PMIT Project Management: Broadband Service Implementation Plan

Verified

Added on  2023/03/30

|17
|2005
|267
Project
AI Summary
This project plan outlines the implementation of a broadband service in a small Australian city, addressing the need for improved internet connectivity for residents. The plan includes a clear project outline with start and end dates, goals, and objectives. It details both non-functional (availability, performance, reliability) and functional requirements (historical data, authentication, business rules). Key project team members and their roles are defined, including the project manager, network analyst, workers, network engineers, project planner, network administrator, and sponsor. The project plan covers scope, a work breakdown structure, time estimation, resource needs (hardware, software, human resources), a Gantt chart, cost estimation, a quality plan, stakeholder analysis, a communication plan, and a risk management plan. The cost estimation indicates a total project cost of $209,680. The document concludes with project sign-off and recommendations for post-project maintenance and authorization, emphasizing the importance of reliable and secure internet service. Desklib provides access to this and other solved assignments.
Document Page
Running head: PROJECT MANAGEMENT
Implementation of broadband service in a small city of Australia
Name of the Student
Name of the University
Author’s note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
PROJECT MANAGEMENT
Table of Contents
1. Introduction.............................................................................................................................................2
2. Clear outline of the project......................................................................................................................2
3. Project needs...........................................................................................................................................2
4. Project team members............................................................................................................................3
5. Project plan.............................................................................................................................................4
5.1 Project scope.....................................................................................................................................4
5.1.1 Work breakdown structure.........................................................................................................5
5.2 Time estimation.................................................................................................................................6
5.3 Resource need...................................................................................................................................7
5.4 Gantt chart.........................................................................................................................................8
5.5 Cost estimation..................................................................................................................................9
5.6 Quality plan.....................................................................................................................................10
5.7 Stakeholder analysis............................................................................................................................11
5.8 Communication plan........................................................................................................................11
5.9 Risk management plan....................................................................................................................12
5.10 Project deployment.......................................................................................................................14
6. Project sign off.......................................................................................................................................14
7. Post project review and recommendations...........................................................................................14
Bibliography...............................................................................................................................................15
Document Page
2
PROJECT MANAGEMENT
1. Introduction
The paper mainly reflects on the project that generally aims to implement a broadband service
within an Australian city for providing proper services of internet connection. It is found that the entire
plan of implementing the broadband services was prepared for the people who generally lives in the city
who mainly live far away from the cities and are not getting proper internet services. As the Australian
government wants to provide the service to each and every single citizen therefore the project was
executed for providing them the opportunity of keeping touch with the other parts of the world with the
proper facility of internet connect.
2. Clear outline of the projectStart date: 31-05-2019
End date:11-10-19
Goals: The goal is to successfully provide proper facility of internet connection to a small city in Australia
with the implementation of broadband facility.
Objectives: The objectives include:
ï‚· To implement the broadband services
ï‚· To provide proper opportunity of internet connection
3. Project needs
Non-Functional requirements
Availability: The services by the broadband
should be present 24x7.
Performance: High speed service should be given
to the users so that they do not face issues
related with speed while using the internet
connection service.
Reliability: The provided services should be very
much reliable such that the people will have trust
on the provided services.
Functional requirements Historical data: The broadband service that is
provided generally assists in providing proper
Document Page
3
PROJECT MANAGEMENT
accessibility of data.
Authentication: Login account is present for the
users so that the unauthorized people cannot get
into the system.
Business rules: The broadband services that is
generally created should follow the rules of the
business effectively.
4. Project team members
Stakeholders Internal/external Expertise
Project manager Internal The project manager is the
person who is generally
responsible of activity as well as
resource planning in order to
control proper management of
project time.
Network analyst Internal Network analyst is skilled in
creating the design layout,
installation as well as
maintenance of the entire
network-based components
within the entire company.
Workers Internal The workers are mainly skilled
in working with the team for
implementing the broadband
services quite effectively.
Network engineers Internal The network engineers are the
person who generally set up as
well as develops and maintains
the entire computer-based
networks successfully.
Project planner Internal The project planner are the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
PROJECT MANAGEMENT
individuals who are mainly
responsible of finishing the
work of the project quite
efficiently by successfully
creating proper project plan.
Network administrator Internal The network administrator are
the ones who generally
maintains the entire computer
network that further helps in
solving any type of issues
effectively.
Sponsor External The sponsor provides funding
for the entire project such that
the entire project work gets
completed within the budget
and time that is mainly
estimated.
5. Project plan
5.1 Project scope
ï‚· Providing the service of broadband so that the users can enjoy proper internet connection
ï‚· Designing the entire network for the project
ï‚· Installing the hardware as well as required software
ï‚· Creating appropriate connection by using proper cable
ï‚· Properly installing the software for the broadband service
Document Page
5
PROJECT MANAGEMENT
5.1.1 Work breakdown structure
Figure 1: Work breakdown structure
(Source: Created by Author)
Document Page
6
PROJECT MANAGEMENT
5.2 Time estimation
Figure 2: Time estimation
(Source: Created by Author)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
PROJECT MANAGEMENT
5.3 Resource need
Hardware ï‚· Monitor
ï‚· RAM
HDD
ï‚· Quad core processor and more
Software ï‚· Oracle enterprise edition
ï‚· Windows 10
ï‚· Adobe reader
Human resources ï‚· Project manager
ï‚· Network analyst
ï‚· Workers
ï‚· Network engineers
ï‚· Project planner
ï‚· Network administrator
ï‚· Sponsor
Document Page
8
PROJECT MANAGEMENT
5.4 Gantt chart
Figure 3: Gantt chart
(Source: Created by Author)
Document Page
9
PROJECT MANAGEMENT
5.5 Cost estimation
As per the below table, the setting of the broadband service will get finished within $209,680.
The detailed cost estimation for the project is reflected below:
WBS Task Name Duration Cost
0 Setting the broadband services 96 days $209,680.00
1 Initiation phase 10 days $5,440.00
1.1 Preparation of the business case for
analyzing the situation 3 days $1,440.00
1.2 Feasibility analysis within the project 2 days $800.00
1.3 Hiring the team members 3 days $1,440.00
1.4 Preparing the charter 2 days $1,760.00
2 Planning phase 19 days $10,440.00
2.1 Arrangement of meeting with the
project client 3 days $1,440.00
2.2 Getting the overview of the client 3 days $1,200.00
2.3 Developing the plan for the entire
project 4 days $1,920.00
2.4 Preparing the resource plan 2 days $800.00
2.5 Preparation of project quality plan 2 days $800.00
2.6 Preparation for resolving risks 3 days $2,520.00
2.7 Preparation for mitigating
communication gaps 2 days $1,760.00
3 Project analysis 9 days $11,360.00
3.1 Needs analysis of the project 4 days $4,800.00
3.2 Needs of the project 3 days $4,800.00
3.3 Budget analysis 2 days $1,760.00
4 Project development phase 22 days $75,400.00
4.1 Selecting the required hardware and
software 7 days $63,000.00
4.2 Designing the entire network 10 days $8,400.00
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
PROJECT MANAGEMENT
4.3 Procuring raw materials 5 days $4,000.00
5 Project implementation phase 18 days $94,200.00
5.1 Installation of hardware 6 days $7,200.00
5.2 Making connection with the cable 7 days $51,000.00
5.3 Software implementation 5 days $36,000.00
6 Project testing phase 10 days $7,840.00
6.1 Undertaking black box testing 6 days $4,800.00
6.2 Undertaking white box testing 4 days $3,040.00
7 Project closure phase 6 days $5,000.00
7.1 Delivery of the project 1 day $1,160.00
7.2 Signing off the project 1 day $480.00
7.3 Documentation of the project 4 days $3,360.00
5.6 Quality plan
Quality based items Verification
Yes No
Does proper plan of quality
management is utilized in the
project?
Yes ---
Does the entire metrics link
with the project quality gets
approved?
Yes ----
Does the project stakeholders
who are associated with the
project are generally getting the
accessibility of the entire quality
plan?
Yes ----
Does the documentation that is
linked with the quality is
successfully developed?
----- No
Document Page
11
PROJECT MANAGEMENT
5.7 Stakeholder analysis
Stakeholders Interest Power
Project manager High High
Network analyst High Low
Workers Low Low
Network engineers High Low
Project planner High Low
Network administrator High Low
Sponsor High High
5.8 Communication plan
Type Key message Audience Responsibility Vehicle Frequency
Kick off report The kick off
phase of the
project helps
in stating that
the entire
team
members
must focus on
the project
objectives
while progress
with the work
of the project
Team
members
Project
manager
Email Once
Status report The status
report is
shared with
the project
managers for
providing
them
information
Project
planner
Project
manager
Email/Face to
face
Monthly
chevron_up_icon
1 out of 17
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]