This report provides a comprehensive analysis of project management principles, focusing on the context of Peak project, a construction company in the UK, and its community centre project. The report begins with an introduction to project management, defining its core functions and importance. Task 1 delves into the background and principles of project management, exploring its evolution and key concepts such as design objectives, commitment, success, and quality improvement. It also assesses project viability using payback period and net present value methods. Task 2 examines the organizational structure, roles, and responsibilities within the Peak project, including project boards, champions, and sponsors. It explores project leadership requirements, human resource planning, and project control mechanisms. Task 3 focuses on project planning, scheduling, estimating, and cost control techniques, including the use of Gantt charts and network diagrams. The report also addresses methods for measuring project performance and explains project change control procedures. The conclusion summarizes the key findings and recommendations, highlighting the importance of effective project management for achieving organizational goals. The report also includes references and illustrations to support the analysis.

PROJECT MANAGEMENT IN BUSINESS
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
Introduction..........................................................................................................................................4
Task 1....................................................................................................................................................4
1.1Background and principles of project management...................................................................4
1.3 Principles of project management system and process..............................................................7
1.4 Key elements of terminating project and conducting post project appraisals...........................8
Task 2....................................................................................................................................................9
2.1 Determining the appropriate firm structure as well as roles and responsibilities of associates.9
Project board:.................................................................................................................................10
Project champion:..........................................................................................................................10
Project sponsor:..............................................................................................................................10
User:...............................................................................................................................................10
2.2 Control and coordinate the project...........................................................................................10
2.3 Assessing project Leadership requirements and qualities........................................................10
2.4 Plan and specify the human resources and requirement for project........................................11
Task 3..................................................................................................................................................12
3.1 Design Project Plans and establish the Project Organisation...................................................12
3.2 Explaining project Scheduling, estimating and Cost Control techniques................................14
3.3 Determining the methods are utilized to measure project performance..................................16
3.4 Explaining Project Change Control Procedure and assess the completed project...................17
Conclusion..........................................................................................................................................18
REFERENCES...................................................................................................................................18
Introduction..........................................................................................................................................4
Task 1....................................................................................................................................................4
1.1Background and principles of project management...................................................................4
1.3 Principles of project management system and process..............................................................7
1.4 Key elements of terminating project and conducting post project appraisals...........................8
Task 2....................................................................................................................................................9
2.1 Determining the appropriate firm structure as well as roles and responsibilities of associates.9
Project board:.................................................................................................................................10
Project champion:..........................................................................................................................10
Project sponsor:..............................................................................................................................10
User:...............................................................................................................................................10
2.2 Control and coordinate the project...........................................................................................10
2.3 Assessing project Leadership requirements and qualities........................................................10
2.4 Plan and specify the human resources and requirement for project........................................11
Task 3..................................................................................................................................................12
3.1 Design Project Plans and establish the Project Organisation...................................................12
3.2 Explaining project Scheduling, estimating and Cost Control techniques................................14
3.3 Determining the methods are utilized to measure project performance..................................16
3.4 Explaining Project Change Control Procedure and assess the completed project...................17
Conclusion..........................................................................................................................................18
REFERENCES...................................................................................................................................18

Illustration Index
Illustration 1: Ganntt chart..................................................................................................................15
Illustration 2: Network diagram for project........................................................................................16
Illustration 3: Project summery for the community centre project.....................................................17
Illustration 4: change control process.................................................................................................20
Illustration 1: Ganntt chart..................................................................................................................15
Illustration 2: Network diagram for project........................................................................................16
Illustration 3: Project summery for the community centre project.....................................................17
Illustration 4: change control process.................................................................................................20

INTRODUCTION
Project management can be defined as the process of planning, initiating, implementing,
controlling and accomplishing the job in order to achieve goals and objectives of the enterprise. It is
helpful in designing specific products and services for fulfilling the needs of consumers (Tayur,
Ganeshan and Magazine, 2012). It is valuable for organisation to ensure whether project developed
is meeting their requirements or not. Peak project is a construction corporation which offers
infrastructure development and consultancy services to its customers in the United Kingdom. The
present report introduces the principles of project management. Further, it describes the project
leadership requirements and qualities in Peak project organisation. In addition to this, it analyses the
approaches which are used to monitor project performance.
TASK 1
1.1Background and principles of project management
Principles of project management help in managing the functions of peak project in the
corporation.
Background of project management
Corporations utilized Ad-hoc and informal approaches to function its projects. Then after,
Project management procedure initiated in era of 1950. In addition to this, many organizations were
used many methods to manage its projects (Reiss, 2013.). Further, Dupont firm discovered critical
path method to forecast project duration by analysing sequence of its actions in 1957. US Navy
designed PERT method to complete job and find out minimum time needed to finish job in 1958.
Further, US defence division released WBS (Work break down structure) in 1962. WBS was
utilized to analyse scope and size of future project. In addition to this, new project management
approaches are launched in order to manage project with a systematic way which contributes
effective role to increase efficiency and performance of the corporation (Haughey, 2014).
Peak project construction company can able to accomplish its objectives by proper planning,
analysing, supervising, monitoring and controlling the projects with respect to the students. Firm
invests its money for developing student life centre by using innovative, creative and effective
technologies (Pina, Romão and Oliveira, 2013). The main aim of community centre project is to
aware students about the new and innovative techniques so that they can implement those tools and
techniques in their working life.
Project management can be defined as the process of planning, initiating, implementing,
controlling and accomplishing the job in order to achieve goals and objectives of the enterprise. It is
helpful in designing specific products and services for fulfilling the needs of consumers (Tayur,
Ganeshan and Magazine, 2012). It is valuable for organisation to ensure whether project developed
is meeting their requirements or not. Peak project is a construction corporation which offers
infrastructure development and consultancy services to its customers in the United Kingdom. The
present report introduces the principles of project management. Further, it describes the project
leadership requirements and qualities in Peak project organisation. In addition to this, it analyses the
approaches which are used to monitor project performance.
TASK 1
1.1Background and principles of project management
Principles of project management help in managing the functions of peak project in the
corporation.
Background of project management
Corporations utilized Ad-hoc and informal approaches to function its projects. Then after,
Project management procedure initiated in era of 1950. In addition to this, many organizations were
used many methods to manage its projects (Reiss, 2013.). Further, Dupont firm discovered critical
path method to forecast project duration by analysing sequence of its actions in 1957. US Navy
designed PERT method to complete job and find out minimum time needed to finish job in 1958.
Further, US defence division released WBS (Work break down structure) in 1962. WBS was
utilized to analyse scope and size of future project. In addition to this, new project management
approaches are launched in order to manage project with a systematic way which contributes
effective role to increase efficiency and performance of the corporation (Haughey, 2014).
Peak project construction company can able to accomplish its objectives by proper planning,
analysing, supervising, monitoring and controlling the projects with respect to the students. Firm
invests its money for developing student life centre by using innovative, creative and effective
technologies (Pina, Romão and Oliveira, 2013). The main aim of community centre project is to
aware students about the new and innovative techniques so that they can implement those tools and
techniques in their working life.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Principles of project management
Design the objectives- Principles of project management aid firm to organize job by
analysing its goal and objectives. So, it helps in developing strategies to accomplish mission
and vision of peak project.
Commitment principle: As per this principle project manager needs to develop a mutual
commitment and understanding between associated stakeholders, team members and
sponsors (Andersen, 2016).
Success principle: It is principle of deciding success and failure criteria for this project.
According to this principle project manager needs to focus on all those requirements which
are necessary for completing project in successful manner (Caniëls and Bakens, 2012).
Along with this, project manager of community centre project should focus on appropriate
allocation of roles, responsibilities and resources for accomplishing projection in successful
manner.
Tetrad trade-off principle: As per this principle project manager needs to assure about the
appropriate documentation of all information including project scope, quality, time and cost.
Along with this, estimated time and cost must be attainable (Wilson, 2014).
Cultural environment principle: As per this principle, project manager should have to
maintain a participative and supportive culture and environment for team members. It will
help in increasing communication among team mebers which will play important role in
success of community centre project (Meng, 2012).
Quality improvement – Principle of quality improvement helps in improving the quality of
community centre project which is managed by peak project firm. So, it can aid firm to
enhance productivity and performance regarding project.
Understating of the constraints- This Principle contributes effective role in the organization
by analysing future complexities like shortage and price changes of raw material at the time
of managing community centre project. It can also help Peak project firm to reduce its
various problems (Kodukula, 2012).
1.2 Viability of project through various methods
Design the objectives- Principles of project management aid firm to organize job by
analysing its goal and objectives. So, it helps in developing strategies to accomplish mission
and vision of peak project.
Commitment principle: As per this principle project manager needs to develop a mutual
commitment and understanding between associated stakeholders, team members and
sponsors (Andersen, 2016).
Success principle: It is principle of deciding success and failure criteria for this project.
According to this principle project manager needs to focus on all those requirements which
are necessary for completing project in successful manner (Caniëls and Bakens, 2012).
Along with this, project manager of community centre project should focus on appropriate
allocation of roles, responsibilities and resources for accomplishing projection in successful
manner.
Tetrad trade-off principle: As per this principle project manager needs to assure about the
appropriate documentation of all information including project scope, quality, time and cost.
Along with this, estimated time and cost must be attainable (Wilson, 2014).
Cultural environment principle: As per this principle, project manager should have to
maintain a participative and supportive culture and environment for team members. It will
help in increasing communication among team mebers which will play important role in
success of community centre project (Meng, 2012).
Quality improvement – Principle of quality improvement helps in improving the quality of
community centre project which is managed by peak project firm. So, it can aid firm to
enhance productivity and performance regarding project.
Understating of the constraints- This Principle contributes effective role in the organization
by analysing future complexities like shortage and price changes of raw material at the time
of managing community centre project. It can also help Peak project firm to reduce its
various problems (Kodukula, 2012).
1.2 Viability of project through various methods

Viability of community centre project can be measured through various investment appraisal
approaches like discounted as well as non-discounted methods. Generally, Payback Period (PBP)
and Net Present Value (NPV) are necessary to analyse the viability of new investment project.
According to the question, Peak project can spend £400000. So, PBP and NPV for community
centre project are calculated in the below table.
Pay Back Period:
Table 1: Payback period calculation
Payback Period
Years Cash Inflow Cumulative frequency
1 60,000 60000.00
2 60,000 120000.00
3 60,000 180000.00
4 80,000 260000.00
5 80,000 340000.00
6 80,000 420000.00
Payback period in years = 4 years + {(400000-340000)/ 420000}= 5.14 years
PBP is one of the essential approaches for analysing time in which organization can receive
its invested money back. As per the table, Peak project can get back it’s invested monetary funds in
5.14 years. Further, it also reveals that PBP for project is very higher. So, organization needs to
choose any another project for the investment.
Net Present Value Method:
Table 2: Nat Present Value Method
Net Present Value of
project
Years Cash Inflow £ Present value of 6% Discounted Cash Inflow @
6%
1 60,000 0.94 56603.77
approaches like discounted as well as non-discounted methods. Generally, Payback Period (PBP)
and Net Present Value (NPV) are necessary to analyse the viability of new investment project.
According to the question, Peak project can spend £400000. So, PBP and NPV for community
centre project are calculated in the below table.
Pay Back Period:
Table 1: Payback period calculation
Payback Period
Years Cash Inflow Cumulative frequency
1 60,000 60000.00
2 60,000 120000.00
3 60,000 180000.00
4 80,000 260000.00
5 80,000 340000.00
6 80,000 420000.00
Payback period in years = 4 years + {(400000-340000)/ 420000}= 5.14 years
PBP is one of the essential approaches for analysing time in which organization can receive
its invested money back. As per the table, Peak project can get back it’s invested monetary funds in
5.14 years. Further, it also reveals that PBP for project is very higher. So, organization needs to
choose any another project for the investment.
Net Present Value Method:
Table 2: Nat Present Value Method
Net Present Value of
project
Years Cash Inflow £ Present value of 6% Discounted Cash Inflow @
6%
1 60,000 0.94 56603.77

2 60,000 0.89 53399.79
3 60,000 0.84 50377.16
4 80,000 0.79 63367.49
5 80,000 0.75 59780.65
6 80,000 0.70 56396.84
Total Discounted Cash inflow 339925.71
Less: Initial Investments 400000.00
Net Present value -60074.29
According to the table, NPV of investment project for Peak Project firm is -60074.29 which
provides negative value. It is showed that community centre project will not be feasible and
profitable for the firm. As a result, organisation should not invest money on this project. Enterprise
should not consider this project for the future investment.
1.3 Principles of project management system and process
Principles of project management system aid Peak project firm to manage its projects and
operations regarding community centre project.
Definition of project management system
Project management system is a method which contributes effective role in organizing firm’s
day to day operations. It helps in achieving goals and objectives of the organisation related to
project completion.
Principles of project management system
Principles of project management system help in understanding situation, project strategy,
schedule, design as well as its testing and termination of project. These things aid peak project to
manage its functions in an appropriate manner. These principles also help firm to analyse human
resources, proper idea investment, priorities of tasks to meet deadline of project and quality
measurement to terminate community centre project in the college
Understand project strategy and business case: As per this principle, project manager
needs to understand the actual requirements of the community centre project. Analysis has
reflected that major requirements of current project is appropriate arrangement of the
resources, allocation of role and responsibility, appropriate communication, etc (Pemsel and
3 60,000 0.84 50377.16
4 80,000 0.79 63367.49
5 80,000 0.75 59780.65
6 80,000 0.70 56396.84
Total Discounted Cash inflow 339925.71
Less: Initial Investments 400000.00
Net Present value -60074.29
According to the table, NPV of investment project for Peak Project firm is -60074.29 which
provides negative value. It is showed that community centre project will not be feasible and
profitable for the firm. As a result, organisation should not invest money on this project. Enterprise
should not consider this project for the future investment.
1.3 Principles of project management system and process
Principles of project management system aid Peak project firm to manage its projects and
operations regarding community centre project.
Definition of project management system
Project management system is a method which contributes effective role in organizing firm’s
day to day operations. It helps in achieving goals and objectives of the organisation related to
project completion.
Principles of project management system
Principles of project management system help in understanding situation, project strategy,
schedule, design as well as its testing and termination of project. These things aid peak project to
manage its functions in an appropriate manner. These principles also help firm to analyse human
resources, proper idea investment, priorities of tasks to meet deadline of project and quality
measurement to terminate community centre project in the college
Understand project strategy and business case: As per this principle, project manager
needs to understand the actual requirements of the community centre project. Analysis has
reflected that major requirements of current project is appropriate arrangement of the
resources, allocation of role and responsibility, appropriate communication, etc (Pemsel and
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Wiewiora, 2013). Regarding this project manager needs to arrange meetings and
conferences with team members which will help in distributing information to the respective
person. Project scheduling: As per this principle, project manager needs to estimate a reliable and
attainable time for completing the whole project. Regarding this project manager needs to
allocate roles and responsibility to those person who have capable enough to complete their
task in effective manner (Alhawari and et.al., 2012). Regarding this manager needs to focus
on skills and knowledge of every team member. It will help in accomplishing the current
construction project of community centre development in appropriate time. Project developing and testing: After completing the project plan, manager of community
centre project needs to focus on implementation of this project. At this time project manage
resource about that whether construction of the community centre project is as per the
requirement of client or not (Sadgrove, 2015). Along with this, project manager also needs
to monitor the performance of project implementation on regular basis.
Project Closing: As per this principle project manager needs to focus on appropriate
execution and completion of the project in effective manner. At the time of project closing,
project manager needs to use balance score card method and variance analysis for closing
project in effective manner (Sommer and et.al., 2014).
Importance of project management system
Project management system plays important role to manage record of daily based activities
in order to do systematic work for the organisation. It helps peak project firm to handle its progress
reports, allocation of employees, effective planning, monitoring and communication with
customers. It gives appropriate power to corporation for arranging information of project and
ensuring its accountability. In addition to this, it plays major role for peak project to maintain the
transparency and proper flow of functioning in the running task. Project management system aids
firm to complete job before its deadline by utilizing optimistic allocation of resources in order to
increase its efficiency and productivity in the market. Arrangement of resources: Principles of the project management system is beneficial for
determining the actual needs of the all types of resources. It will help in making arrangement
of all resources in effective manner. Monitoring: Project management system helps in monitoring performance and progress of
the project in effective manner (Catanio, Armstrong and Tucker, 2013). It will help in
determining the necessary improvement in the project for attaining all standards. It will also
conferences with team members which will help in distributing information to the respective
person. Project scheduling: As per this principle, project manager needs to estimate a reliable and
attainable time for completing the whole project. Regarding this project manager needs to
allocate roles and responsibility to those person who have capable enough to complete their
task in effective manner (Alhawari and et.al., 2012). Regarding this manager needs to focus
on skills and knowledge of every team member. It will help in accomplishing the current
construction project of community centre development in appropriate time. Project developing and testing: After completing the project plan, manager of community
centre project needs to focus on implementation of this project. At this time project manage
resource about that whether construction of the community centre project is as per the
requirement of client or not (Sadgrove, 2015). Along with this, project manager also needs
to monitor the performance of project implementation on regular basis.
Project Closing: As per this principle project manager needs to focus on appropriate
execution and completion of the project in effective manner. At the time of project closing,
project manager needs to use balance score card method and variance analysis for closing
project in effective manner (Sommer and et.al., 2014).
Importance of project management system
Project management system plays important role to manage record of daily based activities
in order to do systematic work for the organisation. It helps peak project firm to handle its progress
reports, allocation of employees, effective planning, monitoring and communication with
customers. It gives appropriate power to corporation for arranging information of project and
ensuring its accountability. In addition to this, it plays major role for peak project to maintain the
transparency and proper flow of functioning in the running task. Project management system aids
firm to complete job before its deadline by utilizing optimistic allocation of resources in order to
increase its efficiency and productivity in the market. Arrangement of resources: Principles of the project management system is beneficial for
determining the actual needs of the all types of resources. It will help in making arrangement
of all resources in effective manner. Monitoring: Project management system helps in monitoring performance and progress of
the project in effective manner (Catanio, Armstrong and Tucker, 2013). It will help in
determining the necessary improvement in the project for attaining all standards. It will also

help in managing cost and time in effective manner.
Effective planning: With consideration of all principle of project management system,
manager of community centre project can develop an effective plan for attaining all
objectives. Along with this, effective planning will help in maintaining quality in outcomes
of the project (Hwang and Ng, 2013).
1.4 Key elements of terminating project and conducting post project appraisals
There are many elements for terminating community centre project and conducting post
project appraisals.
Key elements of terminating project
Management of Peak project can face with unnatural issues like lack of raw material, less
monetary funds and union strike that can lead to terminate community centre project. For
example, Peak project can suffer with the issue related to the shortage of cement and wood
which are essential to build the infrastructure of community centre. This condition can
create bad impact on activities of the organisation.
Natural disaster can also influence Peak project to terminate its project. For example, Alton
area is suffering from flood and tornadoes which can directly affect development
community centre project.
Elements of post project appraisal
Management of peak project can use cost benefit analyse which helps to interpret difference
between the approximate and actual cost. It is used to determine expenditure on labour and
time which help to save monetary funds of the firm. Further, it can also contribute effective
role for Peak project to conduct post project appraisals for the better infrastructure
development of community centre in the college.
According to the case, management of firm can take feedback from students by analysing
completion status of their requirements in the college. This process can also help Peak
project to determine final achievements of its project in the institute of UK.
TASK 2
2.1 Determining the appropriate firm structure as well as roles and responsibilities of
associates
Organisation structure
Generally, Peak project can utilize matrix structure for community centre project. This
structure provides optimistic reliability to organize project activities for its staff members in the
Effective planning: With consideration of all principle of project management system,
manager of community centre project can develop an effective plan for attaining all
objectives. Along with this, effective planning will help in maintaining quality in outcomes
of the project (Hwang and Ng, 2013).
1.4 Key elements of terminating project and conducting post project appraisals
There are many elements for terminating community centre project and conducting post
project appraisals.
Key elements of terminating project
Management of Peak project can face with unnatural issues like lack of raw material, less
monetary funds and union strike that can lead to terminate community centre project. For
example, Peak project can suffer with the issue related to the shortage of cement and wood
which are essential to build the infrastructure of community centre. This condition can
create bad impact on activities of the organisation.
Natural disaster can also influence Peak project to terminate its project. For example, Alton
area is suffering from flood and tornadoes which can directly affect development
community centre project.
Elements of post project appraisal
Management of peak project can use cost benefit analyse which helps to interpret difference
between the approximate and actual cost. It is used to determine expenditure on labour and
time which help to save monetary funds of the firm. Further, it can also contribute effective
role for Peak project to conduct post project appraisals for the better infrastructure
development of community centre in the college.
According to the case, management of firm can take feedback from students by analysing
completion status of their requirements in the college. This process can also help Peak
project to determine final achievements of its project in the institute of UK.
TASK 2
2.1 Determining the appropriate firm structure as well as roles and responsibilities of
associates
Organisation structure
Generally, Peak project can utilize matrix structure for community centre project. This
structure provides optimistic reliability to organize project activities for its staff members in the

firm. Further, it can aid organisation to enhance its efficiency and performance by consuming less
time in comparison to hierarchical structure for managing its various activities of community centre
project. Mainly, Matrix structure gives dual reporting relationship for the Peak project. For
example: employee of project can report the finance as well as project manager in respect of
infrastructure development of community centre project in the college. This thing also helps
company to take fast decision in short time by providing huge reliability. According to case, peak
project can terminate its project planning within the period of three month with the help of this
structure.
Role and responsibilities of employees
Peak project requires various staff members to complete community centre project in the
institute. Management of the organisation needs HR manager, operation executive, architect, project
manager, finance manager etc. to design planning of this project under three month period.
Employees of operation division help in managing all the project related activities according to the
guidance of project manager. In addition to this, finance manager aids in arranging budget for the
development of this project. Project manager also liable for analysing the all activities the regarding
infrastructure development of canteen in the college. Further, Architect is responsible for designing
map of community centre project and analysing materials required to design this building. Further,
HR manager is also responsible to allocate human resources and other things to complete project in
a systematic manner.
Project manager: The role and responsibility of project manager is to manage and lead the
team. In addition to it, his role is to record, manage and resolve the problems that arises at
the time of project implementation (Kavadias, 2014). He also plays essential role in User
Acceptance phase of the testing for delivering the project in line as per the client
expectations.
Project leader:The role of project leader is to perform different kind of activities such as
maintaining relationships with the stakeholders, guiding and monitoring team members and
measuring their performance.
Project board: Project board consists of the executive, senior user and senior supplier
whose responsibility is related to the delivery of project (Dwivedula, Bredillet and Müller,
2012).
Project champion: He is the one who supports the team members in their projects till the
completion of those projects.
time in comparison to hierarchical structure for managing its various activities of community centre
project. Mainly, Matrix structure gives dual reporting relationship for the Peak project. For
example: employee of project can report the finance as well as project manager in respect of
infrastructure development of community centre project in the college. This thing also helps
company to take fast decision in short time by providing huge reliability. According to case, peak
project can terminate its project planning within the period of three month with the help of this
structure.
Role and responsibilities of employees
Peak project requires various staff members to complete community centre project in the
institute. Management of the organisation needs HR manager, operation executive, architect, project
manager, finance manager etc. to design planning of this project under three month period.
Employees of operation division help in managing all the project related activities according to the
guidance of project manager. In addition to this, finance manager aids in arranging budget for the
development of this project. Project manager also liable for analysing the all activities the regarding
infrastructure development of canteen in the college. Further, Architect is responsible for designing
map of community centre project and analysing materials required to design this building. Further,
HR manager is also responsible to allocate human resources and other things to complete project in
a systematic manner.
Project manager: The role and responsibility of project manager is to manage and lead the
team. In addition to it, his role is to record, manage and resolve the problems that arises at
the time of project implementation (Kavadias, 2014). He also plays essential role in User
Acceptance phase of the testing for delivering the project in line as per the client
expectations.
Project leader:The role of project leader is to perform different kind of activities such as
maintaining relationships with the stakeholders, guiding and monitoring team members and
measuring their performance.
Project board: Project board consists of the executive, senior user and senior supplier
whose responsibility is related to the delivery of project (Dwivedula, Bredillet and Müller,
2012).
Project champion: He is the one who supports the team members in their projects till the
completion of those projects.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Project sponsor: Project sponsor is responsible for the case related to the project and owns the
project as per the perspective of enterprise (Lindberg, Voss and Blackmon, 2013).
User: User is the one who uses the project and takes advantages of its products and services.
Job and person specification
Person specification: The candidate who is applying for the post of project manager should
have experience of at least 3 years. He should posses management skills, time management
skills, team management skills, technical skills and communication skills and have
knowledge related to the planing, managing and analysing the process with respect to the
project management (Caniëls and Bakens, 2012).
Job specification: The role of project manager in the field of project management is crucial
as it require proper planning and monitoring of the processes of the complete tasks
(Haughey, 2014). He has to manage the resource properly along with the cost and overall
budget of the project.
2.2 Control and coordinate the project
Configuration Control: This tool is used for observing the emerging project scopes with
respect to the original scope. Company can use this tool for proper monitoring and
controlling the processes related to the project.
Design control: In this stage, project scope, schedule, cost and required resources are
observed by the project manager (Lientz and Rea, 2012).
Trend monitoring: With the help of this tool, project manager can easily track the
estimated costs, schedules and other required resources against the planned ones.
Acquisition control: It monitors the required equipments, materials, resources, services and
many more things for the development of project
Specification control: In this, it is checked that whether the project specification are meet
as per the expectations or not. If not, then they can be changed as per the requirement.
There are many approaches to control and coordinate project in the firm. It is described in
below paragraph:
Peak project organisation can utilize Work down break (WBS) structure method for
controlling and coordinating project of community centre. WBS provides systematic base for the
development of this project in respect to its complete planning as well as control. It helps in
dividing work into many parts. In addition to this, it aids peak project to enhance coordination,
calculate the cost, prepare scheduling of work and reporting of labour hour to manage project
effectively. This way, Peak project can systematically control and coordinate the project of
project as per the perspective of enterprise (Lindberg, Voss and Blackmon, 2013).
User: User is the one who uses the project and takes advantages of its products and services.
Job and person specification
Person specification: The candidate who is applying for the post of project manager should
have experience of at least 3 years. He should posses management skills, time management
skills, team management skills, technical skills and communication skills and have
knowledge related to the planing, managing and analysing the process with respect to the
project management (Caniëls and Bakens, 2012).
Job specification: The role of project manager in the field of project management is crucial
as it require proper planning and monitoring of the processes of the complete tasks
(Haughey, 2014). He has to manage the resource properly along with the cost and overall
budget of the project.
2.2 Control and coordinate the project
Configuration Control: This tool is used for observing the emerging project scopes with
respect to the original scope. Company can use this tool for proper monitoring and
controlling the processes related to the project.
Design control: In this stage, project scope, schedule, cost and required resources are
observed by the project manager (Lientz and Rea, 2012).
Trend monitoring: With the help of this tool, project manager can easily track the
estimated costs, schedules and other required resources against the planned ones.
Acquisition control: It monitors the required equipments, materials, resources, services and
many more things for the development of project
Specification control: In this, it is checked that whether the project specification are meet
as per the expectations or not. If not, then they can be changed as per the requirement.
There are many approaches to control and coordinate project in the firm. It is described in
below paragraph:
Peak project organisation can utilize Work down break (WBS) structure method for
controlling and coordinating project of community centre. WBS provides systematic base for the
development of this project in respect to its complete planning as well as control. It helps in
dividing work into many parts. In addition to this, it aids peak project to enhance coordination,
calculate the cost, prepare scheduling of work and reporting of labour hour to manage project
effectively. This way, Peak project can systematically control and coordinate the project of

community centre in the college.
It is important to complete the project on time with proper coordination and cooperation of
the workers. There are various types of techniques such as Schedule Performance Index and Project
Management Reporting tool which company can use for making their work effective and efficient
(Pemsel and Wiewiora, 2013). UK based enterprises can use NPV and pay back period method for
identifying the exisiting position of it in the market. In addition to this, PERT and CPM methods
can be considered as useful for the team-members in completing their project.
2.3 Assessing project Leadership requirements and qualities
There are many roles and qualities of project leader which contribute effective role to lead
any type of project in the organisation.
Role of project leader
Project manager is essential to organize and coordinate all the operations with employees
regarding appropriate development of any project. For example: project leader plays an important
role in planning, controlling as well as implementing infrastructure development of community
centre project in the college.
Leadership requirements and Qualities of leaders
Core competency- Project leader has many qualities to guide and direct employees
regarding work which help to solve the queries of them. Further, core knowledge of project
management can help peak project to manage its project in an appropriate manner. In
addition to this, it also aids Peak project to achieve success in infrastructure development of
the project.
Communication and liaison making skills- Effective interaction abilities contribute
effective role for project leader to sort out project related issues of employees in team. In
addition to this, communication skills also help manager to manage appropriate relationship
with other leaders, employees, directors as well as customers which aid to improve the
quality and performance of peak project.
2.4 Plan and specify the human resources and requirement for project
Management of Peak project can utilize requirement assignment matrix for infrastructure
development of community centre project. It is stated below the table.
Function Operation Project Architect Quality analyst Finance
It is important to complete the project on time with proper coordination and cooperation of
the workers. There are various types of techniques such as Schedule Performance Index and Project
Management Reporting tool which company can use for making their work effective and efficient
(Pemsel and Wiewiora, 2013). UK based enterprises can use NPV and pay back period method for
identifying the exisiting position of it in the market. In addition to this, PERT and CPM methods
can be considered as useful for the team-members in completing their project.
2.3 Assessing project Leadership requirements and qualities
There are many roles and qualities of project leader which contribute effective role to lead
any type of project in the organisation.
Role of project leader
Project manager is essential to organize and coordinate all the operations with employees
regarding appropriate development of any project. For example: project leader plays an important
role in planning, controlling as well as implementing infrastructure development of community
centre project in the college.
Leadership requirements and Qualities of leaders
Core competency- Project leader has many qualities to guide and direct employees
regarding work which help to solve the queries of them. Further, core knowledge of project
management can help peak project to manage its project in an appropriate manner. In
addition to this, it also aids Peak project to achieve success in infrastructure development of
the project.
Communication and liaison making skills- Effective interaction abilities contribute
effective role for project leader to sort out project related issues of employees in team. In
addition to this, communication skills also help manager to manage appropriate relationship
with other leaders, employees, directors as well as customers which aid to improve the
quality and performance of peak project.
2.4 Plan and specify the human resources and requirement for project
Management of Peak project can utilize requirement assignment matrix for infrastructure
development of community centre project. It is stated below the table.
Function Operation Project Architect Quality analyst Finance

executive manager manager
Planning of
Project
A R I I I
Identification of
needs
R R I I I
Preparation of
the goals and
objectives
A R A I I
Budget
Estimation
I A I I R
Execution of
strategies
R R I A I
Controlling of
project
A R R R I
Review I A I AR I
R – Responsible, A – Accountable
C – Consult, I – Inform
From the above table, functions are categorised for planning of project, identification of
needs as well as preparation of the goals and objectives. In addition to this, it also covers budget
estimation, execution of strategies, controlling of project and review which help to analyse as well
as monitor the development process. Further, operation executive, project manager, architect,
quality analyst as well as finance manager also play important role to manage their functions in
community centre project (Responsibility Assignment Matrix, 2015).
TASK 3
3.1 Design Project Plans and establish the Project Organisation
Project plan:
Table 3: Project plan for community centre project
WB Task Name Duratio Start Finish Predecessors
Planning of
Project
A R I I I
Identification of
needs
R R I I I
Preparation of
the goals and
objectives
A R A I I
Budget
Estimation
I A I I R
Execution of
strategies
R R I A I
Controlling of
project
A R R R I
Review I A I AR I
R – Responsible, A – Accountable
C – Consult, I – Inform
From the above table, functions are categorised for planning of project, identification of
needs as well as preparation of the goals and objectives. In addition to this, it also covers budget
estimation, execution of strategies, controlling of project and review which help to analyse as well
as monitor the development process. Further, operation executive, project manager, architect,
quality analyst as well as finance manager also play important role to manage their functions in
community centre project (Responsibility Assignment Matrix, 2015).
TASK 3
3.1 Design Project Plans and establish the Project Organisation
Project plan:
Table 3: Project plan for community centre project
WB Task Name Duratio Start Finish Predecessors
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

S n
1 <Community center project> 65 days Mon
1/19/15
Fri
4/17/15
1.1 Collection of required
information
10 days Mon
1/19/15
Fri
1/30/15
1.1.1 Meeting 5 days Mon
1/19/15
Fri
1/23/15
1.1.2 Analyzing needs and requirements 5 days Mon
1/26/15
Fri
1/30/15
3
1.2 Planning 17 days Mon
2/2/15
Tue
2/24/15
1.2.1 Formulating goal and objectives 10 days Mon
2/2/15
Fri
2/13/15
3,4
1.2.2 Developing and estimating budget 7 days Mon
2/2/15
Tue
2/10/15
4
1.2.3 Developing quality standards 7 days Mon
2/16/15
Tue
2/24/15
6
1.2.4 Requirement of human resources 5 days Wed
2/11/15
Tue
2/17/15
4,7
1.3 Execution 29 days Wed
2/18/15
Mon
3/30/15
1.3.1 Designing the layout of
community center
8 days Wed
2/18/15
Fri
2/27/15
9
1.3.2 Arrangement of raw materials 7 days Wed
2/18/15
Thu
2/26/15
6,9
1.3.3 Allocation of resources 7 days Fri 2/27/15 Mon
3/9/15
12
1.3.4 implementation of the project
plan
15 days Tue
3/10/15
Mon
3/30/15
11,13
1.4 Controlling 14 days Tue
3/31/15
Fri
4/17/15
1.4.1 Performance analysis 7 days Tue
3/31/15
Wed
4/8/15
8,14
1.4.2 Supervision of raw material 5 days Thu 4/9/15 Wed
4/15/15
16
1 <Community center project> 65 days Mon
1/19/15
Fri
4/17/15
1.1 Collection of required
information
10 days Mon
1/19/15
Fri
1/30/15
1.1.1 Meeting 5 days Mon
1/19/15
Fri
1/23/15
1.1.2 Analyzing needs and requirements 5 days Mon
1/26/15
Fri
1/30/15
3
1.2 Planning 17 days Mon
2/2/15
Tue
2/24/15
1.2.1 Formulating goal and objectives 10 days Mon
2/2/15
Fri
2/13/15
3,4
1.2.2 Developing and estimating budget 7 days Mon
2/2/15
Tue
2/10/15
4
1.2.3 Developing quality standards 7 days Mon
2/16/15
Tue
2/24/15
6
1.2.4 Requirement of human resources 5 days Wed
2/11/15
Tue
2/17/15
4,7
1.3 Execution 29 days Wed
2/18/15
Mon
3/30/15
1.3.1 Designing the layout of
community center
8 days Wed
2/18/15
Fri
2/27/15
9
1.3.2 Arrangement of raw materials 7 days Wed
2/18/15
Thu
2/26/15
6,9
1.3.3 Allocation of resources 7 days Fri 2/27/15 Mon
3/9/15
12
1.3.4 implementation of the project
plan
15 days Tue
3/10/15
Mon
3/30/15
11,13
1.4 Controlling 14 days Tue
3/31/15
Fri
4/17/15
1.4.1 Performance analysis 7 days Tue
3/31/15
Wed
4/8/15
8,14
1.4.2 Supervision of raw material 5 days Thu 4/9/15 Wed
4/15/15
16

1.4.3 Monitoring Progress of goal and
objectives
2 days Thu
4/16/15
Fri
4/17/15
17
Gantt chart:
Illustration 1: Ganntt chart
Figure 1: Gantt chart
3.2 Explaining project Scheduling, estimating and Cost Control techniques
Project scheduling and cost control approaches contribute effective role for Peak project in
the development of community centre project.
Importance of scheduling
Project scheduling is necessary for firm to handle and complete the project in a systematic
manner by emphasizing on following factors such as quality, financial and time. It aids scheduling
of community centre project in a proper way. It contributes an effective role for the organisation to
gain success in this project. In addition to this, it helps in maintaining project, allocation of
employees and adjustment of realistic time frames to decrease mistakes in infrastructure
development of the project. Further, project scheduling also gives better quality assurance, reduced
cost and appropriate consumers satisfaction by completing their demands in the peak project.
Estimating and cost control techniques
objectives
2 days Thu
4/16/15
Fri
4/17/15
17
Gantt chart:
Illustration 1: Ganntt chart
Figure 1: Gantt chart
3.2 Explaining project Scheduling, estimating and Cost Control techniques
Project scheduling and cost control approaches contribute effective role for Peak project in
the development of community centre project.
Importance of scheduling
Project scheduling is necessary for firm to handle and complete the project in a systematic
manner by emphasizing on following factors such as quality, financial and time. It aids scheduling
of community centre project in a proper way. It contributes an effective role for the organisation to
gain success in this project. In addition to this, it helps in maintaining project, allocation of
employees and adjustment of realistic time frames to decrease mistakes in infrastructure
development of the project. Further, project scheduling also gives better quality assurance, reduced
cost and appropriate consumers satisfaction by completing their demands in the peak project.
Estimating and cost control techniques

PERT method can be used to analyse the completion time of community centre project of
Peak project. It gives optimistic, worse as well as best time durations for each project operation
which helps to complete the project in the task. Further, it can help firm to determine average
finishing time of this project. PERT method can be operated by assigning probabilities to three
estimates. It can also aid to measure estimated value for the project. In addition to this, it contributes
an effective role for peak project to determine the expected cost for project. It shows only working
days by excluding all holidays in a month or year which provides effective help to firm for
terminating the project on time. This thing helps to calculate exact completion time for community
centre project. Further, Crashing also aids in controlling cost in the firm. This process also helps to
save huge monetary funds of peak project by reducing expenses in project execution.
Project manager can use network diagram and critical path analysis methods for Scheduling,
estimating and Cost Control purpose. Implementation of all these techniques are as follows:
Network diagram:
Illustration 2: Network diagram for project
Figure 2: Network diagram for project
Project summary:
Peak project. It gives optimistic, worse as well as best time durations for each project operation
which helps to complete the project in the task. Further, it can help firm to determine average
finishing time of this project. PERT method can be operated by assigning probabilities to three
estimates. It can also aid to measure estimated value for the project. In addition to this, it contributes
an effective role for peak project to determine the expected cost for project. It shows only working
days by excluding all holidays in a month or year which provides effective help to firm for
terminating the project on time. This thing helps to calculate exact completion time for community
centre project. Further, Crashing also aids in controlling cost in the firm. This process also helps to
save huge monetary funds of peak project by reducing expenses in project execution.
Project manager can use network diagram and critical path analysis methods for Scheduling,
estimating and Cost Control purpose. Implementation of all these techniques are as follows:
Network diagram:
Illustration 2: Network diagram for project
Figure 2: Network diagram for project
Project summary:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Illustration 3: Project summery for the community centre project
Figure 3: Project summery for the community centre project
Critical path analysis:
Critical path Critical duration
3-4-7-9-12-13-14-16-17-18 =5+5+7+5+7+7+15+7+5+2= 65 days
As per the above project plan, critical path duration for community centre project is 65 days
so, this project will be accomplished in this duration. It is the longest path for accomplishing this
project.
3.3 Determining the methods are utilized to measure project performance
Management of Peak project can be utilized project control cycle to determine project
performance regarding the development of community centre project.
Planning- Preparation and establishment of strategic objective and goals.
Executing – Implement task in an efficient manner in order to complete community centre project.
Measuring- Determine differences between the actual and estimated cost by considering time
Figure 3: Project summery for the community centre project
Critical path analysis:
Critical path Critical duration
3-4-7-9-12-13-14-16-17-18 =5+5+7+5+7+7+15+7+5+2= 65 days
As per the above project plan, critical path duration for community centre project is 65 days
so, this project will be accomplished in this duration. It is the longest path for accomplishing this
project.
3.3 Determining the methods are utilized to measure project performance
Management of Peak project can be utilized project control cycle to determine project
performance regarding the development of community centre project.
Planning- Preparation and establishment of strategic objective and goals.
Executing – Implement task in an efficient manner in order to complete community centre project.
Measuring- Determine differences between the actual and estimated cost by considering time

performance and other parameters.
Understanding- Understand all the concepts in respect of infrastructure development of community
centre project
Communicating- Communicate mission, vision, goals and objectives to the staff members in order
to get success.
Improving- Review the project work which helps to increase the chances of success in the future
Project management cycle Determination of goals: The first step is to select the goal and objective of the projec for
creating appropriate plan and strategies. Development of plan: Next step is to develop plan for executing the acitivities in effective
time and with proper utilization of resources (Caniëls and Bakens, 2012). Monitoring of performance: In this step, work of the workers is being monitored by the
higher authorieties for keeping updates related to the progress of the project
Comparison of outcome with planned: In this, the obtained outcome is compared with the
expected outcome which helps in identifying the actual performance and effectiveness of the
tasks (Pemsel and Wiewiora, 2013).
Earned value analysis
It is used by the manager for managing and monitoring the complete project and for
developing the report of it which includes price, resources and steps of project completion.
Advantages
It helps in determining the performance and implementation of objectives in real world.
It is beneficial for resolving the problems that arises during the project completion.
Disadvantages
It is difficult to measure or judge the quantity.
Comparison of Earn value analysis (EVA) and Gantt chart on the basis of advantages and
disadvantages
Milestone analysis
Milestone analysis helps in evaluating and completing the important steps with respect to the
work along with the effective team management. It works as a motivational approach for the project
manager which makes him to properly coordinate the schedule between suppliers and vendors
(Caniëls and Bakens, 2012).
Understanding- Understand all the concepts in respect of infrastructure development of community
centre project
Communicating- Communicate mission, vision, goals and objectives to the staff members in order
to get success.
Improving- Review the project work which helps to increase the chances of success in the future
Project management cycle Determination of goals: The first step is to select the goal and objective of the projec for
creating appropriate plan and strategies. Development of plan: Next step is to develop plan for executing the acitivities in effective
time and with proper utilization of resources (Caniëls and Bakens, 2012). Monitoring of performance: In this step, work of the workers is being monitored by the
higher authorieties for keeping updates related to the progress of the project
Comparison of outcome with planned: In this, the obtained outcome is compared with the
expected outcome which helps in identifying the actual performance and effectiveness of the
tasks (Pemsel and Wiewiora, 2013).
Earned value analysis
It is used by the manager for managing and monitoring the complete project and for
developing the report of it which includes price, resources and steps of project completion.
Advantages
It helps in determining the performance and implementation of objectives in real world.
It is beneficial for resolving the problems that arises during the project completion.
Disadvantages
It is difficult to measure or judge the quantity.
Comparison of Earn value analysis (EVA) and Gantt chart on the basis of advantages and
disadvantages
Milestone analysis
Milestone analysis helps in evaluating and completing the important steps with respect to the
work along with the effective team management. It works as a motivational approach for the project
manager which makes him to properly coordinate the schedule between suppliers and vendors
(Caniëls and Bakens, 2012).

Advantage of milestone analysis
It is a motivational approach
It is simple and easy to use (Pemsel and Wiewiora, 2013).
It provides opportunity to create coordination between supplier and vendor
Disadvantages:
It is complex to implement in the detailed scheduled analysis.
Peak project can utilize Earn value analysis as well as Gantt chart for analysing performance
of the project. Mainly, EVA is focused on measuring that all the factors are on right track or not in
order to determine the performance of community centre project. It is reliable procedure as compare
to Gantt chart. However, it can generate many problems to assign resources on the higher number
due to increasing parameters of projects. EVA can analyse the performance of project on the basis
of money and work time. In addition to this, it can give limited view to understand the problems of
project. On the other side, Gantt chart can measure the performance of project on the basis of
different aspects. It contributes an effective role for firm to divide complexities in a systematic
manner. Further, it demands regular updates from internet in specific time intervals.
3.4 Explaining Project Change Control Procedure and assess the completed project
Management of organisation can use project change control process to increase the
performance of Community centre in the college.
It is a motivational approach
It is simple and easy to use (Pemsel and Wiewiora, 2013).
It provides opportunity to create coordination between supplier and vendor
Disadvantages:
It is complex to implement in the detailed scheduled analysis.
Peak project can utilize Earn value analysis as well as Gantt chart for analysing performance
of the project. Mainly, EVA is focused on measuring that all the factors are on right track or not in
order to determine the performance of community centre project. It is reliable procedure as compare
to Gantt chart. However, it can generate many problems to assign resources on the higher number
due to increasing parameters of projects. EVA can analyse the performance of project on the basis
of money and work time. In addition to this, it can give limited view to understand the problems of
project. On the other side, Gantt chart can measure the performance of project on the basis of
different aspects. It contributes an effective role for firm to divide complexities in a systematic
manner. Further, it demands regular updates from internet in specific time intervals.
3.4 Explaining Project Change Control Procedure and assess the completed project
Management of organisation can use project change control process to increase the
performance of Community centre in the college.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Illustration 4: change control process
(Source: Integrated Change Control Procedure, 2013)
In the first step, employees of Peak project identifies the requirement of change for the
better improvement.
Further, project manager evaluates change request in order to analyse genuine modification
in the present procedure. If, request is valid then project manager would convey the request
among all employees or else he would remove request in cited firm.
In addition to this, manager of peak project discusses with all the employees to identify
positive effect in the organisation. He approves request for short time in order to monitor
long term impact in the firm.
Then after, he evaluates the results of modification in the present process (Integrated Change
Control Procedure, 2013). On the basis of results, he gives permanent status to the change
request in the process. This way, Project manager can execute request in order to enhance
performance with the help of updated process in the market.
Role of project Board
Change control process helps the manager to identify that objective are properly achieved
or not. On the basis of change, project conduct various operations like project support and project
(Source: Integrated Change Control Procedure, 2013)
In the first step, employees of Peak project identifies the requirement of change for the
better improvement.
Further, project manager evaluates change request in order to analyse genuine modification
in the present procedure. If, request is valid then project manager would convey the request
among all employees or else he would remove request in cited firm.
In addition to this, manager of peak project discusses with all the employees to identify
positive effect in the organisation. He approves request for short time in order to monitor
long term impact in the firm.
Then after, he evaluates the results of modification in the present process (Integrated Change
Control Procedure, 2013). On the basis of results, he gives permanent status to the change
request in the process. This way, Project manager can execute request in order to enhance
performance with the help of updated process in the market.
Role of project Board
Change control process helps the manager to identify that objective are properly achieved
or not. On the basis of change, project conduct various operations like project support and project

assurance as well as controlling .
Evaluation of project
Management of Peak project firm is successfully accomplished community centre project.
Construction cost of community centre is similar as per planed task. Further, project is completed
on the right time in Peak project .In addition to this, human and other resources contribute an
effective role for organisation to finish job in the Birkbeck College.
CONCLUSION
From the report, it is found that principles of project management help to manage
community centre project in United Kingdom. Viability of project shows negative impact which
will create complexities to recover money regarding project. Matrix structure contributes an
effective role in Peak project to organize work very fast. Further, effective leadership skill of
manager provides good guidance to employees for completing community centre project in an
effective manner. Requirement assignment matrix helps to manage operations and specify plan with
contribution of appropriate human resources in the college. It can be concluded that change control
process also aids to improve efficiency and performance of peak project in the United Kingdom.
REFERENCES
Journals and books
Reiss, G., 2013. Project management demystified: Today's tools and techniques. Routledge.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in project-based
organisations. International Journal of Project Management. 31(1), pp.31-42.
Alhawari, S., Karadsheh, L., Talet, A.N. and Mansour, E., 2012. Knowledge-based risk
management framework for information technology project.International Journal of Information
Management. 32(1), pp.50-65.
Sommer, A.F., Dukovska-Popovska, I. and Steger-Jensen, K., 2014. Barriers towards integrated
product development—Challenges from a holistic project management perspective. International
Journal of Project Management. 32(6), pp.970-982.
Catanio, J.T., Armstrong, G. and Tucker, J., 2013. The Effects of Project Management Certification
on the Triple Constraint. International Journal of Information Technology Project Management
(IJITPM). 4(4), pp.93-111.
Sadgrove, M.K., 2015. The complete guide to business risk management. Ashgate Publishing, Ltd..
Andersen, E.S., 2016. Do project managers have different perspectives on project
management?. International Journal of Project Management. 34(1), pp.58-65.
Dwivedula, R., Bredillet, C.N. and Müller, R., 2012. The relation between work motivation and
Evaluation of project
Management of Peak project firm is successfully accomplished community centre project.
Construction cost of community centre is similar as per planed task. Further, project is completed
on the right time in Peak project .In addition to this, human and other resources contribute an
effective role for organisation to finish job in the Birkbeck College.
CONCLUSION
From the report, it is found that principles of project management help to manage
community centre project in United Kingdom. Viability of project shows negative impact which
will create complexities to recover money regarding project. Matrix structure contributes an
effective role in Peak project to organize work very fast. Further, effective leadership skill of
manager provides good guidance to employees for completing community centre project in an
effective manner. Requirement assignment matrix helps to manage operations and specify plan with
contribution of appropriate human resources in the college. It can be concluded that change control
process also aids to improve efficiency and performance of peak project in the United Kingdom.
REFERENCES
Journals and books
Reiss, G., 2013. Project management demystified: Today's tools and techniques. Routledge.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in project-based
organisations. International Journal of Project Management. 31(1), pp.31-42.
Alhawari, S., Karadsheh, L., Talet, A.N. and Mansour, E., 2012. Knowledge-based risk
management framework for information technology project.International Journal of Information
Management. 32(1), pp.50-65.
Sommer, A.F., Dukovska-Popovska, I. and Steger-Jensen, K., 2014. Barriers towards integrated
product development—Challenges from a holistic project management perspective. International
Journal of Project Management. 32(6), pp.970-982.
Catanio, J.T., Armstrong, G. and Tucker, J., 2013. The Effects of Project Management Certification
on the Triple Constraint. International Journal of Information Technology Project Management
(IJITPM). 4(4), pp.93-111.
Sadgrove, M.K., 2015. The complete guide to business risk management. Ashgate Publishing, Ltd..
Andersen, E.S., 2016. Do project managers have different perspectives on project
management?. International Journal of Project Management. 34(1), pp.58-65.
Dwivedula, R., Bredillet, C.N. and Müller, R., 2012. The relation between work motivation and

project management success in case of temporary organizations: theoretical lenses. Academy of
Business Research Journal. 2. pp.41-64.
Dwivedula, R., Bredillet, C.N. and Müller, R., 2012. The relation between work motivation and
project management success in case of temporary organizations: theoretical lenses. Academy of
Business Research Journal. 2. pp.41-64.
Wilson, J., 2014. Essentials of business research: A guide to doing your research project. Sage.
Meng, X., 2012. The effect of relationship management on project performance in
construction. International journal of project management. 30(2). pp.188-198.
Hwang, B.G. and Ng, W.J., 2013. Project management knowledge and skills for green construction:
Overcoming challenges. International Journal of Project Management. 31(2). pp.272-284.
Lindberg, P., Voss, C.A. and Blackmon, K.L. eds., 2013. International manufacturing strategies:
context, content and change. Springer Science & Business Media.
Tayur, S., Ganeshan, R. and Magazine, M. eds., 2012. Quantitative models for supply chain
management (Vol. 17). Springer Science & Business Media.
Lientz, B. and Rea, K., 2012. International project management. Routledge.
Pina, P., Romão, M. and Oliveira, M., 2013. Using benefits management to link knowledge
management to business objectives. VINE. 43(1). pp.22-38.
Kavadias, S.S., 2014. 10‐year Anniversary of the New Product Development, R&D, and Project
Management Department in Production and Operations Management—Progress, Thoughts, and
Perspectives. Production and Operations Management. 23(8). pp.1259-1264.
Caniëls, M.C. and Bakens, R.J., 2012. The effects of Project Management Information Systems on
decision making in a multi project environment. International Journal of Project
Management. 30(2). pp.162-175.
Kodukula, P.S., 2012. Strategic Project Management Transformation: Delivering Maximum ROI &
Sustainable Business Value. Project Management Journal. 43(5). pp.100-100.
Online
Haughey, D., 2014. A Brief History of Project Management. [Online]. Available Through:
<https://www.projectsmart.co.uk/brief-history-of-project-management.php>. [Accessed on
25th January 2016].
Integrated Change Control Procedure, 2013. [Online]. Available Through:
<http://www.itplanning.org.vt.edu/pm/integratedchangecontrol.html>. [Accessed on 25th
January 2016].
Responsibility Assignment Matrix, 2015. [Online]. Available Through:
<http://2020projectmanagement.com/2013/10/the-responsibility-assignment-matrix-ram/>.
[Accessed on 25th January 2016].
Business Research Journal. 2. pp.41-64.
Dwivedula, R., Bredillet, C.N. and Müller, R., 2012. The relation between work motivation and
project management success in case of temporary organizations: theoretical lenses. Academy of
Business Research Journal. 2. pp.41-64.
Wilson, J., 2014. Essentials of business research: A guide to doing your research project. Sage.
Meng, X., 2012. The effect of relationship management on project performance in
construction. International journal of project management. 30(2). pp.188-198.
Hwang, B.G. and Ng, W.J., 2013. Project management knowledge and skills for green construction:
Overcoming challenges. International Journal of Project Management. 31(2). pp.272-284.
Lindberg, P., Voss, C.A. and Blackmon, K.L. eds., 2013. International manufacturing strategies:
context, content and change. Springer Science & Business Media.
Tayur, S., Ganeshan, R. and Magazine, M. eds., 2012. Quantitative models for supply chain
management (Vol. 17). Springer Science & Business Media.
Lientz, B. and Rea, K., 2012. International project management. Routledge.
Pina, P., Romão, M. and Oliveira, M., 2013. Using benefits management to link knowledge
management to business objectives. VINE. 43(1). pp.22-38.
Kavadias, S.S., 2014. 10‐year Anniversary of the New Product Development, R&D, and Project
Management Department in Production and Operations Management—Progress, Thoughts, and
Perspectives. Production and Operations Management. 23(8). pp.1259-1264.
Caniëls, M.C. and Bakens, R.J., 2012. The effects of Project Management Information Systems on
decision making in a multi project environment. International Journal of Project
Management. 30(2). pp.162-175.
Kodukula, P.S., 2012. Strategic Project Management Transformation: Delivering Maximum ROI &
Sustainable Business Value. Project Management Journal. 43(5). pp.100-100.
Online
Haughey, D., 2014. A Brief History of Project Management. [Online]. Available Through:
<https://www.projectsmart.co.uk/brief-history-of-project-management.php>. [Accessed on
25th January 2016].
Integrated Change Control Procedure, 2013. [Online]. Available Through:
<http://www.itplanning.org.vt.edu/pm/integratedchangecontrol.html>. [Accessed on 25th
January 2016].
Responsibility Assignment Matrix, 2015. [Online]. Available Through:
<http://2020projectmanagement.com/2013/10/the-responsibility-assignment-matrix-ram/>.
[Accessed on 25th January 2016].
1 out of 22
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.