This Chemical Engineering project provides a comprehensive analysis of the energy scenario in Pakistan, focusing on the influence of energy resources on social prosperity and long-term energy planning. It discusses Pakistan's unprecedented energy crisis, the dependence on imported oil, and government policies aimed at securing energy supplies. The project examines the contributions of various energy sources, including natural gas, oil, hydro-electricity, and coal, and explores the roots of the energy crisis, including historical events and emerging shortages. It further delves into the current energy shortage in Pakistan, highlighting the shortfall in capacity and the factors contributing to it, such as dry weather and poor planning. The document also touches upon alternative solutions like syngas production using rice husk gasification.
Document Page
1CHEMICAL ENGINEERING
Chemical Engineering
[Name of the student]
[Name of the University]
[Author note]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2CHEMICAL ENGINEERING
Chapter 1:
Energy Scenario in Pakistan:
Influence upon the social prosperity along with in the planning for long term usage of the
energy resources which are domestic in nature in order have stability in the economy of the
developing countries which includes Pakistan which is dependent upon the energy sectors
growth. Since last few years it has been seen that Pakistan is facing an energy crisis which is
totally unprecedented. The demand for energy has exceeded beyond the indigenous supplies
which has initially lead to the situation where Pakistan has become dependent upon imported oil
which acts as a substantial burden upon the country’s economy.
Government of Pakistan has been associated with perusing of certain policies so as to
confirm the security of the energy supply of the country and also to increase the domestic
supplies, diversifying of the imports and attracting of more foreign investments in order to
include the coal, natural gas and electricity which initially encourages the economic inter-fuel
substitution along with the promotion of the energy efficiency and renewable energy. This was
also done in order to provide support to the regional as well as to the interregional cooperation.
Pakistan is generally considered to be the ideal location where foreign private investment can be
made in order to upstream and downstream the hydrocarbon sector. This is mainly done for the
purpose of providing a deregulated transparent level playing field for all.
An increase in the primary commercial energy supplies was witnessed in the financial
year of 2009-10 which was around 0.8 %( i.e. 62.6 million tons of oil to 63.1 million tons of oil
from the year 2008-2009 to 2009-2010). The increased rate of supply came from various sources
which included the hydel electricity (0.1 mtoe), nuclear electricity (0.3 mtoe), natural gas (0.6
mtoe), and imported electricity (0.01 mtoe). As compared to the last year there was a decrease in
the supplies of the LPG, oil and coal. The different shares that the various sources of energy
Document Page
3CHEMICAL ENGINEERING
were having in the year of 2009-2010 are 48.8% of natural gas, which was followed by the
31.4% oil, 10.6% of hydro-electricity, 7.3% of coal, 1.1% of nuclear energy, o.6% of LPG and
lastly 0.1% of electricity.
There was an increase in the natural gas production from 4002 to 4063 million cubic feet
per day in the year of 2009-2010, whereas the production of oil decreased to 64,948 barrels per
day to 65,845 barrels per day. A slow progress was seen in the drilling activity in the two
preceding years. In the year of 2009-10 about 26 explanatory wells were drilled whereas in the
year of 2008-2009 and 2007-2208 it was around 27. In the year of 2009-2010 about 42
development wells were drilled which was around 59 in the year of 2008-2009 and 53 in the year
of 2007-2008. The efforts made due to drilling resulted in 15 new discoveries which mainly
consisted of the gas/condensate and out of this 15 discoveries 7 were done by the OFDCL and 8
of them were discovered by the private sector companies.
There was an increase in the consumption of oil by 7% in the year of 2009-2010.the main
reason lying behind this was the increase in the consumption of motor spirit by 27% in the
transport sector and besides this the consumption of furnace oil increased by 16% in the power
sector. Besides this the consumption of E-10 fuel also increased which was added in the transport
sector this year. There was a decline in the consumption of fuels by 7% in domestic sector, 17%
in the agriculture sector and 12% in the government sector. There was a drop in the consumption
of furnace oil in the cement industry as well which was around 41% that is 105,4242 tons in the
year of 2008-2009 to 61,787 tons in the year of 2009-2010.
There was an increase in the importing of petroleum by 12% and it was also seen that the
importing of crude oil decreased by 15% than the previous years. The increase in the POL
occurred due to the increased rate of import of the furnace oil by 10%, motor sprit by 132% and
aviation fuel by 140%. The overall production of the refineries decreased by 8% and this resulted
Document Page
4CHEMICAL ENGINEERING
in the less production of the kerosene by 21%, diesel furnace by 29%, and oil by 19% and
naphtha by 11%.
In the year of 2009-2010 the consumption of natural gas increased slightly by 1% than
the previous years and this increase in the consumption was due to the fertilizer by 22%,
transport by 12%, and industry by 5%, commercial by 4% and lastly domestic by 3%. There was
also decrease in the consumption of natural gas which was around 73% in the cement industries,
7% in the Pakistan steel mills and lastly 9% in the power sector.
There was also decrease in the production of coal as well by 7% in the year of 2009-2010
and this mainly happened due to the lower rate of production by the Baluchistan and the KPK
coalfields. The importing of coal had increased slightly by 0.13% and this initially resulted in the
3% decrease on the overall coal supplies/consumption. There was also increase in the
consumption of coal for generating power and the increase was about 12% that is from 112520
tons to 125482 tons.
Commissioning of five new IPPs were done in the power sector and this includes the
Engro, Orient, Atlas, Saif Power and lastly Nishat in the year of 2009-10. This initially resulted
in the providing of help for increasing the installed capacity that the power plant was having
which was seen to be around 1089MW in the year of the 2009-10.
In the year of 2009-10 the generation of electricity also increased by 4.1% which reached
an amount of about 95608 GWh. The generation of electricity mainly included thermal energy of
about 67.3%, hydel energy of about 29.4%, nuclear energy of about 3.0% and the imported
amount of electricity was around 0.3%. The consumption of electricity increased by 5.7% which
was around 74348 GWh and was more than the amount of the last year which was around 70371
GWh last year. The major amount of increased rate of consumption was seen in the domestic
sector which was around 1990 GWh, agriculture which was around 894 GWh, industry sector
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
5CHEMICAL ENGINEERING
which was around 494 GWh, commercial sector which was around 354 GWh and lastly in the
bulk supplies which was around 241GWh. There also occurred a reduction in the losses of T&D
public sector power system and the reduction was from 21.6% to 20.6% in the year of 2009-10.
1.2. Roots of Energy Crisis
1.2.1. Historical crises
Oil crisis in the year of 1973: the major cause lying behind the crisis was that exporting
of one of the OPEC oil was restricted and this was done by the major Arab oil-producing
states and this happened when support was being provided by the western Israel at the
time of Yom Kippur War.
Energy crisis of 1979: the major cause lying behind this was the Iranian revolution
Rise in oil price in the year of 1990: Gulf war was the major cause behind this.
Electricity crisis of California in the year of 2000-200: the major cause included the
failure in deregulation as well as in the business corruption.
Fuel protest of UK in the year of 2000: the major cause lying behind this was the increase
in crude oil’s price which were added with the existing high taxation on the road fuel in
the UK.
Natural gas crisis of North America.
2004 energy crises of Argentina
From many years there existed energy shortage in North Korea
Shortage in energy supplies was also experienced by Zimbabwe for many years which
mainly occurred due to mismanagement of finance.
1.2.2. Emerging shortage
Within 40 years it is estimated that the second largest oil field Kuwait’s Al Burqan Oil Filed
would get depleted.
Document Page
6CHEMICAL ENGINEERING
The major crises which are existing in today’s world mainly includes the following:
Increase in the price of fuel since 2003 and this was mainly caused due to the increased global
demand of petroleum which initially coupled with the production stagnation, along with the fall
in US dollars value along with other several causes.
The central Asian crisis of 2008 which was mainly caused due to the abnormal temperature and
the level of water in the areas which are dependent upon the hydroelectric power. Although there
existed significant number of hydrocarbon reserves in February 2008 but still the President of
Pakistan was associated with announcement of plans in order to tackle the shortages which were
was moving towards the stage of crisis. Along with this the president of South African President
was also associated with appeasing the fears related to the prolonged crisis of electricity in the
country of South Africa.
Electrical crisis of South Africa was estimated to be lasting till 2012 which was responsible for
the rise in price of platinum in February 2008 which also resulted in the reduction of gold
production.
Towards the end of 2005 China also experienced severe amount of shortage in energy which
occurred again in the early days of 2008. At the time of latter crisis China also suffered severe
amount of damage in the power networks associated with the shortage in the amount of diesel
and coal. The supplies of electricity in the Guangdong province was estimated to have a short
fall of 10 GW.
1.3. Current Energy Shortage in Pakistan:
July 2008
Power crisis is also suffered by Pakistan which is the world’s sixth most populous
country and by power it means electric power not political power. In the year of 2001 it was seen
Document Page
7CHEMICAL ENGINEERING
that the country had an excess power capacity of 4000 megawatts. In today’s world it has been
seen that there exists 15% shortfall in the capacity that is needed. The main reason lying behind
the shortfall is mainly due in the parts due to the existence of dry weather that is responsible for
the reduction in the output of hydropower. Another major lying behind this is due to the poor
quality of planning. Pakistan also had the high capacity of hydropower and large deposits of coal
however it has been seen to be very slow for the purpose of exploiting the resources.
Besides this it has also been seen that Pakistan is associated moving more and more
towards the energy crisis and it has been seen that shortfall in this has been associated with
hitting a record of level of around 7,075 MW in the month of July which initially resulted in
gradual shutdown of around 24 units of the plants generating power which was followed by
severe scarcity of fuel. According to a source there was a situation which initially pushed to
customers to bear the brunt of 18 to 20 hours load shedding and this might seem to be increasing
due to various factors
The WAPDA has been associated with facing an electricity shortfall of 5750 MW within
its own system and along with this in the IPPs there was a recorded shortfall of about 1325 MW.
The IPPs are associated with including the country’s largest IPP which was having the capacity
of around 1600 MW Kot Addu Power Company (KAPCO), 120MW Japan, 365 MW AES Pak-
Gen. limited and fifty percent shutdown of 117 MW Southern Electric Power Company (Sepcol),
362 MW AES Lalpir, 586 Uch Power Limited. Kot Addu Power Company (KAPCO), country’s
largest IPP with a capacity of 1600 MW, which compromised of 10 multi fuel fired gas.
The present situation on ground can be stated that there is a lack in the capacity addition
which would be associated with causing a shortage in the power to an extent of 5,500 MW in the
year of 2010. Besides this the current shortfall taking place in the demand of electricity and the
supply mainly occurred due to the inability of the government to make the entire payments and
this initially forced towards the closure of some of the thermal power plants.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
8CHEMICAL ENGINEERING
According to the official records it was seen that the generation from the Pepco,s own
thermal power plant had shrunk to the low ebb because of the fact that Pepco was not capable of
purchasing the fuel oil from its suppliers. Wapda’s thermal plant was capable of producing a
maximum amount of 1900 MW electricity on 20th August against their capacity of about of 4829
MW and this mainly happened due to the inability of purchasing the furnace oil along with the
minor technical faults in gears, clutches and the switches.
Similarly the generation occurring from the IPPs was seen to be around 3470 MW on 19th
August which occurred against the capacity of 6115 MW which again occurred because of the
fiscal constraints. The same thing has been occurring since last two months as the total thermal
power generation remained less and this was seen to be around 6000 MW which is against the
total capacity that is around 12000 MW.
Due to all this thing Pakistan State Oil which is the largest and state owned supplier had
refused the making of payments to all the refineries or lift fuel oil. Due to all this reason the
refining the capacity of some of the refineries had reduced by an amount of one-third and
because of this the shortage constraints lead to the shortage in the consumer market of the
petroleum product.
Besides the availability of the generating capacity of around 18000MW Pepco plants were not
having the capability of generating more than an amount of 12000 MW for the last two months
in spite of having the maximum amount of power generation due to the hydropower projects
which mainly due to the high rate of flow of water in the rivers because of the monsoon season.
Karachi Situation
The system of Karachi Electric Supply Company’s is consisting of the thermal plants in
Karachi which were not capable of generating more than 1,300MW electricity against their
capacity of about 1,800MW. The major reason lying behind this was due to the technical
problems that lead to shortage in the fuel.
Document Page
9CHEMICAL ENGINEERING
The companies producing Oil and gas were associated with making demands regarding
the enforcement of laws which would be responsible for providing power to the suppliers to stop
the supply to the power companies in case when they are not capable or fails to make payments
in time. Along with this few lenders also realized the fact that if it is not done then, the
continuous debt of the energy sector would be associated with making various oils and gas
companies face turmoil’s in their financial conditions and would also be responsible for keeping
the foreign investors away from few of the firms.
1.4 Reason for Less Electricity Production
1. It has cost much more than 400 billion INR for the circular death in the inter-corporate region
and it has been becoming much larger in the energy sector for the looming of widespread default.
This is due to the fact that many companies have now started to default the commitments in
technical terms and financial terms.
2. It has been reported by the oil firms that they have been unable to ensure the smooth supply of
generating independent power procedure or IPPS in the further Days Ahead and they are running
at last for generating the capacity due to the financial crunch that they feel while they have been
purchasing fuel.
3. The government is taking the authority to eliminate the. It has been reported that the electricity
rates and Sceneries of 16 per cent in the last month and with the withdrawal of the “general sales
tax” along with the implementation of additional 61 per cent increase would take place after the
Presidential elections.
5. It is also been reported that the gas rates that is the natural gas rates has seen a considerable
rise twice by the month and this mainly happened due to the fact that the democratic government
had taken over and have been associated with increasing the oil prices much more than 50 per
Document Page
10CHEMICAL ENGINEERING
cent. There has been escalation in all sorts of essential and non-essential commodities and this is
given a rise in the cost of utility.
6. Digging deep into the problem it could be seen that there have been on payment of areas by
public sector companies and government entities that have resulted in the problem. They have
been more than 130 billion INR of receivables by the Pakistan electric power company or Pepco
and the allied powers it has. On the other hand the Karachi electric power supply company or
Kesc has an overdue bill of 56 billion INR to Pepco while there are other areas that is governed
by the federally administered tribal areas which have an overdue bill of almost 75 billion INR as
a counted on 31st July.
7. There is an overdue bill of another 18 Million INR to the Electricity Distribution Company by
the Federal government provinces in JK and also there are some public sector corporations that
or this amount to the company all together.
The organization of Pepco and chest have put together the total accumulated table of about 100
billion INR. Out of this total amount Pepco has to pay 64 billion INR to IPPS which would limit
their ability of buying the oil and continue the run on less than half of the total capacity.
However, the Pepco organization has also to pay the outstanding of about 10 billion INR and 1
billion INR to Oil and Gas companies respectively.
In accordance to that it is the inability of the government that they have not been able to clear the
outstanding bill of 84 billion INR to the all companies and refineries with only one claim of price
differential. The PDC amount is expected to be of March high range but the burden for that has
been clearly replaced with the borrowing of even more expensive amount in accordance from the
commercial banks. It has been reported that the government has paid off near about 50 Billion
INR sofa to the oil companies and Refineries with the help of arranging of syndicated loans from
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
11CHEMICAL ENGINEERING
the market and it is also been reported that PSO has over 25 billions INR of receivables both
from IPPS and pepco.
Therefore the government has not been able to perform a differential claim on liquid petroleum
and it is also been reported that the marketing forms of oil and refinery is have informed that
they have been unable to make payments to the oil refinery to the government.
This has been the Re occurrence of the energy sector that that has been into corporate
which is used in the early 1990s. This is a situation that has been much worse in today's time
according to what a senior official in the ministry of finance has been dealing with. The person
has been appointed this issue as a chronic one. This is such a situation that energy sector crisis
can become much was in the short run because of the destruction and the kind of problems that
has been created in the oil supplier risk and there has been reports of much higher scale of load
shedding that kept on having occurrences for another year. Further in the long run that has been
deficiency of budget which is supposedly expected to go much beyond 8per cent of GDP by the
end of the current year. The currency of Pakistan has already slammed and hit Rock bottom
whereas the development schemes are still being curtailed and even the cost of safeguarding the
sovereign bonds from the default has been increasingly rising so far as to reach almost ripple the
amount since October last year and the Foreign Exchange Reserves have reported to be declined
by a total of 7 billion INR which is only enough to cover 3 months of the imports.
This is a much interesting term that the current state of the power load shedding that has been or
curing rapidly has emerged primarily as there have been financial crisis and shortage of well and
this is not due to the capacity constraints as they have been portrayed as per the government. The
government has sofa activated the load shedding as a fault of the previous Government and
therefore they have been trying to enhance the generation capacity because there has been an
increase demand of power consumption.
Document Page
12CHEMICAL ENGINEERING
1.5. Gasification:
Gasification is generally considered to be a technological process which is associated with the
conversion of carbonaceous (carbon based) raw material by making use of the heat, steam &
pressure into synthesis gas. The process is associated with involving the reaction of
carbonaceous feedstock with an oxygen containing reagent that might include an oxygen, air,
steam or carbon dioxide. This is generally done at a temperatures which is more than 800°C. The
process is also associated with taking into account the partial oxidation of substance. This means
only a partial amount of oxygen is supplied in a limited way so as to make sure that the entire
fuel is not completely oxidized. This ultimately results in the partial combustion. Despite of
being largely exothermic, there still exists the requirement of some heat in order to initiate the
process of gasification and also for the purpose of sustaining it in order to have operation which
are effective. Besides this the demand of Gasification systems is also increasing, which is mainly
happening due to the fact that they are being used in order to turn the feed stocks such as the
transformation of the coal into useful chemical products like ammonia.
Synthesis gas is considered to be the main product, which mainly includes the following:
1. Methane
2. Carbon monoxide
3. Hydrogen
Basically the gases which are produced due to gasification would be consisting of a net calorific
value which is around 4 – 10 MJ/Nm3. Some of the major products which are produced due to
gasification mainly includes a solid residue of non-combustible materials (ash) that mainly
contains carbon which is relatively low in amount.