Niagara Falls Tourism Development Consultant Report

Verified

Added on  2022/08/18

|5
|695
|14
Report
AI Summary
This report, prepared as a consultant's analysis, focuses on the tourism development of Niagara Falls. It identifies key issues and problems faced by the site, including seasonal shifts, heavy rain events, and heat waves, all of which are exacerbated by climate change. The report categorizes Niagara Falls as a B1 asset, with high to moderate market appeal but low robusticity. To address these challenges, the report proposes several solutions, including the implementation of a Niagara Climate Action Plan, neighborhood planning to protect infrastructure, climate change risk assessments, adaptation workshops, and the integration of climate considerations into infrastructure design. The report provides a detailed overview of the site's challenges and offers a comprehensive set of recommendations to ensure the long-term sustainability of the destination.
Document Page
Running head: TOURISM DEVELOPMENT
TOURISM DEVELOPMENT
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1TOURISM DEVELOPMENT
Answer to Question 6
Problems and Issues being faced by the Niagara Falls
As the destination can be mentioned to be a tourist destination, the different issues and
problems which are currently being faced by the site can be mentioned to be as follows:
1. Seasonal shifts: There takes place considerable seasonal shifts in the particular region
which then leads to problems related to management of the water flow and the tourism
aspect. In addition to this, as the climate change has been a constant issue in the globe,
the tourist destination is greatly impacted by the operations of the climate change and this
leads to the tourist activity becoming quite difficult to manage and the tourist demand
also gets affected (Ijc.com ,2020).
2. Heavy rain events: Another issue relating to the climatic problems which are being faced
by the destination can be mentioned to be the issue relating to the management of the
climatic conditions (Niagararegion.ca ,2020). In association with this, it can be
essentially mentioned that, very often the area received heavy rains and in association
with this, it becomes increasingly difficult for the association manage the various
operations in an adequate manner.
3. Hot days and heat waves: There are many days as faced by the Tourist destination
whereby there exists hot days and heat waves which makes the footfall considerably low
and affects successful operations.
Document Page
2TOURISM DEVELOPMENT
High D1 C1 A1
Robusticity
D2 C2 A2
D3 B2 B1
Niagara
Falls
Low Low High
Market Appeal
From the Market Appeal-Robusticity matrix of tourism Potential, it can be rightfully
mentioned that, the Niagara Falls belongs to the B grade assets which have high to moderate
market appeal but are very low in Robusticity. Here Robusticity can be defined as the fragility of
the tourist destination. Hence, Niagara in this scenario belongs to B1.
Answer to Question 7
Solutions
As observed from the given solution and the matrix placement it can be rightfully
mentioned that the given plan has to be adopted by the enterprise to deal with the problems and
come up with an adequate plan to solve the same:
Niagara Climate Action Plan: An action plan needs to be adequately formulated by the
different authorities with the assistance of which the protection of the critical
infrastructure can be undertaken with respect to the climate change.
The firm would also be required to engage in neighbourhood planning so that the nearby
areas of the Niagara can be protected accordingly so as to see to it that, the nearby areas
can be adequately saved from the destruction caused by climate change and related
activities (Healy, 2006).
Document Page
3TOURISM DEVELOPMENT
Another initiative which has to be adopted by the enterprise can be successfully
mentioned to be to engage in a climate change risk assessment whereby an assessment of
the infrastructure near Niagara will be undertaken.
Another solution for the problems being faced by the enterprise can be mentioned to be
the adaptation workshop whereby the assessment and mapping of the future flood risks
will be undertaken. In addition to this, the need to undertake climate changes before
designing infrastructure will also be undertaken (McKercher & Du Cros, 2002).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4TOURISM DEVELOPMENT
References
Healy, R. G. (2006). The commons problem and Canada’s Niagara Falls. Annals of Tourism
Research, 33(2), 525-544.
Ijc.com (2020). Niagara Falls [online]. Available at: https://www.ijc.org/en/niagara-falls-moving
(Retrieved on: 06 March. 2020).
McKercher, B., & Du Cros, H. (2002). Cultural tourism: The partnership between tourism and
cultural heritage management. Routledge.
Niagararegion.ca (2020). Niagara Falls [online]. Available at:
https://www.niagararegion.ca/government/planning/pdf/climatechangerport.pdf
(Retrieved on: 06 March. 2020).
chevron_up_icon
1 out of 5
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]