Pharmacy App Design & Implementation: Project Schedule, Budget & Plan
VerifiedAdded on  2023/04/11
|11
|1662
|175
Project
AI Summary
This project focuses on the design and implementation of a pharmacy application, including the establishment of database servers and hardware infrastructure. The project plan encompasses several key phases: initiation, planning, execution, close-out, and completion. The schedule details tasks ranging from project charter design and technical requirement planning to software development, testing, and system analysis. Resource allocation includes roles such as project manager, IT manager, software developers, and pharmacy consultants, with associated staffing costs outlined. A comprehensive budget is provided, covering all project activities, hardware, and technical support. The project also includes a Gantt chart for visual representation of the timeline and milestones. The ultimate goal is to create a functional application for local pharmacies to streamline prescription orders and delivery processes, aligning with the company's objectives to reduce customer wait times.

Running head: PROJECT MANAGEMENT
Designing pharmacy App and database servers & hardware
Name of the Student:
Name of the University:
Designing pharmacy App and database servers & hardware
Name of the Student:
Name of the University:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Table of Contents
1. Project schedule..................................................................................................................2
2. Assign milestones...............................................................................................................4
3. Assign resources.................................................................................................................4
4. Assign project cost for staffing...........................................................................................6
5. Project budget.....................................................................................................................7
6. Project Gantt chart..............................................................................................................9
Bibliography.............................................................................................................................10
Table of Contents
1. Project schedule..................................................................................................................2
2. Assign milestones...............................................................................................................4
3. Assign resources.................................................................................................................4
4. Assign project cost for staffing...........................................................................................6
5. Project budget.....................................................................................................................7
6. Project Gantt chart..............................................................................................................9
Bibliography.............................................................................................................................10

2PROJECT MANAGEMENT
1. Project schedule
Outline
Number Task Name Duration Start Finish
0 Designing of Pharmacy Application 61 days Thu 28-02-19 Mon 29-04-
19
1 Start of Project 0 days Thu 28-02-19 Thu 28-02-19
2 Project Initiation Phase 10 days Thu 28-02-19 Sun 10-03-19
2.1 Preparing of a project plan 2 days Thu 28-02-19 Fri 01-03-19
2.2 Allocation of stakeholders 2 days Sat 02-03-19 Sun 03-03-19
2.3 Preparing financial plan 2 days Mon 04-03-
19 Tue 05-03-19
2.4 Feasibility study 1 day Wed 06-03-
19
Wed 06-03-
19
2.5 Discussion on project overview 3 days Thu 07-03-19 Sat 09-03-19
2.6 Approval of Project 0 days Sun 10-03-19 Sun 10-03-19
3 Project Planning Phase 6 days Sun 10-03-19 Fri 15-03-19
3.1 Design of Project Charter 1 day Sun 10-03-19 Sun 10-03-19
3.2 Planning on technical requirements 1.5 days Mon 11-03-
19 Tue 12-03-19
3.3 Making a final budget plan based on project
requirements 1.5 days Tue 12-03-19 Wed 13-03-
19
3.4 Sanction of budget for procuring technical
aspects and project developers 0.5 days Thu 14-03-19 Thu 14-03-19
3.5 Procuring technical requirements and
developers 1.5 days Thu 14-03-19 Fri 15-03-19
3.6 Completion of Planning Phase 0 days Fri 15-03-19 Fri 15-03-19
4 Performing of Project Execution 9 days Sat 16-03-19 Sun 24-03-19
4.1 Designing of the project layout 1 day Sat 16-03-19 Sat 16-03-19
4.2 Arranging network and Database hardware
and server requirements 2 days Sun 17-03-19 Mon 18-03-
19
4.3 Performing of software development for the
Appication 1 day Tue 19-03-19 Tue 19-03-19
4.4 Testing of compiled code 5 days Wed 20-03-
19 Sun 24-03-19
4.4.1 Testing cases 1 day Wed 20-03-
19
Wed 20-03-
19
4.4.2 Execute the testing 2 days Thu 21-03-19 Fri 22-03-19
4.4.3 Testing the software 2 days Sat 23-03-19 Sun 24-03-19
4.5 Completion of Execution Phase 0 days Sun 24-03-19 Sun 24-03-19
5 Project Close-out Phase 29 days Mon 25-03-
19
Mon 22-04-
19
5.1 Identification of raised issues during testing
phase 2 days Mon 25-03-
19 Tue 26-03-19
5.2 Resolving over issues and final checkout of 2 days Wed 27-03- Thu 28-03-19
1. Project schedule
Outline
Number Task Name Duration Start Finish
0 Designing of Pharmacy Application 61 days Thu 28-02-19 Mon 29-04-
19
1 Start of Project 0 days Thu 28-02-19 Thu 28-02-19
2 Project Initiation Phase 10 days Thu 28-02-19 Sun 10-03-19
2.1 Preparing of a project plan 2 days Thu 28-02-19 Fri 01-03-19
2.2 Allocation of stakeholders 2 days Sat 02-03-19 Sun 03-03-19
2.3 Preparing financial plan 2 days Mon 04-03-
19 Tue 05-03-19
2.4 Feasibility study 1 day Wed 06-03-
19
Wed 06-03-
19
2.5 Discussion on project overview 3 days Thu 07-03-19 Sat 09-03-19
2.6 Approval of Project 0 days Sun 10-03-19 Sun 10-03-19
3 Project Planning Phase 6 days Sun 10-03-19 Fri 15-03-19
3.1 Design of Project Charter 1 day Sun 10-03-19 Sun 10-03-19
3.2 Planning on technical requirements 1.5 days Mon 11-03-
19 Tue 12-03-19
3.3 Making a final budget plan based on project
requirements 1.5 days Tue 12-03-19 Wed 13-03-
19
3.4 Sanction of budget for procuring technical
aspects and project developers 0.5 days Thu 14-03-19 Thu 14-03-19
3.5 Procuring technical requirements and
developers 1.5 days Thu 14-03-19 Fri 15-03-19
3.6 Completion of Planning Phase 0 days Fri 15-03-19 Fri 15-03-19
4 Performing of Project Execution 9 days Sat 16-03-19 Sun 24-03-19
4.1 Designing of the project layout 1 day Sat 16-03-19 Sat 16-03-19
4.2 Arranging network and Database hardware
and server requirements 2 days Sun 17-03-19 Mon 18-03-
19
4.3 Performing of software development for the
Appication 1 day Tue 19-03-19 Tue 19-03-19
4.4 Testing of compiled code 5 days Wed 20-03-
19 Sun 24-03-19
4.4.1 Testing cases 1 day Wed 20-03-
19
Wed 20-03-
19
4.4.2 Execute the testing 2 days Thu 21-03-19 Fri 22-03-19
4.4.3 Testing the software 2 days Sat 23-03-19 Sun 24-03-19
4.5 Completion of Execution Phase 0 days Sun 24-03-19 Sun 24-03-19
5 Project Close-out Phase 29 days Mon 25-03-
19
Mon 22-04-
19
5.1 Identification of raised issues during testing
phase 2 days Mon 25-03-
19 Tue 26-03-19
5.2 Resolving over issues and final checkout of 2 days Wed 27-03- Thu 28-03-19
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT
project code 19
5.3 Laying out of servers and hardware 2 days Fri 29-03-19 Sat 30-03-19
5.4 Design of network plan 3 days Sun 31-03-19 Tue 02-04-19
5.5 System analysis and design 8 days Wed 03-04-
19
Wed 10-04-
19
5.5.1 Analysing existing system 1 day Wed 03-04-
19
Wed 03-04-
19
5.5.2 Analysing the system requirements 2 days Thu 04-04-19 Fri 05-04-19
5.5.3 Design of database 3 days Sat 06-04-19 Mon 08-04-
19
5.5.4 System modelling 2 days Tue 09-04-19 Wed 10-04-
19
5.6 System implementation 12 days Thu 11-04-19 Mon 22-04-
19
5.6.1 Documentation of system 4 days Thu 11-04-19 Sun 14-04-19
5.6.2 Hardware requirements 2 days Mon 15-04-
19 Tue 16-04-19
5.6.3 Database specifications 1 day Wed 17-04-
19
Wed 17-04-
19
5.6.4 Description of system module 2 days Thu 18-04-19 Fri 19-04-19
5.6.5 Maintenance of the system 3 days Sat 20-04-19 Mon 22-04-
19
5.7 Completion of close phase 0 days Mon 22-04-
19
Mon 22-04-
19
6 Project completion phase 7 days Tue 23-04-19 Mon 29-04-
19
6.1 Final project plan document 2 days Tue 23-04-19 Wed 24-04-
19
6.2 Handling over project documentation 1 day Thu 25-04-19 Thu 25-04-19
6.3 Training of employees 1 day Fri 26-04-19 Fri 26-04-19
6.4 Releasing the project resources 2 days Sat 27-04-19 Sun 28-04-19
6.4.1 Communicate the closure to project
stakeholders 1 day Sat 27-04-19 Sat 27-04-19
6.4.2 Terminating the supplier contracts 1 day Sun 28-04-19 Sun 28-04-19
6.5 Gaining feedback 1 day Mon 29-04-
19
Mon 29-04-
19
6.6 Completion of final phase 0 days Mon 29-04-
19
Mon 29-04-
19
project code 19
5.3 Laying out of servers and hardware 2 days Fri 29-03-19 Sat 30-03-19
5.4 Design of network plan 3 days Sun 31-03-19 Tue 02-04-19
5.5 System analysis and design 8 days Wed 03-04-
19
Wed 10-04-
19
5.5.1 Analysing existing system 1 day Wed 03-04-
19
Wed 03-04-
19
5.5.2 Analysing the system requirements 2 days Thu 04-04-19 Fri 05-04-19
5.5.3 Design of database 3 days Sat 06-04-19 Mon 08-04-
19
5.5.4 System modelling 2 days Tue 09-04-19 Wed 10-04-
19
5.6 System implementation 12 days Thu 11-04-19 Mon 22-04-
19
5.6.1 Documentation of system 4 days Thu 11-04-19 Sun 14-04-19
5.6.2 Hardware requirements 2 days Mon 15-04-
19 Tue 16-04-19
5.6.3 Database specifications 1 day Wed 17-04-
19
Wed 17-04-
19
5.6.4 Description of system module 2 days Thu 18-04-19 Fri 19-04-19
5.6.5 Maintenance of the system 3 days Sat 20-04-19 Mon 22-04-
19
5.7 Completion of close phase 0 days Mon 22-04-
19
Mon 22-04-
19
6 Project completion phase 7 days Tue 23-04-19 Mon 29-04-
19
6.1 Final project plan document 2 days Tue 23-04-19 Wed 24-04-
19
6.2 Handling over project documentation 1 day Thu 25-04-19 Thu 25-04-19
6.3 Training of employees 1 day Fri 26-04-19 Fri 26-04-19
6.4 Releasing the project resources 2 days Sat 27-04-19 Sun 28-04-19
6.4.1 Communicate the closure to project
stakeholders 1 day Sat 27-04-19 Sat 27-04-19
6.4.2 Terminating the supplier contracts 1 day Sun 28-04-19 Sun 28-04-19
6.5 Gaining feedback 1 day Mon 29-04-
19
Mon 29-04-
19
6.6 Completion of final phase 0 days Mon 29-04-
19
Mon 29-04-
19
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
2. Assign milestones
Milestone tasks Expected Start Date
Completion of Planning Phase Fri 15-03-19
Completion of Execution Phase Sun 24-03-19
Completion of close phase Mon 22-04-19
Completion of final phase Mon 29-04-19
3. Assign resources
Outline
Numbe
r
Task Name Resource Names
0 Designing of Pharmacy
Application
1 Start of Project
2 Project Initiation Phase
2.1 Preparing of a project plan Project Manager
2.2 Allocation of stakeholders Project Leader
2.3 Preparing financial plan Project Manager
2.4 Feasibility study Project Leader, Project Manager
2.5 Discussion on project overview Project Manager, External application
consultant, IT Manager
2.6 Approval of Project
3 Project Planning Phase
3.1 Design of Project Charter
Project Manager,Operations Team and
Development Team,Software Developer,IT
Manager
3.2 Planning on technical
requirements IT Manager
3.3 Making a final budget plan
based on project requirements
Pharmacy Consultant,Project
Manager,Application Team Members
3.4
Sanction of budget for procuring
technical aspects and project
developers
IT Manager,Project Manager,DBMS
administrator,External application
consultant
3.5 Procuring technical
requirements and developers External application consultant,IT Manager
3.6 Completion of Planning Phase
4 Performing of Project Execution
4.1 Designing of the project layout
Application Team Members,External
application consultant,Project
Manager,Software Developer
4.2 Arranging network and Database DBMS administrator
2. Assign milestones
Milestone tasks Expected Start Date
Completion of Planning Phase Fri 15-03-19
Completion of Execution Phase Sun 24-03-19
Completion of close phase Mon 22-04-19
Completion of final phase Mon 29-04-19
3. Assign resources
Outline
Numbe
r
Task Name Resource Names
0 Designing of Pharmacy
Application
1 Start of Project
2 Project Initiation Phase
2.1 Preparing of a project plan Project Manager
2.2 Allocation of stakeholders Project Leader
2.3 Preparing financial plan Project Manager
2.4 Feasibility study Project Leader, Project Manager
2.5 Discussion on project overview Project Manager, External application
consultant, IT Manager
2.6 Approval of Project
3 Project Planning Phase
3.1 Design of Project Charter
Project Manager,Operations Team and
Development Team,Software Developer,IT
Manager
3.2 Planning on technical
requirements IT Manager
3.3 Making a final budget plan
based on project requirements
Pharmacy Consultant,Project
Manager,Application Team Members
3.4
Sanction of budget for procuring
technical aspects and project
developers
IT Manager,Project Manager,DBMS
administrator,External application
consultant
3.5 Procuring technical
requirements and developers External application consultant,IT Manager
3.6 Completion of Planning Phase
4 Performing of Project Execution
4.1 Designing of the project layout
Application Team Members,External
application consultant,Project
Manager,Software Developer
4.2 Arranging network and Database DBMS administrator

5PROJECT MANAGEMENT
hardware and server requirements
4.3 Performing of software
development for the Appication
Designer,Software Developer,IT
Manager,Operations Team and
Development Team,Programmer
4.4 Testing of compiled code
4.4.1 Testing cases IT Manager,Tester
4.4.2 Execute the testing Tester,DBMS administrator,External
application consultant,Software Developer
4.4.3 Testing the software Tester,IT Manager,Programmer,Software
Developer
4.5 Completion of Execution Phase
5 Project Close-out Phase
5.1 Identification of raised issues
during testing phase External application consultant,Tester
5.2 Resolving over issues and final
checkout of project code
Operations Team and Development
Team,Programmer
5.3 Laying out of servers and
hardware technical support and hardware fee[1]
5.4 Design of network plan Software Developer,Designer,IT Manager
5.5 System analysis and design
5.5.1 Analysing existing system IT Manager
5.5.2 Analysing the system
requirements Software Developer
5.5.3 Design of database DBMS administrator
5.5.4 System modelling External application consultant
5.6 System implementation
5.6.1 Documentation of system IT Manager,Project Manager
5.6.2 Hardware requirements IT Manager,Operations Team and
Development Team
5.6.3 Database specifications DBMS administrator,Designer
5.6.4 Description of system module DBMS administrator
5.6.5 Maintenance of the system Software Developer,IT Manager,Pharmacy
Consultant,Programmer
5.7 Completion of close phase
6 Project completion phase
6.1 Final project plan document
External application consultant,Operations
Team and Development
Team,Programmer,Project Manager,DBMS
administrator,Designer
6.2 Handling over project
documentation
External application consultant,Operations
Team and Development Team,Project
Manager,Application Team Members
6.3 Training of employees Project Manager,Application Team
Members,IT Manager
6.4 Releasing the project
resources
hardware and server requirements
4.3 Performing of software
development for the Appication
Designer,Software Developer,IT
Manager,Operations Team and
Development Team,Programmer
4.4 Testing of compiled code
4.4.1 Testing cases IT Manager,Tester
4.4.2 Execute the testing Tester,DBMS administrator,External
application consultant,Software Developer
4.4.3 Testing the software Tester,IT Manager,Programmer,Software
Developer
4.5 Completion of Execution Phase
5 Project Close-out Phase
5.1 Identification of raised issues
during testing phase External application consultant,Tester
5.2 Resolving over issues and final
checkout of project code
Operations Team and Development
Team,Programmer
5.3 Laying out of servers and
hardware technical support and hardware fee[1]
5.4 Design of network plan Software Developer,Designer,IT Manager
5.5 System analysis and design
5.5.1 Analysing existing system IT Manager
5.5.2 Analysing the system
requirements Software Developer
5.5.3 Design of database DBMS administrator
5.5.4 System modelling External application consultant
5.6 System implementation
5.6.1 Documentation of system IT Manager,Project Manager
5.6.2 Hardware requirements IT Manager,Operations Team and
Development Team
5.6.3 Database specifications DBMS administrator,Designer
5.6.4 Description of system module DBMS administrator
5.6.5 Maintenance of the system Software Developer,IT Manager,Pharmacy
Consultant,Programmer
5.7 Completion of close phase
6 Project completion phase
6.1 Final project plan document
External application consultant,Operations
Team and Development
Team,Programmer,Project Manager,DBMS
administrator,Designer
6.2 Handling over project
documentation
External application consultant,Operations
Team and Development Team,Project
Manager,Application Team Members
6.3 Training of employees Project Manager,Application Team
Members,IT Manager
6.4 Releasing the project
resources
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT
6.4.1 Communicate the closure to
project stakeholders Project Leader,Project Manager
6.4.2 Terminating the supplier
contracts
Project Manager,External application
consultant,Project Leader
6.5 Gaining feedback Project Manager
6.6 Completion of final phase
4. Assign project cost for staffing
Resource Name Type Max. Units Std. Rate
Project Leader Work 100% $ 10.00/hr
Application Team Members Work 100% $ 125.00/hr
Operations Team and
Development Team Work 100% $ 100.00/hr
Project Manager Work 100% $ 100.00/hr
IT Manager Work 100% $ 130.00/hr
Tester Work 100% $ 130.00/hr
Designer Work 100% $ 130.00/hr
Software Developer Work 100% $ 90.00/hr
Programmer Work 100% $ 45.00/hr
External application
consultant Work 100% $ 50.00/hr
Pharmacy Consultant Work 100% $ 40.00/hr
DBMS administrator Work 100% $ 40.00/hr
technical support and
hardware fee Material $ 15,000.00
6.4.1 Communicate the closure to
project stakeholders Project Leader,Project Manager
6.4.2 Terminating the supplier
contracts
Project Manager,External application
consultant,Project Leader
6.5 Gaining feedback Project Manager
6.6 Completion of final phase
4. Assign project cost for staffing
Resource Name Type Max. Units Std. Rate
Project Leader Work 100% $ 10.00/hr
Application Team Members Work 100% $ 125.00/hr
Operations Team and
Development Team Work 100% $ 100.00/hr
Project Manager Work 100% $ 100.00/hr
IT Manager Work 100% $ 130.00/hr
Tester Work 100% $ 130.00/hr
Designer Work 100% $ 130.00/hr
Software Developer Work 100% $ 90.00/hr
Programmer Work 100% $ 45.00/hr
External application
consultant Work 100% $ 50.00/hr
Pharmacy Consultant Work 100% $ 40.00/hr
DBMS administrator Work 100% $ 40.00/hr
technical support and
hardware fee Material $ 15,000.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
5. Project budget
Outline
Number Task Name Cost
0 Designing of Pharmacy Application $ 112,600.00
1 Start of Project $ 0.00
2 Project Initiation Phase $ 10,960.00
2.1 Preparing of a project plan $ 1,600.00
2.2 Allocation of stakeholders $ 160.00
2.3 Preparing financial plan $ 1,600.00
2.4 Feasibility study $ 880.00
2.5 Discussion on project overview $ 6,720.00
2.6 Approval of Project $ 0.00
3 Project Planning Phase $ 11,320.00
3.1 Design of Project Charter $ 3,360.00
3.2 Planning on technical requirements $ 1,500.00
3.3 Making a final budget plan based on project
requirements $ 3,020.00
3.4 Sanction of budget for procuring technical aspects
and project developers $ 1,280.00
3.5 Procuring technical requirements and developers $ 2,160.00
3.6 Completion of Planning Phase $ 0.00
4 Performing of Project Execution $ 20,880.00
4.1 Designing of the project layout $ 2,920.00
4.2 Arranging network and Database hardware and
server requirements $ 640.00
4.3 Performing of software development for the
Application $ 3,960.00
4.4 Testing of compiled code $ 13,360.00
4.4.1 Testing cases $ 2,080.00
4.4.2 Execute the testing $ 4,960.00
4.4.3 Testing the software $ 6,320.00
4.5 Completion of Execution Phase $ 0.00
5 Project Close-out Phase $ 53,200.00
5.1 Identification of raised issues during testing phase $ 2,880.00
5.2 Resolving over issues and final checkout of project
code $ 2,320.00
5.3 Laying out of servers and hardware $ 15,000.00
5.4 Design of network plan $ 8,400.00
5.5 System analysis and design $ 4,240.00
5.5.1 Analysing existing system $ 1,040.00
5.5.2 Analysing the system requirements $ 1,440.00
5.5.3 Design of database $ 960.00
5.5.4 System modelling $ 800.00
5. Project budget
Outline
Number Task Name Cost
0 Designing of Pharmacy Application $ 112,600.00
1 Start of Project $ 0.00
2 Project Initiation Phase $ 10,960.00
2.1 Preparing of a project plan $ 1,600.00
2.2 Allocation of stakeholders $ 160.00
2.3 Preparing financial plan $ 1,600.00
2.4 Feasibility study $ 880.00
2.5 Discussion on project overview $ 6,720.00
2.6 Approval of Project $ 0.00
3 Project Planning Phase $ 11,320.00
3.1 Design of Project Charter $ 3,360.00
3.2 Planning on technical requirements $ 1,500.00
3.3 Making a final budget plan based on project
requirements $ 3,020.00
3.4 Sanction of budget for procuring technical aspects
and project developers $ 1,280.00
3.5 Procuring technical requirements and developers $ 2,160.00
3.6 Completion of Planning Phase $ 0.00
4 Performing of Project Execution $ 20,880.00
4.1 Designing of the project layout $ 2,920.00
4.2 Arranging network and Database hardware and
server requirements $ 640.00
4.3 Performing of software development for the
Application $ 3,960.00
4.4 Testing of compiled code $ 13,360.00
4.4.1 Testing cases $ 2,080.00
4.4.2 Execute the testing $ 4,960.00
4.4.3 Testing the software $ 6,320.00
4.5 Completion of Execution Phase $ 0.00
5 Project Close-out Phase $ 53,200.00
5.1 Identification of raised issues during testing phase $ 2,880.00
5.2 Resolving over issues and final checkout of project
code $ 2,320.00
5.3 Laying out of servers and hardware $ 15,000.00
5.4 Design of network plan $ 8,400.00
5.5 System analysis and design $ 4,240.00
5.5.1 Analysing existing system $ 1,040.00
5.5.2 Analysing the system requirements $ 1,440.00
5.5.3 Design of database $ 960.00
5.5.4 System modelling $ 800.00

8PROJECT MANAGEMENT
5.6 System implementation $ 20,360.00
5.6.1 Documentation of system $ 7,360.00
5.6.2 Hardware requirements $ 3,680.00
5.6.3 Database specifications $ 1,360.00
5.6.4 Description of system module $ 640.00
5.6.5 Maintenance of the system $ 7,320.00
5.7 Completion of close phase $ 0.00
6 Project completion phase $ 16,240.00
6.1 Final project plan document $ 7,440.00
6.2 Handling over project documentation $ 3,000.00
6.3 Training of employees $ 2,840.00
6.4 Releasing the project resources $ 2,160.00
6.4.1 Communicate the closure to project stakeholders $ 880.00
6.4.2 Terminating the supplier contracts $ 1,280.00
6.5 Gaining feedback $ 800.00
6.6 Completion of final phase $ 0.00
5.6 System implementation $ 20,360.00
5.6.1 Documentation of system $ 7,360.00
5.6.2 Hardware requirements $ 3,680.00
5.6.3 Database specifications $ 1,360.00
5.6.4 Description of system module $ 640.00
5.6.5 Maintenance of the system $ 7,320.00
5.7 Completion of close phase $ 0.00
6 Project completion phase $ 16,240.00
6.1 Final project plan document $ 7,440.00
6.2 Handling over project documentation $ 3,000.00
6.3 Training of employees $ 2,840.00
6.4 Releasing the project resources $ 2,160.00
6.4.1 Communicate the closure to project stakeholders $ 880.00
6.4.2 Terminating the supplier contracts $ 1,280.00
6.5 Gaining feedback $ 800.00
6.6 Completion of final phase $ 0.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT
6. Project Gantt chart
Figure 1: Gantt chart
(Source: Created by author)
6. Project Gantt chart
Figure 1: Gantt chart
(Source: Created by author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT
Bibliography
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Bibliography
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
1 out of 11
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.