Network Requirement Analysis and Plan: Obbario Office Network Design

Verified

Added on  2025/08/26

|20
|1505
|298
AI Summary
Desklib provides solved assignments and past papers for students.
Document Page
Advanced Network Design
19
Network Requirement
Analysis and Plan
Assignment 1
Author ID
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Contents
1 Project Outline..........................................................................................................................................4
Industry Visit................................................................................................................................................4
Meeting with Industry Professional: Data gathered for network design.................................................4
2 Network Design for Obbario Offices.........................................................................................................4
Tabular IP Addressing..............................................................................................................................5
Usage of Static and Dynamic Routing || Access Control List...................................................................5
Configuration of router #2:..................................................................................................................7
3. Network Configuration............................................................................................................................8
Communication between PCs..............................................................................................................8
Switch configuration..............................................................................................................................10
Step 1:................................................................................................................................................11
Step 2:................................................................................................................................................11
Step 3:................................................................................................................................................11
Router Configuration:............................................................................................................................12
Host configuration:................................................................................................................................14
AP and Server Config. Guidelines..........................................................................................................16
4. Timeline and Budget estimation............................................................................................................16
Human resources and logistics..............................................................................................................17
Timeline Specifications..........................................................................................................................17
References.................................................................................................................................................18
Annex: Industry Visit Evidence..................................................................................................................19
Document Page
Figure 1: Network Design (20 PCs, 6 Switches, 3 routers)...........................................................................4
Figure 2: Creating vlan.................................................................................................................................4
Figure 3: Access Point connection with routers through switches..............................................................5
Figure 4 1st router protocol setting.............................................................................................................6
Figure 5 Router 0 protocol setting...............................................................................................................7
Figure 6: Router 2 protocol setting..............................................................................................................7
Figure 7: Router 2 protocol setting..............................................................................................................8
Figure 8 simulator diagram..........................................................................................................................8
Figure 9 pinging the 192.168.168.0.............................................................................................................9
Figure 10 Pinging from PC zero to PC one.................................................................................................10
Figure 11: Switch configuration.................................................................................................................10
Figure 12: Switch configuration.................................................................................................................11
Figure 13: Switch configuration.................................................................................................................11
Figure 14: Switch configuration.................................................................................................................12
Figure 15: Configuration of Router............................................................................................................12
Figure 16: Configuration of Router............................................................................................................13
Figure 17: Configuration of Router............................................................................................................13
Figure 18: Configuration of Router............................................................................................................14
Figure 19 Gateway IP address of Host.......................................................................................................15
Figure 20 Creating subnet marks of network............................................................................................15
Figure 21 Access point setting...................................................................................................................16
List of Tables
Table 1: IP and Subnet marks Table.............................................................................................................5
Table 2: timeline........................................................................................................................................17
Document Page
1 Project Outline
In this project, we first have made an industry visit, analyzed its number of rooms, computers in each
room, and network requirements to be fulfilled. Then a diversified network has been designed including
20PCs that are interconnected through 6 switches. Component cast off are designed in this network for
one department, placing of host at one AP. Further AP’s are connected via router by switches. Proper
configuration and testing is applied to the whole network components such as hosts, switches and
routers. A proper hardware requirement plan with timeline estimation is also attached in report.
Industry Visit
On visiting obbario offices, with almost 20 rooms in a department are available. Evidence of the visiting
is in appendix for reference.
Meeting with Industry Professional: Data gathered for network design
Network system in industry was totally unforgettable because of management as well as the designs. In
industry there were different departments and each department is connected with the central unit.
Every department was communicated with the other department through Network system. The pcs
which were using departments called host and each of them are connected with the router via switches.
The router was making VLAN with the other networking communication with other connected routers
. To understand this system I tried to learn the protocol which they were following in order to
maintain the network systems.
2 Design of Network for Obbario Offices
In the below image Network system is designed according to this 20 pc’s are attached with the 6
different switches which are combined different departments and these 6 switches are connected with
the 3 router which make the VLAN [1]. Every router is connected with its adjacent router via a line are
able to communicate via specific protocol.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Figure 1: Network Design (20 PCs, 6 Switches, 3 routers)
Figure 2: Creating vlan
Network system is designed according to the given instruction of above and in this networking system
the component which are used are designed for the one department in which all the hosts are
connected at one access point and that point is connected with the router through the switch [2].
Document Page
Figure 3: Access Point connection with routers through switches
Tabular IP Addressing Scheme
Table 1: IP and Subnet marks Table
IP address DHCP IP Subnet marks
169.254.94.107 255.255.0.0
169.254.124.46 255.255.0.0
169.254.74.168 255.255.0.0
169.254.152.139 255.255.0.0
169.254.107.130 255.255.0.0
Usage of Static and Dynamic Routing
In Network system, selection of techniques varies according to the industry, for instance, in case of small
industry ,I will prefer the RIP protocol as there are limited hosts and OSPF which will follow routing
which is dynamic and in the given network the open shortest path first protocol is followed and this
protocol provides the efficient routing in an industrial level [3].
At industrial level the departments are divided into different parts and sub parts in the above design
static routing is used in the sub parts and in essential departments dynamic router is used.
Document Page
Figure 4 1st router protocol setting
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Figure 5 Router 0 protocol setting
Configuration of router #2:
Figure 6: Router 2
Document Page
Figure 7: Router 2 protocol setting
3. Network Configuration
Packet Tracer provides us complete image of network and its working.
Figure 8 simulator diagram
Communication between PCs
After configuration of pcs, switches and servers system network is ready to communicate with one
another. To check the communication, the response can be checked by pinging the two pcs.
Document Page
In the blow command prompt, the address of one pc 192.168.1.0 is pinged with the other pc and also
second pc is replying [4]. Similarly, communication of every pcs can be connected with one another. The
ping cammand is working for every device, this command ensure that the packet of information can be
send from one node to another node. After sending the packets the positive response can be achieved.
Figure 9 pinging the 192.168.168.0
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Figure 10 Pinging from PC zero to PC one
Switch configuration
In the dynamic routing switch is configured via ports the commands are mentioned below.
Figure 11: Switch configuration
Document Page
Step 1: Provide the IP address and subnet marks of router to create the strong wire wall between the
networks.
Step 2: create an IP address inside the network and every department will use this IP address to
communicate with the PCs which are attached with switches.
Figure 12: Switch configuration
Step 3: Pc of every department will be use same level of dynamic ip address. There will no static ip.
Figure 13: Switch configuration
chevron_up_icon
1 out of 20
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]