Analysis of Operations and Project Management for BSH Home Appliances
VerifiedAdded on 2020/06/05
|16
|4693
|63
Report
AI Summary
This report provides a comprehensive analysis of operations and project management principles within the context of BSH, a home appliance company. It begins with a review and critique of operational management principles, followed by an examination of BSH's adherence to these principles, including reality, organization, fundamentals, and accountability. The report then delves into the application of a continuous improvement plan, outlining strategies for enhancing promotional events and after-sales service. The report also explores the use of product life cycle (PLC) stages and the effectiveness of PLC with different theories, concepts, and models. Key methodologies like Six Sigma and lean principles are discussed in relation to BSH's operations. The report concludes by emphasizing the importance of good employee relations, proper communication channels, and the use of organizational theories and models to drive continuous improvement and achieve business objectives. The report aims to provide a practical understanding of how operational strategies can be applied within a real-world business setting to improve efficiency, customer satisfaction, and overall performance.

Operations and Project
Management
Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
P.1 Review and critique of operational management principles.................................................1
TASK 2............................................................................................................................................3
P.2 Preparation of continuous improvement plan based on operation management principles: 3
TASK 3............................................................................................................................................5
P.3 Use of product life cycle stages............................................................................................5
TASK 4............................................................................................................................................8
P.4 Reviewing and effectiveness of PLC with different theories,concepts and model...............8
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................10
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
P.1 Review and critique of operational management principles.................................................1
TASK 2............................................................................................................................................3
P.2 Preparation of continuous improvement plan based on operation management principles: 3
TASK 3............................................................................................................................................5
P.3 Use of product life cycle stages............................................................................................5
TASK 4............................................................................................................................................8
P.4 Reviewing and effectiveness of PLC with different theories,concepts and model...............8
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................10

INTRODUCTION
Operation management is the management of all activities and tasks in the business. It is
crucial so that firm can easily run the production and operation functions in management.
Through this all tasks can run efficiently and effectively. This supports operations functions of
the company. Hence organization can fulfil all requirements of customers (Antonio Martins and
Ramos Martins, 2012). Hence it can increase the satisfaction level of all users. This helps them
in earn more profits and support in increase their market share. Assignment discusses about BSH
company which is a home appliances firm. It was found in 1967 in U.K. It sells products such as
Fridge, mixture grinder, stoves, air conditioners to people. Report explains about the application
of continuous improvement in operational management. It describes about the use of PLC in the
project. It further explains about describes about the receiving application of PLC in project.
TASK 1
P.1 Review and critique of operational management principles
Operations management is controlling production and manufacturing process in the firm
so that it can run successfully. Through this different decision are made such as of project
planning, design, control of stocks and creation of operation's strategy in their business.
Operational management principles:
Company have to follow all principles so that their production process can run smoothly
and it also helps in creation of strategies. Principles followed by BSH are:
Reality: They follow a principle which means that they are focusing on issues and
problems rather than techniques and tools regarding any method. Identification of main issue of
problem helps in develop better solution to deal with it. Through this, managers of BSH can
remove all the issues which is very essential for effective completion of production process.
Organization: In this, all components are similar and are connected with each other. It
helps them in earning more revenues.
Fundamentals: In this, success comes from using of new techniques and 80% can be
achieved through following the discipline etc.
Accountability: Managers are responsible for performance of all employees. They
monitor that targets and goals are achieved by staff members or not. With help of this, managers
1
Operation management is the management of all activities and tasks in the business. It is
crucial so that firm can easily run the production and operation functions in management.
Through this all tasks can run efficiently and effectively. This supports operations functions of
the company. Hence organization can fulfil all requirements of customers (Antonio Martins and
Ramos Martins, 2012). Hence it can increase the satisfaction level of all users. This helps them
in earn more profits and support in increase their market share. Assignment discusses about BSH
company which is a home appliances firm. It was found in 1967 in U.K. It sells products such as
Fridge, mixture grinder, stoves, air conditioners to people. Report explains about the application
of continuous improvement in operational management. It describes about the use of PLC in the
project. It further explains about describes about the receiving application of PLC in project.
TASK 1
P.1 Review and critique of operational management principles
Operations management is controlling production and manufacturing process in the firm
so that it can run successfully. Through this different decision are made such as of project
planning, design, control of stocks and creation of operation's strategy in their business.
Operational management principles:
Company have to follow all principles so that their production process can run smoothly
and it also helps in creation of strategies. Principles followed by BSH are:
Reality: They follow a principle which means that they are focusing on issues and
problems rather than techniques and tools regarding any method. Identification of main issue of
problem helps in develop better solution to deal with it. Through this, managers of BSH can
remove all the issues which is very essential for effective completion of production process.
Organization: In this, all components are similar and are connected with each other. It
helps them in earning more revenues.
Fundamentals: In this, success comes from using of new techniques and 80% can be
achieved through following the discipline etc.
Accountability: Managers are responsible for performance of all employees. They
monitor that targets and goals are achieved by staff members or not. With help of this, managers
1

and leaders of BSH can monitor the performance of employees through which company can
easily achieve its set business objectives.
Variance: If there is difference between actual and standard performance then it has to be
removed immediately (Beringer, Jonas, and Kock, 2013). With this, BSH can easily identify the
gap between actual and standard performance and can identify the ways to remove the same.
Causality: It is important for important manager find root cause for the problem so that
they can find effective solution for their problem (Blomquist, and et. al., 2010).
Managed passion: It is crucial that project manager motivates all staff members so that
they can work properly with full dedication and passion. By encourage employees to perform
well, managers can achieve the set objectives and can provide better services to its customers.
Through this, managers of BSH can achieve customer satisfaction.
Humility: Manager can see the limitation of trial and error methods which helps them in
improving their mistakes and hence they can work in effective manner.
Success: Project manager can evaluate all aspects and recent trends so that it can use
latest strategies to deal with it. Through this it can easily gain attention of more people.
Change: Project manager of BCS has to change their theories and models of change so
that can maintain sustainability in their activities. Through this they can create new methods and
techniques so that their production and manufacturing process can run smoothly and
successfully.
Six Sigma
It is a technique in which there is no wastage of goods and services. So hence as a result
BSH can start production of new television sets which is their main objective. Hence they can
produce good quality of goods with minimum wastage. This process has 5 steps:
Define: In this process identification of users’ needs and requirements and hence as a
result they can create various goals. By clearly defining goals firm can give responsibility to all
employees and hence all staff members can perform their task effectively and efficiently.
Measure: In this stage BSH evaluates the features of process which they are currently
following and hence they can improve the weak points in their processes. Through this they can
easily improve their performance.
2
easily achieve its set business objectives.
Variance: If there is difference between actual and standard performance then it has to be
removed immediately (Beringer, Jonas, and Kock, 2013). With this, BSH can easily identify the
gap between actual and standard performance and can identify the ways to remove the same.
Causality: It is important for important manager find root cause for the problem so that
they can find effective solution for their problem (Blomquist, and et. al., 2010).
Managed passion: It is crucial that project manager motivates all staff members so that
they can work properly with full dedication and passion. By encourage employees to perform
well, managers can achieve the set objectives and can provide better services to its customers.
Through this, managers of BSH can achieve customer satisfaction.
Humility: Manager can see the limitation of trial and error methods which helps them in
improving their mistakes and hence they can work in effective manner.
Success: Project manager can evaluate all aspects and recent trends so that it can use
latest strategies to deal with it. Through this it can easily gain attention of more people.
Change: Project manager of BCS has to change their theories and models of change so
that can maintain sustainability in their activities. Through this they can create new methods and
techniques so that their production and manufacturing process can run smoothly and
successfully.
Six Sigma
It is a technique in which there is no wastage of goods and services. So hence as a result
BSH can start production of new television sets which is their main objective. Hence they can
produce good quality of goods with minimum wastage. This process has 5 steps:
Define: In this process identification of users’ needs and requirements and hence as a
result they can create various goals. By clearly defining goals firm can give responsibility to all
employees and hence all staff members can perform their task effectively and efficiently.
Measure: In this stage BSH evaluates the features of process which they are currently
following and hence they can improve the weak points in their processes. Through this they can
easily improve their performance.
2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Analyse: In this stage various methods are used by company which can check their
performance of all processes such as standard work, mistake proofing etc. To check capability of
all techniques pilot run is also used. Through this they can create new methods and processes.
Control: BSH can use different system so that they can find errors and they can improve
them. So hence managers can easily execute processes such as statistical process control, visual
workplace etc. so that they can monitors methods and processes (Brauers and Zavadskas, 2010).
This process in continuously repeated so that it can produce good quality of products.
With help of six sigma BSH can improve its offerings and can fulfil the requirements of
its target customers. Main focus of this method is to satisfy the needs of customers that’s why
managers formulate the approaches as per that so satisfaction of customers can be achieved. One
main issues related with this approach is that it lacks in flexibility which create unnecessary
delays in production process.
Lean principle:
Lean principles helps in giving good quality of products with use of less resources
(Fernández-Sánchez and Rodríguez-López, 2010). Hence company can use them. So lean
principles followed by BSH are-
Identification of value: In this company can determine amount of money that consumer
can pay for many products. Project manager tries to reduce wastage in products so that it can be
sell at reasonable price to consumer.
Value stream: In this process all methods and techniques which can easily deliver the
products to all customers are performed. It helps in removing those techniques which do not
create any value to all users.
Flow: In this process sequencing all task are performed so that there is flow of goods
from introduction to finished stage. Hence through this production process and delivery process
of television can run smoothly.
Pull: In this all processes and activities are performed by company according to user's
needs and wants. It helps in removing unnecessary activities and tasks. Hence it can fulfil
requirements of all users.
Perfection: In this perfection can be maintained as removing unnecessary activities which
can increase the costs. Hence all process can run smoothly and successfully. Thus process of
television sets can run smoothly (Fleming and Koppelman, 2016).
3
performance of all processes such as standard work, mistake proofing etc. To check capability of
all techniques pilot run is also used. Through this they can create new methods and processes.
Control: BSH can use different system so that they can find errors and they can improve
them. So hence managers can easily execute processes such as statistical process control, visual
workplace etc. so that they can monitors methods and processes (Brauers and Zavadskas, 2010).
This process in continuously repeated so that it can produce good quality of products.
With help of six sigma BSH can improve its offerings and can fulfil the requirements of
its target customers. Main focus of this method is to satisfy the needs of customers that’s why
managers formulate the approaches as per that so satisfaction of customers can be achieved. One
main issues related with this approach is that it lacks in flexibility which create unnecessary
delays in production process.
Lean principle:
Lean principles helps in giving good quality of products with use of less resources
(Fernández-Sánchez and Rodríguez-López, 2010). Hence company can use them. So lean
principles followed by BSH are-
Identification of value: In this company can determine amount of money that consumer
can pay for many products. Project manager tries to reduce wastage in products so that it can be
sell at reasonable price to consumer.
Value stream: In this process all methods and techniques which can easily deliver the
products to all customers are performed. It helps in removing those techniques which do not
create any value to all users.
Flow: In this process sequencing all task are performed so that there is flow of goods
from introduction to finished stage. Hence through this production process and delivery process
of television can run smoothly.
Pull: In this all processes and activities are performed by company according to user's
needs and wants. It helps in removing unnecessary activities and tasks. Hence it can fulfil
requirements of all users.
Perfection: In this perfection can be maintained as removing unnecessary activities which
can increase the costs. Hence all process can run smoothly and successfully. Thus process of
television sets can run smoothly (Fleming and Koppelman, 2016).
3

BSH can apply these principles in production of their television, with this, company can
ensure minimum wastage of its resources which improve the overall efficiency. It also helps in
utilise all the resources and better satisfy the needs of customers. With effective implementation
of these principles company can create and maintain good relation with customers.
TASK 2
P2. Preparation of continuous improvement plan based on operation management principles:
Continuous improvement plans is important and it is followed company so that they can
continuously change their products and services. So BSH can use this process so that they can
create new methods and techniques of production of television sets and hence they can deliver it
to users. Continuous plan is described below:
Provider
Date
Source Existing performance
levels
Improvement in
strategies
Expected outcome
Promotional events There is lack of
information and data
so thus customers do
not purchase the goods
and services. It leads
to reducing sales of
company.
Firm can use adequate
promotional strategies
such as advertising,
online promotion etc.
This helps in gaining
attention of more
users. So hence it can
increase their sales.
Through using this
strategics it can give
full information
related to attributes
and benefits of
television set to all
customers and hence
they can easily attract
customers. Thus they
can increase their
sales.
After Sales service They do not provide
much after sales
services to all users.
Company has less
More customer centres
can be developed so
that they can provide
effective services to all
By providing effective
an efficient services all
customer can get
satisfied. So hence as a
4
ensure minimum wastage of its resources which improve the overall efficiency. It also helps in
utilise all the resources and better satisfy the needs of customers. With effective implementation
of these principles company can create and maintain good relation with customers.
TASK 2
P2. Preparation of continuous improvement plan based on operation management principles:
Continuous improvement plans is important and it is followed company so that they can
continuously change their products and services. So BSH can use this process so that they can
create new methods and techniques of production of television sets and hence they can deliver it
to users. Continuous plan is described below:
Provider
Date
Source Existing performance
levels
Improvement in
strategies
Expected outcome
Promotional events There is lack of
information and data
so thus customers do
not purchase the goods
and services. It leads
to reducing sales of
company.
Firm can use adequate
promotional strategies
such as advertising,
online promotion etc.
This helps in gaining
attention of more
users. So hence it can
increase their sales.
Through using this
strategics it can give
full information
related to attributes
and benefits of
television set to all
customers and hence
they can easily attract
customers. Thus they
can increase their
sales.
After Sales service They do not provide
much after sales
services to all users.
Company has less
More customer centres
can be developed so
that they can provide
effective services to all
By providing effective
an efficient services all
customer can get
satisfied. So hence as a
4

customer services
centre so hence users
cannot solve all their
issues. Through this it
can hamper all work
and procedures of
company.
users. Users
suggestion can be
taken so that company
can change in its
strategy and activities.
Through opening of
many customers
servicing centres all
customer problem gets
solved.
result firm can gain
attention of all
customers. It also
helps in maintaining
brand loyalty. Through
this it can easily
expand and diversify
their operations. Hence
it can maintain good
position in minds of al
users.
Improvement plan and its effects:
From above continuous improvement plan it is very beneficial useful to BSH company.
Through this it can effective produce television set in proper and effective manne (Gunasekaran,
and Ngai, 2012).Turner, R., 2016 r. They can change thus methods and plans so that they can
create good quality of products. Hence flow of process from introduction to finished stage can
run smoothly and successfully. Hence there is no defects and flaws in the process of production
and manufacturing process (Lenfle and Loch, 2010). Thus as a result they can perform all
activities in proper and efficient manner. Thus they can deliver television sets to customers in
time. So hence it leads to increasing the level of satisfaction of all users. This helps in increasing
the image of Brand in front of all customers and in market.
Strategies for implementation of plan
Continuous improvement plan assists project manager in continuously creates new
methods of producing goods in firm. So hence they can provide good quality of television sets to
all users. It leads to increasing in sales and profits of the firm. So hence BSH follows all
activities which are described below:
Good employment relation: Manager can maintain good relation with all employees.
Through thus they can perform their work effectively and efficiently. Hence they an give good
results. Thus they can maintain good and unique and strong position in firm to of all users and in
market.
5
centre so hence users
cannot solve all their
issues. Through this it
can hamper all work
and procedures of
company.
users. Users
suggestion can be
taken so that company
can change in its
strategy and activities.
Through opening of
many customers
servicing centres all
customer problem gets
solved.
result firm can gain
attention of all
customers. It also
helps in maintaining
brand loyalty. Through
this it can easily
expand and diversify
their operations. Hence
it can maintain good
position in minds of al
users.
Improvement plan and its effects:
From above continuous improvement plan it is very beneficial useful to BSH company.
Through this it can effective produce television set in proper and effective manne (Gunasekaran,
and Ngai, 2012).Turner, R., 2016 r. They can change thus methods and plans so that they can
create good quality of products. Hence flow of process from introduction to finished stage can
run smoothly and successfully. Hence there is no defects and flaws in the process of production
and manufacturing process (Lenfle and Loch, 2010). Thus as a result they can perform all
activities in proper and efficient manner. Thus they can deliver television sets to customers in
time. So hence it leads to increasing the level of satisfaction of all users. This helps in increasing
the image of Brand in front of all customers and in market.
Strategies for implementation of plan
Continuous improvement plan assists project manager in continuously creates new
methods of producing goods in firm. So hence they can provide good quality of television sets to
all users. It leads to increasing in sales and profits of the firm. So hence BSH follows all
activities which are described below:
Good employment relation: Manager can maintain good relation with all employees.
Through thus they can perform their work effectively and efficiently. Hence they an give good
results. Thus they can maintain good and unique and strong position in firm to of all users and in
market.
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Proper communication channel: Project manager follows a particular channel of
communication so that they can solve all problems and issues of all customers. Hence as a result
the can perform their work in an effective and efficient manner. Through this all activities run
smoothly. This results in increasing of more revenues and productivity. Hence it leads to
expansion of firm.
Organizational theories and models:
Different theories and models are used by firm so that company can continuously change
in their methods and strategies. Theories such as bureaucratic, classic and scientific approaches
are used which helps in improving the efficiency and effectiveness in all activities and tasks. So
BSC company can use these theories and models so that all employees can perform in an better
manner. Through this all activities and task run inn an proper manner. Hence BSC can easily sell
television sets to users and can increase their satisfaction level. This leads to generating of more
revenues and in increasing of market share (Mir and Pinnington, 2014).
Various approaches of operation management are there which can be used by managers
to measure the effectiveness of continuous improvement plan which can be understood by the
following points:
TQM (Total Quality Management): With this approach, BSH can ensure production of
its products with good quality as per the set standards. Through this company can better satisfy
the needs of its customers and can sustain them for long time period. With implementation of
TQM, BSH can maintain the quality of its television.
Kaizen: This approach helps to create continuous improvement which ensure ongoing
improvement. It is based on cooperation which ensure effective transformation of raw materials
into finished goods. This is used to eliminate waste, lower defects and encourage innovation so
company can offer innovative solution to the problems of its customers.
Six Sigma: This approach provides an opportunity to enterprise to design and use
effective delivery methods. Through this, company can reduce cost and time of delivery which
help in attain customer satisfaction.
Lean principles: These principles could be use by managers of BSH to ensure safety in
production process. Through this manager could focus more on safety and can offer maximum
value to its customers.
6
communication so that they can solve all problems and issues of all customers. Hence as a result
the can perform their work in an effective and efficient manner. Through this all activities run
smoothly. This results in increasing of more revenues and productivity. Hence it leads to
expansion of firm.
Organizational theories and models:
Different theories and models are used by firm so that company can continuously change
in their methods and strategies. Theories such as bureaucratic, classic and scientific approaches
are used which helps in improving the efficiency and effectiveness in all activities and tasks. So
BSC company can use these theories and models so that all employees can perform in an better
manner. Through this all activities and task run inn an proper manner. Hence BSC can easily sell
television sets to users and can increase their satisfaction level. This leads to generating of more
revenues and in increasing of market share (Mir and Pinnington, 2014).
Various approaches of operation management are there which can be used by managers
to measure the effectiveness of continuous improvement plan which can be understood by the
following points:
TQM (Total Quality Management): With this approach, BSH can ensure production of
its products with good quality as per the set standards. Through this company can better satisfy
the needs of its customers and can sustain them for long time period. With implementation of
TQM, BSH can maintain the quality of its television.
Kaizen: This approach helps to create continuous improvement which ensure ongoing
improvement. It is based on cooperation which ensure effective transformation of raw materials
into finished goods. This is used to eliminate waste, lower defects and encourage innovation so
company can offer innovative solution to the problems of its customers.
Six Sigma: This approach provides an opportunity to enterprise to design and use
effective delivery methods. Through this, company can reduce cost and time of delivery which
help in attain customer satisfaction.
Lean principles: These principles could be use by managers of BSH to ensure safety in
production process. Through this manager could focus more on safety and can offer maximum
value to its customers.
6

In addition to this, various principles of operations management are there which can be
use by BSH to ensure effective production TV sets with maximum quality. These principles can
be understood by the following points:
Principles of variance: This principle could be use by managers to implement cost
effective methods and techniques which help in manage inventory and ensure maximum
utilisation of other resources. With help of this company can minimise the cost of inventory and
can carry out production process in effective manner.
Principle of reality: As per this principle, operations management require to emphasis
more on overall issue rather than the techniques. With help of this managers can easily identify
the issue and can find better solution for it.
TASK 3
P.3 Use of product life cycle stages
BSC has to launch a television set which is of 58 inches. So hence they to conduct a
market research so that they can identify all needs and requirement of all users. As a result, they
can change all methods and processes related to production, marketing and promotional
procedures (emsel and Wiewiora, 2013). It helps them in earning of more revenues and in
increasing their production. After identifying their needs company can easily produce television
sets according to their needs and convenience. Hence it leads to increasing customer satisfaction
level of all users. They have to add such attribute which are different from other competitors.
Product life cycle is method through which product from different stages from initial
development to obsolescence level. Stages of PLC are-
Project initiation: In this stage ideas or thoughts of staff members can begin. In this
objectives of project are evaluated. Need and cost is also monitored. There are 2 parts of it. It
includes:
Business case: In this step needs are to be monitored of project. So BSC monitors need of
project after performing a research analysis.
Feasibility study: In this step Project manager of BSC company can monitor targets,
resources and costs of creating new television sets. It is crucial so that firm can develop
strategies so that objectives of selling more television sets can be achieved.
Planning stage: In this stage firm can create different plans and policies. Various
strategies are designed are made so that BSC objectives can easily be achieved. Project manager
7
use by BSH to ensure effective production TV sets with maximum quality. These principles can
be understood by the following points:
Principles of variance: This principle could be use by managers to implement cost
effective methods and techniques which help in manage inventory and ensure maximum
utilisation of other resources. With help of this company can minimise the cost of inventory and
can carry out production process in effective manner.
Principle of reality: As per this principle, operations management require to emphasis
more on overall issue rather than the techniques. With help of this managers can easily identify
the issue and can find better solution for it.
TASK 3
P.3 Use of product life cycle stages
BSC has to launch a television set which is of 58 inches. So hence they to conduct a
market research so that they can identify all needs and requirement of all users. As a result, they
can change all methods and processes related to production, marketing and promotional
procedures (emsel and Wiewiora, 2013). It helps them in earning of more revenues and in
increasing their production. After identifying their needs company can easily produce television
sets according to their needs and convenience. Hence it leads to increasing customer satisfaction
level of all users. They have to add such attribute which are different from other competitors.
Product life cycle is method through which product from different stages from initial
development to obsolescence level. Stages of PLC are-
Project initiation: In this stage ideas or thoughts of staff members can begin. In this
objectives of project are evaluated. Need and cost is also monitored. There are 2 parts of it. It
includes:
Business case: In this step needs are to be monitored of project. So BSC monitors need of
project after performing a research analysis.
Feasibility study: In this step Project manager of BSC company can monitor targets,
resources and costs of creating new television sets. It is crucial so that firm can develop
strategies so that objectives of selling more television sets can be achieved.
Planning stage: In this stage firm can create different plans and policies. Various
strategies are designed are made so that BSC objectives can easily be achieved. Project manager
7

can determine quality of products, risks in selling new television sets. Manager can provide
direction to all employees regarding creation of good quality of television sets etc. They can
predict obstacles and create plans to remove it.
Project execution: In this project manager communicates different employees about their
roles and responsibilities and hence the perform all activities and task in the business. Proper
interaction take place between project manager and employees so that they can perform their
work with efficiency.
Project monitoring and control: In this stage project manager can monitor the work
performed by all staff members. They also evaluates that staff members can perform all work
properly. They can use different methods such as key indicators and track variation between
actual and standard performance so that their performance can be improved (Ramasesh and
Browning, 2014).
Project closure: In this stage they can close this project. So all staff members are given
instructions correct the mistakes and flaws in the project. By improving mistakes and flaws staff
members can improve them and can perform well in firm.
Business case
There is a business case in which new product that is television set is manufactured. It is
important so that all people can watch daily news and other advertisements at home. This is new
product launched by BCS which deals with home appliances firm (Robichaud and Anantatmula,
2010).
Importance: BCS deals with only home appliances so it is important for company to
launch new product. New television can show clear images and pictures which is earlier not
possible with using old products. Through this people can watch advertisements, news and
pictures by sitting at home. So hence it can give more suitability and convenience to all people.
So this product is important for company so that all buyers can easily purchase them.
Target market: Their main target market is to capture all customers belonging to various
age. As it is suitable for all age groups So hence it targets to whole population belonging to
different group.
Cost benefit analysis:
Costs: BSC can consider various factors related to production,manufacturing processes so hence
it can gain more users. It has different costs related to manufacturing and production costs.
8
direction to all employees regarding creation of good quality of television sets etc. They can
predict obstacles and create plans to remove it.
Project execution: In this project manager communicates different employees about their
roles and responsibilities and hence the perform all activities and task in the business. Proper
interaction take place between project manager and employees so that they can perform their
work with efficiency.
Project monitoring and control: In this stage project manager can monitor the work
performed by all staff members. They also evaluates that staff members can perform all work
properly. They can use different methods such as key indicators and track variation between
actual and standard performance so that their performance can be improved (Ramasesh and
Browning, 2014).
Project closure: In this stage they can close this project. So all staff members are given
instructions correct the mistakes and flaws in the project. By improving mistakes and flaws staff
members can improve them and can perform well in firm.
Business case
There is a business case in which new product that is television set is manufactured. It is
important so that all people can watch daily news and other advertisements at home. This is new
product launched by BCS which deals with home appliances firm (Robichaud and Anantatmula,
2010).
Importance: BCS deals with only home appliances so it is important for company to
launch new product. New television can show clear images and pictures which is earlier not
possible with using old products. Through this people can watch advertisements, news and
pictures by sitting at home. So hence it can give more suitability and convenience to all people.
So this product is important for company so that all buyers can easily purchase them.
Target market: Their main target market is to capture all customers belonging to various
age. As it is suitable for all age groups So hence it targets to whole population belonging to
different group.
Cost benefit analysis:
Costs: BSC can consider various factors related to production,manufacturing processes so hence
it can gain more users. It has different costs related to manufacturing and production costs.
8
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Benefits: Company can increase their sales and hence it has high net profits as compared to other
costs so hence it have high benefits as compared to costs.
Work breakdown structure for new product:
It refers to process of project manage. In this process it helps in dividing team work into
different divisions. So hence as a result there is creation of hierarchical structure which is
created in firm. It is monitored by project manager so hat work can be properly divided in
various activities.
Gantt chart: In this schedule of project is determined. In X axis time intervals are given.
In Y axis there is work and activities are mentioned (Söderlund, 2011).
9
costs so hence it have high benefits as compared to costs.
Work breakdown structure for new product:
It refers to process of project manage. In this process it helps in dividing team work into
different divisions. So hence as a result there is creation of hierarchical structure which is
created in firm. It is monitored by project manager so hat work can be properly divided in
various activities.
Gantt chart: In this schedule of project is determined. In X axis time intervals are given.
In Y axis there is work and activities are mentioned (Söderlund, 2011).
9

10

TASK 4
P.4 Reviewing and effectiveness of PLC with different theories, concepts and model
There are various theories and models which can helps project manager to save time of
all activities. Hence they can control the time of completing all activities and tasks. Thus as a
result they can save their time on performing all tasks. Two models which can be used by BCS
company are (Management Theories & Concepts at the Workplace, 2018):
PERT: It is a technique in which probabilities of completing time is determined. It is
important so that BSC can find out the time of completing all activities and tasks in firm.
Through PLC stage can easily be monitored in the firm. As project manager can easily fund time
and hence they can create plans and policies related to completion of time in all the activities and
tasks. So thus it can easily be implemented in PLC stage (Subramanian and Ramanathan, 2012).
Through this technique project manager can easily evaluate. Hence after this it can be used in it
also helps in implementing the plans and strategies in the firm. So it is very beneficial situation
for the firm.
CPM: Critical path method is a technique in which starting and completion time of each
activity can be determined. It is important so that firm can finish all activities of project in time.
11
Illustration 1: Work Break-down structure
P.4 Reviewing and effectiveness of PLC with different theories, concepts and model
There are various theories and models which can helps project manager to save time of
all activities. Hence they can control the time of completing all activities and tasks. Thus as a
result they can save their time on performing all tasks. Two models which can be used by BCS
company are (Management Theories & Concepts at the Workplace, 2018):
PERT: It is a technique in which probabilities of completing time is determined. It is
important so that BSC can find out the time of completing all activities and tasks in firm.
Through PLC stage can easily be monitored in the firm. As project manager can easily fund time
and hence they can create plans and policies related to completion of time in all the activities and
tasks. So thus it can easily be implemented in PLC stage (Subramanian and Ramanathan, 2012).
Through this technique project manager can easily evaluate. Hence after this it can be used in it
also helps in implementing the plans and strategies in the firm. So it is very beneficial situation
for the firm.
CPM: Critical path method is a technique in which starting and completion time of each
activity can be determined. It is important so that firm can finish all activities of project in time.
11
Illustration 1: Work Break-down structure
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Through this BSC can use this PLC stages. Hence through this they can find time that is
earliest starting time and latest finish time. Thus it gives different benefits to various projects. So
hence project manager can apply this model in initiating stage in which they can find resources
and time of completing the project. They can create different plans and strategies so that time can
be saved as they have used this model. Hence as a result they can implement these strategies and
plans in their respective project. So at last two stages monitoring and closing can also be
effectively done through using this model.
Project life cycle is very important for every company. Through this BCS company can
easily create new product development plans and policies. PLC process is very important for
every project so that all tasks and activities can be easily be implemented in the firm. As it
provides a structural process and different stages though which new product can easily be
launched in the market. It helps project manager to to determine that stages from initiating and
completing stages are determined. It helps in finding weak points or deviations and can take
necessary steps to improve those variations. They can also determine different risks in the project
so that all activities and tasks can easily be performed. Through this they can also fund different
advantages and benefits deriving from the project after creating PLC stages.
BSC can also determine the facts and figures which are required in the project through
this stage. Important advantages of PLC in BCS are described below:
It helps in reducing the defects in performing all activities by staff members. So as a
result they can take corrective actions to improve these deviations. Through this it can
give opportunity to staff members to perform efficiently and effectively.
By using PLC stages project manager can give direction to all staff members so that they
can perform their role very effectively. This is important so that they can have knowledge
of activities and hence they can finish their task in time.
Thee are different stages which can be provided to project manager so hence as a result
they can fund weak points and can also find stronger areas. Through this they can easily
take decisions such as improving weak points and working more on stronger areas so that
activities can be performed in an better manner. Through this all task can be completed in
time. Hence it saves time of project manager in evaluating all activities which are
performed in firm. It leads to success and growth of BCS.
12
earliest starting time and latest finish time. Thus it gives different benefits to various projects. So
hence project manager can apply this model in initiating stage in which they can find resources
and time of completing the project. They can create different plans and strategies so that time can
be saved as they have used this model. Hence as a result they can implement these strategies and
plans in their respective project. So at last two stages monitoring and closing can also be
effectively done through using this model.
Project life cycle is very important for every company. Through this BCS company can
easily create new product development plans and policies. PLC process is very important for
every project so that all tasks and activities can be easily be implemented in the firm. As it
provides a structural process and different stages though which new product can easily be
launched in the market. It helps project manager to to determine that stages from initiating and
completing stages are determined. It helps in finding weak points or deviations and can take
necessary steps to improve those variations. They can also determine different risks in the project
so that all activities and tasks can easily be performed. Through this they can also fund different
advantages and benefits deriving from the project after creating PLC stages.
BSC can also determine the facts and figures which are required in the project through
this stage. Important advantages of PLC in BCS are described below:
It helps in reducing the defects in performing all activities by staff members. So as a
result they can take corrective actions to improve these deviations. Through this it can
give opportunity to staff members to perform efficiently and effectively.
By using PLC stages project manager can give direction to all staff members so that they
can perform their role very effectively. This is important so that they can have knowledge
of activities and hence they can finish their task in time.
Thee are different stages which can be provided to project manager so hence as a result
they can fund weak points and can also find stronger areas. Through this they can easily
take decisions such as improving weak points and working more on stronger areas so that
activities can be performed in an better manner. Through this all task can be completed in
time. Hence it saves time of project manager in evaluating all activities which are
performed in firm. It leads to success and growth of BCS.
12

CONCLUSION
Operations and project management is very important for every company. Through this
they can manage all activities and tasks in business. Hence it leads to effective functioning of
production process. Reviewing of different operational management principles are followed in
company. Continuous improvement plans is created. Application of PLC stages in firm and
evaluate effectiveness of PLC with different theories and models.
13
Operations and project management is very important for every company. Through this
they can manage all activities and tasks in business. Hence it leads to effective functioning of
production process. Reviewing of different operational management principles are followed in
company. Continuous improvement plans is created. Application of PLC stages in firm and
evaluate effectiveness of PLC with different theories and models.
13

REFERENCES
Books and Journals
Antonio Martins, V. and Ramos Martins, M., 2012. Outsourcing operations in project
management offices: The reality of Brazilian companies.Project management
journal.43(2). pp.68-83.
Beringer, C., Jonas, D. and Kock, A., 2013. Behavior of internal stakeholders in project portfolio
management and its impact on success.International Journal of Project
Management.31(6). pp.830-846.
Blomquist, T. and et. al., 2010. Project‐as‐practice: In search of project management research
that matters.Project Management Journal.41(1). pp.5-16.
Brauers, W. K. M. and Zavadskas, E. K., 2010. Project management by MULTIMOORA as an
instrument for transition economies.Technological and Economic Development of
Economy.16(1). pp.5-24.
Fernández-Sánchez, G. and Rodríguez-López, F., 2010. A methodology to identify sustainability
indicators in construction project management—Application to infrastructure projects in
Spain.Ecological Indicators.10(6). pp.1193-1201.
Fleming, Q. W. and Koppelman, J. M., 2016, December. Earned value project management.
Project Management Institute.
Gunasekaran, A. and Ngai, E. W., 2012. The future of operations management: an outlook and
analysis.International Journal of Production Economics. 135(2). pp.687-701.
Lenfle, S. and Loch, C., 2010. Lost roots: how project management came to emphasize control
over flexibility and novelty. California Management Review. 53(1). pp.32-55.
Mir, F. A. and Pinnington, A. H., 2014. Exploring the value of project management: linking
project management performance and project success. International journal of project
management.32(2). pp.202-217.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in project-
based organisations.International Journal of Project Management.31(1). pp.31-42.
Ramasesh, R. V. and Browning, T. R., 2014. A conceptual framework for tackling knowable
unknown unknowns in project management. Journal of Operations Management. 32(4).
pp.190-204.
Robichaud, L. B. and Anantatmula, V. S., 2010. Greening project management practices for
sustainable construction.Journal of Management in Engineering.27(1). pp.48-57.
Söderlund, J., 2011. Pluralism in project management: navigating the crossroads of
specialization and fragmentation International Journal of Management Reviews. 13(2).
pp.153-176.
Subramanian, N. and Ramanathan, R., 2012. A review of applications of Analytic Hierarchy
Process in operations management.International Journal of Production
Economics. 138(2). pp.215-241.
Turner, R., 2016. Gower handbook of project management. Routledge.
Online
Management Theories & Concepts at the Workplace. 2018. [Online]. Available
through:<http://smallbusiness.chron.com/management-theories-concepts-workplace-17693.
html>.
14
Books and Journals
Antonio Martins, V. and Ramos Martins, M., 2012. Outsourcing operations in project
management offices: The reality of Brazilian companies.Project management
journal.43(2). pp.68-83.
Beringer, C., Jonas, D. and Kock, A., 2013. Behavior of internal stakeholders in project portfolio
management and its impact on success.International Journal of Project
Management.31(6). pp.830-846.
Blomquist, T. and et. al., 2010. Project‐as‐practice: In search of project management research
that matters.Project Management Journal.41(1). pp.5-16.
Brauers, W. K. M. and Zavadskas, E. K., 2010. Project management by MULTIMOORA as an
instrument for transition economies.Technological and Economic Development of
Economy.16(1). pp.5-24.
Fernández-Sánchez, G. and Rodríguez-López, F., 2010. A methodology to identify sustainability
indicators in construction project management—Application to infrastructure projects in
Spain.Ecological Indicators.10(6). pp.1193-1201.
Fleming, Q. W. and Koppelman, J. M., 2016, December. Earned value project management.
Project Management Institute.
Gunasekaran, A. and Ngai, E. W., 2012. The future of operations management: an outlook and
analysis.International Journal of Production Economics. 135(2). pp.687-701.
Lenfle, S. and Loch, C., 2010. Lost roots: how project management came to emphasize control
over flexibility and novelty. California Management Review. 53(1). pp.32-55.
Mir, F. A. and Pinnington, A. H., 2014. Exploring the value of project management: linking
project management performance and project success. International journal of project
management.32(2). pp.202-217.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in project-
based organisations.International Journal of Project Management.31(1). pp.31-42.
Ramasesh, R. V. and Browning, T. R., 2014. A conceptual framework for tackling knowable
unknown unknowns in project management. Journal of Operations Management. 32(4).
pp.190-204.
Robichaud, L. B. and Anantatmula, V. S., 2010. Greening project management practices for
sustainable construction.Journal of Management in Engineering.27(1). pp.48-57.
Söderlund, J., 2011. Pluralism in project management: navigating the crossroads of
specialization and fragmentation International Journal of Management Reviews. 13(2).
pp.153-176.
Subramanian, N. and Ramanathan, R., 2012. A review of applications of Analytic Hierarchy
Process in operations management.International Journal of Production
Economics. 138(2). pp.215-241.
Turner, R., 2016. Gower handbook of project management. Routledge.
Online
Management Theories & Concepts at the Workplace. 2018. [Online]. Available
through:<http://smallbusiness.chron.com/management-theories-concepts-workplace-17693.
html>.
14
1 out of 16
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.