PPMP20012 Unit Portfolio: Role of PM Application Systems in Projects
VerifiedAdded on 2023/06/03
|6
|2418
|94
Portfolio
AI Summary
This portfolio assignment focuses on the role and impact of project management (PM) application systems in monitoring project performance and managing changes. It identifies how these systems assist project managers in maintaining standards, quality, and adapting to necessary adjustments. The assignment discusses the importance of hardware and software components, effective communication within PMIS, and decision-making processes. It also highlights the need for system engineering and thinking to prevent disasters, emphasizing the BP disaster as a case study. The portfolio concludes by discussing contemporary developments in PPPM application systems, stressing the importance of considering real-world factors and ethical responsibilities in project implementation. This resource is available on Desklib, where students can access similar solved assignments and study tools.

(
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013) The
Standard for
Portfolio
Management --
Third Edition
Chapter 7;
Optional Readings
-
Web Sites
-
8: Identify how PM
application systems
can assist project
managers to monitor
performance and
manage changes
within the project.
Application helps in monitoring the performance .an application
software is designed that help the administrators of IT to ensure
that the application operating are performing well and the users
are receiving the desired performance .The standards as well as
the quality are maintained properly. The application system all the
data from the utilization made by the client CPU (Zhang and
Swanson 2015). Accordingly the application system checks all the
requirement and monitors the performance of the system. The
main reason is that the performance monitoring of the system is
very important if the performance is not monitored the entire
system can fail and the project can stop suddenly .Such accident
will lead to the complete destruction of the ongoing project and it
will be really difficult for the managers to bring the project back to
the track.
The application helps in managing the changes with the help of a
tool that looks after the change in the methods are not having
severe effect on the system. To ensure that the changes are not
causing any accident and not destroying the quality of the service.
The application system tools to manage the changes are a set of
techniques that looks after the changes so that the system easily
adopts all the changes that are made (Yumerefendi
et al. 2014).
The changes are evaluated and examined for the proper of the
functioning of the system.
It can be also stated that is application system important for the
functioning of the system .The changes made to the system are
Zhang, Y. and Swanson, S.,
2015, May. A study
of application
performance with
non-volatile main
memory. In
2015
31st Symposium on
Mass Storage
Systems and
Technologies
(MSST) (pp. 1-10).
IEEE.
Yumerefendi, A.R., Reynolds,
P.A. and Bley, J.B.,
Blue Stripe
Software Inc,
2014.
Methods and
computer program
products for
monitoring and
reporting network
application
performance. U.S.
Patent 8,700,765.
1 of 6
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013) The
Standard for
Portfolio
Management --
Third Edition
Chapter 7;
Optional Readings
-
Web Sites
-
8: Identify how PM
application systems
can assist project
managers to monitor
performance and
manage changes
within the project.
Application helps in monitoring the performance .an application
software is designed that help the administrators of IT to ensure
that the application operating are performing well and the users
are receiving the desired performance .The standards as well as
the quality are maintained properly. The application system all the
data from the utilization made by the client CPU (Zhang and
Swanson 2015). Accordingly the application system checks all the
requirement and monitors the performance of the system. The
main reason is that the performance monitoring of the system is
very important if the performance is not monitored the entire
system can fail and the project can stop suddenly .Such accident
will lead to the complete destruction of the ongoing project and it
will be really difficult for the managers to bring the project back to
the track.
The application helps in managing the changes with the help of a
tool that looks after the change in the methods are not having
severe effect on the system. To ensure that the changes are not
causing any accident and not destroying the quality of the service.
The application system tools to manage the changes are a set of
techniques that looks after the changes so that the system easily
adopts all the changes that are made (Yumerefendi
et al. 2014).
The changes are evaluated and examined for the proper of the
functioning of the system.
It can be also stated that is application system important for the
functioning of the system .The changes made to the system are
Zhang, Y. and Swanson, S.,
2015, May. A study
of application
performance with
non-volatile main
memory. In
2015
31st Symposium on
Mass Storage
Systems and
Technologies
(MSST) (pp. 1-10).
IEEE.
Yumerefendi, A.R., Reynolds,
P.A. and Bley, J.B.,
Blue Stripe
Software Inc,
2014.
Methods and
computer program
products for
monitoring and
reporting network
application
performance. U.S.
Patent 8,700,765.
1 of 6
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

(
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
looked after will the help of application system or not. For fun
purpose the application system need to take care of the
performance and monitor it is that true and lastly the changes
made are how detected and balance so that the project is not
affected.
Mandatory Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013) The
Standard for
Portfolio
Management --
Third Edition
Chapter 7;
Optional Readings
-
Web Sites
-
9. Propose
appropriate PM
application systems
to support successful
project execution in
different industries.
The application system required the software as well as the
hardware components at the same time .For the effective
functioning of the application system. With the increase demand
of the correct processing and functioning of the application system
the application system requires the hardware component as well.
The physical resources are also required. The memory and the
architecture is also required.
The communication is one of the most important thing in project
management for the proper functioning of the project. For the
communication in a PMIS a process is required with effective
functioning so that the communication is, made much easier.
Within a PMIS the communication is done with the help of
different step that can be done in a proper way so that the
management function. The communication from the portfolio to
the project and then back to the management is made easy when
it is planned (Mantripragada and Mukherjee 2014). The
communication is done with the help of a software that makes the
communication much easy. The information is transferred through
different layers and the information are encrypted and the
information need to be decrypted.
The application systems helps in making effective decision that can
help BP has well as every organization .Every organization
Mantripragada, S. and
Mukherjee, A.,
REDSHIFT
INTERNETWORKIN
G Inc, 2014.
System
and method to
precisely learn and
abstract the
positive flow
behavior of a
unified
communication
(UC) application
and endpoints. U.S.
Patent 8,730,946.
Tekade, U., Mutalik, M. and
Groose, B., Actifio
Inc, 2016.
System
and method for
providing intra-
process
communication for
an application
programming
interface. U.S.
2 of 6
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
looked after will the help of application system or not. For fun
purpose the application system need to take care of the
performance and monitor it is that true and lastly the changes
made are how detected and balance so that the project is not
affected.
Mandatory Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013) The
Standard for
Portfolio
Management --
Third Edition
Chapter 7;
Optional Readings
-
Web Sites
-
9. Propose
appropriate PM
application systems
to support successful
project execution in
different industries.
The application system required the software as well as the
hardware components at the same time .For the effective
functioning of the application system. With the increase demand
of the correct processing and functioning of the application system
the application system requires the hardware component as well.
The physical resources are also required. The memory and the
architecture is also required.
The communication is one of the most important thing in project
management for the proper functioning of the project. For the
communication in a PMIS a process is required with effective
functioning so that the communication is, made much easier.
Within a PMIS the communication is done with the help of
different step that can be done in a proper way so that the
management function. The communication from the portfolio to
the project and then back to the management is made easy when
it is planned (Mantripragada and Mukherjee 2014). The
communication is done with the help of a software that makes the
communication much easy. The information is transferred through
different layers and the information are encrypted and the
information need to be decrypted.
The application systems helps in making effective decision that can
help BP has well as every organization .Every organization
Mantripragada, S. and
Mukherjee, A.,
REDSHIFT
INTERNETWORKIN
G Inc, 2014.
System
and method to
precisely learn and
abstract the
positive flow
behavior of a
unified
communication
(UC) application
and endpoints. U.S.
Patent 8,730,946.
Tekade, U., Mutalik, M. and
Groose, B., Actifio
Inc, 2016.
System
and method for
providing intra-
process
communication for
an application
programming
interface. U.S.
2 of 6

(
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
irrespective of the sector they are working requires effective
decision making. The appropriate application system helps in
facing all the risks in a way that the impact of the accident is not
much and the application system helps in the overall functioning
of the system. The application system helps in applying the
process and bringing back the project on track and recovering all
loses that occurred (Tekade
et al. 2016). The application process
helps in receiving all the feedbacks and with the help of that the
system can perform in a complete different and improved way.
The application that need to be implemented must be related with
the system engineering and system thinking so that the entire
linkages of the system can be observed.
Every organization need to take care of all the process and steps
so that the process and the function is well improved. The process
need to be looked after by every organization so that all the
process are working properly and no such accident take place that
can impact the overall functioning of the organization.
Patent 9,384,254.
Mandatory Readings
Sterman Chapters
1, 2, 13 and 15;
Insight Maker
Optional Readings
INCOSE
Web Sites
-
10. Discuss
contemporary
developments in the
use of project, program
and portfolio (PPPM)
application systems.
Examining of the scenario will is going to really beneficial to any
organization as well to the BP. To prove and to analyse that a model is
accurate and reflective the concept need to be clear enough. The
model need to have a descriptive view of all the facts that can be faced
and on that base the model will reflect the real world. When a model
is made considering all the real life fact and situation that can arise
states that the model is based and related to the reality and not
limited to the theoretical knowledge (Sutton 2013). The commitment
that is needed by people to make sure that the model is appropriate
Bacosa, H.P., Thyng, K.M.,
Plunkett, S., Erdner,
D.L. and Liu, Z.,
2016. The tarballs
on Texas beaches
following the 2014
Texas City “Y” Spill:
modeling, chemical,
and microbiological
studies.
Marine
3 of 6
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
irrespective of the sector they are working requires effective
decision making. The appropriate application system helps in
facing all the risks in a way that the impact of the accident is not
much and the application system helps in the overall functioning
of the system. The application system helps in applying the
process and bringing back the project on track and recovering all
loses that occurred (Tekade
et al. 2016). The application process
helps in receiving all the feedbacks and with the help of that the
system can perform in a complete different and improved way.
The application that need to be implemented must be related with
the system engineering and system thinking so that the entire
linkages of the system can be observed.
Every organization need to take care of all the process and steps
so that the process and the function is well improved. The process
need to be looked after by every organization so that all the
process are working properly and no such accident take place that
can impact the overall functioning of the organization.
Patent 9,384,254.
Mandatory Readings
Sterman Chapters
1, 2, 13 and 15;
Insight Maker
Optional Readings
INCOSE
Web Sites
-
10. Discuss
contemporary
developments in the
use of project, program
and portfolio (PPPM)
application systems.
Examining of the scenario will is going to really beneficial to any
organization as well to the BP. To prove and to analyse that a model is
accurate and reflective the concept need to be clear enough. The
model need to have a descriptive view of all the facts that can be faced
and on that base the model will reflect the real world. When a model
is made considering all the real life fact and situation that can arise
states that the model is based and related to the reality and not
limited to the theoretical knowledge (Sutton 2013). The commitment
that is needed by people to make sure that the model is appropriate
Bacosa, H.P., Thyng, K.M.,
Plunkett, S., Erdner,
D.L. and Liu, Z.,
2016. The tarballs
on Texas beaches
following the 2014
Texas City “Y” Spill:
modeling, chemical,
and microbiological
studies.
Marine
3 of 6

(
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
and connected to the real world, the model must be made keeping in
mind of the maker all the situation, costs and implementation.
The very first thing that can be made out of the learning that the BP
disaster was a planned disaster .In spite of having all the money to
make a correct investment the BP did not made any efforts in order to
prevent the disasters (Bacosa
et al. 2016). The system engineering and
system thinking need to be implemented so that the overall
performance is maintained. The outcomes are that it gives the ability
to gather knowledge from different fields of science, ability to design
and implement different design so that the project works safely. It also
gives a clear understanding about the professional responsibility
related to ethics. It gives the knowledge about the various tools and
techniques that can be used in order to prevent the changes.
Application system also plays a vital role and helps in monitoring all
the performance related to the changes and to the environment.
Decision making plays a major role in any organization.
Communication needs to flow within all the steps so that the entire
functioning is done in a proper and in an effective way.
pollution
bulletin,
109(1),
pp.236-244.
Sutton, I.S., 2013, May.
Summarizing the
deepwater
horizon/macondo
reports. In
Offshore
technology
conference.
Offshore
Technology
Conference.
References
Ansari, A., Cowgill, G.A., Masina, R., Ramayya, J.P., McQuarters, A.R., Raissyan, A. and Nicholls, L.E., PRODEA SYSTEMS Inc, 2013.
Multi-services application
gateway and system employing the same. U.S. Patent 8,543,665.
Bacosa, H.P., Thyng, K.M., Plunkett, S., Erdner, D.L. and Liu, Z., 2016. The tarballs on Texas beaches following the 2014 Texas City “Y” Spill: modeling,
chemical, and microbiological studies.
Marine pollution bulletin,
109(1), pp.236-244.
4 of 6
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and prior
unit readings and assignments
Supporting
documentation
including any prior
learning
and connected to the real world, the model must be made keeping in
mind of the maker all the situation, costs and implementation.
The very first thing that can be made out of the learning that the BP
disaster was a planned disaster .In spite of having all the money to
make a correct investment the BP did not made any efforts in order to
prevent the disasters (Bacosa
et al. 2016). The system engineering and
system thinking need to be implemented so that the overall
performance is maintained. The outcomes are that it gives the ability
to gather knowledge from different fields of science, ability to design
and implement different design so that the project works safely. It also
gives a clear understanding about the professional responsibility
related to ethics. It gives the knowledge about the various tools and
techniques that can be used in order to prevent the changes.
Application system also plays a vital role and helps in monitoring all
the performance related to the changes and to the environment.
Decision making plays a major role in any organization.
Communication needs to flow within all the steps so that the entire
functioning is done in a proper and in an effective way.
pollution
bulletin,
109(1),
pp.236-244.
Sutton, I.S., 2013, May.
Summarizing the
deepwater
horizon/macondo
reports. In
Offshore
technology
conference.
Offshore
Technology
Conference.
References
Ansari, A., Cowgill, G.A., Masina, R., Ramayya, J.P., McQuarters, A.R., Raissyan, A. and Nicholls, L.E., PRODEA SYSTEMS Inc, 2013.
Multi-services application
gateway and system employing the same. U.S. Patent 8,543,665.
Bacosa, H.P., Thyng, K.M., Plunkett, S., Erdner, D.L. and Liu, Z., 2016. The tarballs on Texas beaches following the 2014 Texas City “Y” Spill: modeling,
chemical, and microbiological studies.
Marine pollution bulletin,
109(1), pp.236-244.
4 of 6
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

(
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Chudik, A., Grossman, V. and Pesaran, M.H., 2016. A multi-country approach to forecasting output growth using PMIs.
Journal of Econometrics,
192(2),
pp.349-365.
Coker, J. and Mukundan, A., Siebel Systems Inc, 2013.
Computing system and method to implicitly commit unsaved data for a world wide web application.
U.S. Patent 8,359,335.
Costa, A. and Lowery, L.F., 2016.
Techniques for teaching thinking. Routledge.
Dupont, D.H. and Eskerod, P., 2016. Enhancing project benefit realization through integration of line managers as project benefit managers.
International
Journal of Project Management,
34(4), pp.779-788.
Foster, W.R. and Rosenberg, J.D., Cisco Technology Inc, 2013.
System and method for optimizing communications between session border controllers and
endpoints in a network environment. U.S. Patent 8,432,896.
Incardona, J.P., Gardner, L.D., Linbo, T.L., Brown, T.L., Esbaugh, A.J., Mager, E.M., Stieglitz, J.D., French, B.L., Labenia, J.S., Laetz, C.A. and Tagal, M., 2014.
Deepwater Horizon crude oil impacts the developing hearts of large predatory pelagic fish.
Proceedings of the National Academy of Sciences,
111(15),
pp.E1510-E1518.
Lüdeke-Freund, F. and Zvezdov, D., 2013. The Manager's Job at BP: Decision Making and Responsibilities on the High Seas.
International Journal of Case
Studies in Management,
11(2), pp.1-32.
MacKenzie, C.A., Baroud, H. and Barker, K., 2016. Static and dynamic resource allocation models for recovery of interdependent systems: application to the
Deepwater Horizon oil spill.
Annals of Operations Research,
236(1), pp.103-129.
Mantripragada, S. and Mukherjee, A., REDSHIFT INTERNETWORKING Inc, 2014.
System and method to precisely learn and abstract the positive flow
behavior of a unified communication (UC) application and endpoints. U.S. Patent 8,730,946.
Reader, T.W. and O’Connor, P., 2014. The deepwater horizon explosion: Non-technical skills, safety culture, and system complexity.
Journal of Risk
Research,
17(3), pp.405-424.
Rosas, S.R., 2017. Group concept mapping methodology: Toward an epistemology of group conceptualization, complexity, and emergence.
Quality &
Quantity,
51(3), pp.1403-1416.
5 of 6
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Chudik, A., Grossman, V. and Pesaran, M.H., 2016. A multi-country approach to forecasting output growth using PMIs.
Journal of Econometrics,
192(2),
pp.349-365.
Coker, J. and Mukundan, A., Siebel Systems Inc, 2013.
Computing system and method to implicitly commit unsaved data for a world wide web application.
U.S. Patent 8,359,335.
Costa, A. and Lowery, L.F., 2016.
Techniques for teaching thinking. Routledge.
Dupont, D.H. and Eskerod, P., 2016. Enhancing project benefit realization through integration of line managers as project benefit managers.
International
Journal of Project Management,
34(4), pp.779-788.
Foster, W.R. and Rosenberg, J.D., Cisco Technology Inc, 2013.
System and method for optimizing communications between session border controllers and
endpoints in a network environment. U.S. Patent 8,432,896.
Incardona, J.P., Gardner, L.D., Linbo, T.L., Brown, T.L., Esbaugh, A.J., Mager, E.M., Stieglitz, J.D., French, B.L., Labenia, J.S., Laetz, C.A. and Tagal, M., 2014.
Deepwater Horizon crude oil impacts the developing hearts of large predatory pelagic fish.
Proceedings of the National Academy of Sciences,
111(15),
pp.E1510-E1518.
Lüdeke-Freund, F. and Zvezdov, D., 2013. The Manager's Job at BP: Decision Making and Responsibilities on the High Seas.
International Journal of Case
Studies in Management,
11(2), pp.1-32.
MacKenzie, C.A., Baroud, H. and Barker, K., 2016. Static and dynamic resource allocation models for recovery of interdependent systems: application to the
Deepwater Horizon oil spill.
Annals of Operations Research,
236(1), pp.103-129.
Mantripragada, S. and Mukherjee, A., REDSHIFT INTERNETWORKING Inc, 2014.
System and method to precisely learn and abstract the positive flow
behavior of a unified communication (UC) application and endpoints. U.S. Patent 8,730,946.
Reader, T.W. and O’Connor, P., 2014. The deepwater horizon explosion: Non-technical skills, safety culture, and system complexity.
Journal of Risk
Research,
17(3), pp.405-424.
Rosas, S.R., 2017. Group concept mapping methodology: Toward an epistemology of group conceptualization, complexity, and emergence.
Quality &
Quantity,
51(3), pp.1403-1416.
5 of 6

(
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Sutton, I.S., 2013, May. Summarizing the deepwater horizon/macondo reports. In
Offshore technology conference. Offshore Technology Conference.
Tekade, U., Mutalik, M. and Groose, B., Actifio Inc, 2016.
System and method for providing intra-process communication for an application programming
interface. U.S. Patent 9,384,254.
Young, W. and Leveson, N.G., 2014. An integrated approach to safety and security based on systems theory.
Commun. ACM,
57(2), pp.31-35.
Yumerefendi, A.R., Reynolds, P.A. and Bley, J.B., Blue Stripe Software Inc, 2014.
Methods and computer program products for monitoring and reporting
network application performance. U.S. Patent 8,700,765.
Zhang, Y. and Swanson, S., 2015, May. A study of application performance with non-volatile main memory. In
2015 31st Symposium on Mass Storage
Systems and Technologies (MSST) (pp. 1-10). IEEE.
6 of 6
Insert Student Name) / (
Insert Student Number) - PPMP20012 Unit Portfolio for Week 8
Sutton, I.S., 2013, May. Summarizing the deepwater horizon/macondo reports. In
Offshore technology conference. Offshore Technology Conference.
Tekade, U., Mutalik, M. and Groose, B., Actifio Inc, 2016.
System and method for providing intra-process communication for an application programming
interface. U.S. Patent 9,384,254.
Young, W. and Leveson, N.G., 2014. An integrated approach to safety and security based on systems theory.
Commun. ACM,
57(2), pp.31-35.
Yumerefendi, A.R., Reynolds, P.A. and Bley, J.B., Blue Stripe Software Inc, 2014.
Methods and computer program products for monitoring and reporting
network application performance. U.S. Patent 8,700,765.
Zhang, Y. and Swanson, S., 2015, May. A study of application performance with non-volatile main memory. In
2015 31st Symposium on Mass Storage
Systems and Technologies (MSST) (pp. 1-10). IEEE.
6 of 6
1 out of 6
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.