This project report details the development of an Online Stud Farm Management System (OSFMS) contracted by Globex to Virticon, aiming to replace the error-prone manual systems with an efficient online platform. The report covers various aspects of the project, including the Measurable Organizational Value (MOV), which focuses on customer, social, strategic, operational, and financial impacts. It outlines the scope management plan, detailing what is included and excluded, along with deliverables and scope verification procedures. The project schedule is presented using a Work Breakdown Structure (WBS) and Gantt chart, highlighting milestones and deliverables. Furthermore, the report includes a risk analysis and planning section, identifying potential risks and mitigation strategies. Finally, it addresses the quality management plan, focusing on objectives for quality system delivery, including addressing issues in quality assurance. Appendices include an annotated bibliography, a closure checklist, and a project evaluation.
Document Page
Running head: PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Project Management: Online Stud Farm Management (OSFMS)
Name of the Student
Name of the University
Authors Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Table of Contents
1. Project Description:............................................................................................................3
2. Part One:.............................................................................................................................3
2.1 Measurable Organizational Value (MOV).......................................................................3
2.2 Area of impact..................................................................................................................3
2.3 Types of Value.................................................................................................................4
2.4 Project Metric...................................................................................................................4
2.5 MOV timeframe...............................................................................................................5
2.6 Summary..........................................................................................................................5
3. Part Two:............................................................................................................................5
3.1 Scope Management Plan.............................................................................................5
3.1.1 Project Scope.................................................................................................................5
3.1.2 List of Resources...........................................................................................................7
4. Part Three...........................................................................................................................7
4.1 Project schedule using WBS:......................................................................................7
4.1.1 Schedule of the Project..................................................................................................7
4.1.2 WBS............................................................................................................................10
4.1.3 Milestones Phases and Deliverables...........................................................................10
5. Part Four:..........................................................................................................................11
5.1 Risk Analysis and Planning of a Project:.......................................................................11
5.1.1 Assumption for the Project..........................................................................................11
5.1.2 Risk Identification Framework...................................................................................11
Document Page
2PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
6. Part Five:..........................................................................................................................15
6.1 Quality Management Plan..............................................................................................15
6.2 Objectives of quality system delivery for the client.......................................................15
6.2.1 Issues in Quality..........................................................................................................15
7. Bibliography.....................................................................................................................17
8. Appendices:......................................................................................................................20
Appendix 1: Annotated Bibliography..................................................................................20
Appendix 2: Closure Checklist............................................................................................21
Appendix 3: Project Evaluation:..........................................................................................22
Document Page
3PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
1. Project Description:
The project is based on the case study Online Stud Farm Management System (OSFMS).
For the development in the OSFMS, Globex has contracted Virticon for developing and
managing the project. It is a newly development Farm and since Globex as a long-standing
client of Virtucon, it has made the contract with them and plan to develop the farm. The
OSFMS will be develop in house by the Globex and they will make sure that the solution of
this project is on time and with less expenses as much it is possible taking into consideration
that the requirement of the project is met.
The current Manual Systems of the Stud Farm will be replacing by the OSFMS as this
process handle the information with open error and it is unsustainable. In Manual Systems,
breeders book the services by call or mail and the stud manager has to record them in the
spreadsheet and accept the payment by cheque or credit cards. Now, the breeder will be able
to book and make the payment for services through online platform or from any mobile
devices. The system will be generating breeder’s details, payments, stud details and reports.
The breeder still has an additional option of calling the Stud Manager and booking the
services over phone as per the need arises. The project report in this study will consider
several factors such as the breeding features, financial features and mobile features.
2. Part One:
2.1 Measurable Organizational Value (MOV)
The goal of the project is to develop the Online Stud Farm Management System
(OSFMS) and it will define the value that the Virticon team will provide to the Globex
client.
2.2 Area of impact
The impact of the project will be rank based on the importance as follow:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Customer: The Breeder of Globex can adopt Online Stud Farm Management System
(OSFMS) to book their services and make the payment online. It can reduce the effort to call
and wait to get the things done manually.
Social: The new Online Stud Farm Management System is easy to book services
between the clients and communicate effectively and smoothly with less time consume.
Strategy: Every details of the breeding report that are booked and all the payment
made are being properly recorded in this newly built Online Stud Farm Management System
Operational: The operation become easier for the Stud Farm as it uses the OSFMS
online system to store their details in the database. The Stud Manager can easily get the
details of any breeder simply by acquiring the information from the database.
Financial: The OSFMS system is designed in such manner that it can help in making
the payment quickly by the breeder and keeping the records of the payment made by the
breeders.
2.3 Types of Value
According to the project being develop following are the types of value being
identified:
Better: The system has improved the manual record to online entry, which has been
helpful for the Stud Manager to check through the records
Faster: The process has been faster and quick, quick booking and making payment
with any much delay
Do more: The client would definitely consider the online system for the growth of
their services.
Document Page
5PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
2.4 Project Metric
Stakeholder Quantitative Target (money increase / decrease)
Target Expectation
Breeder Target +20 % Very Favorably Exceeding Target
Target +10% Exceeding Target
Target ±10% Performance Target
Target -20% Unfavorable Expectation
Target -10% Risk of Project Failure
Stud Manager
Table 1: Project Matric
2.5 MOV timeframe
Rank Effect Metrics Timeframe
1 Customer The Online Stud Farm Management System has the
capability to reduce the time of booking and making
the payment
1 months
2 Social Provide better communication between Breeder and
Stud Manager
2 months
3 Strategy With the Online Stud Farm Management System the
details of the booked services are recorded
3.5 months
4 Operationa
l
With the new design of Online Stud Farm
Management System, it become easier for the Business
Operation to keep record of the breeder
2.5 months
5 Financial The Online Stud Farm Management System made the
payment easier
4 months
2.6 Summary
MOV has provides the area of impact with reference to the OSFMS project and
identified the best type of value that suits the project and finally provided with the MOV
timeframe of the project.
3. Part Two:
3.1 Scope Management Plan
3.1.1 Project Scope
The project is all about developing the Online Stud Farm Management System.
Document Page
6PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Requisite: Virtucon has design the online system for the Globex to record the
details of booking and payment and track details of the breeders.
In of scope and out of scope:
In of scope: The project In of scope include
 The design of the Online Stud Farm Management System (OSFMS)
that provide the activities of the business
 It identifies and manage the records of the breeder services that has
been book
 It helps is making the payment quick and easier
 All the functionalities and non-functionalities of the requirement has
provided in the documented format about the OSFMS system that has
been design by the Virtucon
 The OSFMS system facilitate the project completion within the time of
20 days.
Out of Scope: The project Out of Scope include
 Providing an appropriate training to the staff has not been incorporated.
 Security Maintenance could not be assuring as data is stored online,
there are higher chance of the attackers to hack the data.
Deliverables: Deliverables of the project need-
 To understand the report design based on the system requirements.
 To follow the verification procedure of the project scope
 To document the budget of the project
 To give the overview of the development phase related to the project
 To document the test plan of the report of the system
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Procedure of Scope Verification: The scope of the project will meet the project
deliverables, understand the client requirement and solve the queries raised by the
client.
3.1.2 List of Resources
Resource Name Type Max.
Units Std. Rate
Project Manager Work 100% $100.00/hr
Program Developer Work 100% $82.00/hr
Database Administrator Work 100% $90.00/hr
Developer of GUI Work 100% $77.00/hr
Tester Work 100% $79.00/hr
System Analyst Work 100% $87.00/hr
Accountant Work 100% $88.00/hr
Requirement Analyst Work 100% $68.00/hr
Risk Manager Work 100% $66.00/hr
4. Part Three
4.1 Project schedule using WBS:
4.1.1 Schedule of the Project
Task Name Duration Start Finish Predecessors Resource
Names
OSFMS System 20 days? Sat 5/19/18 Fri 6/15/18
Initiation 3 days? Sat 5/19/18 Wed 5/23/18
Start the Business
Case development 1 day? Mon 5/21/18 Mon 5/21/18 Project
Manager
Assigning a project
manager 1 day? Tue 5/22/18 Tue 5/22/18 2 Project
Manager
Project Charter has
to develop 1 day? Wed 5/23/18 Wed 5/23/18 3 Project
Manager
Milestone 1:
Initiation 0 days Sat 5/19/18 Sat 5/19/18
Planning 12 days? Sat 5/19/18 Tue 6/5/18
Primary Planning
need to perform 7 days? Sat 5/19/18 Tue 5/29/18
Performing a Plan
with Supplementary 12 days? Sat 5/19/18 Tue 6/5/18
Document Page
8PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Quality
Management Planning 1 day? Wed 5/30/18 Wed 5/30/18 11 Project
Manager
Management of
database 1 day? Thu 5/31/18 Thu 5/31/18 14
Management of
Risk planning 1 day? Fri 6/1/18 Fri 6/1/18 15 Risk Manager
Management of
change planning 1 day? Mon 6/4/18 Mon 6/4/18 16 Project
Manager
Management of
communication Planning 1 day? Tue 6/5/18 Tue 6/5/18 17 Project
Manager
Milestone 3:
Confirmation of
Supplementary Planning
0 days Sat 5/19/18 Sat 5/19/18
Milestone 4:
Planning 0 days Sat 5/19/18 Sat 5/19/18
Execution 16 days? Sat 5/19/18 Mon 6/11/18
Checking of Records 1 day? Wed 6/6/18 Wed 6/6/18 18 Tester
Planning a meeting
with the stud manager 1 day? Thu 6/7/18 Thu 6/7/18 22 Project
Manager
providing with
updates 1 day? Fri 6/8/18 Fri 6/8/18 23 Program
Developer
Made necessary
modification 1 day? Mon 6/11/18 Mon 6/11/18 24 Program
Developer
Milestone 5:
Completion of
Execution
0 days Sat 5/19/18 Sat 5/19/18
Performance and
control 18 days? Sat 5/19/18 Wed 6/13/18
Checking progress of
the project 1 day Tue 6/12/18 Tue 6/12/18 25 Project
Manager
Checking the budget
cost and effort 1 day? Wed 6/13/18 Wed 6/13/18 28 Accountant
Milestone 6:
Completion of
performance and control
0 days Sat 5/19/18 Sat 5/19/18
Project Closure 20 days? Sat 5/19/18 Fri 6/15/18
Online Stud Farm
Management System
functioning evaluation
1 day? Thu 6/14/18 Thu 6/14/18 29 System
Analyst
Product Launch 1 day? Fri 6/15/18 Fri 6/15/18 32 Project
Manager
Milestone 6: Closing
of the project 0 days Sat 5/19/18 Sat 5/19/18
Document Page
9PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
Figure 1: Gantt Chart
Source: Created by Author
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
4.1.2 WBS
OSFMS System
Inititaon
Start the Business Case
development
Assigning a project
manager
Project Charter has to
develop
Milestone 1: Initiation
Planning
Primary Planning need to
perform
Create a WBS
Schedule the plan
Resources need for the
plan
Budgeting the plan
Milestone 2: Confirmation
of Primary Planning
Performing a Plan with
Supplementary
Quality Management
Planning
Management of database
Management of Risk
planning
Management of change
planning
Management of
communication Planning
Milestone 3: Confirmation
of Supplementary
Planning
Milestone 4: Planning
Execution
Checking of Records
Planning a meeting with
the stud manager
providing with updates
Made necessary
modification
Milestone 5: Completion
of Execution
Performance and control
Checking progress of the
project
Checking the budget cost
and effort
Milestone 6: Completion
of performance and
control
Project Closure
Online Stud Farm
Management System
functioning evaluation
Product Launch
Milestone 6: Closing of
the project
Figure 2: Work Breakdown Structure
Source: Created by Author
4.1.3 Milestones Phases and Deliverables
Task Name Start
OSFMS System Sat 5/19/18
Milestone 1: Initiation Sat 5/19/18
Milestone 2: Confirmation of Primary Planning Sat 5/19/18
Milestone 3: Confirmation of Supplementary Planning Sat 5/19/18
Milestone 4: Planning Sat 5/19/18
Milestone 5: Completion of Execution Sat 5/19/18
Milestone 6: Completion of performance and control Sat 5/19/18
Milestone 7: Closing of the project Sat 5/19/18
Document Page
11PROJECT MANAGEMENT: ONLINE STUD FARM MANAGEMENT (OSFMS)
5. Part Four:
5.1 Risk Analysis and Planning of a Project:
5.1.1 Assumption for the Project
Time: Total time required for completion of the OSFMS project would be 20 days.
Budget: Estimation of the cost of the project is $13,920
Resources: All necessary resources have to be carried out for business operations.
5.1.2 Risk Identification Framework
Sl
No.
Rank Risk Descriptio
n
Category Root
Caus
e
Trig
gers
Potential
Response
s
Risk
Owne
r
Probabilit
y
Impact Status