be used in decision making (Gonçalves &
Von Wangenheim 2016). This methods will be used for better commencing of the development
process of the Uber application. These varied methods will ensure that the commencing of the
project will be performed as per decisions that will be made as per the commencement of the
system of uber application. These technologies will help in better understanding of the
sustainability of the project (Varajão, Colomo-Palacios & Silva 2017).
Document Page
3
UBER NEW APPLICATION
Calculating Net Present value
Net Present value is concerned about the functioning of the difference that will be present
in between the cash that is inflowing and the cash that is being out flowing. Net Present value
calculation of the newly developed Uber application will help in better understanding of the
sustainability of the entire project. This is one of the major aspect that will help in calculating the
prospect of capital budgeting (Dudley, Banister & Schwanen 2017). This calculation of the
budgeting process includes the aspect that deployment decision making can be performed. With
this process the main advantage that will be present includes better estimation of retrieving
period of money. This is one of the major aspect that helps in better commencing of the project.
This will help the board of directors to calculate the profits that will be earned in the recent
times. Hence managing of the process will ensure that proper management of the Uber
Application can be performed in a better manner (Hayes, Snow & Altuwayjiri 2017). The
discount rates or the amount that can be earned as per alternate means are also considered in this
system. Hence proper decision making can be made regarding accepting the project of
developing of the Uber application. Designing of the new Uber application must be performed
only if the Net present Value of the Uber application will be high.
Discount Cash Flow
Discounted cash flow has been one of the major aspect that has been affecting the project
functioning in a manner that has been performing in a better manner. This will help in
calculating the processes that will help in better understanding of the entire aspect of the project
scenario. This will ensure that newly developing Uber application election model will be
performed as per understanding of the entire scenario will get enhanced as the evaluation of the
investments that are being made presently (Rogers 2015). This values are calculated with the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
UBER NEW APPLICATION
future estimated interest rates. This will ensure that functioning of the entire system will get
functional as per deciding regarding choosing the project of developing of the new Uber
application. It is expected that the project with higher DCF that the cost that is incurred in the
developing Uber application can be accepted and if the DCF is lower than that of the cost that is
incurred in the developing process, the project must not be taken and hence proper decision
making can be performed.
Strategic Fit
Strategic Fit is one of the best decision making tool and method that can be used for
deciding whether to take up the new project of creating of a less complex application. This
process ensures that commencing of the entire system as proper definition of scope will be done.
This definition of scope will be performed form both the board of directors and the developing
team. Strategic fit is used for proper decision making of the starting developing of the new Uber
app because the function of the entire system will start only if the scope of both the developing
team and the board of directors will be same (Cohen et al., 2016). Proper negotiation process will
be performed in order to start the developing team. In case the negotiation process is not
performed in a proper manner, developing process stops. Hence this process will also help in
understanding the viability of the project. With the help of the understanding of viability of the
development process, will help in better processing of decision making. This also helps in
understanding the difference of the scope set of both the developing team and the board of
directors and analysis of both their protocols must be made (Glöss, McGregor & Brown 2016).
80/20 Rule
Document Page
5
UBER NEW APPLICATION
The 80/20 rule is highly used in decision making regarding the selection of whether to
start the developing of New Uber application. This is one of the major aspect that benefits the
functioning of the system. With the help of the 80/20 rule, the developing team gets to
understand the aspect that after completion of the 20% of the project, issues that might arise after
completion of the 80% of the app developing process can be well understood. Hence proper
management of the decision making gets performed. Hence this evaluation will help in
understanding the process and this is one of the major aspect that decision making can be
performed in an efficient manner (Mittendorf 2017).
PART 2.
Initial process group
The major terminologies that are included in the initiation stage of PMBOK, developing
of the project charter of the newly developing uber application. Usage of the Stakeholder register
is also beneficial in the commencing of the entire scenario. This will benefit the functioning of
the newly developing Uber application.
Project Charter
Project charter is one of the documentation process that helps in better processing of the
developing process. The main aspect that is taken into consideration includes proper
management of the developing of the new Uber app. This ensures the fact that the developing of
the new Uber application will ensure the fact that the functioning of the Uber application will be
well described in the project charter (Bitran 2016). The project charter of the new developing
Uber application includes documentation of the reasons that are required for better understanding
of the project. Outlining the processes that will be required includes better provisioning of the
Document Page
6
UBER NEW APPLICATION
output that might be received for the application. Basic solutions to the issues that are present in
the processing of the application is also stated in the project charted. Project charter also helps in
better understanding of the stakeholders of the project.
Stakeholder register
Stakeholder register performing is very important. The main reason behind performing of
the project includes better understanding of the stakeholders who are responsible for their duties
and job aspects of new Uber application that is being developed. Allotment of task to the
stakeholder is one of the main responsibility of the Uber application. This performing of the
basic understanding of the Uber application helps in better estimation of the time schedule that is
needed in the functional process. Responsibilities of the stakeholders are well responsible for the
entire system.
Input process
The input processes of PMBOK that must be used in the processing of the developing
process of the new Uber application. The Input process includes Scope management plan,
requirement management plan, stakeholder management plan, project charter, stakeholder
register. Scope management will be used for understanding thee goal of the newly developing
application of Uber. Requirement management plan will help in gaining inputs regarding the
resources that will be required for completion of the developing process of the new Uber app.
Stakeholder management plan will help in providing proper input regarding managing the
stakeholders of the business organisation (Moon 2015). This ensures the fact that processing of
the entire scenario will be affected in a positive manner as the developing of the new Uber
application will be knowing which stakeholder will be responsible for performing the
responsibilities. Project charter is the ultimate documentation that is used for approval of the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
UBER NEW APPLICATION
starting of the development of the Uber application project. The tools that can be used by the
developing team of the Uber application includes taking of interviews. This will help in proper
understanding of the view points of the internal as well as external stakeholders. Understanding
of the facilitated workshops ill hep in bettering of the inputs that are provided. Developing
prototype of the application will also help in proper provisioning of the input process.
Document Page
8
UBER NEW APPLICATION
Reference
Bitran, A. D. (2016). The Uber Innovations That Lyfted Our Standards out of Thin Air [BnB],
because Now, There's an App for That. Elon L. Rev., 8, 503.
Cohen, P., Hahn, R., Hall, J., Levitt, S., & Metcalfe, R. (2016). Using big data to estimate
consumer surplus: The case of uber (No. w22627). National Bureau of Economic
Research.
Dudley, G., Banister, D., & Schwanen, T. (2017). The rise of Uber and regulating the disruptive
innovator. The political quarterly, 88(3), 492-499.
Glöss, M., McGregor, M., & Brown, B. (2016, May). Designing for labour: uber and the on-
demand mobile workforce. In Proceedings of the 2016 CHI conference on human factors
in computing systems (pp. 1632-1643). ACM.
Gonçalves, R. Q., & Von Wangenheim, C. G. (2016, April). An instructional unit for teaching
project management tools aligned with PMBOK. In 2016 IEEE 29th International
Conference on Software Engineering Education and Training (CSEET) (pp. 46-55).
IEEE.
Hayes, D. R., Snow, C., & Altuwayjiri, S. (2017). Geolocation Tracking and Privacy Issues
Associated with the Uber Mobile Application. In Proceedings of the Conference on
Information Systems Applied Research (Vol. 2167, p. 1508).
Mittendorf, C. (2017, January). The implications of trust in the Sharing Economy–an empirical
analysis of uber. In Proceedings of the 50th Hawaii International Conference on System
Sciences.
Document Page
9
UBER NEW APPLICATION
Moon, Y. (2015). Uber: changing the way the world moves. Harvard Business School,
Case, 101.
Rogers, B. (2015). The social costs of Uber. U. Chi. L. Rev. Dialogue, 82, 85.
Varajão, J., Colomo-Palacios, R., & Silva, H. (2017). ISO 21500: 2012 and PMBoK 5 processes
in information systems project management. Computer Standards & Interfaces, 50, 216-
222.
chevron_up_icon
1 out of 10
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]