Project Management Plan for Oil Tank Refurbishment
VerifiedAdded on 2025/04/15
|17
|2856
|179
AI Summary
Desklib provides past papers and solved assignments for students. This project details the complete management plan for oil tank refurbishment.

Assessment 4 Complete Project Documentation
Page | 1
Page | 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
Introduction......................................................................................................................................3
Implementation Plan....................................................................................................................4
Project Management Plan............................................................................................................9
Project Performance Evaluation.................................................................................................12
Project Closure...........................................................................................................................13
Conclusion.....................................................................................................................................16
References......................................................................................................................................17
Page | 2
Introduction......................................................................................................................................3
Implementation Plan....................................................................................................................4
Project Management Plan............................................................................................................9
Project Performance Evaluation.................................................................................................12
Project Closure...........................................................................................................................13
Conclusion.....................................................................................................................................16
References......................................................................................................................................17
Page | 2

Introduction
Project Management is considered as an essential part of projects conducted by the organisation.
Project management provides assistance in managing and controlling the activities involved in
the project and makes sure that desired goals and objectives are accomplished as per developed
plans or strategies. It is essential that such activities or tasks are managed properly. In a project,
there are various factors which are to be controlled by the manager of the project. This includes
the cost of the project, time frame, resources, etc. This assignment is based on the plans
developed under project management. The development of these plans takes place in the form of
the document. These plans include a management plan, implementation plans, evaluation of
performance and project closure. A case scenario of the large international organisation
operating in the oil industry is provided under this assignment which includes certain issues and
management of operations and the functions of the organisation.
Page | 3
Project Management is considered as an essential part of projects conducted by the organisation.
Project management provides assistance in managing and controlling the activities involved in
the project and makes sure that desired goals and objectives are accomplished as per developed
plans or strategies. It is essential that such activities or tasks are managed properly. In a project,
there are various factors which are to be controlled by the manager of the project. This includes
the cost of the project, time frame, resources, etc. This assignment is based on the plans
developed under project management. The development of these plans takes place in the form of
the document. These plans include a management plan, implementation plans, evaluation of
performance and project closure. A case scenario of the large international organisation
operating in the oil industry is provided under this assignment which includes certain issues and
management of operations and the functions of the organisation.
Page | 3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Implementation Plan
Such plan is termed a significant part which plays its part in making sure that the project
performance takes place in accordance with formulated plans and desired goals or objectives are
accomplished. This means that according to the implementation plan, application of the plans
related to the projects is made adequately. There is the number of activities which are included in
this plan, the definition of proper duties and authorities are also specified in this plan. As the
market is uncertain, the project manager is required to make certain assumptions and establish
certain limits for the project. There are various aspects to which such assumptions are related and
these aspects incline budget development, time schedule, and human and financial resources in
which reforms take place from time to time. Implementation of technology is done by the
management of the organisations with the view of resolving the issues being faced by the
organisation.
Project Aims and Goals
Aims
The aim of the project at making tanks repair, repainting them with a view of fixing the leakage
and ensuring environmental protection.
Goals
The project goals are provide below:
Cleaning and repainting the three tanks storing oil available at Western Australian center
of the organisation.
Carrying out refurbishment of the tanks which a different number of steel patches and
steel anchors as per their size.
Completion of the refurbishment of tanks within a period of 2 months.
Ensuring environment protection by eliminating the loop of leakage of petroleum
products.
Making use of appropriate technology and plans for accomplishing the aims.
Page | 4
Such plan is termed a significant part which plays its part in making sure that the project
performance takes place in accordance with formulated plans and desired goals or objectives are
accomplished. This means that according to the implementation plan, application of the plans
related to the projects is made adequately. There is the number of activities which are included in
this plan, the definition of proper duties and authorities are also specified in this plan. As the
market is uncertain, the project manager is required to make certain assumptions and establish
certain limits for the project. There are various aspects to which such assumptions are related and
these aspects incline budget development, time schedule, and human and financial resources in
which reforms take place from time to time. Implementation of technology is done by the
management of the organisations with the view of resolving the issues being faced by the
organisation.
Project Aims and Goals
Aims
The aim of the project at making tanks repair, repainting them with a view of fixing the leakage
and ensuring environmental protection.
Goals
The project goals are provide below:
Cleaning and repainting the three tanks storing oil available at Western Australian center
of the organisation.
Carrying out refurbishment of the tanks which a different number of steel patches and
steel anchors as per their size.
Completion of the refurbishment of tanks within a period of 2 months.
Ensuring environment protection by eliminating the loop of leakage of petroleum
products.
Making use of appropriate technology and plans for accomplishing the aims.
Page | 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Implementation Defining
As the project aims at repairing and refurbishment of the tanks storing oil or petroleum products
located at west side of Australia, it essential that the adoption of the phased approach is made for
dividing different activities into the different phases. At the time of completion of one phase,
next phase is commenced. As there are various activities in a project, the performance of such
different phases is an ongoing process which ends with the completion of the project. Such
approach divides the activities into different and smaller tasks which are easily completed and
contributes to the attainment of the project goals not having an impact on the operating and
functional activities of the organisation.
Point of Contact
It is well established that tasks or activities must be assigned to the specified teams having
expertise on such activities or task as per its nature. This provides assistance in the proper plans
implementation. The roles played in the project as provide below:
Role Name Contact Details
(Number/ Email)
Project Manager
Sponsor
Project Officer (Government)
Technical Head
Site General Manager
Page | 5
As the project aims at repairing and refurbishment of the tanks storing oil or petroleum products
located at west side of Australia, it essential that the adoption of the phased approach is made for
dividing different activities into the different phases. At the time of completion of one phase,
next phase is commenced. As there are various activities in a project, the performance of such
different phases is an ongoing process which ends with the completion of the project. Such
approach divides the activities into different and smaller tasks which are easily completed and
contributes to the attainment of the project goals not having an impact on the operating and
functional activities of the organisation.
Point of Contact
It is well established that tasks or activities must be assigned to the specified teams having
expertise on such activities or task as per its nature. This provides assistance in the proper plans
implementation. The roles played in the project as provide below:
Role Name Contact Details
(Number/ Email)
Project Manager
Sponsor
Project Officer (Government)
Technical Head
Site General Manager
Page | 5

Quality Assurance Manager
Manager of Database
System Developer
Compliance/ Legal Officer
Security Officer
IV&V Representative
Project Management Structure
It is well known that various issues are faced by the manager of the project and other related
personnel within a project which influences operating and functional activities involved in the
project. Issues are also faced by multinational organisations due to different cultures (Basili,
et.al, 2014). For proper management of the operations, it is essential that the management of the
organisation is structured properly. The structure of the project management is provided below:
Page | 6
ProjectmanagerSystemDeveloperSiteGeneralManagerSecurityOfficerDatabaseManagerSponsor
Manager of Database
System Developer
Compliance/ Legal Officer
Security Officer
IV&V Representative
Project Management Structure
It is well known that various issues are faced by the manager of the project and other related
personnel within a project which influences operating and functional activities involved in the
project. Issues are also faced by multinational organisations due to different cultures (Basili,
et.al, 2014). For proper management of the operations, it is essential that the management of the
organisation is structured properly. The structure of the project management is provided below:
Page | 6
ProjectmanagerSystemDeveloperSiteGeneralManagerSecurityOfficerDatabaseManagerSponsor
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Major Tasks
In the given scenario, there is a large organisation which means that various activities or tasks
are the part of the refurbishment projects. Repairing and refurbishment of the projects are
required to be done for providing environmental protection. Moreover, sustaining of penalties is
also suffered by the organization. It involves a series of steps in which performance of such
project must be made which are provide below:
Current Conditions Evaluation
Estimating cost
Funds arrangement
Proposal Development
Resource Allocation
Designing
Contract establishment and enforcement
Monitoring and Regulating
Inspection
Project Completion
Project Closure
Gantt Chart
Page | 7
In the given scenario, there is a large organisation which means that various activities or tasks
are the part of the refurbishment projects. Repairing and refurbishment of the projects are
required to be done for providing environmental protection. Moreover, sustaining of penalties is
also suffered by the organization. It involves a series of steps in which performance of such
project must be made which are provide below:
Current Conditions Evaluation
Estimating cost
Funds arrangement
Proposal Development
Resource Allocation
Designing
Contract establishment and enforcement
Monitoring and Regulating
Inspection
Project Completion
Project Closure
Gantt Chart
Page | 7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Privacy and Security
As data and information of the organisation of considered as the essence of its growth and
development, therefore it becomes necessary that proper steps are taken to make sure proper
safeguard to such data and information is provided. In this regards, the management of the
organisation must make sure that compliance with provisions of the GDPR Act, 2018 is made.
This will provide protection against the uncertain digital threats to information and data of the
staff as well as of the organisational business.
Supporting Plans
Provision of Training: Training is the base of performances required in the project, therefore,
proper training sessions will be organised and employees will be provided effective.
Resources: Scarcity of resources is an issue faced by the organisation, therefore, it will be made
sure that optimum utilisation of resources takes place in a project. This includes properly
utilising the machinery, workforce, funds, etc.
Page | 8
As data and information of the organisation of considered as the essence of its growth and
development, therefore it becomes necessary that proper steps are taken to make sure proper
safeguard to such data and information is provided. In this regards, the management of the
organisation must make sure that compliance with provisions of the GDPR Act, 2018 is made.
This will provide protection against the uncertain digital threats to information and data of the
staff as well as of the organisational business.
Supporting Plans
Provision of Training: Training is the base of performances required in the project, therefore,
proper training sessions will be organised and employees will be provided effective.
Resources: Scarcity of resources is an issue faced by the organisation, therefore, it will be made
sure that optimum utilisation of resources takes place in a project. This includes properly
utilising the machinery, workforce, funds, etc.
Page | 8

Project Management Plan
In a project management plan, there are number of components involved. Such components are
cost management, change management plan, risk management, requirement management and
communication management.
Change Management
The business environment is an uncertain environment and such uncertainty impacts the
performance of the tasks in the project. The changes taking place in the lifecycle of the project is
required to be managed so that its impact can be reduced. Adoption of change management
provides assistance in managing such changes.
(Source: Prosci, 2019)
Cost Management
One of the major factors of the project is cost. It is necessary that proper plans or strategies are
adopted by the management of the organisation to manage the cost of the project. Project cost
management provides assistance in cost managing with the adoption of technology (Martinelli &
Page | 9
In a project management plan, there are number of components involved. Such components are
cost management, change management plan, risk management, requirement management and
communication management.
Change Management
The business environment is an uncertain environment and such uncertainty impacts the
performance of the tasks in the project. The changes taking place in the lifecycle of the project is
required to be managed so that its impact can be reduced. Adoption of change management
provides assistance in managing such changes.
(Source: Prosci, 2019)
Cost Management
One of the major factors of the project is cost. It is necessary that proper plans or strategies are
adopted by the management of the organisation to manage the cost of the project. Project cost
management provides assistance in cost managing with the adoption of technology (Martinelli &
Page | 9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Milosevic, 2016). It also provides assistance on assessing productivity. Following are the steps
involved in cost management:
Cost Estimation
Determination of the project’s Budget
Cost Control
(Source: Free management books, 2019)
Risk Management
From the commencement of the project until the project is completed, there are various risks and
challenges which may have an impact on the effectiveness of the project. It is essential that risk
is mitigated by the development of suitable plans (Harrison & Lock, 2017). Repairing and
refurbishment of the tanks storing attract various risks which are as follows:
Health and Safety of the employees
Legal Risk i.e. risk of following the established legislation
Political Risk
Technical Risk i.e. failure of the technology being used and causing havoc.
Requirement Management
Resources are the factors due to which performance of the activities of the project is possible. It
is essential that resources must be properly utilised and for this requirement management will be
adopted. According to this management, the resources required by different departments are
managed so that the wastage of resources is minimised.
Page | 10
involved in cost management:
Cost Estimation
Determination of the project’s Budget
Cost Control
(Source: Free management books, 2019)
Risk Management
From the commencement of the project until the project is completed, there are various risks and
challenges which may have an impact on the effectiveness of the project. It is essential that risk
is mitigated by the development of suitable plans (Harrison & Lock, 2017). Repairing and
refurbishment of the tanks storing attract various risks which are as follows:
Health and Safety of the employees
Legal Risk i.e. risk of following the established legislation
Political Risk
Technical Risk i.e. failure of the technology being used and causing havoc.
Requirement Management
Resources are the factors due to which performance of the activities of the project is possible. It
is essential that resources must be properly utilised and for this requirement management will be
adopted. According to this management, the resources required by different departments are
managed so that the wastage of resources is minimised.
Page | 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Communication Management
Communication is considered as a key to the success and it is important proper communication is
established in the project. Communication is useful in making performances of the tasks,
exchanging views and ideas, communication of issues and providing resolutions of the same
(Binder, 2016). Managers are responsible for making communication effectively so that tasks
and the plans can be communicated and performances of the tasks can be made accordingly by
the workforce project engagement.
Page | 11
Communication is considered as a key to the success and it is important proper communication is
established in the project. Communication is useful in making performances of the tasks,
exchanging views and ideas, communication of issues and providing resolutions of the same
(Binder, 2016). Managers are responsible for making communication effectively so that tasks
and the plans can be communicated and performances of the tasks can be made accordingly by
the workforce project engagement.
Page | 11

Project Performance Evaluation
A project of refurbishments and repairing of the tanks requires performance which is considered
as a complex procedure. There is a number of challenges related with the digital technology and
resources and such issues impact the operations and functions of the organisation. Time and cost
involved in the project are some other factors which make the performance evaluation difficult.
Formulation of proper plans or strategies must be made by the management and the project
manager with the view of dealing with the issues (Ward & Levin, 2016). Adoption of different
techniques can be made by the management in order to make an evaluation of the performance.
Such techniques involve Performance Prism, SMART System, AHP (Analytic Hierarchy
Process) and so on.
Key performance indicators are considered as the benchmarks attainment of which helps in
making performance evaluation. It also helps in providing an overview and defining the works
within the project. The proper establishment of the KPIs helps in making sure about the success
of the organisation. Following are the project’s KPIs of repairing and refurbishment of tanks are
provided below:
Environmental Impact: As mentioned above, the project aims at making repairs and
refurbishments of the tanks storing petroleum products, this will reduce the leakage and will
provide environmental protection. Elimination of the payment of the penalties is also termed as
KPI as it will reduce the expenses of the organisation.
Cost and Time Schedule: Whole proper is based on time and cost as these are the main
parameters of the project and performance evaluation (Cooke, 2016). If the completion of the
project is made within the established cost and as decided time, then it will be considered as well
performed.
Support and employee engagement: One of the most significant resources in a project is its
workforce as the performance of the project is made by the workforce by making sure that it is
completed within time. Provision of proper guidance and training will help the employees to
perform the tasks in accordance with the set standards.
Page | 12
A project of refurbishments and repairing of the tanks requires performance which is considered
as a complex procedure. There is a number of challenges related with the digital technology and
resources and such issues impact the operations and functions of the organisation. Time and cost
involved in the project are some other factors which make the performance evaluation difficult.
Formulation of proper plans or strategies must be made by the management and the project
manager with the view of dealing with the issues (Ward & Levin, 2016). Adoption of different
techniques can be made by the management in order to make an evaluation of the performance.
Such techniques involve Performance Prism, SMART System, AHP (Analytic Hierarchy
Process) and so on.
Key performance indicators are considered as the benchmarks attainment of which helps in
making performance evaluation. It also helps in providing an overview and defining the works
within the project. The proper establishment of the KPIs helps in making sure about the success
of the organisation. Following are the project’s KPIs of repairing and refurbishment of tanks are
provided below:
Environmental Impact: As mentioned above, the project aims at making repairs and
refurbishments of the tanks storing petroleum products, this will reduce the leakage and will
provide environmental protection. Elimination of the payment of the penalties is also termed as
KPI as it will reduce the expenses of the organisation.
Cost and Time Schedule: Whole proper is based on time and cost as these are the main
parameters of the project and performance evaluation (Cooke, 2016). If the completion of the
project is made within the established cost and as decided time, then it will be considered as well
performed.
Support and employee engagement: One of the most significant resources in a project is its
workforce as the performance of the project is made by the workforce by making sure that it is
completed within time. Provision of proper guidance and training will help the employees to
perform the tasks in accordance with the set standards.
Page | 12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 17
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.