PPMP20013 Assessment: A Detailed Mining Project Tender Request

Verified

Added on  2023/06/11

|15
|3134
|129
Practical Assignment
AI Summary
Read More
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Name of the Student
Name of the Professor
City/ State
Date/ Month/ Year
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1. Definition.
Principal- The Talia Construction Company request all the locals who are capable of offering the
construction materials which shall be needed in the construction.
Tenderer- Any person who has the capability of providing the services needed by the ministry.
1.2. Ethics
This particular tender is based on the following principles;
a) The tendering work shall only be taken by those tenderers who are capable of carrying
out that particular work.
b) This particular tender on mining equipment shall be done in a free and honest manner.
c) The conditions for the tender shall be similar for all the tenderers.
1.3. Tendering Procedure covered
The procedures for tendering is discussed below,
1.3.1. OBLIGATION OF THE PRINCIPAL
General- The contractor will carry out his duties in accordance with the SC
Prohibition of conflicting activities- The contractor shall not engage in activities conflicting to
the work assigned to them.
Confidentiality-Both the parties shall not disclose any credentials information in the term of the
contract and after the expiry of the contract for 2 years.
1.3.1.1. Pre-tender
1.1 The tenders are invited to hand over their Financial and Technical Proposal for
transportation services needed. The submission of a technical report may be done in case the
client has intentions to apply standard conditions of engagement and scales of fees for
professional services.
1.2 The price to be charged for tender document shall not exceed 5000/=
Document Page
1.3. The review of the tender document by the tenderer shall not be allowed before making the
purchase of the certified document from the office1.4. Please note that the cost involves in
preparation of the proposal and negotiating the contract is not recognized as a direct cost of
the assignment
2.1 The request from any tenderers regarding RFP documents shall take place 7 days before the
proposed date of submission. The clarification request shall be sent in the writing paper
mail, facsimile, electronic mail, and telex.
1.3.1.2. Tender documents
3.1 The English language shall be used in writing the proposal of the tenderers.
3.2. Examination of the documents constituting this RFP in should be looked at detail during the
preparation of the Technical Proposal (Rees, 2012, p. 45).
3.3 During preparation of the technical proposal, the tenderers must give attention to the
following;
i. If the firm considers that it does not have all the expertise for the assignment
ii. Alternative professional staff shall not be proposed and only one Curriculum Vitae may
be submitted for each position (Moelmann, 2009, p. 178)
1.3.1.3. Selecting tenderers
The principal shall apply pre-qualification criteria complying with the applicable code of practice
in order to determine who shall be invited to tender.
1.3.1.4. Call for tenderers
The Talia Construction Company invites any eligible tenderer to provide construction
materials which shall be used in the construction of public schools and hospitals in the whole
country. The prices set should be net inclusive of all taxes and shall remain valid for a period of
120 days from the closing date of the proposal. The filled tender documents MUST be enclosed
in plain sealed envelopes marked with the tender number and delivered to the location
provided below.
Document Page
The Operation Manager,
The Talia Building Company.
The Bomas of Australia, Room 231B
The opening of Tenders shall take place instantly and in the presence of the representatives
representing the tenderers. The selection of the tenderers shall be based on Quality Cost Based
Selection in accordance with the policies laid down in the Public Procurement and Asset
Disposal Act (Collins, 2008, p. 142).
1.3.1.5. Tendering
The principal shall have obligation to arrange the project funding before arranging the
tendering process.
1.3.1.6. Tender Inquiries
3.5. The Technical Proposal shall provide the following information using the attached standard
form
i. A brief description of the firm organization and an outline of the recent experience of
assignment of a similar nature.
ii. A description of the methodology and work plan for performing the assignment.
iii. The list of a proposed staff team
iv. CVs recently signed by the proposed professional staff and authorized representatives
submitting the proposal.
v. Estimates of the total staff inputs
3.6 The Technical Proposal shall not include any financial information
3.7. During the preparation of the technical proposal, the tenderers shall express the prices of
their services in figures, commissions, and gratuities to be paid if there is any. The proposal
must remain valid for 60 days after the submission date (Brook, 2016, p. 429).
1.3.1.7. Amendment of the document.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
The corrections on the document shall be allowed only 7 days after the collection of the tender
document by the tenderers. The tenderers are requested to review the document keenly
before the mentioned days ends.
1.3.1.8. Receipts and submission of tenders
3.8 The number of copies to be submitted are indicated above.
3.9 The original and all copies of Technical Proposal shall be placed in a sealed envelope labeled
TECHNICAL PROPOSAL (Polishuk, 2009, p. 321)
1.3.1.9. Closing of tenders
4.0 The submission of the concluded financial and technical proposal shall be done to the
address given above and LATE submission of a proposal shall not be acknowledged. The
tender shall be closed on 2nd November 2018.
1.3.1.10. Evaluation of the tenders
4.1 None of the evaluators shall have access to the financial proposal until the conclusion of
technical evaluation (Uher, 2009, p. 96).
4.2 The criteria mentioned below shall be used in the proposal evaluation by the committee
appointed.
POINTS
The experience of the tenderer relating to this particular task 20
Competence of the work plan proposed and style in replying to the terms
of reference.
30
Proficiency and qualifications of the key staff for the assignment 20
Sustainability to the transfer of Technology program 30
Total Points 100
4.3 The opening of financial proposal financial proposal shall be done in the presence of all the
representatives in place of the tenderers. The prices and the name of every tenderer will be
announced loudly when the financial proposal is opened (Moelmann, 2009, p. 197).
Document Page
4.4 The selected tenderer shall be notified and those whose proposal shall not meet the
credentials then the proposal shall be returned to them. Their financial process will also be
returned to them immediately after completion of the selection process thereafter, the
remaining tenderers will be invited to attend the opening of the financial proposals.
1.3.1.11. Negotiations and selection
4.5 The negotiation will entail discussing the technical proposal, work plan or proposed
methodology and any suggestions.
4.6 The negotiation will also include the contract draft form.
4.7 For the purpose of the negotiation, a team will be appointed by the procuring entity.
4.8 Award of the contract
4.9 The awarding of the contract will be done based on the negotiation. The tenderer who won
the contract will be shortlisted while those who will not qualify, their financial proposal will be
returned to them (Mann, 2009, p. 712).
5.0 The tenderer selected is expected to commence the assignment on the date and location
specified in the document
5.1 The parties involved in the contract shall have it signed within 30 days from the date of
notification of the contract award (Kiiver, 2014, p. 19).
1.3.2. OBLIGATIONS OF THE TENDERERS
1.3.2.1. Genuine belief
5.2 The client shall use his best effort to make sure he renders assistance to the contractor in
case he is needed (Duyshart, 2013, p. 567).
5.3 All the services and facilities shall be made available to the contractor (Brook, 2016, p. 120).
1.3.2.2. Return of the documents
Document Page
All the proposals shall be filled keenly and after completion, they shall be dropped in the
location stated above in a sealed brown envelope.
1.3.2.3. Evaluation of tender document
5.4 The finance committee will assist in determining whether the financial proposals are
complete.
5.5 The formula for determining the financial score will be Sf= 100XFM/f whereof is the financial
score; F is the proposal price (Jacky, 2009, p. 124).
5.6 The evaluation of the tender will be done within 21 days commencing from the date of
opening the tender.
5.7 The variations of the contract price shall not be allowed for the contracts not exceeding 12
months or one year (Uher, 2009, p. 347).
5.8 The processing of price variations will be done by procuring entity within 30 days.
1.3.2.4. Formulation of tender and estimates
Not tender shall be allowed to participate in unlawful activities not highlighted in the contract
such as failing to pay tender fees or bribing the company to be awarded the tender. All the
relevant statutory and other legal requirements shall be observed and the tenderers shall not
collide with other tenderers, provide or accept the secret commission, present inflated
tenderers and influence of contract decision by improper means.
The following estimates are made concerning the contract;
1.3.2.4.1. Project labor
The assignment is estimated to involve 10 workers who are energetic and ready to work under
minimum supervision.
1.3.2.4.2. Project plant
The assignment needs vehicles around 4 vehicles which shall be used in transporting the
construction materials to various places they are required.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1.3.2.4.3. Project material
This particular assignment requires various building materials such as cement, bricks, iron
sheets to take place.
1.3.2.4.4. Project subcontractors
The project only requires only 1 subcontractor who is capable of supplying construction
materials needed for the construction to take place.
1.3.2.5. Submission of tenders
The tender shall be submitted within the time mentioned in the document and LATE submission
shall not be allowed.
1.4. Confidentiality: the parties’ testimonial information should stay secretive even
after the expiration of the contract
2. FINANCIAL JUSTIFICATION AND FINANCIAL ARRANGEMENT
2.1. Source of funds
The tenderer shall submit their bank statement to ensure that they have enough money
to start delivering the services to where they are required since the organization shall
not be liable to underperformed work due to lack of finance.
FINANCIAL PROPOSAL SUBMISSION FORM
…………………………………...(DATE)
To……………………………………………………… (Client name and address)
………………………………………………………….
Ladies/ Gentlemen
Document Page
As the countersigners due agree to provide the construction materials for the firm in
accordance with your Request for Proposal dated……………………. Our attached Financial
Proposal is for the sum of ………………………………………………………………………………… (amount
to be included in words and figures) inclusive of taxes.
We remain
Yours sincerely
………………………………. (Authorized signature)
…………………………………… (Name and title of signatory)
………………………………… (Firms name)
…………………………………………. (address)
2.2. Summary of cost
Subtotal cost…………………………………………...………… (Amount and currency to be stated)
The tax levied……………………………………………………………. (Amount and currency to be
stated)
Total amount needed…………………………………………. (Amount and currency to be stated)
3. Contractual terms
3.1. Nature of the Contract
This contract is the meaning and interpretation and the relationship between the parties and
shall be governed by the Laws of Australia.
3.3. Service Notice
Document Page
All the services needed shall be performed at the location specified at the beginning of the
document (Kelvin, 2008, p. 56).
3.4. Assignment and Subcontracting
The subcontracting clause and other and other issues should be mentioned clearly.
3.5. Statutory Requirement
All the contractors and subcontractors shall pay their fees, taxes, and duties under the law of
Australia (Greg, 2008, p. 21)
3.6. Examination and Testing
A thorough testing policy is needed to identify the project prerequisites and avoid conflict of
contracts.
3.7. Progress and Programming of the work.
Monitoring of the ongoing project is needed to ensure the project is completed at the time
specified in the tender.
3.8. Suspension of works
When the client is involved in illegal activities when performing the contract then it will lead to
the suspension of the contract
3.9. Delay of works
The work needs to be completed within the stipulated time since delays will lead to escalation
in the cost.
3.10. Defects liability
A proper defection policy is needed to deal with the issue of defect liability in case there is any.
3.11. Variations.
Task variation and its principals needs to be followed to assist in the execution of the task.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
3.12. Certificate and Payment
Payment shall be made within 30 days of receipt of the invoice and relevant documents and in
case of delays then the contractor shall be paid simple interest for each day of delay at a rate of
three percentage points (Ayeni, 2011, p. 32).
3.13. Default or Insolvency
Insolvency issue regarding the executing agency within the working structure must not let to
pound on the project structure.
3.14. Termination
The client shall terminate this contract by not less than 30 days’ written notice of termination to
the contractor (Downings, 2011, p. 78).
3.15. Claims
There is need to resolve claims such as contractual claims, monetary claims and infrastructural
claims.
3.16. Dispute resolution
In case of any arising dispute which cannot be settled amicably within thirty days after receipt
of one party of the other party request then for such amicable settlement maybe by either
party or to the arbitration and final decision of a person to agree between the parties (Ross,
2014, p. 34).
4. Quality Assurance and Control requirements
4.1. Customer focus- Application of the customer focus principle shall enhance systematic
managing of the customer relationship, measuring customer satisfaction and acting on them
and researching and understanding the experiences and needs of the customers
4.2. Quality Leadership
Document Page
The organization need quality services to be provided to the customers and this will lead to an
increase in the market share.
4.3. Involvement of people- People involvement in the ongoing events shall make people
understand their role and contribution to the organization, creativity, and innovation in
furthering the objectives of the organization.
4.4. Continuous improvement-The performance of the organization generally shall be a
permanent objective since it will result in the acknowledgment of improvements and provision
of training to the people (Greg, 2008, p. 34).
4.5. Process Approach- The principal shall require efficient managing activities and the related
resources as a process to enable the firm realize the necessary activities needed in order to
achieve better results, measuring the capabilities of the key activities and evaluation of risks.
4.6. System approach
The system approach will assist in the determination market strategy development thus
providing profit to the organization.
4.7. Continuous approach
A continuous improvement in the organization will assist in the elimination of hindrances in the
project execution.
4.8. Mutual benefit- The firm and the tenderer shall enhance their relationship and this will
lead to identification and selection of suppliers, clear and open communication and sharing of
information and future plans.
5. SAFETY REQUIREMENTS
5.1. Safety management review
The organization shall ensure that they understand the safety measures involved in taking
large projects.
5.2. Safety management and evaluation
Document Page
The weak areas should be identified before commencing the project and safety procedures
should also be undertaken to help in maintaining utmost security system.
5.3. Safety implementation
Safety policies should be implemented to avoid safety risk associated with the projects.
5.4. Safety planning
Before developing project design, there is need of identifying risk associated with that
particular risk. Planning should be developed which will assist in curbing the risk in case they
occur.
5.3. OHS policy
The organization shall allocate the budget for OHS professional, ratio safety officers to workers
and appointment of OHS professional.
.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Brandt, T. (2007).
Tendering. Wiley.
Brook, M. (2016).
Estimating and Tendering for Construction. Adventure Works Press.
Collins, S. (2008).
Effect of Competitive Tendering on Value in Construction. Grupo Planeta.
Downings, M. (2011).
Winning Government Tenders. Gakken.
Duyshart, B. (2013).
The Digital Document. Gakken.
Greg, B. (2008).
Construction Tendering and Estimating. Adventure Works Press.
Jacky, T. (2009).
Code of Practice for the Selection of Subcontractors. Sanoma.
Kelvin, C. (2008).
Tendering for Civil Engineering Contracts. HarperCollins.
Kenyia, P. (2011).
Principles of Tendering and Estimating. Hauffe Gruppe.
Kiiver, P. (2014).
The Practice of Public Procurement. Cambridge University Press.
Lewis, H. (2012).
Bids, Tenders, and Proposals. Scholastic.
Mann, D. (2009).
Facility Management. Adventure Works Press.
Document Page
Marsh, P. (2008).
The Art of Tendering. Sanoma.
Moelmann, L. (2009).
The law of Performance Bonds. McGraw-Hill education.
Polishuk, P. (2009).
Competitive Tendering. China Publishing Company.
Rees, G. (2012).
Code of Estimating Practice. Hachette Livre.
Ross, B. (2014).
Total Facilities Management. Ridders digest.
Sayers, P. (2012).
Managing Sports and Leisure Facilities. Informa.
Seddon, N. (2009).
Government Contracts. HarperCollins.
Uher, T. (2009).
Fundamentals of Building Contract Management. Simon & Schuster.
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]