This project charter, developed for the PPMP20008 course at Central Queensland University (CQU), outlines a project aimed at reviving a lost Australian Aboriginal Pidgin language. The project involves installing signages in the School of Engineering and Technology campus to create awareness and conserve indigenous culture. The charter details key deliverables such as designing and fabricating signboards, along with the project's justification, high-level risks, schedule, and budget. The project follows a traditional Waterfall lifecycle and identifies stakeholders, including the School of Engineering and Technology Indigenization Committee, various suppliers, and users like students and staff. Governance structure, including the project board and manager roles, are also defined. The project aims to create awareness among the younger generation and preserve the endangered Aboriginal languages. The document includes assessment criteria and references to support the project's planning and execution.
Document Page
OUR LANGUAGE IS IMPORTANT
PROJECT CHARTER
Version Number: 1.0
Version Date: 31/07/2017
Student name and student number:
Neil Patrick Nacar, 12034170
Campus: Melbourne
Tutor: Daemi, Arash
Tutorial number: PPMP20008 - T2 - MEL - 1 - Tut B/04
[Insert appropriate disclaimer(s)]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Our Language is Important
TABLE OF CONTENTS
1 PROJECT DESCRIPTION.......................................................................................... 2
1.1 Project Description and Background.............................................................2
1.2 Key Deliverables...........................................................................................2
1.3 Justification...................................................................................................2
1.3.1 Output / Outcome / Benefit......................................................................2
1.3.2 Justification statement.............................................................................2
2 HIGH LEVEL RISKS................................................................................................... 3
2.1 Risk 1............................................................................................................3
2.2 Risk 2............................................................................................................3
3 SCHEDULE AND COST............................................................................................. 3
3.1 Schedule for Key Deliverables......................................................................3
3.1.1 Proposed Lifecycle: Waterfall (Traditional) or Agile.................................4
3.2 Summary Budget..........................................................................................4
3.2.1 Proposed Contract Type..........................................................................4
4 STAKEHOLDERS.......................................................................................................4
5 GOVERNANCE........................................................................................................... 5
5.1 Structure of Project Board............................................................................5
5.2 Project Manager...........................................................................................5
5.3 Project Approvals..........................................................................................5
CHARTER APPROVAL...................................................................................................6
REFERENCES 6
Project Charter Template (v1.0) Page 1 of 9
Document Page
Our Language is Important
1 PROJECT DESCRIPTION
1.1 PROJECT DESCRIPTION AND BACKGROUND THE PROJECT AIMS AT
REVIVING THE LOST AUSTRALIAN ABORIGINAL PIDGIN LANGUAGE BY
INSTALLING SIGNAGES IN THE CAMPUS OF THE SCHOOL OF ENGINEERING
AND TECHNOLOGY. IN THE LONG RUN SUCH PROJECTS CONSERVE AND
REVIVE INDIGENOUS CULTURE OF THE COUNTRY AND SHOW THE WORLD THE
RICH CULTURAL HERITAGE.
1.2 KEY DELIVERABLES
Deliverable
Key deliverable Signages in the aboriginal language in the CQU Campus
Sub-deliverable 1 Creating design for sign boards in the aboriginal
language.
Sub-deliverable 2 Fabrication (CNC routing, Laser and Vinyl Cutting) and
Sign painting, channel lettering and laminating prints
1.3 JUSTIFICATION
1.3.1 Output / Outcome / Benefit
Output Outcome Benefits
Creating sign boards in
the campus of CQU in the
local aboriginal Pidgin
language.
Creates awareness in the
minds of youth regarding
the aboriginal languages
and culture ultimately
Lost and endangered
languages are revived
and the coming
generations preserve
them.
1.3.2 Justification statement
The ultimate purpose of the project is the revival of the endangered aboriginal
languages by creating awareness among the younger generation in a systematic
way as explained by this diagram:
Project Charter Template (v1.0) Page 2 of 9
PLANNING
REQUIREMENTS DESIGN IMPLEMENT MAINTAIN
Document Page
Our Language is Important
2 HIGH LEVEL RISKS
2.1 RISK 1
Cause Event Effect
Identifying a person
who has some
knowledge about the
aboriginal pidgin
language as
statistics points out
hardly 4000 people
who speak the same
are present in the
country right now.
Presenting the signages
in the aboriginal
language might take
time.
Delivery of the
Project may get
delayed ultimately.
2.2 RISK 2
Cause Event Effect
Youngsters lack
knowledge of the
language
Lack of knowledge
creates resistance in
implementation.
Handling resistance and
educating the users on a
continuous basis might
delay the project.
3 SCHEDULE AND COST
3.1 SCHEDULE FOR KEY DELIVERABLES
Key Deliverable Start Date End Date
1.Signages in the
CQU campus
February 2018 November 2018
2. Creating the
designs in Aboriginal
language.
February 2018 June 2018
3.Fabrication (CNC
routing, laser and
vinyl cutting) and
Sign painting,
channel lettering and
laminating prints
July 2018 November 2018
Project Charter Template (v1.0) Page 3 of 9
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Our Language is Important
3.1.1 Proposed Lifecycle: Waterfall (Traditional)
A traditional or Waterfall lifecycle best suits the project as this approach is
structured and measuring the progress of the project against the pre- defined
milestones is easy. There are five simple steps in this model, viz., specifying
requirements, getting the design done, implementing the same, verifying and
finally maintaining the signage. The main advantage is that a clear estimate of
the total costs required is done prior to the beginning of the project.
3.2 SUMMARY BUDGET
Activities
Deliverables
Feb Mar Apr May Jun Jul Aug Se
p
Oct Nov
1.Signages in
the CQU
campus
10000$ 50000
$
2. Creating
designs in
the aboriginal
language.
5000$ 5000$
3.Fabrication
and Painting
15000
$
500
0$
500
0$
50
00
$
500
0$
50
00
$
500
0$
5000
$
Total 60000$
3.2.1 Proposed Contract Type
A fixed term contract would be a better option as price increases affect the time
and materials contract type, further using a fixed term contract project is also
delivered in time.
4 STAKEHOLDERS
Stakeholder Category
1 The School of Engineering and Technology
Indigenization Committee
Sponsor
2 Living Archive of Aboriginal Languages Supplier
3 Artcom Fabrication and Design Group Supplier
Project Charter Template (v1.0) Page 4 of 9
Document Page
Our Language is Important
4 Faculties of CQU User
5 Students of CQU User
6 Staff of CQU Users
5 GOVERNANCE
5.1 STRUCTURE OF PROJECT BOARD
Board Role Details
Executive Name: Frederique Darwin
Position: Chairman
Organization: Chair of the SET Indigenization
Committee
Senior user
Name: George Baldwin
Position: Dean, The Civil Engineering Department
Organization: SET
Senior supplier
Name: Mathew Gonzales
Position: Chief- Operations
Organization: Aboriginal Language Revival and
Preservation Movement
5.2 PROJECT MANAGER
Prior to project board meetings the project manager should send a status report to
the project board members for their consideration. The project manager is not a
member of the project board but does attend board meetings to brief the project
board members and answer any questions they may have on the status of the
project.
5.3 Project Approvals
Requires approval of successful
completion / achievement.
Approver
(Name, Position, Organisation)
1. Key Deliverable Frederique Darwin, Chairman, The
Chair of SET indigenization
committee.
2. Sub Deliverable 1 Mathew Gonzales, Chief-
Operations, The Aboriginal
Project Charter Template (v1.0) Page 5 of 9
Document Page
Our Language is Important
Language Revival and
Preservation Movement.
3. Sub Deliverable 2 George Baldwin, Dean, Civil
Engineering Department, SET
4. Project has achieved the benefits. The Chair of SET indigenization
Committee.
Charter Approval
The undersigned acknowledge that they have reviewed the ‘Our Language Is
Important ‘Charter and agree with the information presented within this document.
Signature: Date: 02.01.18
Print Name: Mr. Frederique Darwin
Title: Chairman
Organisation: The Chair of SET Indigenization
Committee
REFERENCES
Aboriginal languages preservation and revival-creative spirits
(2015,November)retrieved from www.creativespirit.info
Project board-prince 2 retrieved from prince2.wikidot.com
Ordering, designing and installing an approved sign retrieved from
www.business.qld.gov.au
Waterfall development methodology retrieved from www.learnaccessvba.com
Project Charter Template (v1.0) Page 6 of 9
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Our Language is Important
Assessment Criteria Allocated
Assessment Criteria 1 (Charter) 18
Project description 1
High level deliverables 1.5
Project justification 2
High level risks (Note two risks, described in terms of Cause/Event/Impact) 3
Summary schedule 1
Proposed project lifecycle - waterfall or agile (including short explanation) 1
Summary budget 1
Contract type 1
Stakeholder list (Note at least six stakeholders or stakeholder groups) 3
Structure of the project board (as per Prince2) including names and titles,
authorising the project charter. 1.5
Project Manager 1
Project Approvals 1
Assessment Criteria 2
Clarity of expression, grammar, spelling and referencing. 2
Penalty for late submission
(as per policy)
Total Marks 20