Suman Sapkota: Project Management and PRINCE2 Methodology Report
VerifiedAdded on 2023/06/04
|16
|3130
|403
Report
AI Summary
This report provides a comprehensive overview of the PRINCE2 project management methodology. It begins with an introduction to project management and the need for structured methodologies, highlighting the potential pitfalls of poorly controlled projects. The report then delves into the history of PRINCE2, tracing its evolution from PROMPT II to its current form, including the 2009 and 2017 updates. The core of the report focuses on the seven processes of PRINCE2: Directing a Project, Starting up a Project, Initiating a Project, Managing Stage Boundaries, Controlling a Stage, Managing Product Delivery, and Closing a Project. Each process is explained in detail, outlining its objectives and key components. Furthermore, the report covers planning within PRINCE2, including product-based planning and the various management products used. A comparison with the Agile methodology is presented, followed by a discussion of the advantages and disadvantages of PRINCE2. The report concludes with a summary of the key takeaways and the overall value of the PRINCE2 methodology in project management. The report is a student submission to Desklib, a platform providing AI-powered study tools.

Running head: PRINCE2 METHODOLOGY
PRINCE2 Methodology
Name of the Student
Name of the University
Author’s Note:
PRINCE2 Methodology
Name of the Student
Name of the University
Author’s Note:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
PRINCE2 METHODOLOGY
Table of Contents
Introduction................................................................................................................................2
Overview....................................................................................................................................3
History of PRINCE2..................................................................................................................4
2009- A Major Review...........................................................................................................4
2017- The Second Significant Improvement.........................................................................4
The Seven Processes of PRINCE2.............................................................................................5
Directing a Project..................................................................................................................5
Starting up a Project...............................................................................................................5
Initiating a Project..................................................................................................................6
Managing Stage Boundaries..................................................................................................6
Controlling a Stage.................................................................................................................7
Managing Product Delivery...................................................................................................7
Closing a Project....................................................................................................................8
Planning......................................................................................................................................8
Management Products................................................................................................................9
Comparison of PRINCE2 Methodology with Agile Methodology..........................................10
Advantages of PRINCE2 Methodology...................................................................................11
Issues with PRINCE2 Methodology........................................................................................12
Conclusion................................................................................................................................13
References................................................................................................................................14
PRINCE2 METHODOLOGY
Table of Contents
Introduction................................................................................................................................2
Overview....................................................................................................................................3
History of PRINCE2..................................................................................................................4
2009- A Major Review...........................................................................................................4
2017- The Second Significant Improvement.........................................................................4
The Seven Processes of PRINCE2.............................................................................................5
Directing a Project..................................................................................................................5
Starting up a Project...............................................................................................................5
Initiating a Project..................................................................................................................6
Managing Stage Boundaries..................................................................................................6
Controlling a Stage.................................................................................................................7
Managing Product Delivery...................................................................................................7
Closing a Project....................................................................................................................8
Planning......................................................................................................................................8
Management Products................................................................................................................9
Comparison of PRINCE2 Methodology with Agile Methodology..........................................10
Advantages of PRINCE2 Methodology...................................................................................11
Issues with PRINCE2 Methodology........................................................................................12
Conclusion................................................................................................................................13
References................................................................................................................................14

2
PRINCE2 METHODOLOGY
PRINCE2 METHODOLOGY
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
PRINCE2 METHODOLOGY
Introduction
We could see several projects that are underway in the recent scenarios surrounding
us. Each and every project requires a project manager for ensuring about the fact that the
project would be successful, irrespective of the type of project being executed. A person who
checks every detail of a project is termed as the project manager. The project stages are also
checked by this project manager. The project management is defined as the finding of the
goals that should be achieved by us or the procedure how these goals could be achieved and
the duration required for achieving them.
Before starting anything new like an assignment or any bigger project such as
construction, few questions are required to be answered for us. These questions are as
follows:
What should be done in the work?
When the work is required to start?
Which resources are required by us?
Can we complete the work alone or we would require help from any other person?
What will be the duration of the work?
How much monetary resource will the work incur?
The above mentioned questions can be answered by the building blocks of the project
management.
A poorly controlled project comprises of the high failure probability. Few noteworthy
examples of failed projects are Channel Tunnel and London Ambulance. These two projects
PRINCE2 METHODOLOGY
Introduction
We could see several projects that are underway in the recent scenarios surrounding
us. Each and every project requires a project manager for ensuring about the fact that the
project would be successful, irrespective of the type of project being executed. A person who
checks every detail of a project is termed as the project manager. The project stages are also
checked by this project manager. The project management is defined as the finding of the
goals that should be achieved by us or the procedure how these goals could be achieved and
the duration required for achieving them.
Before starting anything new like an assignment or any bigger project such as
construction, few questions are required to be answered for us. These questions are as
follows:
What should be done in the work?
When the work is required to start?
Which resources are required by us?
Can we complete the work alone or we would require help from any other person?
What will be the duration of the work?
How much monetary resource will the work incur?
The above mentioned questions can be answered by the building blocks of the project
management.
A poorly controlled project comprises of the high failure probability. Few noteworthy
examples of failed projects are Channel Tunnel and London Ambulance. These two projects
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
PRINCE2 METHODOLOGY
were not only two failed projects, but even incurred huge monetary losses. Hence, we would
discuss a structured methodology or project management in the following report that helps in
controlling or reducing project failures to a greater extent.
Overview
PRINCE2 is one of the most popular and prominent methodologies in project
management. This PRINCE2 or Project in Controllable Environment 2 started its journey as
the standard by the government of United Kingdom for any IS project. This is the basic
technique that eventually enforces the need for splitting up the project accountability within
the project manager and board of directors. The management of resources is the main
responsibility of the board of directors. Moreover, they also have to provide business
justification for all projects. However, the manager of that project is responsible for taking
care of every activity and also managing the teams regularly. The best example of the
structured PM is PRINCE2 methodology, in which any project is sub divided to definite steps
for making it more organized as well as logical. According to PRINCE2 framework, all
projects should be having definite and organized starting point, middle point and ending
points. It helps to ensure that the project is being executed as per planned. PRINCE2
methodology is utilized within several countries in the world like the Western European
countries, United Kingdom and Australia.
This particular PM methodology is on the basis of seven principles that are
continuous business justification, learning from experiences, definite roles or responsibilities,
managing by steps, managing by exception, focusing on the products and tailor to suit the
environment of project. The seven themes are business cases, organizations, quality, plan,
risks, changes and progress.
PRINCE2 METHODOLOGY
were not only two failed projects, but even incurred huge monetary losses. Hence, we would
discuss a structured methodology or project management in the following report that helps in
controlling or reducing project failures to a greater extent.
Overview
PRINCE2 is one of the most popular and prominent methodologies in project
management. This PRINCE2 or Project in Controllable Environment 2 started its journey as
the standard by the government of United Kingdom for any IS project. This is the basic
technique that eventually enforces the need for splitting up the project accountability within
the project manager and board of directors. The management of resources is the main
responsibility of the board of directors. Moreover, they also have to provide business
justification for all projects. However, the manager of that project is responsible for taking
care of every activity and also managing the teams regularly. The best example of the
structured PM is PRINCE2 methodology, in which any project is sub divided to definite steps
for making it more organized as well as logical. According to PRINCE2 framework, all
projects should be having definite and organized starting point, middle point and ending
points. It helps to ensure that the project is being executed as per planned. PRINCE2
methodology is utilized within several countries in the world like the Western European
countries, United Kingdom and Australia.
This particular PM methodology is on the basis of seven principles that are
continuous business justification, learning from experiences, definite roles or responsibilities,
managing by steps, managing by exception, focusing on the products and tailor to suit the
environment of project. The seven themes are business cases, organizations, quality, plan,
risks, changes and progress.

5
PRINCE2 METHODOLOGY
History of PRINCE2
PRINCE2 methodology has the core connection with one of the previously utilized
PROMPT II methodology. A specific standard of the government of UK was being adapted
in the year of 1989 for IS project management. This was termed as PRINCE, which was
applied not only within IT sector, but also within several private and public sectors globally.
PRINCE2 is the second version of PRINCE and even this particular methodology has
become popular.
Two major phases of this methodology was launched in 1996. The first was in 2009
and was called PRINCE2 refresh and the next phase was in 2017, called PRINCE2 update.
This update was regarding the various changes within the business practices as well as
reviews or feedbacks from the several users of PRINCE2 for the original environment of
project.
2009- A Major Review
Various corrections were being faced in PRINCE2 from the beginning of 1996. The
client groups started the discussion about the updates of PRINCE2 globally in 2002. By 2009,
this particular methodology was made more customizable. The version of 2009 is from the
seven standards of project management.
2017- The Second Significant Improvement
The next change was announced in 2009 by Axelos and hence the new direction is
about flexibility and scalability. There are various changes within this type of improvement
and the changes are minimum for qualifying like PRINCE2.
PRINCE2 METHODOLOGY
History of PRINCE2
PRINCE2 methodology has the core connection with one of the previously utilized
PROMPT II methodology. A specific standard of the government of UK was being adapted
in the year of 1989 for IS project management. This was termed as PRINCE, which was
applied not only within IT sector, but also within several private and public sectors globally.
PRINCE2 is the second version of PRINCE and even this particular methodology has
become popular.
Two major phases of this methodology was launched in 1996. The first was in 2009
and was called PRINCE2 refresh and the next phase was in 2017, called PRINCE2 update.
This update was regarding the various changes within the business practices as well as
reviews or feedbacks from the several users of PRINCE2 for the original environment of
project.
2009- A Major Review
Various corrections were being faced in PRINCE2 from the beginning of 1996. The
client groups started the discussion about the updates of PRINCE2 globally in 2002. By 2009,
this particular methodology was made more customizable. The version of 2009 is from the
seven standards of project management.
2017- The Second Significant Improvement
The next change was announced in 2009 by Axelos and hence the new direction is
about flexibility and scalability. There are various changes within this type of improvement
and the changes are minimum for qualifying like PRINCE2.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
PRINCE2 METHODOLOGY
The Seven Processes of PRINCE2
Directing a Project
Project direction refers to the proper follow up of project. The coordinates and
controls of the project board undergo several decisions. The main processes could be broken
down into few important territories and these are given below:
i) Project initiation.
ii) Limiting the stages.
iii) Ad hoc directions for checking the progress and providing direction.
iv) Execution of conclusion.
v) The regular exercises are not being covered by project manager.
Starting up a Project
The second process of PRINCE2 methodology is termed as the starting up of project.
This is the previous project procedure that could guarantee previous imperatives to initiate
the project. This process has the expectation of project mandates for undertaking the desired
results. The three major components of this particular project are as follows:
i) The first component is providing guarantee that the data is secured and could be
easily accessed for any type of group task.
ii) The next important component is to plan as well as the name the team of project
management.
iii) Finally, the initiation stage planning is made and this is the third component.
PRINCE2 METHODOLOGY
The Seven Processes of PRINCE2
Directing a Project
Project direction refers to the proper follow up of project. The coordinates and
controls of the project board undergo several decisions. The main processes could be broken
down into few important territories and these are given below:
i) Project initiation.
ii) Limiting the stages.
iii) Ad hoc directions for checking the progress and providing direction.
iv) Execution of conclusion.
v) The regular exercises are not being covered by project manager.
Starting up a Project
The second process of PRINCE2 methodology is termed as the starting up of project.
This is the previous project procedure that could guarantee previous imperatives to initiate
the project. This process has the expectation of project mandates for undertaking the desired
results. The three major components of this particular project are as follows:
i) The first component is providing guarantee that the data is secured and could be
easily accessed for any type of group task.
ii) The next important component is to plan as well as the name the team of project
management.
iii) Finally, the initiation stage planning is made and this is the third component.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PRINCE2 METHODOLOGY
Initiating a Project
The main objectives of project initiation are given below:
i) Concurring of project goals irrespective of the fact that whether there is sufficient
information available or not.
ii) The next objective is building up of the steady management plan.
iii) Affirming and archiving that the sufficient business case is present in the project.
iv) Moreover, the guaranteeing of the firm as well as the acknowledged foundation for
this project even before starting the work.
v) There should be a distinct consent to the asset dedication for the first stage.
vi) Another objective of the project is to empower ad the urge of the project for
undertaking the project responsibilities.
vii) The standards should be given for the basic forms of leadership needed for the
project life cycle.
viii) The time venture should be guaranteed and the exertion is needed carefully for
the proper assessment of the project dangers.
Managing Stage Boundaries
The process provides project board the major choice indication on the proceeding of
projects. The procedural targets are given below:
i) The project board guarantees that each and every expectation that is being arranged
within the current stage plan has been completed as characterization.
PRINCE2 METHODOLOGY
Initiating a Project
The main objectives of project initiation are given below:
i) Concurring of project goals irrespective of the fact that whether there is sufficient
information available or not.
ii) The next objective is building up of the steady management plan.
iii) Affirming and archiving that the sufficient business case is present in the project.
iv) Moreover, the guaranteeing of the firm as well as the acknowledged foundation for
this project even before starting the work.
v) There should be a distinct consent to the asset dedication for the first stage.
vi) Another objective of the project is to empower ad the urge of the project for
undertaking the project responsibilities.
vii) The standards should be given for the basic forms of leadership needed for the
project life cycle.
viii) The time venture should be guaranteed and the exertion is needed carefully for
the proper assessment of the project dangers.
Managing Stage Boundaries
The process provides project board the major choice indication on the proceeding of
projects. The procedural targets are given below:
i) The project board guarantees that each and every expectation that is being arranged
within the current stage plan has been completed as characterization.

8
PRINCE2 METHODOLOGY
ii) This project board is expected to provide data for the proper evaluation of
reasonability of the projects.
iii) This project board provides the data as expected for favouring the current stage
and then approving the starting of the project.
iv) The exercises and estimations are also recorded that would be helpful for the other
project phases.
Controlling a Stage
The significant phase helps in demonstrating the control exercises as well as checking
of project manager for guaranteeing the stage for responses. The phase of the project after
comprising the:
i) The work that could be finished is approved.
ii) The respective progress data is collected regarding the work.
iii) The changes are checked properly.
iv) Various circumstances are evaluated.
v) Reporting of the project.
vi) The final component is to make the important remedial moves.
Managing Product Delivery
The process target is the guaranteeing of arranged item for proper delivery:
i) The verification of the work on products is approved by checking and accepting of
the work progress.
ii) The work progress is evaluated frequently.
PRINCE2 METHODOLOGY
ii) This project board is expected to provide data for the proper evaluation of
reasonability of the projects.
iii) This project board provides the data as expected for favouring the current stage
and then approving the starting of the project.
iv) The exercises and estimations are also recorded that would be helpful for the other
project phases.
Controlling a Stage
The significant phase helps in demonstrating the control exercises as well as checking
of project manager for guaranteeing the stage for responses. The phase of the project after
comprising the:
i) The work that could be finished is approved.
ii) The respective progress data is collected regarding the work.
iii) The changes are checked properly.
iv) Various circumstances are evaluated.
v) Reporting of the project.
vi) The final component is to make the important remedial moves.
Managing Product Delivery
The process target is the guaranteeing of arranged item for proper delivery:
i) The verification of the work on products is approved by checking and accepting of
the work progress.
ii) The work progress is evaluated frequently.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9
PRINCE2 METHODOLOGY
iii) Acquiring the endorsement of finished items.
iv) Ensuring that the quality criteria are met properly.
Closing a Project
This is the final process of the PRINCE2 methodology. Here, the project is being
wrapped up and the guarantee is provided the project would close. The main targets of project
closure are given below:
i) Confirmation of degree for setting the project initiation documents.
ii) Providing affirmation that the satisfaction degree is being achieved.
iii) Acquiring the formal expectation acknowledgement.
iv) Making suggestions of the project activities.
v) Catching the exercises for finishing the lessons learning report.
vi) The activity course of actions are properly set up in this target.
vii) Setting up of end project reports.
viii) Ensuring that all the requirements of the clients are properly met.
ix) Informing the hosting association for the purpose of disbanding project resources
and organizations.
Planning
PRINCE2 has three distinct plans for showing the several requirements within the
management levels of groups, stages and project.
PRINCE2 METHODOLOGY
iii) Acquiring the endorsement of finished items.
iv) Ensuring that the quality criteria are met properly.
Closing a Project
This is the final process of the PRINCE2 methodology. Here, the project is being
wrapped up and the guarantee is provided the project would close. The main targets of project
closure are given below:
i) Confirmation of degree for setting the project initiation documents.
ii) Providing affirmation that the satisfaction degree is being achieved.
iii) Acquiring the formal expectation acknowledgement.
iv) Making suggestions of the project activities.
v) Catching the exercises for finishing the lessons learning report.
vi) The activity course of actions are properly set up in this target.
vii) Setting up of end project reports.
viii) Ensuring that all the requirements of the clients are properly met.
ix) Informing the hosting association for the purpose of disbanding project resources
and organizations.
Planning
PRINCE2 has three distinct plans for showing the several requirements within the
management levels of groups, stages and project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10
PRINCE2 METHODOLOGY
Planning could be stated as the repetitive process and the exercises could be
incorporated within the seven suitable forms of PRINCE2.
The various activities for arrangement are as follows:
i) Plan outlining.
ii) Characterize or product break down.
iii) Recognition of conditions.
iv) Ready-made assessments.
v) Timetable setting up.
vi) Breaking of dangers.
vii) Arrangement archiving.
The strategy of Product based planning is being utilized by PRINCE2 methodology
for undergoing few exercises:
i) Composing project product description.
ii) Products breakdown structure.
iii) Composing items’ descriptions.
iv) Making of product flow diagrams.
Management Products
The management products of PRINCE2 are given below:
i) Benefits Reviewing Plan: This helps to estimate the advantages of project.
PRINCE2 METHODOLOGY
Planning could be stated as the repetitive process and the exercises could be
incorporated within the seven suitable forms of PRINCE2.
The various activities for arrangement are as follows:
i) Plan outlining.
ii) Characterize or product break down.
iii) Recognition of conditions.
iv) Ready-made assessments.
v) Timetable setting up.
vi) Breaking of dangers.
vii) Arrangement archiving.
The strategy of Product based planning is being utilized by PRINCE2 methodology
for undergoing few exercises:
i) Composing project product description.
ii) Products breakdown structure.
iii) Composing items’ descriptions.
iv) Making of product flow diagrams.
Management Products
The management products of PRINCE2 are given below:
i) Benefits Reviewing Plan: This helps to estimate the advantages of project.

11
PRINCE2 METHODOLOGY
ii) Business Cases: This is utilized for catching monetary defence.
iii) Checkpoint Review: The total follow up of the project is taken by the project
manager.
iv) Communication Management Strategy: The various strategies are being managed
for proper communication in the project.
v) Configuration Items Record: This provides the history, status and version of the
products in details.
vi) Configured Management Strategies: These are utilized for recognizing the
distinguish ability, control and security of the products in a proper manner.
Comparison of PRINCE2 Methodology with Agile Methodology
The Agile as well as PRINCE2 methodologies are produced as the major
characteristic of the technological business. These two methodologies have the same
objective of streamlining the methods for executing the projects. The PRINCE2 methodology
is the step by step process for turning into the pieces of several enterprises; however the
adaptability of the Agile methodology provides the permission for technological projects with
the purpose of development after some time. Axelos has demonstrated a complete review that
consisted of several individuals, who have implemented the information technology
foundation after undertaking the methodology of PRINCE2. This particular review also
comprised of the list of respondents, who have checked the respective Agile incentive
whether PRINCE2 capability is present or absent. This particular factor depicts that there is a
major development within the Agile methodology popularity. PRINCE2, on the other hand
still remains the well known and the most popular methodology of project management that
has been tested over 1 million times from the year of 2012 and hence has been accepted by
PRINCE2 METHODOLOGY
ii) Business Cases: This is utilized for catching monetary defence.
iii) Checkpoint Review: The total follow up of the project is taken by the project
manager.
iv) Communication Management Strategy: The various strategies are being managed
for proper communication in the project.
v) Configuration Items Record: This provides the history, status and version of the
products in details.
vi) Configured Management Strategies: These are utilized for recognizing the
distinguish ability, control and security of the products in a proper manner.
Comparison of PRINCE2 Methodology with Agile Methodology
The Agile as well as PRINCE2 methodologies are produced as the major
characteristic of the technological business. These two methodologies have the same
objective of streamlining the methods for executing the projects. The PRINCE2 methodology
is the step by step process for turning into the pieces of several enterprises; however the
adaptability of the Agile methodology provides the permission for technological projects with
the purpose of development after some time. Axelos has demonstrated a complete review that
consisted of several individuals, who have implemented the information technology
foundation after undertaking the methodology of PRINCE2. This particular review also
comprised of the list of respondents, who have checked the respective Agile incentive
whether PRINCE2 capability is present or absent. This particular factor depicts that there is a
major development within the Agile methodology popularity. PRINCE2, on the other hand
still remains the well known and the most popular methodology of project management that
has been tested over 1 million times from the year of 2012 and hence has been accepted by
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.