Project Management Report: PRINCE-2 Model Application for Construction
VerifiedAdded on 2023/01/07
|10
|3072
|41
Report
AI Summary
This report analyzes project management, emphasizing the execution and control of construction projects through the application of the PRINCE-2 model. It details the project's objectives, including the construction of a building, and the importance of effective resource management and adherence to timelines and budgets. The report discusses the PRINCE-2 model's principles, such as starting, directing, initiating, controlling, managing product delivery, managing stage boundaries, and closing a project within the context of construction planning. It also includes an end-of-project evaluation report that assesses project objectives, stakeholder interests, and the benefits derived from the project, highlighting the importance of customer satisfaction and technological advancements. The report underscores the significance of effective communication, documented planning, and the use of tools like WBS and Gantt charts to ensure quality and manage potential issues, demonstrating the comprehensive approach to project management in the construction industry.

Project Management-2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................1
MAIN BODY...................................................................................................................................1
Execution and control of the project through application of PRINCE-2 model.........................1
End of Project Evaluation report.................................................................................................3
CONCLUSION ...............................................................................................................................7
REFERENCES................................................................................................................................8
INTRODUCTION...........................................................................................................................1
MAIN BODY...................................................................................................................................1
Execution and control of the project through application of PRINCE-2 model.........................1
End of Project Evaluation report.................................................................................................3
CONCLUSION ...............................................................................................................................7
REFERENCES................................................................................................................................8

INTRODUCTION
The project management is a process that reflect the overall working process, skills,
methods, knowledge and the experiences that used to achieve and attain much profit and sales in
appropriate manner. It is based on different working criteria through which the certain
parameters has achieved by completing suitable deliverables within the assigned budget and time
scaling. In this sustain benefits are attained through which more of the profit and sales are
conceived as with this beneficial interest is developed that furthermore assist to maximise the
stakeholders interest. It is beneficiary aspect for the business as under this achievement of goals
and objectives become more easier and flexible (Akkermans, 2020). In this it is also be required
that all the different activities and task are complete within the stipulated period of time. The role
of project manager is also be more important in this as they have helped to process the working
with more effectiveness. The completion of goals is completely depended on the initiation and
ending of the project and it is also be more essential that working is processed by effective
utilisation of resources by which result is accomplish in better format. The following report is
based on the construction of building along with the execution and control of different task and
actions as per the project. In addition to this it include the applications of PRINCE-2 model that
is used to control the different components of project so that successful changes are achieved. In
the end it include the self reflection about the competency that is used while executing certain
roles and responsibilities in effective manner.
MAIN BODY
Execution and control of the project through application of PRINCE-2 model
The project and its completion is totally dependent on desirable outcome as from which
task is attained as within the assigned time and allocated budget. It is the vital prospect in which
different set of activities is used to make efficient control and execution of basic aspect of
project. The project execution is a phase that is prior implementation thus with this the project
manager ensure that all the activities is balanced out in adequate manner. In this it is required
that various products and services are implemented in which the requirement and demand of
customers is fulfilled with more effectiveness (Cha, 2018). It include the task that is more
required while implementing the project so that satisfactory outcomes are attained with more
easiness. The control and execution on the working abilities of the project is based on the
1
The project management is a process that reflect the overall working process, skills,
methods, knowledge and the experiences that used to achieve and attain much profit and sales in
appropriate manner. It is based on different working criteria through which the certain
parameters has achieved by completing suitable deliverables within the assigned budget and time
scaling. In this sustain benefits are attained through which more of the profit and sales are
conceived as with this beneficial interest is developed that furthermore assist to maximise the
stakeholders interest. It is beneficiary aspect for the business as under this achievement of goals
and objectives become more easier and flexible (Akkermans, 2020). In this it is also be required
that all the different activities and task are complete within the stipulated period of time. The role
of project manager is also be more important in this as they have helped to process the working
with more effectiveness. The completion of goals is completely depended on the initiation and
ending of the project and it is also be more essential that working is processed by effective
utilisation of resources by which result is accomplish in better format. The following report is
based on the construction of building along with the execution and control of different task and
actions as per the project. In addition to this it include the applications of PRINCE-2 model that
is used to control the different components of project so that successful changes are achieved. In
the end it include the self reflection about the competency that is used while executing certain
roles and responsibilities in effective manner.
MAIN BODY
Execution and control of the project through application of PRINCE-2 model
The project and its completion is totally dependent on desirable outcome as from which
task is attained as within the assigned time and allocated budget. It is the vital prospect in which
different set of activities is used to make efficient control and execution of basic aspect of
project. The project execution is a phase that is prior implementation thus with this the project
manager ensure that all the activities is balanced out in adequate manner. In this it is required
that various products and services are implemented in which the requirement and demand of
customers is fulfilled with more effectiveness (Cha, 2018). It include the task that is more
required while implementing the project so that satisfactory outcomes are attained with more
easiness. The control and execution on the working abilities of the project is based on the
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

different data and information that is used to collect the implies within the particular time period
or as by managing the cost. The project controlling is a procedure under which effective status
and measuring of project is analysed as with the better forecasting and advancements that
collectively support the defined output. The project management is a method that consist of
various parameters as like planning, budgeting, change management, risk management,
performance management, forecasting, sales and profit proposition and many others factors as
well. It has been used to manage and control the construction site planning and control as with
this a certain level of surety is developed through which project quality is maintained. As much
better the constructed building is that much people are getting attracted thus the market image
and values is developed in sufficient mode (Chawla, 2018).
The PRINCE 2 is a model that defines the Projects IN Controlled Environment under
which the project is controlled and managed as from the initiation to the ending. It is used to
attain more profit as by managing the effective modifications in appropriate way or within
certain time period. It is used by while constructing a building as in this certain drawings,
paperwork, specifications of required equipment’s and machinery, contractors line up and many
other form as well that is used to make balanced level of advancement with the parallel
improvements of working experience. It is used to improvise the working experience as with this
suitable level of modifications is implemented by which advanced level creation and innovation
is processed. This model is more useful for the construction site as well in which they have
maintain the record of all the different changes and modifications that is used to implemented in
certain instance and also defines the pathway of processing in which the cost controlling is being
more effective and efficient. It brings rapid growth and development in which desirable changes
is implemented so that continuous changes is induced as per the requirement and suitability of
business. In this the better return on the investment is processed so that continuous learning from
the working experience is developed (Kerzner, 2018). In this the management department of
construction played vital role and responsibilities so that more focus is maintained under which
rate of deliverable is attained. There is a process of PRINCE 2 method within the construction
planning that is illustrate below as:
Starting the project: The project is started with the parallel consideration of goals as
with this the level of achievement is modifies with the approval of project manager.
2
or as by managing the cost. The project controlling is a procedure under which effective status
and measuring of project is analysed as with the better forecasting and advancements that
collectively support the defined output. The project management is a method that consist of
various parameters as like planning, budgeting, change management, risk management,
performance management, forecasting, sales and profit proposition and many others factors as
well. It has been used to manage and control the construction site planning and control as with
this a certain level of surety is developed through which project quality is maintained. As much
better the constructed building is that much people are getting attracted thus the market image
and values is developed in sufficient mode (Chawla, 2018).
The PRINCE 2 is a model that defines the Projects IN Controlled Environment under
which the project is controlled and managed as from the initiation to the ending. It is used to
attain more profit as by managing the effective modifications in appropriate way or within
certain time period. It is used by while constructing a building as in this certain drawings,
paperwork, specifications of required equipment’s and machinery, contractors line up and many
other form as well that is used to make balanced level of advancement with the parallel
improvements of working experience. It is used to improvise the working experience as with this
suitable level of modifications is implemented by which advanced level creation and innovation
is processed. This model is more useful for the construction site as well in which they have
maintain the record of all the different changes and modifications that is used to implemented in
certain instance and also defines the pathway of processing in which the cost controlling is being
more effective and efficient. It brings rapid growth and development in which desirable changes
is implemented so that continuous changes is induced as per the requirement and suitability of
business. In this the better return on the investment is processed so that continuous learning from
the working experience is developed (Kerzner, 2018). In this the management department of
construction played vital role and responsibilities so that more focus is maintained under which
rate of deliverable is attained. There is a process of PRINCE 2 method within the construction
planning that is illustrate below as:
Starting the project: The project is started with the parallel consideration of goals as
with this the level of achievement is modifies with the approval of project manager.
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Directing a project: The project completion is based on the approval that is processed by
the project manager as they have maintain record about the different resources that is
required to processed effective working. In this all the individual has played its roles and
responsibilities so that standardised output is achieved in timely manner. Initiating the project: In this the project working is started within the assigned period of
time by which achievement of sales is increases. In addition to this project manager
works on the parallel consideration of aim, cost, quality, time, scope, risk and other
benefits as well (LARSON, 2018). Controlling: The construction working is processed with the management of different
components so that progress is achieved with better effectiveness. Managing product delivery: In this stage project is managed with the parallel control on
different factors under which continuous changes is implemented as accordance to the
requirement thus correction is enforced with more suitability. Managing stage boundaries: In this stage the project manager has review all different
changes so that work is completed within timely basis.
Closing a project: It is the ending stage of project that is used to control the deliverables
so that proper documentation and reporting is processed that used to maintain record of
all the changes with better adequacy.
The above principles of PRINCE 2 model is used by construction planning in which the
successful implementation of different set of activities is processed in effective manner. In this
the project is launched with the consideration of technicalities so that it is easy to achieve certain
goals and objectives. The suitable interpretation of various goals and objective within the project
is processed as with the quality enhancement in which probability of attaining better result is
accomplished (Lock, 2020). The business has worked on the project with the aim to gain
appropriate return as per the investment so that long term goals is achieved with much
effectiveness. In this project controlling and execution is important due to which improvised
changes is attained with the parallel management of deliverables in desirable manner.
End of Project Evaluation report
The ending of project is completely dependent on the effectiveness within which the
project completion is managed and controlled in appropriate format. In this it is required to
manage the decision making through which efficient solution of about different problems is
3
the project manager as they have maintain record about the different resources that is
required to processed effective working. In this all the individual has played its roles and
responsibilities so that standardised output is achieved in timely manner. Initiating the project: In this the project working is started within the assigned period of
time by which achievement of sales is increases. In addition to this project manager
works on the parallel consideration of aim, cost, quality, time, scope, risk and other
benefits as well (LARSON, 2018). Controlling: The construction working is processed with the management of different
components so that progress is achieved with better effectiveness. Managing product delivery: In this stage project is managed with the parallel control on
different factors under which continuous changes is implemented as accordance to the
requirement thus correction is enforced with more suitability. Managing stage boundaries: In this stage the project manager has review all different
changes so that work is completed within timely basis.
Closing a project: It is the ending stage of project that is used to control the deliverables
so that proper documentation and reporting is processed that used to maintain record of
all the changes with better adequacy.
The above principles of PRINCE 2 model is used by construction planning in which the
successful implementation of different set of activities is processed in effective manner. In this
the project is launched with the consideration of technicalities so that it is easy to achieve certain
goals and objectives. The suitable interpretation of various goals and objective within the project
is processed as with the quality enhancement in which probability of attaining better result is
accomplished (Lock, 2020). The business has worked on the project with the aim to gain
appropriate return as per the investment so that long term goals is achieved with much
effectiveness. In this project controlling and execution is important due to which improvised
changes is attained with the parallel management of deliverables in desirable manner.
End of Project Evaluation report
The ending of project is completely dependent on the effectiveness within which the
project completion is managed and controlled in appropriate format. In this it is required to
manage the decision making through which efficient solution of about different problems is
3

attained so that project completion is managed with effective management. As from the report it
is analysed that all the project deliverables is based on the project completion so that customer
satisfaction is always been in priority. In this brief detailing is processed so that all the needs and
demand of customers is managed as it is done to gain improvised set of facilities so that easy
acceptance is processed (Meredith, 2020). There is some detailing that is reported within EOP
report as in this possible output is developed and it is as explained below as:
The project objectives is based on the technological advancement and improvements
which is required to processed within the construction site planning. In this the project manager
always tries to ensure that certain level of modifications is implies by which more of the
customers are getting attracted by which profit margin also get developed. The objectives and
target of project is based on the completion of various task and activities by which constructed
building must be more attractive and easily attain the attention of more of customers. In this
brand image and value both get developed so that improvised result is achieved on continuous
basis.
The completion and execution of project is based on the certain benefits that is attained as
per the parallel inducement of different goals and objectives so that profit maximisation is
processed in effective manner. In this the interest level of stakeholder also get considered such as
of constructors, line man, suppliers, customers, government and its regulations etc. The project is
based on the construction of building as in this different modifications are implies as in terms of
technological advancements. As of now more of the unified buildings are constructed those
provide better facilities to the customers as like gym, parking, event management, sports ground,
halls, Wi-Fi and many others as well. Thus to construct the building it is considerate the people
only get attract if they get durable services with affordable pricing thus requirement of fund
generation is more required (Owusu, 2019). In this the project manager ensure that better
services are provided so that more of the public get attracted.
The management and project manager ensure that while accomplishing the goals and
objectives better scope is focused so that all the deliverables are managed and controlled with
better perfection. It is more supportive as well this the project manager assigned the different
amount to all the task as while considering the budget that is as of £50000 and it is consumed
within the time period of 6 months. In addition it is required to manage the quality within which
the better scope is attained in timely manner. The roles and responsibilities is being managed by
4
is analysed that all the project deliverables is based on the project completion so that customer
satisfaction is always been in priority. In this brief detailing is processed so that all the needs and
demand of customers is managed as it is done to gain improvised set of facilities so that easy
acceptance is processed (Meredith, 2020). There is some detailing that is reported within EOP
report as in this possible output is developed and it is as explained below as:
The project objectives is based on the technological advancement and improvements
which is required to processed within the construction site planning. In this the project manager
always tries to ensure that certain level of modifications is implies by which more of the
customers are getting attracted by which profit margin also get developed. The objectives and
target of project is based on the completion of various task and activities by which constructed
building must be more attractive and easily attain the attention of more of customers. In this
brand image and value both get developed so that improvised result is achieved on continuous
basis.
The completion and execution of project is based on the certain benefits that is attained as
per the parallel inducement of different goals and objectives so that profit maximisation is
processed in effective manner. In this the interest level of stakeholder also get considered such as
of constructors, line man, suppliers, customers, government and its regulations etc. The project is
based on the construction of building as in this different modifications are implies as in terms of
technological advancements. As of now more of the unified buildings are constructed those
provide better facilities to the customers as like gym, parking, event management, sports ground,
halls, Wi-Fi and many others as well. Thus to construct the building it is considerate the people
only get attract if they get durable services with affordable pricing thus requirement of fund
generation is more required (Owusu, 2019). In this the project manager ensure that better
services are provided so that more of the public get attracted.
The management and project manager ensure that while accomplishing the goals and
objectives better scope is focused so that all the deliverables are managed and controlled with
better perfection. It is more supportive as well this the project manager assigned the different
amount to all the task as while considering the budget that is as of £50000 and it is consumed
within the time period of 6 months. In addition it is required to manage the quality within which
the better scope is attained in timely manner. The roles and responsibilities is being managed by
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

all the designator by which managerial actions is conceived so that long term benefits are
attained with more easiness. It is essential to make suitable interpretation of working and it is
done with the support of resources by which completion of segmented task become more easy.
The completion of project is processed effectively with the support of PRINCE 2 model
as it is used to make continuous review on the working progress by which efficient changes are
measured as per the requirement and growth of business (Bjorvatn, 2018). It is used to make
continuous improvements within the project so that working performance is maintained and
under this all the skills and abilities get developed in sustained mode. These changes and
modifications has been done with the support of effective communication that is processed in
between the different workers those are worked within the construction site. In this some of the
issues also get generated on random basis so that prior changes is induced within which situation
dealing is managed and controlled systematically. In this detailed planning is induced as with
this all the working is controlled so that conflicts, decision making issues, misshapenness in
between workers and challenges is managed and processed with more accountability. The
documented planning is used to make modified changes within this effective alterations is
managed in organised manner and it is done with the support of WBS, Gantt chart, suitable
communication tools etc. is being used by project manager by which quality advancement is
progressed with better efficiency.
As per the conduction of project I am taking balanced participation and implies all my
learning and attributes within the completion of project so that the working capabilities and skills
is getting advanced in accurate form (Rowe, 2020). I have played all the assigned roles and
responsibilities as by using the personal and professional learning in order to attain more sales
and profit in satisfactorily mode. I have limited amount of knowledge that helped me to make
effective understanding about the different working aspect within which I have also tried to make
balanced level of coordination within the other members of team. I have learnt about different
sessions and along with this also uses leadership styles so that effective management is arranged.
In addition all the changes are implemented as per the management of various approaches and in
this ability to complete the project in increases. I have gain more learning and in this tries to
increase the communication level by which the flow of information is addressed in smooth
manner by which more clarity is processed in the workings. I have also uses the critical thinking
and analytical skills through which balanced decisions are taken that is used to make improvised
5
attained with more easiness. It is essential to make suitable interpretation of working and it is
done with the support of resources by which completion of segmented task become more easy.
The completion of project is processed effectively with the support of PRINCE 2 model
as it is used to make continuous review on the working progress by which efficient changes are
measured as per the requirement and growth of business (Bjorvatn, 2018). It is used to make
continuous improvements within the project so that working performance is maintained and
under this all the skills and abilities get developed in sustained mode. These changes and
modifications has been done with the support of effective communication that is processed in
between the different workers those are worked within the construction site. In this some of the
issues also get generated on random basis so that prior changes is induced within which situation
dealing is managed and controlled systematically. In this detailed planning is induced as with
this all the working is controlled so that conflicts, decision making issues, misshapenness in
between workers and challenges is managed and processed with more accountability. The
documented planning is used to make modified changes within this effective alterations is
managed in organised manner and it is done with the support of WBS, Gantt chart, suitable
communication tools etc. is being used by project manager by which quality advancement is
progressed with better efficiency.
As per the conduction of project I am taking balanced participation and implies all my
learning and attributes within the completion of project so that the working capabilities and skills
is getting advanced in accurate form (Rowe, 2020). I have played all the assigned roles and
responsibilities as by using the personal and professional learning in order to attain more sales
and profit in satisfactorily mode. I have limited amount of knowledge that helped me to make
effective understanding about the different working aspect within which I have also tried to make
balanced level of coordination within the other members of team. I have learnt about different
sessions and along with this also uses leadership styles so that effective management is arranged.
In addition all the changes are implemented as per the management of various approaches and in
this ability to complete the project in increases. I have gain more learning and in this tries to
increase the communication level by which the flow of information is addressed in smooth
manner by which more clarity is processed in the workings. I have also uses the critical thinking
and analytical skills through which balanced decisions are taken that is used to make improvised
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

changes as per suitability. In support of stress management skills I have managed all the
challenging situations so that improvised result is developed and conceived.
The successful changes is managed within the project by which the effective utilisation
and consumption of all the resources is controlled so as to complete the project within timely
basis. The PRINCE 2 model having more applications as well as it helps to resolve the different
issues by which the sufficient outcome is developed as per the requirement of project. There is
some recommendations as well that assist in future period of time as in this all the team members
have performed their working as per the assigned responsibilities. It is used to attain efficient
capabilities under which all the work is reviewed on timely basis by which the redundancies has
been removed with more perfectness (Willumsen, 2019). In this the democratic style of
leadership is managed by the business within which the improvised decision-making is
implemented as it is also used to enlarge the employee engagement of the business in this the
working quality is developed. In addition I have make suitable interpretation of the different
skills through which work is managed within the stipulated period of instance so that efficient
outcome is developed.
There is few risk as well that is used to identified while completing the project as in this
the parallel acknowledge of different resources is managed so that balanced level of
communication is processed by which efficient team work is processed. In this I have also uses
the different skills by which adequate changes is implies in which appropriate time is managed.
The inappropriateness of the workers is also be the widest risk in which performance probability
is negatively affected. On the other hand it is addressed as by the identification of various team
members and there skills thus the work is assigned as per the skills and abilities and it is used to
mitigate the risk.
6
challenging situations so that improvised result is developed and conceived.
The successful changes is managed within the project by which the effective utilisation
and consumption of all the resources is controlled so as to complete the project within timely
basis. The PRINCE 2 model having more applications as well as it helps to resolve the different
issues by which the sufficient outcome is developed as per the requirement of project. There is
some recommendations as well that assist in future period of time as in this all the team members
have performed their working as per the assigned responsibilities. It is used to attain efficient
capabilities under which all the work is reviewed on timely basis by which the redundancies has
been removed with more perfectness (Willumsen, 2019). In this the democratic style of
leadership is managed by the business within which the improvised decision-making is
implemented as it is also used to enlarge the employee engagement of the business in this the
working quality is developed. In addition I have make suitable interpretation of the different
skills through which work is managed within the stipulated period of instance so that efficient
outcome is developed.
There is few risk as well that is used to identified while completing the project as in this
the parallel acknowledge of different resources is managed so that balanced level of
communication is processed by which efficient team work is processed. In this I have also uses
the different skills by which adequate changes is implies in which appropriate time is managed.
The inappropriateness of the workers is also be the widest risk in which performance probability
is negatively affected. On the other hand it is addressed as by the identification of various team
members and there skills thus the work is assigned as per the skills and abilities and it is used to
mitigate the risk.
6

CONCLUSION
It has been concluded from the above report that project management is considered while
accomplishing some new prospect within the timely basis as in this the effective controlling and
execution is required. The project completion is based on the two phase that is initiation and final
aspect in which desirable changes is implemented in constrained format. In addition to this it is
necessary that EOP report is developed through which project execution and completion is
processed with better effectiveness so that favourable changes is processed for future period of
time.
7
It has been concluded from the above report that project management is considered while
accomplishing some new prospect within the timely basis as in this the effective controlling and
execution is required. The project completion is based on the two phase that is initiation and final
aspect in which desirable changes is implemented in constrained format. In addition to this it is
necessary that EOP report is developed through which project execution and completion is
processed with better effectiveness so that favourable changes is processed for future period of
time.
7
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

REFERENCES
Books and Journals
Akkermans, J. and et. al., 2020. Crafting project managers’ careers: Integrating the fields of
careers and project management. Project management journal. 51(2). pp.135-153.
Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as
drivers of project management performance. International Journal of Project
Management. 36(6). pp.876-888.
Cha, J., Newman, M. and Winch, G., 2018. Revisiting the project management knowledge
framework. International Journal of Managing Projects in Business.
Chawla, V. and et. al., 2018. The sustainable project management: A review and future
possibilities. Journal of Project Management. 3(3). pp.157-170.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
LARSON, E.W. and GRAY, C.F., 2018. Project management: the managerial process.
McGraw-Hill.
Lock, D., 2020. Project management. Routledge.
Meredith, J.R. And et. al., 2020.Project management in practice. John Wiley & Sons.
Owusu, E.K. And et. al., 2019. Causal factors of corruption in construction project management:
An overview. Science and engineering ethics. 25(1). pp.1-31.
Rowe, S.F., 2020. Project management for small projects. Berrett-Koehler Publishers.
Willumsen, P. and et. al., 2019. Value creation through project risk management. International
Journal of Project Management. 37(5). pp.731-749.
8
Books and Journals
Akkermans, J. and et. al., 2020. Crafting project managers’ careers: Integrating the fields of
careers and project management. Project management journal. 51(2). pp.135-153.
Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as
drivers of project management performance. International Journal of Project
Management. 36(6). pp.876-888.
Cha, J., Newman, M. and Winch, G., 2018. Revisiting the project management knowledge
framework. International Journal of Managing Projects in Business.
Chawla, V. and et. al., 2018. The sustainable project management: A review and future
possibilities. Journal of Project Management. 3(3). pp.157-170.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
LARSON, E.W. and GRAY, C.F., 2018. Project management: the managerial process.
McGraw-Hill.
Lock, D., 2020. Project management. Routledge.
Meredith, J.R. And et. al., 2020.Project management in practice. John Wiley & Sons.
Owusu, E.K. And et. al., 2019. Causal factors of corruption in construction project management:
An overview. Science and engineering ethics. 25(1). pp.1-31.
Rowe, S.F., 2020. Project management for small projects. Berrett-Koehler Publishers.
Willumsen, P. and et. al., 2019. Value creation through project risk management. International
Journal of Project Management. 37(5). pp.731-749.
8
1 out of 10
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.