COIT20254 Information Systems Project Term 1, 2018: Progress Report
VerifiedAdded on  2024/05/31
|16
|1693
|137
Report
AI Summary
This progress report details the system design and current status of a pharmaceutical system project. It outlines the use of fact-finding techniques to gather information for user interface design, employing UML diagrams to model the system. The report reviews the project schedule, highlighting completed, in-progress, and scheduled tasks. It also addresses potential project risks, offering recommendations for mitigation plans. Key aspects covered include the system's architecture, interface, and database design, as well as a matrix illustrating project status, group meeting outcomes, and a risk review that considers cost, usability, design, communication, and failure-related risks. The report emphasizes the importance of cloud storage for platform independence and outlines strategies for managing potential system failures.

COIT20254: Information Systems Project
Term 1, 2018
Progress Report 2
Pharmaceutical System
Lecturer and Tutor: Indra Seher
Prepared by
Sadiquddin Syed S0277988
Srijan Nepali 12044047
Nishan khadka 12025666
1
Term 1, 2018
Progress Report 2
Pharmaceutical System
Lecturer and Tutor: Indra Seher
Prepared by
Sadiquddin Syed S0277988
Srijan Nepali 12044047
Nishan khadka 12025666
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Executive Summary
In this progress report, we have outlined the System design of our Pharmaceutical System. It
also states the current stage of Pharmaceutical System. In progress report, we have used
fact-finding techniques to gather the sufficient so that we can analyse before designing the
user interface. Unified Modelling language diagram also used to design the system as per
the collected information. There are no changes in the specification of the project. The
project schedule is reviewed and three parameters namely, Completed, In-Progress and
Scheduled have been used to highlight the current progress of the project. In the Last all the
concerned project risks are taken into consideration and group also provide
recommendations to provide a mitigation plan to these risks.
2
In this progress report, we have outlined the System design of our Pharmaceutical System. It
also states the current stage of Pharmaceutical System. In progress report, we have used
fact-finding techniques to gather the sufficient so that we can analyse before designing the
user interface. Unified Modelling language diagram also used to design the system as per
the collected information. There are no changes in the specification of the project. The
project schedule is reviewed and three parameters namely, Completed, In-Progress and
Scheduled have been used to highlight the current progress of the project. In the Last all the
concerned project risks are taken into consideration and group also provide
recommendations to provide a mitigation plan to these risks.
2

Table of Contents
Executive Summary....................................................................................................................2
Introduction................................................................................................................................4
Description of any changes and/or description of status of project..........................................4
Use Case Diagram...................................................................................................................5
Architecture Diagram.............................................................................................................6
Interface Design......................................................................................................................7
Database Design Diagram.......................................................................................................9
Project Status Matrix..............................................................................................................9
Group Meeting Status..........................................................................................................10
Schedule Review.......................................................................................................................11
Risk Review...............................................................................................................................15
Cost-Related Risk..................................................................................................................15
System Usability Risk............................................................................................................15
System Design Risk...............................................................................................................15
Team Communication Risk...................................................................................................15
System Failure Risk...............................................................................................................15
Summary...................................................................................................................................16
3
Executive Summary....................................................................................................................2
Introduction................................................................................................................................4
Description of any changes and/or description of status of project..........................................4
Use Case Diagram...................................................................................................................5
Architecture Diagram.............................................................................................................6
Interface Design......................................................................................................................7
Database Design Diagram.......................................................................................................9
Project Status Matrix..............................................................................................................9
Group Meeting Status..........................................................................................................10
Schedule Review.......................................................................................................................11
Risk Review...............................................................................................................................15
Cost-Related Risk..................................................................................................................15
System Usability Risk............................................................................................................15
System Design Risk...............................................................................................................15
Team Communication Risk...................................................................................................15
System Failure Risk...............................................................................................................15
Summary...................................................................................................................................16
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Introduction
Pharmaceutical system have been designed keeping all the current issues of the
pharmaceutical industry in mind. It helps to manage all the troublesome operations in a
better manner. It takes cares of sales and stock information of the medicine. It is designed
to store all the present as well as past transactions.
Currently, the project is in the design phase. All the stakeholders have been mapped and
their role and responsibilities have been outlined in the system design. In this stage, system
functional, non- functional requirements are also decided keeping the usability
fundamentals in mind. Risk management strategies are discussed and formulated so that
system can withstand every failure situation. To make the system platform independent,
cloud storage have been selected to provide the back-end support to the Pharmaceutical
system.
Description of any changes and/or description of
status of project
Till now the system and solution design of the Pharmaceutical system have been outlined.
All the Stakeholder where this system is proposed to be used have been evaluated to
formulate the functional and non-functional requirements of the system.
Fact-Finding techniques such as have been used to gather sufficient information form the
potential stakeholders. Following fact-finding techniques that have been used are:
Questionnaire, Interviews, Observation and Site Visit were used.
Unified Modelling Language diagram have been used to convert the collected information
into system design.
4
Pharmaceutical system have been designed keeping all the current issues of the
pharmaceutical industry in mind. It helps to manage all the troublesome operations in a
better manner. It takes cares of sales and stock information of the medicine. It is designed
to store all the present as well as past transactions.
Currently, the project is in the design phase. All the stakeholders have been mapped and
their role and responsibilities have been outlined in the system design. In this stage, system
functional, non- functional requirements are also decided keeping the usability
fundamentals in mind. Risk management strategies are discussed and formulated so that
system can withstand every failure situation. To make the system platform independent,
cloud storage have been selected to provide the back-end support to the Pharmaceutical
system.
Description of any changes and/or description of
status of project
Till now the system and solution design of the Pharmaceutical system have been outlined.
All the Stakeholder where this system is proposed to be used have been evaluated to
formulate the functional and non-functional requirements of the system.
Fact-Finding techniques such as have been used to gather sufficient information form the
potential stakeholders. Following fact-finding techniques that have been used are:
Questionnaire, Interviews, Observation and Site Visit were used.
Unified Modelling Language diagram have been used to convert the collected information
into system design.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Use Case Diagram
Use case Diagram outlines the actors and their possible actions.
Figure 1 Use Case Diagram
5
Use case Diagram outlines the actors and their possible actions.
Figure 1 Use Case Diagram
5

Architecture Diagram
This architecture diagram help to provide the working of the system on a cloud platform.
Figure 2 Architecture Diagram
6
This architecture diagram help to provide the working of the system on a cloud platform.
Figure 2 Architecture Diagram
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Interface Design
Following are the User Interface of the Pharmaceutical System.
Figure 3 Account
Figure 4 Inventory Management
7
Following are the User Interface of the Pharmaceutical System.
Figure 3 Account
Figure 4 Inventory Management
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Figure 5 Authentication
8
8

Database Design Diagram
Figure 6 Database Design
Project Status Matrix
Following task have been accomplished as per the decided schedule.
4 Explain solution and system design Completed
4.1 Defining stakeholders Completed
4.2 Define methodology Completed
4.3 System Analysis Completed
4.3.
1 Functional Requirement Completed
4.3.
2 Usability requirement Completed
4.3.
3 Reliability requirement Completed
4.3.
4 Performance requirement Completed
4.3.
5 Security requirement Completed
4.4 Explain risk management strategies Completed
4.5 New System Design Completed
4.5. Database design Completed
9
Figure 6 Database Design
Project Status Matrix
Following task have been accomplished as per the decided schedule.
4 Explain solution and system design Completed
4.1 Defining stakeholders Completed
4.2 Define methodology Completed
4.3 System Analysis Completed
4.3.
1 Functional Requirement Completed
4.3.
2 Usability requirement Completed
4.3.
3 Reliability requirement Completed
4.3.
4 Performance requirement Completed
4.3.
5 Security requirement Completed
4.4 Explain risk management strategies Completed
4.5 New System Design Completed
4.5. Database design Completed
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

1
4.5.
2 Design system models Completed
5 Documentation Scheduled
6 Report Scheduled
7 Closing Scheduled
Group Meeting Status
Since it’s a group activity collaboration is the key to the success of this project. All the task
have been divided among the group member and in the last group meeting, it was decided
to use collaborated tools frequently to keep the track of the progress. Apart from the face-
face discussion this time we have used slack and Skype to keep track of the progress.
S.No Purpose Meeting Type
1. Brainstorming Session Face-Face Session
2. Group Meeting Slack and Skype
3. Feedback Session Face-Face Session
4. Training Session Face-Face Session
5. Documentation Session Skype
10
4.5.
2 Design system models Completed
5 Documentation Scheduled
6 Report Scheduled
7 Closing Scheduled
Group Meeting Status
Since it’s a group activity collaboration is the key to the success of this project. All the task
have been divided among the group member and in the last group meeting, it was decided
to use collaborated tools frequently to keep the track of the progress. Apart from the face-
face discussion this time we have used slack and Skype to keep track of the progress.
S.No Purpose Meeting Type
1. Brainstorming Session Face-Face Session
2. Group Meeting Slack and Skype
3. Feedback Session Face-Face Session
4. Training Session Face-Face Session
5. Documentation Session Skype
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Schedule Review
Project Schedule helps the group to keep track of the all initially outline tasks. Project plan
helps the group member to strategies the project tasks in a better way.
Task Name Status
1 Planning Completed
1.1 Group Development Completed
1.2 Arranging meetings Completed
1.3 Selection of project topic Completed
1.4 System Analysis Completed
1.5 Defining project objectives and constraints Completed
1.6 Assigning project member tasks Completed
1.7 Work break down structure Completed
1.8 Project schedule Completed
1.9 Risks Analysis and Quality control Completed
2 Project Research Completed
2.1 Research on current business process and existing
system
Completed
2.2 Market research Completed
2.3 Research on possible solution Completed
3 Analysis Completed
3.1 Business process analysis Completed
3.2 Stakeholder analysis Completed
3.3 Risk assessment Completed
3.4 System analysis Completed
3.5 Present system analysis Completed
3.5.1 Client-based system analysis Completed
3.5.2 Distribution system analysis Completed
4 Explain solution and system design Completed
11
Project Schedule helps the group to keep track of the all initially outline tasks. Project plan
helps the group member to strategies the project tasks in a better way.
Task Name Status
1 Planning Completed
1.1 Group Development Completed
1.2 Arranging meetings Completed
1.3 Selection of project topic Completed
1.4 System Analysis Completed
1.5 Defining project objectives and constraints Completed
1.6 Assigning project member tasks Completed
1.7 Work break down structure Completed
1.8 Project schedule Completed
1.9 Risks Analysis and Quality control Completed
2 Project Research Completed
2.1 Research on current business process and existing
system
Completed
2.2 Market research Completed
2.3 Research on possible solution Completed
3 Analysis Completed
3.1 Business process analysis Completed
3.2 Stakeholder analysis Completed
3.3 Risk assessment Completed
3.4 System analysis Completed
3.5 Present system analysis Completed
3.5.1 Client-based system analysis Completed
3.5.2 Distribution system analysis Completed
4 Explain solution and system design Completed
11

4.1 Defining stakeholders Completed
4.2 Define methodology Completed
4.3 System Requirements Completed
4.3.1 Functional Requirement Completed
4.3.2 Usability requirement Completed
4.3.3 Reliability requirement Completed
4.3.4 Performance requirement Completed
4.3.5 Security requirement Completed
4.4 Explain risk management strategies Completed
4.5 New System Design Completed
4.5.1 Database design Completed
4.5.2 Design system models Completed
5 Documentation In Progress
5.1 Executive Summary In Progress
5.2 Introduction In Progress
5.3 Project Management Overview In Progress
5.3.1 Statement of Work In Progress
5.3.2 Project Team Members and Responsibilities In Progress
5.3.3 Project Schedule In Progress
5.4 Proposed Strategic Alignment Scheduled
5.5 Proposed Strategic Alignment Scheduled
12
4.2 Define methodology Completed
4.3 System Requirements Completed
4.3.1 Functional Requirement Completed
4.3.2 Usability requirement Completed
4.3.3 Reliability requirement Completed
4.3.4 Performance requirement Completed
4.3.5 Security requirement Completed
4.4 Explain risk management strategies Completed
4.5 New System Design Completed
4.5.1 Database design Completed
4.5.2 Design system models Completed
5 Documentation In Progress
5.1 Executive Summary In Progress
5.2 Introduction In Progress
5.3 Project Management Overview In Progress
5.3.1 Statement of Work In Progress
5.3.2 Project Team Members and Responsibilities In Progress
5.3.3 Project Schedule In Progress
5.4 Proposed Strategic Alignment Scheduled
5.5 Proposed Strategic Alignment Scheduled
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.