Contracts & Procurement Management: TopEd Campus Refurbishment Report

Verified

Added on  2022/10/15

|12
|809
|15
Report
AI Summary
This report provides a comprehensive analysis of the TopEd Campus Refurbishment project, focusing on contract and procurement management. It outlines the procurement strategy, considering factors such as price, time, and risk. The report explores various procurement routes and contract types, including fixed cost and time & material contracts, while also addressing associated risks. A detailed budget breakdown for infrastructure enhancement and smart university development is presented. The report further delves into contract negotiation procedures and methodologies, emphasizing the importance of adhering to legal and financial regulations. The conclusion highlights the need for TopEd to meet all contract-related requirements and identify potential risks to ensure the successful and timely completion of the smart campus project, ultimately enhancing student learning and career development. The assignment is a part of the PPMP20011 Contracts & Procurement Management course, and it includes a case study from a real-world context for a multi-component project.
Document Page
Contract and Procurement
Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of contents
Introduction
Procurement Strategy
Procurement Route
Contract Type
Risks associated in the contract types and the proposed routes
Budget breakdown
Contract negotiations, procedures and methodology
Conclusion
References
Document Page
Introduction
Procurement leadership is the method of contract
management and maintenance that helps to create powerful
customer relationships.
This presentation's primary aim is to explain the finest
approach and path to the TopEd Institute.
The aim of this lecture is to explain how to provide the
learners with guiding lessons with high-quality knowledge.
Document Page
Procurement Strategy
Procurement approach implies delivering all products and facilities in
a timely way that helps to properly manage all tasks of the institution.
The acquisition approach considers multiple variables such as price,
moment, service performance, danger, leadership ability, altering
commands and duties.
TopEd analyzes all the variables
to finish the pupils ' intelligent
university development venture.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Procurement Route
TopEd Institute ensure that they have sufficient room allowance to
handle the building and ownership stuff and other logistics that are
needed in the method.
They are developing teachers ' high-tech learning room.
TopEd does not need to substitute the switches because the elevators in
the past year are already changing.
If they want intelligent school to refurbish campus in attempt to
accomplish multiple activities like present-day welcoming and dynamic
picture, appeal, bring greatest advantage of fields.
Document Page
Contract Type
For each venture there are two kinds of contract:
Fixed cost (For Time) Time
Material (For Quality) contract
Document Page
Risk associated in the contract
types and Proposed routes
Danger and hazard danger happens while the intelligent university is being
built using sophisticated technology.
Unqualified employees are at danger when they have less work and there is
also a need for labor that has the ability to correctly solve each technique.
All of these risks occur when using paths and they also need to concentrate
on kinds of contracts that assist them cope with these problems.
TopEd and contractor face such problems and danger while operating
smartly to develop campus.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Budget Breakdown
They can readily retain and handle all of TopEd's significant
tasks with the assistance of adequate expenditure.
Investment is made for infrastructure enhancement and
intelligent university development.
Budget is laid for all operations that include the
implementation of fresh technology, making appealing lecture
spaces, more room for learning exercise and many more
modifications that are needed in the buildings.
Document Page
Contract procedure,
methodology and negotiation
Following TopEd Institute's recognition of the bid, companies have
the freedom to legally begin the venture to create intelligent school.
To do this, they need to learn all the terms and conditions that
describe the contract or agreement laws and regulations.
It contains multiple laws that TopEd should follow after receiving all
of the contract's legal paperwork.
They also needed to fix the price for the growth of intelligent
university created by TopEd Institute.
Document Page
...Continued
Contract Terms and Conditions:
Need to comply with all payment-related regulations (if the
customer does not comply with such regulations so that
refund cash is not relevant).
Contract breach provision (in this case if customers
infringement the agreement so he / she does not receive the
project's complete price).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Conclusion
It can be found that TopEd must meet all contract-related criteria.
TopEd must identify multiple threat variables that have a
significant effect on the moment and learning operations of
students studying.
Smart classroom involves fresh and sophisticated technology as
well as research content that enhances student teaching.
This will help increase the growth and career development of
intelligent university learners.
Document Page
Reference
Lysons, K. and Farrington, B., 2016. Procurement and supply chain management. Pearson
Higher Ed.
Decarolis, F., Giuffrida, L.M., Iossa, E., Mollisi, V. and Spagnolo, G., 2018. Bureaucratic
competence and procurement outcomes (No. w24201). National Bureau of Economic
Research.
Popescu, A., Onofrei, M. and Kelley, C., 2016. An overview of European good practices in
public procurement. Eastern Journal of European Studies, 7(1).
Kerzner, H., 2017. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Liu, W., Xie, D., Liu, Y. and Liu, X., 2015. Service capability procurement decision in
logistics service supply chain: A research under demand updating and quality
guarantee. International Journal of Production Research, 53(2), pp.488-510.