This report delves into the core principles of operations and project management, using Sainsbury and Sunshine as case studies. It begins by reviewing and critiquing the implementation of operations management principles within an organizational context, focusing on variance, organization, change, and fundamentals, and their application to logistics and supply chain management. The report then proposes a continuous improvement plan, examining its effectiveness and incorporating the PDCA cycle. Furthermore, it applies the project life cycle (PLC), analyzing project methodologies, tools, and leadership within the PLC. The report concludes with a review and critique of the PLC's effectiveness, supported by relevant theories and models, considering both small and large-scale projects. The report aims to provide insights into optimizing operations and project management for enhanced organizational performance and sustainable development.

Operations & Project
Management
Management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................3
LO1..................................................................................................................................................3
Review and critique of the implementation of operations management principles within an
organisational context.............................................................................................................3
M1: Review and critique on implementation of operation management...............................6
LO2..................................................................................................................................................6
P1 & D1: Continuous improvement plan based on the review and critique of operations
management principles ..........................................................................................................6
M2: Effectiveness of continuous improvement plan .............................................................9
Apply each stage of the PLC, producing necessary supporting documentation for completing
project.....................................................................................................................................9
M3: Analyse project methodology, tools and leadership within PLC..................................15
LO4................................................................................................................................................15
P4 & D2: Review and critique the effectiveness of the PLC in application to the chosen
project using appropriate theories, concepts and models.....................................................15
M4: Critically analyse different theories on the basis of small and large size project.........17
CONCLUSION..............................................................................................................................19
REFERENCES..............................................................................................................................20
INTRODUCTION...........................................................................................................................3
LO1..................................................................................................................................................3
Review and critique of the implementation of operations management principles within an
organisational context.............................................................................................................3
M1: Review and critique on implementation of operation management...............................6
LO2..................................................................................................................................................6
P1 & D1: Continuous improvement plan based on the review and critique of operations
management principles ..........................................................................................................6
M2: Effectiveness of continuous improvement plan .............................................................9
Apply each stage of the PLC, producing necessary supporting documentation for completing
project.....................................................................................................................................9
M3: Analyse project methodology, tools and leadership within PLC..................................15
LO4................................................................................................................................................15
P4 & D2: Review and critique the effectiveness of the PLC in application to the chosen
project using appropriate theories, concepts and models.....................................................15
M4: Critically analyse different theories on the basis of small and large size project.........17
CONCLUSION..............................................................................................................................19
REFERENCES..............................................................................................................................20

INTRODUCTION
Operations and project management is used to perform routine functions of an
organisation successfully. It involve various process like planning, organising as well as
controlling the resources of organisation to attain the goal of an organisation. Efficient and
effective management of project as well as operations helps the fund in optimum utilisation of
resources in order to achieve long term sustainable development (Heizer and et. al., 2017). To
better under the report Sainsbury and Sunshine company has been selected which is divided in
two parts A and B respectively. Sainsbury is one of the leading multinational retail store of UK
that offer various goods and services to customer. Whereas, Sunshine drink they engage to
activities like manufacturing as well as sale of fruit drink to build the confidence of customer
towards the product. Furthermore, first part comprises of information regarding review and
critique of effective management of operation for continuous improvement of company.
Similarly the other part of the report carry application on project life cycle to review and critique
its application (Harrison and Lock, 2017).
LO1
Review and critique of the implementation of operations management principles within an
organisational context
Operations refer to the job or task performed to transfer the raw material into desirable
product by delivering value to the customer. It basically emphasize on activities only associated
with production or operation management. On contrary, Operations Management include the
activity like designing or redesigning the operations of business in order to produce desirable
good and services. Further, it include activities like planning, controlling, coordination,
management as well as marketing the operations of business.
Sainsbury is one of the largest supermarket retail store of UK which was founded in 1869
and has occupied huge market share within its home country by dealing in various product such
as grocery, furniture, electronics and so on. There are over one thousand retail stores of company
that has engaged diverse number of population which result in increase the footfall of each store
(Binder, 2016). Therefore, the continuous improvement of company in terms of project and
operation management has given a tough competition to other retails store of UK that is Asda,
TK Maxx and so on.
Operations and project management is used to perform routine functions of an
organisation successfully. It involve various process like planning, organising as well as
controlling the resources of organisation to attain the goal of an organisation. Efficient and
effective management of project as well as operations helps the fund in optimum utilisation of
resources in order to achieve long term sustainable development (Heizer and et. al., 2017). To
better under the report Sainsbury and Sunshine company has been selected which is divided in
two parts A and B respectively. Sainsbury is one of the leading multinational retail store of UK
that offer various goods and services to customer. Whereas, Sunshine drink they engage to
activities like manufacturing as well as sale of fruit drink to build the confidence of customer
towards the product. Furthermore, first part comprises of information regarding review and
critique of effective management of operation for continuous improvement of company.
Similarly the other part of the report carry application on project life cycle to review and critique
its application (Harrison and Lock, 2017).
LO1
Review and critique of the implementation of operations management principles within an
organisational context
Operations refer to the job or task performed to transfer the raw material into desirable
product by delivering value to the customer. It basically emphasize on activities only associated
with production or operation management. On contrary, Operations Management include the
activity like designing or redesigning the operations of business in order to produce desirable
good and services. Further, it include activities like planning, controlling, coordination,
management as well as marketing the operations of business.
Sainsbury is one of the largest supermarket retail store of UK which was founded in 1869
and has occupied huge market share within its home country by dealing in various product such
as grocery, furniture, electronics and so on. There are over one thousand retail stores of company
that has engaged diverse number of population which result in increase the footfall of each store
(Binder, 2016). Therefore, the continuous improvement of company in terms of project and
operation management has given a tough competition to other retails store of UK that is Asda,
TK Maxx and so on.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Operation management has various principle which can be implemented by Sainsbury
company in order to strengthen its operations that include supply chain as well as logistics.
Therefore, these principle are defined below (Lientz and Rea, 2016):
Variance: Variance refer to the deviation that causes because of gap between standard
performance as well as actual performance of business. To minimise the chances of deviation
and expenditure of company respective principle is adopted. Herein, Sainsbury takes effect to
manage their logistic in order to make the product available to customer but this process ends up
in increasing the expenditure of company. As it consumes huge time as well as fund to
recruitment the workforce and train them. Thus, company need to select most optimum
technique in order to reduce excess cost.
Organisation: To gain long term profitability company should manage its operations
effectively (Fleming and Koppelman, 2016). Like, Sainsbury makes effort to manage its
operations of logistics and supply chain by hiring big vehicles like trucks. Therefore, with the
growth and diversification of company it becomes tough for the organisation to manage all the
operations with same level of efficiency which can act ineffective to run operations.
Change: Changes are significant for the organisation with passage of time like the
existing desirable operations needs to be enhanced in future. In relation to Sainsbury company
can adopt new theory or model to the better management of its supply chain as well as logistics.
Along with that instead of fastest mode standard delivery technique are adopted by company that
leads to increase in cost as well as delay in delivery of items which makes it an ineffective
principle .
Fundamentals: According to this principle there are rules or norms of the company
which needs to be abide by the internal staff so that best possible output is delivered to the
customer (Pheng and Meng, 2018). In order to promote sustainable development respected
company makes measure like “green” clause to maintain the interest on environment as well as
society due to which it is an effective principle.
The motive to implement the principles of operation management is to work on the area
which are ineffective and provide essential solution to meet the upcoming requirement of an
organisation. The analysis of operation management is stated below:
In order to meet the requirement of selected company they need to make significant effort
to lower down the cost of overall operations (van Aken, Chandrasekaran and Halman,
company in order to strengthen its operations that include supply chain as well as logistics.
Therefore, these principle are defined below (Lientz and Rea, 2016):
Variance: Variance refer to the deviation that causes because of gap between standard
performance as well as actual performance of business. To minimise the chances of deviation
and expenditure of company respective principle is adopted. Herein, Sainsbury takes effect to
manage their logistic in order to make the product available to customer but this process ends up
in increasing the expenditure of company. As it consumes huge time as well as fund to
recruitment the workforce and train them. Thus, company need to select most optimum
technique in order to reduce excess cost.
Organisation: To gain long term profitability company should manage its operations
effectively (Fleming and Koppelman, 2016). Like, Sainsbury makes effort to manage its
operations of logistics and supply chain by hiring big vehicles like trucks. Therefore, with the
growth and diversification of company it becomes tough for the organisation to manage all the
operations with same level of efficiency which can act ineffective to run operations.
Change: Changes are significant for the organisation with passage of time like the
existing desirable operations needs to be enhanced in future. In relation to Sainsbury company
can adopt new theory or model to the better management of its supply chain as well as logistics.
Along with that instead of fastest mode standard delivery technique are adopted by company that
leads to increase in cost as well as delay in delivery of items which makes it an ineffective
principle .
Fundamentals: According to this principle there are rules or norms of the company
which needs to be abide by the internal staff so that best possible output is delivered to the
customer (Pheng and Meng, 2018). In order to promote sustainable development respected
company makes measure like “green” clause to maintain the interest on environment as well as
society due to which it is an effective principle.
The motive to implement the principles of operation management is to work on the area
which are ineffective and provide essential solution to meet the upcoming requirement of an
organisation. The analysis of operation management is stated below:
In order to meet the requirement of selected company they need to make significant effort
to lower down the cost of overall operations (van Aken, Chandrasekaran and Halman,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

2016). For instance, company is apply the principle of variance for its wide variety of
products whether it is related to clothes, grocery or furniture. Henceforth, the motive of
this principle is to increase the variety instead of reducing the cost. So if the purpose is to
minimise the cost then this principle fails to fulfil the requirement.
Along with that it is significant to manage the logistics as well as supply chain of
company for which they need to implement such principle which can manage the whole
diverse operation effectively. Therefore, to perform each activity the requirement should
be met that helps in minimise the chances of that can affect the organisation principle.
It is significant to adopt most desirable technique to maintain the supply chain. Like
company has adopted principle of technique to manage the logistics of company. Thus,
this principle are trying to meet the existing requirement because of the progressive
development. Therefore, organisation must make sure they must need the upcoming
requirements as well.
Principles of operation management: Operation management is a driving force that
helps to make the plan, business decision as well as conduct organisation process to make the
business decision successfully. According to Randall Schaeffer there are various principles of
operation management and some of them are defined below:
Principle of reality: Within this principle operation management must focus on the issue
of operation management rather than the technique. This is because the organisation can not have
the universal solution due to which issue needs to be identified effectively.
Positive aspect: It helps to avoid the same problem again even if the problem rises again
then internal member will gain the knowledge about how the things can be tackled.
Negative aspect: It is time consuming problem as huge time gets wasted in understanding
the problem.
Principle of Inventory management: The principle of inventory management includes
the participation of various employee to perform their role as well as responsibility effectively.
Proper management of inventory helps to decrease the chances of defects or spoilage by avoid
wasteful expenditure.
Positive aspect: It is an effective principle which can be adopted by respective company
the identifying the requirement and availability of inventory accordingly this gap is filled
effectively.
products whether it is related to clothes, grocery or furniture. Henceforth, the motive of
this principle is to increase the variety instead of reducing the cost. So if the purpose is to
minimise the cost then this principle fails to fulfil the requirement.
Along with that it is significant to manage the logistics as well as supply chain of
company for which they need to implement such principle which can manage the whole
diverse operation effectively. Therefore, to perform each activity the requirement should
be met that helps in minimise the chances of that can affect the organisation principle.
It is significant to adopt most desirable technique to maintain the supply chain. Like
company has adopted principle of technique to manage the logistics of company. Thus,
this principle are trying to meet the existing requirement because of the progressive
development. Therefore, organisation must make sure they must need the upcoming
requirements as well.
Principles of operation management: Operation management is a driving force that
helps to make the plan, business decision as well as conduct organisation process to make the
business decision successfully. According to Randall Schaeffer there are various principles of
operation management and some of them are defined below:
Principle of reality: Within this principle operation management must focus on the issue
of operation management rather than the technique. This is because the organisation can not have
the universal solution due to which issue needs to be identified effectively.
Positive aspect: It helps to avoid the same problem again even if the problem rises again
then internal member will gain the knowledge about how the things can be tackled.
Negative aspect: It is time consuming problem as huge time gets wasted in understanding
the problem.
Principle of Inventory management: The principle of inventory management includes
the participation of various employee to perform their role as well as responsibility effectively.
Proper management of inventory helps to decrease the chances of defects or spoilage by avoid
wasteful expenditure.
Positive aspect: It is an effective principle which can be adopted by respective company
the identifying the requirement and availability of inventory accordingly this gap is filled
effectively.

Negative aspect:It is time consuming process and if the demand is not forecasted
property then it may lead to shortage of good.
Therefore, these are the effective principle of operation management that helps to manage
the internal operation effectively.
Lean principle: This principle is useful for the manufacturing process as it encourages
the internal management team to remain encouraged in order to regular enhance the offering of
company. This principle is implemented in the workplace in order to enhance the efficiency of
the company and remain ahead of the competitors.
Positive: This allow the manager of Sainsbury company in discover the inefficiencies and
work on them so that they can offer the value to the end user. It basically encourages the
workforce to create the better work process and function for the betterment of business. Further,
lean production method even decreases the cost associated with doing the business.
Negative: Here even the minor failure or labour inefficiency can leads to inconsistent
work that directly affect the systematic operations of business. Also machine failure is again the
disadvantage of this principle as it lower down business performance.
M1: Review and critique on implementation of operation management
Operation management is the beneficial activity that assist the manager to carry the
potential bushiness activities in an effective manner. To enhance the profitability and
productivity an organisation require the participation of skilled labour, equipment as well as
material. Such as lean principle comprises of the five stages that is identify value, map value
stream, create flow, establish pull and seek perfection which are followed by the different
business entities in order to establish the functioning effectively. Further, six sigma tool can be
used to bring improvement with the process of organisation capacity. Thus, the modifications in
the existing strategies leads to generate of huge output.
LO2
P1 & D1: Continuous improvement plan based on the review and critique of operations
management principles
Continuous Improvement Plan is the ongoing improvement plan where company takes
significant effort to enhance the quality of product on the basis of review from the potential
property then it may lead to shortage of good.
Therefore, these are the effective principle of operation management that helps to manage
the internal operation effectively.
Lean principle: This principle is useful for the manufacturing process as it encourages
the internal management team to remain encouraged in order to regular enhance the offering of
company. This principle is implemented in the workplace in order to enhance the efficiency of
the company and remain ahead of the competitors.
Positive: This allow the manager of Sainsbury company in discover the inefficiencies and
work on them so that they can offer the value to the end user. It basically encourages the
workforce to create the better work process and function for the betterment of business. Further,
lean production method even decreases the cost associated with doing the business.
Negative: Here even the minor failure or labour inefficiency can leads to inconsistent
work that directly affect the systematic operations of business. Also machine failure is again the
disadvantage of this principle as it lower down business performance.
M1: Review and critique on implementation of operation management
Operation management is the beneficial activity that assist the manager to carry the
potential bushiness activities in an effective manner. To enhance the profitability and
productivity an organisation require the participation of skilled labour, equipment as well as
material. Such as lean principle comprises of the five stages that is identify value, map value
stream, create flow, establish pull and seek perfection which are followed by the different
business entities in order to establish the functioning effectively. Further, six sigma tool can be
used to bring improvement with the process of organisation capacity. Thus, the modifications in
the existing strategies leads to generate of huge output.
LO2
P1 & D1: Continuous improvement plan based on the review and critique of operations
management principles
Continuous Improvement Plan is the ongoing improvement plan where company takes
significant effort to enhance the quality of product on the basis of review from the potential
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

customer. Sainbury can adopt continuous planning plan to enhance the operations of business
and produce desirable output within stipulated time period.
Lean principle aim of application of this methodology is to provide maximum value to
the customer by minimising or controlling the unnecessary expenditure of company. It comprise
of five principles that is define, value, map the value stream, create flow, establish pull as well as
pursue perfection (Verzuh, 2015). These principle enhance the overall productivity as well as
profitability of firm.
Hence, the continuous improvement method for Sainsbury in order to enhance its
performance is defined below:
BASIS CURRENT
METHODOLOGIES
PROPOSED
METHODOLOGIES
COST MANAGEMENT
Principle of variance is
implemented for multiple
goods of Sainsbury that
manage the operations of
business rather than
expenditure of company
The variance of company
between actual and standard
performance can be minimised
(Logistics, 2019). Along with
that company can lower down
its cost, manage its logistics
that further minimises the cost
of labour intensive technique.
QUALITY
The principle implemented to
enhance the quality of
customer services as well as
supply chain management
needs to be enhanced to gain
better output.
To maintain the quality of
services respected company
make sure they manage the
internal operations effectively
through just in time method.
Along with that company can
formulation good supplier
relation in order to gain the
quality inventory without
facing its shortage.
DELIVERY The current methodology Company and enhance its
and produce desirable output within stipulated time period.
Lean principle aim of application of this methodology is to provide maximum value to
the customer by minimising or controlling the unnecessary expenditure of company. It comprise
of five principles that is define, value, map the value stream, create flow, establish pull as well as
pursue perfection (Verzuh, 2015). These principle enhance the overall productivity as well as
profitability of firm.
Hence, the continuous improvement method for Sainsbury in order to enhance its
performance is defined below:
BASIS CURRENT
METHODOLOGIES
PROPOSED
METHODOLOGIES
COST MANAGEMENT
Principle of variance is
implemented for multiple
goods of Sainsbury that
manage the operations of
business rather than
expenditure of company
The variance of company
between actual and standard
performance can be minimised
(Logistics, 2019). Along with
that company can lower down
its cost, manage its logistics
that further minimises the cost
of labour intensive technique.
QUALITY
The principle implemented to
enhance the quality of
customer services as well as
supply chain management
needs to be enhanced to gain
better output.
To maintain the quality of
services respected company
make sure they manage the
internal operations effectively
through just in time method.
Along with that company can
formulation good supplier
relation in order to gain the
quality inventory without
facing its shortage.
DELIVERY The current methodology Company and enhance its
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

require change, as the product
needs to be delivered
effectively for which company
needs to enhance its operations
and choose those mode that
delivery to ultimate user within
stipulated time period.
distribution channel like
instead of only delivery the
product to retailer company
can choose more effective
modes such as airways or
seaways to make the delivery
of product.
Recommendations
Instead of just maintaining existing innovation Sainsbury can enhance its method of
operations through continuous improvement programme. This can help the company to
adopt advance technology that can give company core advantage over others.
Along with that company can use just in time method that helps to reduce the storage and
wastage cost of inventory for the company (Kerzner, 2019).
PDCA Cycle: It refer to plan do check and act which is a continuous improvement
process that enhance the quality of the product. It include four stages which are defined below:
Plan: Plan include the problem which needs to be addressed for which all decision are
made like how data will be collected to eradicate the root cause of problem.
Do: It refer to the action which needs to be implemented as a solution of the problem.
Check: After the solution is implemented check help the business tgo identify the
ultimate result and variation by comparing the data.
Act: Within this the further changes are imposed by the company based on the
recommendations of the problem.
Continuous improvement plan: While formulating the project business manager can
consider this entity in order to receive efficient result and overcome the problem faced by firm. It
include the preparation of PDAC plan which is formulated below:
Plan Do Action Check
Quality While engaging with
customers and offer them
wide range of products,
Sainsbury basically rely
on the total quality
management technique
To check the functioning
manager of Sainsbury
company compare the
needs to be delivered
effectively for which company
needs to enhance its operations
and choose those mode that
delivery to ultimate user within
stipulated time period.
distribution channel like
instead of only delivery the
product to retailer company
can choose more effective
modes such as airways or
seaways to make the delivery
of product.
Recommendations
Instead of just maintaining existing innovation Sainsbury can enhance its method of
operations through continuous improvement programme. This can help the company to
adopt advance technology that can give company core advantage over others.
Along with that company can use just in time method that helps to reduce the storage and
wastage cost of inventory for the company (Kerzner, 2019).
PDCA Cycle: It refer to plan do check and act which is a continuous improvement
process that enhance the quality of the product. It include four stages which are defined below:
Plan: Plan include the problem which needs to be addressed for which all decision are
made like how data will be collected to eradicate the root cause of problem.
Do: It refer to the action which needs to be implemented as a solution of the problem.
Check: After the solution is implemented check help the business tgo identify the
ultimate result and variation by comparing the data.
Act: Within this the further changes are imposed by the company based on the
recommendations of the problem.
Continuous improvement plan: While formulating the project business manager can
consider this entity in order to receive efficient result and overcome the problem faced by firm. It
include the preparation of PDAC plan which is formulated below:
Plan Do Action Check
Quality While engaging with
customers and offer them
wide range of products,
Sainsbury basically rely
on the total quality
management technique
To check the functioning
manager of Sainsbury
company compare the

the manager of
Sainsbury company
need to maintain the
quality of product and
make viable decision to
carry out business
processes.
in order to meet the
expectation of customer
and remain competitive.
current standard with the
actual standard to attain
the appropriate result for
adequate business
functioning.
Promotion Sainsbury can use
different promotional
tool and technique to
generate the awareness
of company regarding
the specific brand in the
market.
Within this stage digital
media or traditional
platform such as leaflet,
newspaper as well as
customised advertisement
can assist the company to
remain ahead of rivalries.
On the basis of google
analytics, Sainsbury
company can demonstrate
whether their technique
are giving them
affirmative result or not.
M2: Effectiveness of continuous improvement plan
Continuous improvement plan assist to modify the existing business processes
appropriately by allocating the customer activities to meet the objective. In case of the changing
environment the organisation modify its technique in order to allocate the resources effectively
due to which they can serve potential market suitable. Along with that promotional activities can
help the Sainsbury company to wide up the existing footfall with the efforts of consumer.
Apply each stage of the PLC, producing necessary supporting documentation for completing
project
There are various phases of product life cycle such as initiation, planning, execution as
well as closure that helps to perform the overall work of an organisation effectively.
Business Case:
BASIS DESCRIPTION
Importance Sunshine Drinks Company is into manufacturing, market as well as
sell the fruit drinks of various flavour such as tropical fruit flavour
and summer fruit flavour. Along with that company serve special
Sainsbury company
need to maintain the
quality of product and
make viable decision to
carry out business
processes.
in order to meet the
expectation of customer
and remain competitive.
current standard with the
actual standard to attain
the appropriate result for
adequate business
functioning.
Promotion Sainsbury can use
different promotional
tool and technique to
generate the awareness
of company regarding
the specific brand in the
market.
Within this stage digital
media or traditional
platform such as leaflet,
newspaper as well as
customised advertisement
can assist the company to
remain ahead of rivalries.
On the basis of google
analytics, Sainsbury
company can demonstrate
whether their technique
are giving them
affirmative result or not.
M2: Effectiveness of continuous improvement plan
Continuous improvement plan assist to modify the existing business processes
appropriately by allocating the customer activities to meet the objective. In case of the changing
environment the organisation modify its technique in order to allocate the resources effectively
due to which they can serve potential market suitable. Along with that promotional activities can
help the Sainsbury company to wide up the existing footfall with the efforts of consumer.
Apply each stage of the PLC, producing necessary supporting documentation for completing
project
There are various phases of product life cycle such as initiation, planning, execution as
well as closure that helps to perform the overall work of an organisation effectively.
Business Case:
BASIS DESCRIPTION
Importance Sunshine Drinks Company is into manufacturing, market as well as
sell the fruit drinks of various flavour such as tropical fruit flavour
and summer fruit flavour. Along with that company serve special
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

drink based on the season like natural filtered soft drink are served
during the spring season. These drinks are basically served to
refresh the consumer by eliminating added preservatives, flavour
and sugar content and making the drink healthier to consumed
Target Market
Sunshine drink target to youth, middle as well as old adult who are
the local resident of UK. This target group especially include those
people who are health freak or conscious and likes to intake organic
food or beverages (Simpson and et. al., 2015).
Cost Benefit Analysis:
Particulars Situation 1 Situation 2
Costs 100000 120000
Benefit 0 20000
(BEP point)
Costs Benefit
0
20000
40000
60000
80000
100000
120000
140000 Chart Title
Column C Column D
Project Initiation:
If is the first stage of product life cycle which is used to determine objective,
requirement, opportunity which is needed for the project (Slack and Brandon-Jones, 2018).
Herein, respective company with the help of this stage checks the feasibility of overall project
and that value it will derive to the customer. It include decision making process where the ideas
of internal member are put forward to solve the issues meet the requirement of business.
during the spring season. These drinks are basically served to
refresh the consumer by eliminating added preservatives, flavour
and sugar content and making the drink healthier to consumed
Target Market
Sunshine drink target to youth, middle as well as old adult who are
the local resident of UK. This target group especially include those
people who are health freak or conscious and likes to intake organic
food or beverages (Simpson and et. al., 2015).
Cost Benefit Analysis:
Particulars Situation 1 Situation 2
Costs 100000 120000
Benefit 0 20000
(BEP point)
Costs Benefit
0
20000
40000
60000
80000
100000
120000
140000 Chart Title
Column C Column D
Project Initiation:
If is the first stage of product life cycle which is used to determine objective,
requirement, opportunity which is needed for the project (Slack and Brandon-Jones, 2018).
Herein, respective company with the help of this stage checks the feasibility of overall project
and that value it will derive to the customer. It include decision making process where the ideas
of internal member are put forward to solve the issues meet the requirement of business.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Objectives
The objective of Sunshine drink company is to increase the
market share of company by at-least 5% so that customer
starts recognising the product and leads to repeat purchasing
and word of mouth promotion.
Moreover, the purpose of company is to enhance the
customer base rapidly as the organisation cannot force the
people to make purchase from their company only but they
can compel them to switch to their brand (McArthur, 2015).
Strategies
To accomplish the same, this company would be developing a top
quality energy drink along with robust advertising and marketing
through social media to gain popularity. Further, pricing penetration
strategy would be used by the firm to sell this product.
Thus, at this stage the project manager further passes the report to the higher authority or level
for approval to rectify the omissions of company. Sunshine energy company can apply the six
sigma methodology to improve the existing function of business. Along with that it helps to
lower down the expenditure of company and making the project more feasible.
Project Planning:
This stage require detail planning regarding the development of new or innovative
product. Moreover, it include the role of top management as well as project manager to gain deep
insights about the project. Along with that there are various factors which are associated with
implementation of project such as availability of resources and fund. Thus, management makes
discussion regarding all of these factors and accordingly budget is prepared to fill the gaps of
organisation. Therefore, the project planning for Sunshine is mentioned below:
Cost Sunshine company has to incur expenditure on the technology as well
as resources require to perform the activities associated with the
project. The estimated total expenditure which company needs to incur
is approximately £95,000
The objective of Sunshine drink company is to increase the
market share of company by at-least 5% so that customer
starts recognising the product and leads to repeat purchasing
and word of mouth promotion.
Moreover, the purpose of company is to enhance the
customer base rapidly as the organisation cannot force the
people to make purchase from their company only but they
can compel them to switch to their brand (McArthur, 2015).
Strategies
To accomplish the same, this company would be developing a top
quality energy drink along with robust advertising and marketing
through social media to gain popularity. Further, pricing penetration
strategy would be used by the firm to sell this product.
Thus, at this stage the project manager further passes the report to the higher authority or level
for approval to rectify the omissions of company. Sunshine energy company can apply the six
sigma methodology to improve the existing function of business. Along with that it helps to
lower down the expenditure of company and making the project more feasible.
Project Planning:
This stage require detail planning regarding the development of new or innovative
product. Moreover, it include the role of top management as well as project manager to gain deep
insights about the project. Along with that there are various factors which are associated with
implementation of project such as availability of resources and fund. Thus, management makes
discussion regarding all of these factors and accordingly budget is prepared to fill the gaps of
organisation. Therefore, the project planning for Sunshine is mentioned below:
Cost Sunshine company has to incur expenditure on the technology as well
as resources require to perform the activities associated with the
project. The estimated total expenditure which company needs to incur
is approximately £95,000

Communication
In order to maintain smooth business process company conduct two
way communication where both the management as well as staff
remain free to share their views (Maylor, Turner and Murray-Webster,
2015).
Quality
To maintain the quality of innovative product company adopt upgraded
technology to maintain the quality of product and prepare the product
within stipulated time period.
Scope Scope of project is to employee the most suitable workforce and can
maintain the quality and helps to achieve sustainable development.
Therefore, at this stage lean principle can be used by company to control their waste that
result in lower downing overall expenditure of company. Along with that company can adopt
autocratic leadership style instead of democratic because this stage require allocation of roles
which are delivered by the top managers. Thus, to better understand gantt chart as well as work
breakdown structure has been prepared.
Gantt Chart:
In order to maintain smooth business process company conduct two
way communication where both the management as well as staff
remain free to share their views (Maylor, Turner and Murray-Webster,
2015).
Quality
To maintain the quality of innovative product company adopt upgraded
technology to maintain the quality of product and prepare the product
within stipulated time period.
Scope Scope of project is to employee the most suitable workforce and can
maintain the quality and helps to achieve sustainable development.
Therefore, at this stage lean principle can be used by company to control their waste that
result in lower downing overall expenditure of company. Along with that company can adopt
autocratic leadership style instead of democratic because this stage require allocation of roles
which are delivered by the top managers. Thus, to better understand gantt chart as well as work
breakdown structure has been prepared.
Gantt Chart:
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 21
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.