This PPMP20013 unit portfolio examines the relevance of systems thinking to project management, drawing upon readings, personal experiences, and the Brisbane Airport's New Parallel Runway project as a case study. The portfolio reflects on various aspects of project management, including the unit's objectives, project planning, value management, and the Australian standard code of tendering (AS 4120-1994). It discusses the project's strategic direction, future investments, and environmental considerations, highlighting the importance of effective strategies and stakeholder consultation in large-scale, long-term projects. The portfolio also addresses the significance of tools and techniques for investigating project processes, justifying new developments, and maintaining existing facilities, while emphasizing safety, quality, and risk management in project operations. Desklib offers a wealth of similar solved assignments and resources for students.

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Week 1 Topic: Explain the relevance of systems thinking to PM.
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
1. Review using clear
terminology the
key areas and
processes of
project, program
and portfolio
management
practices as applies
to asset rich
organisations.
After the successful investigation of Brisbane’s New Runway project it
has been noticed that the fundamental objective of this project is to implement
a modified airport which has strategic direction as well as this project wants to
set the future prognostication in order to increase the passenger rate of the
Airlines. Along with this the project developer wants to implement the airport
site in such way which can be additionally used by the users. In order to make a
feasible airport runway the developer has opted for defining the major future
investments and optimal structure which will surely demonstrate about the
strategies and work process of the approached project.
Followed by the purpose of developing the Brisbane’s new runway
project the investors has invested 1.3 billion. Initially in the year 1971 Australian
government has decided that Brisbane needs a larger area in future order to
establish one of the most connected airport in Australia. The project director
has mentioned that according to 1971’s Brisbane airport development plan was
to align two 36 meter long parallel run ways which will be established 2 kilo
meter away from each other with considering the fact that each run way will be
independent of each other. Another significant aspect which was present in the
1971’s project planning was to developing the parallel runways which will never
cross each other path at any cost. The terminals of two run ways were well
strategies in order to avoid any crash with two different terminal such as
domestic terminal and international terminal to create an effective run way
procedure.
Starting from the 1971 it was a long term process in order to develop
the Brisbane’s new Runway. Thus in a significant impact on the environment
which was handled with care by the environmental assessment team. In the
year 2005 and 2006 the assessment team was totally concerned about the
environmental affects in order to reduce the impact of the project on the
environment. As per the Australian government rules it was necessary to receive
Bay, M., 2017. City
of. Operating
Budget for
Fiscal Year
1997-1998.
Coughlan, P., 2016.
Brisbane's
New Parallel
Runway.
Mohd, H., Baharom, F.,
Darus, N.M.,
Saip, M.A.,
Marzuki, Z.,
Yasin, A. and
Robie, M.A.M.,
2016. A
secured e-
tendering
model based
on rational
unified process
(RUP)
approach:
Inception and
elaboration
phases. Intern
ational Journal
of Supply
Chain
1 of 8
Week 1 Topic: Explain the relevance of systems thinking to PM.
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
1. Review using clear
terminology the
key areas and
processes of
project, program
and portfolio
management
practices as applies
to asset rich
organisations.
After the successful investigation of Brisbane’s New Runway project it
has been noticed that the fundamental objective of this project is to implement
a modified airport which has strategic direction as well as this project wants to
set the future prognostication in order to increase the passenger rate of the
Airlines. Along with this the project developer wants to implement the airport
site in such way which can be additionally used by the users. In order to make a
feasible airport runway the developer has opted for defining the major future
investments and optimal structure which will surely demonstrate about the
strategies and work process of the approached project.
Followed by the purpose of developing the Brisbane’s new runway
project the investors has invested 1.3 billion. Initially in the year 1971 Australian
government has decided that Brisbane needs a larger area in future order to
establish one of the most connected airport in Australia. The project director
has mentioned that according to 1971’s Brisbane airport development plan was
to align two 36 meter long parallel run ways which will be established 2 kilo
meter away from each other with considering the fact that each run way will be
independent of each other. Another significant aspect which was present in the
1971’s project planning was to developing the parallel runways which will never
cross each other path at any cost. The terminals of two run ways were well
strategies in order to avoid any crash with two different terminal such as
domestic terminal and international terminal to create an effective run way
procedure.
Starting from the 1971 it was a long term process in order to develop
the Brisbane’s new Runway. Thus in a significant impact on the environment
which was handled with care by the environmental assessment team. In the
year 2005 and 2006 the assessment team was totally concerned about the
environmental affects in order to reduce the impact of the project on the
environment. As per the Australian government rules it was necessary to receive
Bay, M., 2017. City
of. Operating
Budget for
Fiscal Year
1997-1998.
Coughlan, P., 2016.
Brisbane's
New Parallel
Runway.
Mohd, H., Baharom, F.,
Darus, N.M.,
Saip, M.A.,
Marzuki, Z.,
Yasin, A. and
Robie, M.A.M.,
2016. A
secured e-
tendering
model based
on rational
unified process
(RUP)
approach:
Inception and
elaboration
phases. Intern
ational Journal
of Supply
Chain
1 of 8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
the three level government confirmation in order to start any further
development of the Brisbane Runway. In the year 2007 the development of
runway was again started to implement further development. Brisbane New
Runway project was developed in order to create a highly connected airport for
the passengers. Followed by the above development aspects it is assumed that
the Brisbane new Runway project will release in the year 2020.
Since, this project was significantly large project as well as long term
project it was essential to manage the development process with effective
strategies. From the year 1971 the development process was initiated which
was an effective process. The project manager has maintained the work process
by 2014 master plan which was then approved by the Australian government in
the year 2015. The master plan has followed by the aspect of connecting
Australia with the rest of the world as well as being Proactive, innovative and
flexible. As this project was developed to facilitate the Australian population the
project has high priority towards consulting the project proposal with
Commonwealth Minister for infrastructure and Transport for development.
According to Australian standard code of tendering this project should
follow the codes related to the Brisbane New Runway project. In order to
provide an effective and efficient product the development team should surely
follow the ethics and obligation of the principles of construction and tenders.
The ethics and principles present in the field of developing any project are
equally applicable to all most all the stakeholders of the project which includes
Agents, tenders, suppliers, constructors and their professional associations.
Management,
5(4), pp.114-
120.
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
2. Discuss the
relevance of tools
and techniques for
investigating and
describing project
process related to
developing new
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
PPMP20013 Unit Profile
PPMP20013 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
2 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
the three level government confirmation in order to start any further
development of the Brisbane Runway. In the year 2007 the development of
runway was again started to implement further development. Brisbane New
Runway project was developed in order to create a highly connected airport for
the passengers. Followed by the above development aspects it is assumed that
the Brisbane new Runway project will release in the year 2020.
Since, this project was significantly large project as well as long term
project it was essential to manage the development process with effective
strategies. From the year 1971 the development process was initiated which
was an effective process. The project manager has maintained the work process
by 2014 master plan which was then approved by the Australian government in
the year 2015. The master plan has followed by the aspect of connecting
Australia with the rest of the world as well as being Proactive, innovative and
flexible. As this project was developed to facilitate the Australian population the
project has high priority towards consulting the project proposal with
Commonwealth Minister for infrastructure and Transport for development.
According to Australian standard code of tendering this project should
follow the codes related to the Brisbane New Runway project. In order to
provide an effective and efficient product the development team should surely
follow the ethics and obligation of the principles of construction and tenders.
The ethics and principles present in the field of developing any project are
equally applicable to all most all the stakeholders of the project which includes
Agents, tenders, suppliers, constructors and their professional associations.
Management,
5(4), pp.114-
120.
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
2. Discuss the
relevance of tools
and techniques for
investigating and
describing project
process related to
developing new
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
PPMP20013 Unit Profile
PPMP20013 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
2 of 8

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
workings, facilities,
equipment, plant
and processes for
justifying,
designing,
developing, or
maintaining
existing facilities
and equipment
within the context
of their
technological and
asset lifecycle
status.
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
3 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
workings, facilities,
equipment, plant
and processes for
justifying,
designing,
developing, or
maintaining
existing facilities
and equipment
within the context
of their
technological and
asset lifecycle
status.
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
3 of 8
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
3. Present and
interpret major
processes that are
based on sound
policy, information,
and research that
enable project
justification,
tenders, contracts,
and selection
criteria to occur in
an asset rich
organisation.
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
PPMP20013 Unit Profile
PPMP20013 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
4 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
3. Present and
interpret major
processes that are
based on sound
policy, information,
and research that
enable project
justification,
tenders, contracts,
and selection
criteria to occur in
an asset rich
organisation.
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
PPMP20013 Unit Profile
PPMP20013 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
4 of 8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
4. Critically analyse
management
strategies and
operational
activities from a
broad perspective
to ensure safety
and quality, to
avoid overruns or
rework, to manage
variations and
claims, and to make
decisions to
discontinue or
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
PPMP20013 Unit Profile
PPMP20013 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
5 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
Mandatory Readings
Smith Chapters 1
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
4. Critically analyse
management
strategies and
operational
activities from a
broad perspective
to ensure safety
and quality, to
avoid overruns or
rework, to manage
variations and
claims, and to make
decisions to
discontinue or
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
PPMP20013 Unit Profile
PPMP20013 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
5 of 8

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
close projects. case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
Mandatory Readings
Smith Chapters 1
5. Demonstrate an
effective,
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
PPMP20013 Unit Profile
PPMP20013 Moodle
6 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
close projects. case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
Mandatory Readings
Smith Chapters 1
5. Demonstrate an
effective,
The objective of this week’s topic [Week 1: Define project management for
operators of mines, plants and owners of large assets] is to make sure you have
PPMP20013 Unit Profile
PPMP20013 Moodle
6 of 8
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
professional level
of teamwork and
communication and
support
collaborative peer
group learning.
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
7 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
& 2;
Australia National
Audit Office -
Planning and
Approving
Projects
AS 4120-1994
Code of tendering;
Optional Readings
Locate your
company internal
Project
Development
Manuals (if it
exists and
available);
You can also study
the Californian
Government
Department of
Transportation
Project
Development
Procedures;
Download and
study the
Engineers
Australia
Infrastructure
Report Card for
your State;
professional level
of teamwork and
communication and
support
collaborative peer
group learning.
a broad understanding of
The unit’s fundamental objectives;
Projects and Project Management, particularly as applied to a project like
the Brisbane Airport Parallel Runway;
Value Management, particularly as applied to a project like the Brisbane
Airport Parallel Runway;
Other perspectives such as how major organisations like the Australia
National Audit Office, undertake planning and approving of projects;
The contents of AS 4120-1994 Code of tendering.
Note: some of these readings are quite long. You are not expected to read
everything, rather to gain an overview and be able to reflect on the material and
case study using your own thoughts.
In this portfolio please reflect on the readings (1st column) and the learning
outcome (2nd column). Ask yourself in what way does the readings provide
insights into the learning outcome? Maybe they don’t! What are your
thoughts?
Are there other insights that you can make from other units that you have
studied? Or your work and life experience?
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
7 of 8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

(Insert Student Name) / (Insert Student Number) - PPMP20013 Unit Portfolio for Week 1
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
References
8 of 8
Reading samples Learning
outcomes of the
unit
Learnings from your weekly study, experience, this and
prior unit readings and assignments
Supporting
documentation
including any
prior learning
Case Study
Brisbane Airport's
New Parallel
Runway;
YouTube:
Brisbane's New
Parallel Runway –
Overview;
Brisbane Airport
2014 Approved
Master Plan.
References
8 of 8
1 out of 8
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.