PHL Australian Construction Website Redevelopment Project SOW (MBA641)
VerifiedAdded on 2022/10/10
|16
|2652
|56
Project
AI Summary
This project management assignment presents a Statement of Work (SOW) for the website redevelopment of PHL, an Australian construction company. The SOW outlines the project background, scope (in-scope and out-of-scope items), and work requirements, broken down into planning, definition/design, implementation, and conversion phases. It also includes a detailed project schedule spanning 87 days, commencing August 27, 2019, and concluding December 25, 2019, along with a comprehensive breakdown of project pricing totaling $265,000, allocating costs across various tasks and resources. The document concludes with acceptance criteria, stipulating that the project's success hinges on timely completion within budget, a content-rich and user-friendly website with effective navigation, and the provision of timely feedback mechanisms.

Running head: PROJECT MANAGEMENT
PHL Australian construction company
Name of the Student
Name of the University
Author’s Note
PHL Australian construction company
Name of the Student
Name of the University
Author’s Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
PROJECT MANAGEMENT
Table of Contents
1. Introduction.................................................................................................................................2
2. Project background......................................................................................................................2
3. Project scope................................................................................................................................3
4. Statement of work requirements..................................................................................................4
5. Statement of work schedule and pricing......................................................................................5
5.1 Schedule.................................................................................................................................5
5.2 Project Pricing.......................................................................................................................8
6. Acceptance criteria....................................................................................................................12
Bibliography..................................................................................................................................14
PROJECT MANAGEMENT
Table of Contents
1. Introduction.................................................................................................................................2
2. Project background......................................................................................................................2
3. Project scope................................................................................................................................3
4. Statement of work requirements..................................................................................................4
5. Statement of work schedule and pricing......................................................................................5
5.1 Schedule.................................................................................................................................5
5.2 Project Pricing.......................................................................................................................8
6. Acceptance criteria....................................................................................................................12
Bibliography..................................................................................................................................14

2
PROJECT MANAGEMENT
1. Introduction
The paper reflects on the preparation of a “Statement of Work (SOW)” for the PHL
company that is one of the Australian construction company. The organization mainly aims to
enhance the customer as well as marketing service with the help of different multi-tiered
approach for attracting new customers and additionally getting more share in the market. In order
to achieve the objectives, the chief executive officer has mainly approved the redevelopment
project of the website that will further redevelop the present PHL website. It is found that SOW
document that was prepared includes scope of the work as well as other work requirements that
are needed for the website implementation project. In addition to this, the SOW document also
contains work schedule and pricing information for reflecting that the entire project will get
completed by 25th December 2019 by utilizing budget of around $265,000. Moreover, the SOW
acceptance criteria for the project is also discussed in the document.
2. Project background
PHL which is one the construction company in Australia mainly have a strategic aim and
as per which the organization wants to increase both the customer service as well as marketing
service. In order to do so, the organization needs to attract the clients towards their service which
will further be helpful in generating yearly revenue. In order to achieve the organizational
strategic objectives, the higher authority of the organization mainly decided to redevelop the
website. The main purpose of the redevelopment of the website to build a website that must
contain details including the client testimonials, information about new building development as
well as other types of industry information. In addition to this, the website must be designed in
such a way that they must provide the facility for delivering timely feedback for improving the
PROJECT MANAGEMENT
1. Introduction
The paper reflects on the preparation of a “Statement of Work (SOW)” for the PHL
company that is one of the Australian construction company. The organization mainly aims to
enhance the customer as well as marketing service with the help of different multi-tiered
approach for attracting new customers and additionally getting more share in the market. In order
to achieve the objectives, the chief executive officer has mainly approved the redevelopment
project of the website that will further redevelop the present PHL website. It is found that SOW
document that was prepared includes scope of the work as well as other work requirements that
are needed for the website implementation project. In addition to this, the SOW document also
contains work schedule and pricing information for reflecting that the entire project will get
completed by 25th December 2019 by utilizing budget of around $265,000. Moreover, the SOW
acceptance criteria for the project is also discussed in the document.
2. Project background
PHL which is one the construction company in Australia mainly have a strategic aim and
as per which the organization wants to increase both the customer service as well as marketing
service. In order to do so, the organization needs to attract the clients towards their service which
will further be helpful in generating yearly revenue. In order to achieve the organizational
strategic objectives, the higher authority of the organization mainly decided to redevelop the
website. The main purpose of the redevelopment of the website to build a website that must
contain details including the client testimonials, information about new building development as
well as other types of industry information. In addition to this, the website must be designed in
such a way that they must provide the facility for delivering timely feedback for improving the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
PROJECT MANAGEMENT
interaction with the construction of the company. As PHL does not have proper IT department
that can be able to design, implement as well as test therefore the work that is required to be done
needs to be outsourced. It is found that around $265,000 is needed for completing the website
redevelopment within 25th December successfully.
3. Project scope
Project scope is considered to the part of project planning which must determine as well
as document the list of a specific project deliverables, features, tasks, goals as well as the project
deadlines. The scope is categorized into in-scope and out-scope.
In-scope
Implementing the website for the PHL company
Releasing the SOW document
Gathering different types of ideas as well as documents
Undertaking the project feasibility study
Developing the prototype for the project
Building the website
Developing the navigation as well as content pages
Out-scope
The details of the suppliers are not given in the project
Extra charges to the workers are not provided
PROJECT MANAGEMENT
interaction with the construction of the company. As PHL does not have proper IT department
that can be able to design, implement as well as test therefore the work that is required to be done
needs to be outsourced. It is found that around $265,000 is needed for completing the website
redevelopment within 25th December successfully.
3. Project scope
Project scope is considered to the part of project planning which must determine as well
as document the list of a specific project deliverables, features, tasks, goals as well as the project
deadlines. The scope is categorized into in-scope and out-scope.
In-scope
Implementing the website for the PHL company
Releasing the SOW document
Gathering different types of ideas as well as documents
Undertaking the project feasibility study
Developing the prototype for the project
Building the website
Developing the navigation as well as content pages
Out-scope
The details of the suppliers are not given in the project
Extra charges to the workers are not provided
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
PROJECT MANAGEMENT
4. Statement of work requirements
It is found that in order to develop a website for the PHL construction company, it is
quite necessary to undertake different work activities which are mainly categorized into four
different phases.
Planning phase: In this specific phase, proper conversation with the project stakeholders
are done in order to gather ideas which are required for website development. After collection of
ideas, proper project proposal for the entire project is developed after which an agreement is
made so that the project can be delivered within time. After the project plan get approved and the
SOW document is released, the contractor selection procedure for the website design is done.
Definition and design phase: In this phase, various ideas about the project are gathered
and the data which is collected is analyzed successfully so that the design for the website will be
helpful in meeting the needs of PHL construction company. After this phase, the entire design of
the website is again designed by adding all the new features which are needed. In addition to
this, feasibility check as well as budget that is required for the project is analyzed in this phase.
In the last activity of this phase, proposal for the project is created for the successful
implementation of website for PHL.
Implementation phase: In the third phase, the prototype for the website is created for
making sure that all the needs and demands of the PHL construction company will be fulfilled.
After the construction of the project prototype, the team members develop database by validating
the project code. In addition to this, cross-browser testing is mainly undertaken for successful
optimization. Moreover, web content is built which include proper navigation structure as well as
site content pages. After creating the pages of the site proper details of the clients as well as
PROJECT MANAGEMENT
4. Statement of work requirements
It is found that in order to develop a website for the PHL construction company, it is
quite necessary to undertake different work activities which are mainly categorized into four
different phases.
Planning phase: In this specific phase, proper conversation with the project stakeholders
are done in order to gather ideas which are required for website development. After collection of
ideas, proper project proposal for the entire project is developed after which an agreement is
made so that the project can be delivered within time. After the project plan get approved and the
SOW document is released, the contractor selection procedure for the website design is done.
Definition and design phase: In this phase, various ideas about the project are gathered
and the data which is collected is analyzed successfully so that the design for the website will be
helpful in meeting the needs of PHL construction company. After this phase, the entire design of
the website is again designed by adding all the new features which are needed. In addition to
this, feasibility check as well as budget that is required for the project is analyzed in this phase.
In the last activity of this phase, proposal for the project is created for the successful
implementation of website for PHL.
Implementation phase: In the third phase, the prototype for the website is created for
making sure that all the needs and demands of the PHL construction company will be fulfilled.
After the construction of the project prototype, the team members develop database by validating
the project code. In addition to this, cross-browser testing is mainly undertaken for successful
optimization. Moreover, web content is built which include proper navigation structure as well as
site content pages. After creating the pages of the site proper details of the clients as well as

5
PROJECT MANAGEMENT
organization will be updated in the website. Lastly, testing is done for ensuring that the website
is working properly.
Conversion phase: In this phase, training facility is given to the team members and the
documents that are used in the project are approved. After then, the entire project plan is
reviewing for ensuring that all the objectives of the organization are met with the redevelopment
of the new website. In addition to this, the checklist for the project as well as written status for
the entire project is developed. Lastly, the sign from the stakeholders are collected and the
project is closed.
5. Statement of work schedule and pricing
5.1 Schedule
The table which is given below depicts in detail that around 87 days will be required for
implementing the website successfully. The project will be closed on Christmas evening.
WBS Task Name Duration Start Finish
0
Implementation of website for PHL
construction company
87 days
Tue 27-08-
19
Wed 25-12-
19
1 Planning phase 24 days
Tue 27-08-
19
Fri 27-09-19
1.1 Conversation with the project team 2 days Tue 27-08-19
Wed 28-08-
19
1.2 Developing the proposal for the project 3 days Thu 29-08-19
Mon 02-09-
19
1.3 Agreement development for the project 1 day Tue 03-09-19 Tue 03-09-19
PROJECT MANAGEMENT
organization will be updated in the website. Lastly, testing is done for ensuring that the website
is working properly.
Conversion phase: In this phase, training facility is given to the team members and the
documents that are used in the project are approved. After then, the entire project plan is
reviewing for ensuring that all the objectives of the organization are met with the redevelopment
of the new website. In addition to this, the checklist for the project as well as written status for
the entire project is developed. Lastly, the sign from the stakeholders are collected and the
project is closed.
5. Statement of work schedule and pricing
5.1 Schedule
The table which is given below depicts in detail that around 87 days will be required for
implementing the website successfully. The project will be closed on Christmas evening.
WBS Task Name Duration Start Finish
0
Implementation of website for PHL
construction company
87 days
Tue 27-08-
19
Wed 25-12-
19
1 Planning phase 24 days
Tue 27-08-
19
Fri 27-09-19
1.1 Conversation with the project team 2 days Tue 27-08-19
Wed 28-08-
19
1.2 Developing the proposal for the project 3 days Thu 29-08-19
Mon 02-09-
19
1.3 Agreement development for the project 1 day Tue 03-09-19 Tue 03-09-19
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
PROJECT MANAGEMENT
1.4 Stakeholders identification 2 days
Wed 04-09-
19
Thu 05-09-19
M1
Milestone1: Approval of the project
plan and release of SOW
1 day Fri 06-09-19 Fri 06-09-19
1.6
Website design contractor selection
process
15 days Fri 06-09-19 Thu 26-09-19
1.7 Selection of contractor 1 day Fri 27-09-19 Fri 27-09-19
2 Definition and design of website 15 days
Mon 07-10-
19
Fri 25-10-19
2.1 Gathering different types of ideas 3 days
Mon 07-10-
19
Wed 09-10-
19
2.2 Analyzing the collected data 2 days Thu 10-10-19 Fri 11-10-19
2.3 Revising the design of the project 5 days
Mon 14-10-
19
Fri 18-10-19
2.4 Undertaking feasibility study 1 day
Mon 21-10-
19
Mon 21-10-
19
2.5 Analyzing the project budget 1 day Tue 22-10-19 Tue 22-10-19
2.6 Creating project proposal for PHL 3 days
Wed 23-10-
19
Fri 25-10-19
M2
Milestone 2: Completion of design
phase and getting approval for the project
0 days Fri 25-10-19 Fri 25-10-19
PROJECT MANAGEMENT
1.4 Stakeholders identification 2 days
Wed 04-09-
19
Thu 05-09-19
M1
Milestone1: Approval of the project
plan and release of SOW
1 day Fri 06-09-19 Fri 06-09-19
1.6
Website design contractor selection
process
15 days Fri 06-09-19 Thu 26-09-19
1.7 Selection of contractor 1 day Fri 27-09-19 Fri 27-09-19
2 Definition and design of website 15 days
Mon 07-10-
19
Fri 25-10-19
2.1 Gathering different types of ideas 3 days
Mon 07-10-
19
Wed 09-10-
19
2.2 Analyzing the collected data 2 days Thu 10-10-19 Fri 11-10-19
2.3 Revising the design of the project 5 days
Mon 14-10-
19
Fri 18-10-19
2.4 Undertaking feasibility study 1 day
Mon 21-10-
19
Mon 21-10-
19
2.5 Analyzing the project budget 1 day Tue 22-10-19 Tue 22-10-19
2.6 Creating project proposal for PHL 3 days
Wed 23-10-
19
Fri 25-10-19
M2
Milestone 2: Completion of design
phase and getting approval for the project
0 days Fri 25-10-19 Fri 25-10-19
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PROJECT MANAGEMENT
3 Implementation phase 30 days
Mon 28-10-
19
Fri 06-12-19
3.1 Prototype construction 4 days
Mon 28-10-
19
Thu 31-10-19
3.2 Developing the database 3 days Fri 01-11-19 Tue 05-11-19
3.3 Validation of code 2 days
Wed 06-11-
19
Thu 07-11-19
3.4 Cross-browser testing 1 day Fri 08-11-19 Fri 08-11-19
3.5 Proper optimization 3 days
Mon 11-11-
19
Wed 13-11-
19
3.6 Building web content 4 days Thu 14-11-19 Tue 19-11-19
3.7 Developing navigation structure 2 days
Wed 20-11-
19
Thu 21-11-19
3.8 Creating site content pages 2 days Fri 22-11-19
Mon 25-11-
19
3.9
Including client testimonial and recent
company news
8 days Tue 26-11-19 Thu 05-12-19
3.10 Testing and review 1 day Fri 06-12-19 Fri 06-12-19
M3
Milestone 3: Completion of
implementation phase
0 days Fri 06-12-19 Fri 06-12-19
4 Conversion phase 13 days
Mon 09-12-
19
Wed 25-12-
19
PROJECT MANAGEMENT
3 Implementation phase 30 days
Mon 28-10-
19
Fri 06-12-19
3.1 Prototype construction 4 days
Mon 28-10-
19
Thu 31-10-19
3.2 Developing the database 3 days Fri 01-11-19 Tue 05-11-19
3.3 Validation of code 2 days
Wed 06-11-
19
Thu 07-11-19
3.4 Cross-browser testing 1 day Fri 08-11-19 Fri 08-11-19
3.5 Proper optimization 3 days
Mon 11-11-
19
Wed 13-11-
19
3.6 Building web content 4 days Thu 14-11-19 Tue 19-11-19
3.7 Developing navigation structure 2 days
Wed 20-11-
19
Thu 21-11-19
3.8 Creating site content pages 2 days Fri 22-11-19
Mon 25-11-
19
3.9
Including client testimonial and recent
company news
8 days Tue 26-11-19 Thu 05-12-19
3.10 Testing and review 1 day Fri 06-12-19 Fri 06-12-19
M3
Milestone 3: Completion of
implementation phase
0 days Fri 06-12-19 Fri 06-12-19
4 Conversion phase 13 days
Mon 09-12-
19
Wed 25-12-
19

8
PROJECT MANAGEMENT
4.1 Training 5 days
Mon 09-12-
19
Fri 13-12-19
4.2
Providing documents as per the
approved project plan
7 days
Mon 09-12-
19
Tue 17-12-19
4.3 Reviewing the project 3 days
Wed 18-12-
19
Fri 20-12-19
4.4 Project requirement checklist 1 day
Mon 23-12-
19
Mon 23-12-
19
4.5 Providing written project status 1 day Tue 24-12-19 Tue 24-12-19
4.6 Stakeholders sign off 1 day Tue 24-12-19 Tue 24-12-19
4.7 Project closure 1 day
Wed 25-12-
19
Wed 25-12-
19
M4
Milestone 4: Completion of the
conversion phase
0 days
Wed 25-12-
19
Wed 25-12-
19
5.2 Project Pricing
The table that is given below showcase that the website implementation project will need
around $265,000. The expenditure that is done on each of the activities of the project is reflected
with the help of the below table.
WBS Task Name Duration Resource Names Cost
0
Implementation of
website for PHL
construction company
87 days $265,000.00
PROJECT MANAGEMENT
4.1 Training 5 days
Mon 09-12-
19
Fri 13-12-19
4.2
Providing documents as per the
approved project plan
7 days
Mon 09-12-
19
Tue 17-12-19
4.3 Reviewing the project 3 days
Wed 18-12-
19
Fri 20-12-19
4.4 Project requirement checklist 1 day
Mon 23-12-
19
Mon 23-12-
19
4.5 Providing written project status 1 day Tue 24-12-19 Tue 24-12-19
4.6 Stakeholders sign off 1 day Tue 24-12-19 Tue 24-12-19
4.7 Project closure 1 day
Wed 25-12-
19
Wed 25-12-
19
M4
Milestone 4: Completion of the
conversion phase
0 days
Wed 25-12-
19
Wed 25-12-
19
5.2 Project Pricing
The table that is given below showcase that the website implementation project will need
around $265,000. The expenditure that is done on each of the activities of the project is reflected
with the help of the below table.
WBS Task Name Duration Resource Names Cost
0
Implementation of
website for PHL
construction company
87 days $265,000.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9
PROJECT MANAGEMENT
1 Planning phase 24 days $30,000.00
1.1
Conversation with
the project team
2 days Business analyst $2,000.00
1.2
Developing the
proposal for the project
3 days Project planner $3,000.00
1.3
Agreement
development for the
project
1 day Business analyst, HR manager $8,000.00
1.4
Stakeholders
identification
2 days HR manager $4,000.00
M1
Milestone1:
Approval of the project
plan and release of SOW
1 day $0.00
1.6
Website design
contractor selection
process
15 days Project planner $8,000.00
1.7
Selection of
contractor
1 day HR manager $5,000.00
2
Definition and design
of website
15 days $145,000.00
2.1
Gathering different
types of ideas
3 days Business analyst, Project planner $10,000.00
PROJECT MANAGEMENT
1 Planning phase 24 days $30,000.00
1.1
Conversation with
the project team
2 days Business analyst $2,000.00
1.2
Developing the
proposal for the project
3 days Project planner $3,000.00
1.3
Agreement
development for the
project
1 day Business analyst, HR manager $8,000.00
1.4
Stakeholders
identification
2 days HR manager $4,000.00
M1
Milestone1:
Approval of the project
plan and release of SOW
1 day $0.00
1.6
Website design
contractor selection
process
15 days Project planner $8,000.00
1.7
Selection of
contractor
1 day HR manager $5,000.00
2
Definition and design
of website
15 days $145,000.00
2.1
Gathering different
types of ideas
3 days Business analyst, Project planner $10,000.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10
PROJECT MANAGEMENT
2.2
Analyzing the
collected data
2 days Project manager $5,000.00
2.3
Revising the design
of the project
5 days Designer $80,000.00
2.4
Undertaking
feasibility study
1 day Financial manager $10,000.00
2.5
Analyzing the
project budget
1 day Financial manager $5,000.00
2.6
Creating project
proposal for PHL
3 days Project planner $35,000.00
M2
Milestone 2:
Completion of design
phase and getting
approval for the project
0 days $0.00
3
Implementation
phase
30 days $60,000.00
3.1
Prototype
construction
4 days Application manager, Developer $10,000.00
3.2
Developing the
database
3 days
Application manager, Database
administrator
$17,000.00
3.3 Validation of code 2 days Developer, Coder $8,000.00
3.4 Cross-browser 1 day Tester $2,000.00
PROJECT MANAGEMENT
2.2
Analyzing the
collected data
2 days Project manager $5,000.00
2.3
Revising the design
of the project
5 days Designer $80,000.00
2.4
Undertaking
feasibility study
1 day Financial manager $10,000.00
2.5
Analyzing the
project budget
1 day Financial manager $5,000.00
2.6
Creating project
proposal for PHL
3 days Project planner $35,000.00
M2
Milestone 2:
Completion of design
phase and getting
approval for the project
0 days $0.00
3
Implementation
phase
30 days $60,000.00
3.1
Prototype
construction
4 days Application manager, Developer $10,000.00
3.2
Developing the
database
3 days
Application manager, Database
administrator
$17,000.00
3.3 Validation of code 2 days Developer, Coder $8,000.00
3.4 Cross-browser 1 day Tester $2,000.00

11
PROJECT MANAGEMENT
testing
3.5 Proper optimization 3 days
Application manager, Coder,
Developer
$3,000.00
3.6
Building web
content
4 days Application manager, Developer $2,000.00
3.7
Developing
navigation structure
2 days Application manager, Coder $3,000.00
3.8
Creating site content
pages
2 days Application manager, Developer $2,000.00
3.9
Including client
testimonial and recent
company news
8 days Application manager, Coder $3,000.00
3.10 Testing and review 1 day Tester $10,000.00
M3
Milestone 3:
Completion of
implementation phase
0 days $0.00
4 Conversion phase 13 days $30,000.00
4.1 Training 5 days Trainer $11,000.00
4.2
Providing documents
as per the approved
project plan
7 days HR manager, Business analyst $2,000.00
4.3 Reviewing the 3 days Project manager $5,000.00
PROJECT MANAGEMENT
testing
3.5 Proper optimization 3 days
Application manager, Coder,
Developer
$3,000.00
3.6
Building web
content
4 days Application manager, Developer $2,000.00
3.7
Developing
navigation structure
2 days Application manager, Coder $3,000.00
3.8
Creating site content
pages
2 days Application manager, Developer $2,000.00
3.9
Including client
testimonial and recent
company news
8 days Application manager, Coder $3,000.00
3.10 Testing and review 1 day Tester $10,000.00
M3
Milestone 3:
Completion of
implementation phase
0 days $0.00
4 Conversion phase 13 days $30,000.00
4.1 Training 5 days Trainer $11,000.00
4.2
Providing documents
as per the approved
project plan
7 days HR manager, Business analyst $2,000.00
4.3 Reviewing the 3 days Project manager $5,000.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.