This report provides a comprehensive project management plan for launching an accounting software system in Australia by the Sage Group. It outlines project aims, objectives, and a detailed project management plan addressing cost, scope, quality, communication, risk, and resources. The report includes a Work Breakdown Structure (WBS) and a Gantt chart with a timeframe. It also incorporates a small-scale secondary data analysis, focusing on the current market conditions in Australia and the competitive landscape. The research involves a literature review and interview questions to gather both qualitative and quantitative data. The report also provides recommendations for the project scenario, including risk mitigation strategies and resource allocation. The document concludes with a reflection, project logbook, and references, providing a complete overview of the project's planning and execution.

Running head: PROJECT MANAGEMENT
Project Management: Product Launching in a new country
Name of the student:
Name of the university:
Project Management: Product Launching in a new country
Name of the student:
Name of the university:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Table of Contents
Overview............................................................................................................................3
1. Establishing project aim and objectives (P1).................................................................3
1.1Producing an appropriate project management plan (P2,M1,D1)............................4
1.1.1 Cost (P2,M1,D1)................................................................................................4
1.1.2 Scope (P2,M1,D1).............................................................................................4
1.1.3 Quality (P2,M1,D1)............................................................................................4
1.1.4 Communication plan (P2,M1,D1)......................................................................5
1.1.5 Risk (P2,M1,D1)................................................................................................5
1.1.6 Resources (P2,M1,D1)......................................................................................6
1.2 Work Breakdown Structure (P3, M1,D1)..............................................................6
1.2.1 Gantt chart with a timeframe (P3, M1,D1)........................................................7
2. Small scale research regarding the project scenario (P4, M2, D1).............................10
2.1 Literature review (P4, M2, D1)...............................................................................10
2.1.1 Overview..........................................................................................................10
2.1.2 Current condition of the company...................................................................10
2.1.3 Conclusion.......................................................................................................11
3. Analysis of the research and data analysis (P4, M2, D2)...........................................12
3.1 Primary research: Interview Question (P4, M2, D2)..............................................12
3.1.1 Qualitative and quantitative data (P4).............................................................12
3.2Tools and techniques used for conducting the research (P5, M2, D2)..................13
4. Recommendation for project scenario (P6, M3, D2)...................................................14
Reflection (P7, M4)..........................................................................................................15
Conclusion.......................................................................................................................16
Project logbook (g)...........................................................................................................16
References.......................................................................................................................18
Table of Contents
Overview............................................................................................................................3
1. Establishing project aim and objectives (P1).................................................................3
1.1Producing an appropriate project management plan (P2,M1,D1)............................4
1.1.1 Cost (P2,M1,D1)................................................................................................4
1.1.2 Scope (P2,M1,D1).............................................................................................4
1.1.3 Quality (P2,M1,D1)............................................................................................4
1.1.4 Communication plan (P2,M1,D1)......................................................................5
1.1.5 Risk (P2,M1,D1)................................................................................................5
1.1.6 Resources (P2,M1,D1)......................................................................................6
1.2 Work Breakdown Structure (P3, M1,D1)..............................................................6
1.2.1 Gantt chart with a timeframe (P3, M1,D1)........................................................7
2. Small scale research regarding the project scenario (P4, M2, D1).............................10
2.1 Literature review (P4, M2, D1)...............................................................................10
2.1.1 Overview..........................................................................................................10
2.1.2 Current condition of the company...................................................................10
2.1.3 Conclusion.......................................................................................................11
3. Analysis of the research and data analysis (P4, M2, D2)...........................................12
3.1 Primary research: Interview Question (P4, M2, D2)..............................................12
3.1.1 Qualitative and quantitative data (P4).............................................................12
3.2Tools and techniques used for conducting the research (P5, M2, D2)..................13
4. Recommendation for project scenario (P6, M3, D2)...................................................14
Reflection (P7, M4)..........................................................................................................15
Conclusion.......................................................................................................................16
Project logbook (g)...........................................................................................................16
References.......................................................................................................................18

2PROJECT MANAGEMENT
Overview
This report depicts the roles and benefits of using professional project
management practices while launching a new product in a completely separate country.
It is the responsibility of the project manager and company executives to conduct a
market research to check that whether the product is going to enhance the current
revenue structure and competitive advantages or not. The Company nominated for this
report is Sage Group (United Kingdom based) and the product is Accounting
Information system software which is to be launched in Australia, because Australia is
one of those countries that use accounting software products in almost each medium
and large sized companies.
In order to launch this new product a Gantt chart (schedule), key milestones,
cost, communication approach, quality and risks management plan are also elaborated
in this report along with a small scale secondary data analysis. Apart from this, for
avoiding any interruption to the project activities and to accomplish the project within
estimated time and budget a Work Breakdown Structure (WBS) is also elaborated in
this report. In order to analyze the current market environment of Australia before
launching the Accounting software system is another crucial thing to be considered. In
order to draw a meaningful conclusion a set of recommendation is also elaborated in
this report section.
1. Establishing project aim and objectives (P1)
Project aim (P1)
The aim of the project is to launch an accounting software system in Australia to
gain competitive advantages and enhanced commercial revenue. Before launching the
new product to a completely new location the current security market condition of
Australia needs to be analyzed accordingly. The budget and time respectively estimated
for the project is $60,000 and 18 months. The other aim is to devise the project plan in
such a way so that it can compete the current business market of Australia.
Overview
This report depicts the roles and benefits of using professional project
management practices while launching a new product in a completely separate country.
It is the responsibility of the project manager and company executives to conduct a
market research to check that whether the product is going to enhance the current
revenue structure and competitive advantages or not. The Company nominated for this
report is Sage Group (United Kingdom based) and the product is Accounting
Information system software which is to be launched in Australia, because Australia is
one of those countries that use accounting software products in almost each medium
and large sized companies.
In order to launch this new product a Gantt chart (schedule), key milestones,
cost, communication approach, quality and risks management plan are also elaborated
in this report along with a small scale secondary data analysis. Apart from this, for
avoiding any interruption to the project activities and to accomplish the project within
estimated time and budget a Work Breakdown Structure (WBS) is also elaborated in
this report. In order to analyze the current market environment of Australia before
launching the Accounting software system is another crucial thing to be considered. In
order to draw a meaningful conclusion a set of recommendation is also elaborated in
this report section.
1. Establishing project aim and objectives (P1)
Project aim (P1)
The aim of the project is to launch an accounting software system in Australia to
gain competitive advantages and enhanced commercial revenue. Before launching the
new product to a completely new location the current security market condition of
Australia needs to be analyzed accordingly. The budget and time respectively estimated
for the project is $60,000 and 18 months. The other aim is to devise the project plan in
such a way so that it can compete the current business market of Australia.
You're viewing a preview
Unlock full access by subscribing today!

3PROJECT MANAGEMENT
Project objectives (P1)
To launch a new Accounting software solution in Australia after analyzing
the current market situation of Australia
To accomplish the product launching project within the estimated budget
of $60,000 and time of 18 months
To bring all operational and functional features together in the product to
attract more numbers of consumers
1.1Producing an appropriate project management plan (P2,M1,D1)
1.1.1 Cost (P2,M1,D1)
In order to launch the product in a completely separate country it is mandatory for
the project manager to organize an event where the eager consumers can come. The
attendees will also come to know about the features and operational qualities of the new
software products. What are the respective benefits a company can obtain after buying
and applying this product will also be discussed in this event. Overall, for launching the
products in another country the total cost that has been estimated is $60,000.
1.1.2 Scope (P2,M1,D1)
In order to accomplish this project or before launching the accounting software
product in Australia, Sage Group needs to analyze the current Australian market and
then should add required technical features to their newly developed system so that it
can improve the business efficiency. It is expected that with the success of the project
the large and medium organizations of Australia will be able to manage their
accounting, operational, payroll, payment and financial operations all at once. Sage
group provides cloud based solution to their consumers.
1.1.3 Quality (P2,M1,D1)
In order to improve the quality of the product that has been launched the project
manager is required to follow certain steps and the phases are follows:
Project objectives (P1)
To launch a new Accounting software solution in Australia after analyzing
the current market situation of Australia
To accomplish the product launching project within the estimated budget
of $60,000 and time of 18 months
To bring all operational and functional features together in the product to
attract more numbers of consumers
1.1Producing an appropriate project management plan (P2,M1,D1)
1.1.1 Cost (P2,M1,D1)
In order to launch the product in a completely separate country it is mandatory for
the project manager to organize an event where the eager consumers can come. The
attendees will also come to know about the features and operational qualities of the new
software products. What are the respective benefits a company can obtain after buying
and applying this product will also be discussed in this event. Overall, for launching the
products in another country the total cost that has been estimated is $60,000.
1.1.2 Scope (P2,M1,D1)
In order to accomplish this project or before launching the accounting software
product in Australia, Sage Group needs to analyze the current Australian market and
then should add required technical features to their newly developed system so that it
can improve the business efficiency. It is expected that with the success of the project
the large and medium organizations of Australia will be able to manage their
accounting, operational, payroll, payment and financial operations all at once. Sage
group provides cloud based solution to their consumers.
1.1.3 Quality (P2,M1,D1)
In order to improve the quality of the product that has been launched the project
manager is required to follow certain steps and the phases are follows:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
The mission, vision, values and business strategies are needed to be
verified by the project manager
The critical success factors should be identified
In order to track the CSF data the project manager should develop
measures and metrics
The consumer group must be identified initially
Developing survey tool to survey the consumers and to gather feedback
from the solicit consumers
Developing improvement planning to monitor the CSF much effectively
Incorporating market plan to satisfy data
1.1.4 Communication plan (P2,M1,D1)
Purpose Responsible person Medium of
communication
Frequency
To discuss regarding
the project scope
Project manager Face to face meeting
and, presentation
Monthly
Project status report/
current status of the
project
Project manager and
sponsors
Face to face meeting
and, presentation
Weekly
To discuss regarding
the roles and
responsibility division
Project manager, HR
manager and resource
manager
Face to face meeting
and, presentation
Monthly
1.1.5 Risk (P2,M1,D1)
Name of the
risks
Likelihood Impact Probabilit
y
Mitigation strategy
Improper resource
allocation
Likely Major High Assign proper resources
for specific activities at the
initiation phase
Inaccurate budget
management
Likely Significant Extreme To estimate an accurate
feasibility study
The mission, vision, values and business strategies are needed to be
verified by the project manager
The critical success factors should be identified
In order to track the CSF data the project manager should develop
measures and metrics
The consumer group must be identified initially
Developing survey tool to survey the consumers and to gather feedback
from the solicit consumers
Developing improvement planning to monitor the CSF much effectively
Incorporating market plan to satisfy data
1.1.4 Communication plan (P2,M1,D1)
Purpose Responsible person Medium of
communication
Frequency
To discuss regarding
the project scope
Project manager Face to face meeting
and, presentation
Monthly
Project status report/
current status of the
project
Project manager and
sponsors
Face to face meeting
and, presentation
Weekly
To discuss regarding
the roles and
responsibility division
Project manager, HR
manager and resource
manager
Face to face meeting
and, presentation
Monthly
1.1.5 Risk (P2,M1,D1)
Name of the
risks
Likelihood Impact Probabilit
y
Mitigation strategy
Improper resource
allocation
Likely Major High Assign proper resources
for specific activities at the
initiation phase
Inaccurate budget
management
Likely Significant Extreme To estimate an accurate
feasibility study

5PROJECT MANAGEMENT
Improper
management of
time
Very likely Severe Extreme Developing proper time
plan and schedule for the
separate activities
Lack of
communication
Possible Medium Medium All the members must use
open communication
Lack of skills
among the project
team members
Very
unlikely
Minor Low Arranging professional
training and development
program for the project
team members to increase
technical awareness
among
1.1.6 Resources (P2,M1,D1)
Name of the
resources
Roles
Project manager Responsible to accomplish the project within estimated time and
budget
Finance
manager
The finance manager needs to accomplish a feasibility study to
ensure that the project is being completing within the estimated
budget
Operation
manager
Must make sure that the product operations are co
Security
manager
Make sure that security of the products are being well managed
Marketing
manager
Develop marketing strategies supporting the product launch event
HR manager To hire employees based on their skills and knowledge
1.2 Work Breakdown Structure (P3, M1,D1)
Improper
management of
time
Very likely Severe Extreme Developing proper time
plan and schedule for the
separate activities
Lack of
communication
Possible Medium Medium All the members must use
open communication
Lack of skills
among the project
team members
Very
unlikely
Minor Low Arranging professional
training and development
program for the project
team members to increase
technical awareness
among
1.1.6 Resources (P2,M1,D1)
Name of the
resources
Roles
Project manager Responsible to accomplish the project within estimated time and
budget
Finance
manager
The finance manager needs to accomplish a feasibility study to
ensure that the project is being completing within the estimated
budget
Operation
manager
Must make sure that the product operations are co
Security
manager
Make sure that security of the products are being well managed
Marketing
manager
Develop marketing strategies supporting the product launch event
HR manager To hire employees based on their skills and knowledge
1.2 Work Breakdown Structure (P3, M1,D1)
You're viewing a preview
Unlock full access by subscribing today!

6PROJECT MANAGEMENT
Product launching
schedule
Product development
Identification of the
requirements
Planning the budget
Preparing goals and
objectives
Team meetings and
review
Approval from the
stakeholders
Identification of
sources for article
review
Preparing the
literature review
Deteriming the
primary and
secondary data
sources
Gathering of data
Conducting
interview
Acquisition of
feedback
Product launch
Arranging sponsors
Making necessary
arrangements
Hosting launch
event
Post implementation
review
Documentation of
lessons learnt
Sign-off from
stakeholders
Figure1: Work Breakdown Structure for the new product launching project
(Source: created by author)
1.2.1 Gantt chart with a timeframe (P3, M1,D1)
WB
S Task Name Duration Start Finish Predecessors Resource
Names Cost
0
Product
launching
schedule
275
days
Mon
1/21/19
Fri
2/7/20 $320,080.00
1 Product
development 44 days Mon
1/21/19
Thu
3/21/19 $14,120.00
Product launching
schedule
Product development
Identification of the
requirements
Planning the budget
Preparing goals and
objectives
Team meetings and
review
Approval from the
stakeholders
Identification of
sources for article
review
Preparing the
literature review
Deteriming the
primary and
secondary data
sources
Gathering of data
Conducting
interview
Acquisition of
feedback
Product launch
Arranging sponsors
Making necessary
arrangements
Hosting launch
event
Post implementation
review
Documentation of
lessons learnt
Sign-off from
stakeholders
Figure1: Work Breakdown Structure for the new product launching project
(Source: created by author)
1.2.1 Gantt chart with a timeframe (P3, M1,D1)
WB
S Task Name Duration Start Finish Predecessors Resource
Names Cost
0
Product
launching
schedule
275
days
Mon
1/21/19
Fri
2/7/20 $320,080.00
1 Product
development 44 days Mon
1/21/19
Thu
3/21/19 $14,120.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
1.1 Identification of
the
requirements
3 days Mon
1/21/19
Wed
1/23/19
Operations
manager,
Project
Manager
$1,560.00
1.2 Planning
the budget 4 days Thu
1/24/19
Tue
1/29/19 2
Finance
manager,
Project
Manager
$2,240.00
1.3
Preparing
goals and
objectives
10 days Wed
1/30/19
Tue
2/12/19 3 Project
Manager $2,400.00
1.4
Team
meetings and
review
1 day Wed
2/13/19
Wed
2/13/19 4
Finance
manager,
Operations
manager,
Project
Manager
$840.00
1.5
Approval
from the
stakeholders
1 day Thu
2/14/19
Thu
2/14/19 5 Project
Manager $240.00
1.6 Identification of
sources for
article review
7 days Fri
2/15/19
Mon
2/25/19 6 Project
Manager $1,680.00
1.7
Preparing
the literature
review
5 days Tue
2/26/19
Mon
3/4/19 7 Project
Manager $1,200.00
1.8
Determining
the primary
and secondary
data sources
4 days Tue
3/5/19
Fri
3/8/19 8 Project
Manager $960.00
1.9 Gathering
of data 3 days Mon
3/11/19
Wed
3/13/19 9
Operations
manager,
Project
Manager
$1,560.00
1.10 Conducting
interview 4 days Thu
3/14/19
Tue
3/19/19 10 Project
Manager $960.00
1.11 Acquisition
of feedback 2 days Wed
3/20/19
Thu
3/21/19 11 Project
Manager $480.00
2 Product
launch
231
days
Fri
3/22/19
Fri
2/7/20 $305,960.00
2.1 Arranging
sponsors
5 days Fri
3/22/19
Thu
3/28/19
12 Finance
manager,
HR
$4,000.00
1.1 Identification of
the
requirements
3 days Mon
1/21/19
Wed
1/23/19
Operations
manager,
Project
Manager
$1,560.00
1.2 Planning
the budget 4 days Thu
1/24/19
Tue
1/29/19 2
Finance
manager,
Project
Manager
$2,240.00
1.3
Preparing
goals and
objectives
10 days Wed
1/30/19
Tue
2/12/19 3 Project
Manager $2,400.00
1.4
Team
meetings and
review
1 day Wed
2/13/19
Wed
2/13/19 4
Finance
manager,
Operations
manager,
Project
Manager
$840.00
1.5
Approval
from the
stakeholders
1 day Thu
2/14/19
Thu
2/14/19 5 Project
Manager $240.00
1.6 Identification of
sources for
article review
7 days Fri
2/15/19
Mon
2/25/19 6 Project
Manager $1,680.00
1.7
Preparing
the literature
review
5 days Tue
2/26/19
Mon
3/4/19 7 Project
Manager $1,200.00
1.8
Determining
the primary
and secondary
data sources
4 days Tue
3/5/19
Fri
3/8/19 8 Project
Manager $960.00
1.9 Gathering
of data 3 days Mon
3/11/19
Wed
3/13/19 9
Operations
manager,
Project
Manager
$1,560.00
1.10 Conducting
interview 4 days Thu
3/14/19
Tue
3/19/19 10 Project
Manager $960.00
1.11 Acquisition
of feedback 2 days Wed
3/20/19
Thu
3/21/19 11 Project
Manager $480.00
2 Product
launch
231
days
Fri
3/22/19
Fri
2/7/20 $305,960.00
2.1 Arranging
sponsors
5 days Fri
3/22/19
Thu
3/28/19
12 Finance
manager,
HR
$4,000.00

8PROJECT MANAGEMENT
manager,
Project
Manager
2.2
Making
necessary
arrangements
165 days Fri
3/29/19
Thu
11/14/19 14
Finance
manager,
HR
manager,
Marketing
manager,
Operations
manager,
Security
manager
$231,000.00
2.3 Hosting
launch event 50 days Fri
11/15/19
Thu
1/23/20 15
HR
manager,
Marketing
manager,
Operations
manager,
Project
Manager,
Security
manager
$66,000.00
2.4
Post
implementation
review
5 days Fri
1/24/20
Thu
1/30/20 16 Project
Manager $1,200.00
2.5 Documentation
of lessons
learnt
4 days Fri
1/31/20
Wed
2/5/20 17 Project
Manager $960.00
2.6
Sign-off
from
stakeholders
2 days Thu
2/6/20
Fri
2/7/20 18
Finance
manager,
HR
manager,
Marketing
manager,
Operations
manager,
Security
manager
$2,800.00
manager,
Project
Manager
2.2
Making
necessary
arrangements
165 days Fri
3/29/19
Thu
11/14/19 14
Finance
manager,
HR
manager,
Marketing
manager,
Operations
manager,
Security
manager
$231,000.00
2.3 Hosting
launch event 50 days Fri
11/15/19
Thu
1/23/20 15
HR
manager,
Marketing
manager,
Operations
manager,
Project
Manager,
Security
manager
$66,000.00
2.4
Post
implementation
review
5 days Fri
1/24/20
Thu
1/30/20 16 Project
Manager $1,200.00
2.5 Documentation
of lessons
learnt
4 days Fri
1/31/20
Wed
2/5/20 17 Project
Manager $960.00
2.6
Sign-off
from
stakeholders
2 days Thu
2/6/20
Fri
2/7/20 18
Finance
manager,
HR
manager,
Marketing
manager,
Operations
manager,
Security
manager
$2,800.00
You're viewing a preview
Unlock full access by subscribing today!

9PROJECT MANAGEMENT
2. Small scale research regarding the project scenario (P4, M2, D1)
2.1 Literature review (P4, M2, D1)
2.1.1 Overview
Before launching the accounting software product in Australia, the Australian
market needs to be analyzed by the project manager and the resource manager. Sage
Software Solution is one of the leading CRM, ERP and Human resource management
system providers. Currently the company offers their services to United Kingdom
however the marketing department of the company is interested to spread their services
and offers outside United Kingdom also (Cagliano, Grimaldi and Rafele 2015). The
country which is being recently targeted by Sage is Australia. The current business
management platform, accountants, sponsors and competitive market of company are
also highlighted with the secondary research. In order to gather secondary data many
recent journals, blogs, websites and articles are considered.
2.1.2 Current condition of the company
Sage Group Plc that is also known as Sage is a multinational British software
company which offers their services to almost all over United Kingdom. However, they
are eager to spread their business outside the country also. This company is the second
largest technology based companies in United Kingdom (UK). The public limited
company offers accounting software packages, CRM, ERP solution to the willing
consumes (Mir and Pinnington 2014). However, the company is interested to launch
only accounting system in Australia and not ERP and CRM.
XERO, Reckon, Saasu, MYOB are the biggest competitions to Sage being a new
entrant. The current revenue amount of the company is $1.7 Billion. The operating
income amount, net income amount and net asset of the company are respectively
$348 Million, $300 Billion and 3.22 billion.
The current cities where the country offers their services include USA, Germany,
Brazil, Spain, France etc. They do not server their offering in Australia there are many
companies which offers the similar services. However, the new accounting system is
2. Small scale research regarding the project scenario (P4, M2, D1)
2.1 Literature review (P4, M2, D1)
2.1.1 Overview
Before launching the accounting software product in Australia, the Australian
market needs to be analyzed by the project manager and the resource manager. Sage
Software Solution is one of the leading CRM, ERP and Human resource management
system providers. Currently the company offers their services to United Kingdom
however the marketing department of the company is interested to spread their services
and offers outside United Kingdom also (Cagliano, Grimaldi and Rafele 2015). The
country which is being recently targeted by Sage is Australia. The current business
management platform, accountants, sponsors and competitive market of company are
also highlighted with the secondary research. In order to gather secondary data many
recent journals, blogs, websites and articles are considered.
2.1.2 Current condition of the company
Sage Group Plc that is also known as Sage is a multinational British software
company which offers their services to almost all over United Kingdom. However, they
are eager to spread their business outside the country also. This company is the second
largest technology based companies in United Kingdom (UK). The public limited
company offers accounting software packages, CRM, ERP solution to the willing
consumes (Mir and Pinnington 2014). However, the company is interested to launch
only accounting system in Australia and not ERP and CRM.
XERO, Reckon, Saasu, MYOB are the biggest competitions to Sage being a new
entrant. The current revenue amount of the company is $1.7 Billion. The operating
income amount, net income amount and net asset of the company are respectively
$348 Million, $300 Billion and 3.22 billion.
The current cities where the country offers their services include USA, Germany,
Brazil, Spain, France etc. They do not server their offering in Australia there are many
companies which offers the similar services. However, the new accounting system is
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT
comprises of such advanced features which define that it can easily survive in the
Australian market and can also can give high competition to the similar organizations.
The features of the newly developed Accounting software system are as follows:
The accounting system has the ability to make the invoice much simple
and complex free
The invoice approach is mush simple from the operational perspectives
The system is capable to provide real time information regarding the
business
The decision making approach also become much easier from the
managerial perspectives
The complexity of cost and old ERP applications also become easier
It gives high rated growth to the business
The users will be able to store huge amount of information in their system
server and keep them safe from external attackers.
The three major features associated to the Accounting software system
include application resilience, disaster recovery and data backup
2.1.3 Conclusion
After analyzing the current condition of this United Kingdom based company
Sage Group it has been determined that with proper managerial and operational
activities the company will be able to launch their new products to Australia. The
company has also developed certain business strategies which are helpful to evaluate
the recent market condition of Australia and the ways through which the business
approaches can be successfully improved. Besides this it is also determined that the
management system Sage enterprise can make the business management of the
consumers companies much faster, simpler, interoperable, reliable, secure as well as
flexible.
comprises of such advanced features which define that it can easily survive in the
Australian market and can also can give high competition to the similar organizations.
The features of the newly developed Accounting software system are as follows:
The accounting system has the ability to make the invoice much simple
and complex free
The invoice approach is mush simple from the operational perspectives
The system is capable to provide real time information regarding the
business
The decision making approach also become much easier from the
managerial perspectives
The complexity of cost and old ERP applications also become easier
It gives high rated growth to the business
The users will be able to store huge amount of information in their system
server and keep them safe from external attackers.
The three major features associated to the Accounting software system
include application resilience, disaster recovery and data backup
2.1.3 Conclusion
After analyzing the current condition of this United Kingdom based company
Sage Group it has been determined that with proper managerial and operational
activities the company will be able to launch their new products to Australia. The
company has also developed certain business strategies which are helpful to evaluate
the recent market condition of Australia and the ways through which the business
approaches can be successfully improved. Besides this it is also determined that the
management system Sage enterprise can make the business management of the
consumers companies much faster, simpler, interoperable, reliable, secure as well as
flexible.

11PROJECT MANAGEMENT
3. Analysis of the research and data analysis (P4, M2, D2)
3.1 Primary research: Interview Question (P4, M2, D2)
3.1.1 Qualitative and quantitative data (P4)
There is a vast difference between the qualitative and quantitative data. The
qualitative data is concerned regarding human behavior those are obtained from the
participant’s aspect. These data assumes negotiated reality as well as dynamics. In
order to collect the qualitative data for conducting this research work interview questions
are designed. These data are collected via interviews and observation of the
participants. This research methodology is completely exploratory, non statistical,
subjective and unstructured.
On the other hand, the quantitative data are concerned regarding discovery of
facts related to the social phenomena. As it helps to assume measurable and fixed
reality therefore, data are gathered by measuring different things. Though numerical
comparison and statistical inferences these data are analyzed. These data are
conclusive, statistical and well structured. However, in order to exploit the hidden facts
regard impact of globalization and its relationship with new product launch in separate
country both qualitative and quantitative data are used.
For this specific project also interview questions are being enlisted and the target
participants for whom the interview questions are prepared include: employees working
in Sage group, the members of the management board and some consumers to know
their expectation from the project.
Question1: What are the different features added to it that can uplift the quality
of the accounting software package?
This question is asked to the working employees who are associated to the
product development team.
Question 2: How the new accounting software package developed by your
company can compete the existing companies of Australia Xero and MYOB?
3. Analysis of the research and data analysis (P4, M2, D2)
3.1 Primary research: Interview Question (P4, M2, D2)
3.1.1 Qualitative and quantitative data (P4)
There is a vast difference between the qualitative and quantitative data. The
qualitative data is concerned regarding human behavior those are obtained from the
participant’s aspect. These data assumes negotiated reality as well as dynamics. In
order to collect the qualitative data for conducting this research work interview questions
are designed. These data are collected via interviews and observation of the
participants. This research methodology is completely exploratory, non statistical,
subjective and unstructured.
On the other hand, the quantitative data are concerned regarding discovery of
facts related to the social phenomena. As it helps to assume measurable and fixed
reality therefore, data are gathered by measuring different things. Though numerical
comparison and statistical inferences these data are analyzed. These data are
conclusive, statistical and well structured. However, in order to exploit the hidden facts
regard impact of globalization and its relationship with new product launch in separate
country both qualitative and quantitative data are used.
For this specific project also interview questions are being enlisted and the target
participants for whom the interview questions are prepared include: employees working
in Sage group, the members of the management board and some consumers to know
their expectation from the project.
Question1: What are the different features added to it that can uplift the quality
of the accounting software package?
This question is asked to the working employees who are associated to the
product development team.
Question 2: How the new accounting software package developed by your
company can compete the existing companies of Australia Xero and MYOB?
You're viewing a preview
Unlock full access by subscribing today!

12PROJECT MANAGEMENT
This question is asked to the working employees who are associated to the
product development team.
Question 3: What are the business strategies you people have evolved while
launching the product in Australia?
This question is asked to the members of management committee of Saga.
Question4: What are you expecting from this new accounting software
package?
This question is asked to some interested group of consumers
Question 5: What are the different additional security measurements who people
have incorporated to your newly launched system?
This question is asked to the security manager and project manager of the
company. The interview questions have given a positive result which implies that the
launching this new product in Australia will always become beneficial for the company. It
will help the company to gain competitive advantages and high revenue structure as
well. The data analysis is elaborated in the below section:
1. Do you believe that the Accounting Information System would save the time
for completing a specific work?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 5
17
%
3
0
Disagr
ee 4
13
%
3
0
Neutra
l 1
3
%
3
0
Agree
1
0
33
%
3
0
Strong
ly Agree
1
0
33
%
3
0
This question is asked to the working employees who are associated to the
product development team.
Question 3: What are the business strategies you people have evolved while
launching the product in Australia?
This question is asked to the members of management committee of Saga.
Question4: What are you expecting from this new accounting software
package?
This question is asked to some interested group of consumers
Question 5: What are the different additional security measurements who people
have incorporated to your newly launched system?
This question is asked to the security manager and project manager of the
company. The interview questions have given a positive result which implies that the
launching this new product in Australia will always become beneficial for the company. It
will help the company to gain competitive advantages and high revenue structure as
well. The data analysis is elaborated in the below section:
1. Do you believe that the Accounting Information System would save the time
for completing a specific work?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 5
17
%
3
0
Disagr
ee 4
13
%
3
0
Neutra
l 1
3
%
3
0
Agree
1
0
33
%
3
0
Strong
ly Agree
1
0
33
%
3
0
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

13PROJECT MANAGEMENT
The users of accounting IS are asked this question and from the analysis result it
is determined that, that 33% of the participants agreed that this advanced system saves
time and increase overall efficiency.
2. Do you believe that the newly implemented Accounting Information System
would deliver more productivity than the legacy systems?
Options
Fr
equency
Per
centage
T
otal
Strongl
y Disagree 4
13
%
3
0
Disagre
e 3
10
%
3
0
Neutral 1 3%
3
0
Agree 12
40
%
3
0
Strongl
y Agree 10
33
%
3
0
The users of accounting IS are asked this question and from the analysis result it
is determined that, that 33% of the participants agreed that this advanced system saves
time and increase overall efficiency.
2. Do you believe that the newly implemented Accounting Information System
would deliver more productivity than the legacy systems?
Options
Fr
equency
Per
centage
T
otal
Strongl
y Disagree 4
13
%
3
0
Disagre
e 3
10
%
3
0
Neutral 1 3%
3
0
Agree 12
40
%
3
0
Strongl
y Agree 10
33
%
3
0

14PROJECT MANAGEMENT
13%
3%
40%
43%
From the analysis resultant or response from the participants it has been
determined that, Accounting Information System would deliver more productivity than
the legacy system as 40% of the total participants are agreed to this statement.
3. Do you believe that the Accounting Information System would generate
efficient information about the organization?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 1
3
%
3
0
Disagr
ee 7
23
%
3
0
Neutra
l
1
0
33
%
3
0
Agree 5
17
%
3
0
Strong
ly Agree 7
23
%
3
0
13%
3%
40%
43%
From the analysis resultant or response from the participants it has been
determined that, Accounting Information System would deliver more productivity than
the legacy system as 40% of the total participants are agreed to this statement.
3. Do you believe that the Accounting Information System would generate
efficient information about the organization?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 1
3
%
3
0
Disagr
ee 7
23
%
3
0
Neutra
l
1
0
33
%
3
0
Agree 5
17
%
3
0
Strong
ly Agree 7
23
%
3
0
You're viewing a preview
Unlock full access by subscribing today!

15PROJECT MANAGEMENT
Strongly
Disagree Disagree Neutral Agree Strongly
Agree
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
7%
27%
43%
17%
23%
AIS can generate frequent information regarding any organization is not agreed
by maximum of the survey participants. On the other hand, respectively 17% and 23%
of the total participants agreed to the above statement.
4. Do you believe that the business standards would improve with the
implementation of the Accounting Information Systems?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 2
7
%
3
0
Disagr
ee 8
27
%
3
0
Neutra
l 6
20
%
3
0
Agree
1
2
40
%
3
0
Strong
ly Agree 2
7
%
3
0
Strongly
Disagree Disagree Neutral Agree Strongly
Agree
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
7%
27%
43%
17%
23%
AIS can generate frequent information regarding any organization is not agreed
by maximum of the survey participants. On the other hand, respectively 17% and 23%
of the total participants agreed to the above statement.
4. Do you believe that the business standards would improve with the
implementation of the Accounting Information Systems?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 2
7
%
3
0
Disagr
ee 8
27
%
3
0
Neutra
l 6
20
%
3
0
Agree
1
2
40
%
3
0
Strong
ly Agree 2
7
%
3
0
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

16PROJECT MANAGEMENT
According to the response given by the participants it has been determined that,
40% of the participants are agreed to the statement which states that business
standards followed by any organization can be improved with the implementation of the
AIS.
5. Do you think that the newly implemented Accounting Information Systems
would ensure proper security to the information generated within the organization?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 1
3
%
3
0
Disagr
ee 2
7
%
3
0
Neutra
l 9
30
%
3
0
Agree
1
2
40
%
3
0
Strong
ly Agree 6
20
%
3
0
According to the response given by the participants it has been determined that,
40% of the participants are agreed to the statement which states that business
standards followed by any organization can be improved with the implementation of the
AIS.
5. Do you think that the newly implemented Accounting Information Systems
would ensure proper security to the information generated within the organization?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 1
3
%
3
0
Disagr
ee 2
7
%
3
0
Neutra
l 9
30
%
3
0
Agree
1
2
40
%
3
0
Strong
ly Agree 6
20
%
3
0

17PROJECT MANAGEMENT
Security is referred to as one of the most frequently asked questions to the
participants and the response shows that, 30% are neutral but 40% of the participants
are agreed that the AIS provides high security to the users.
6. Do you think that the newly implemented system would reduce the everyday
challenges occurring within the industry?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 6
20
%
3
0
Disagr
ee 1
3
%
3
0
Neutra
l 8
27
%
3
0
Agree 6
20
%
3
0
Strong
ly Agree 9
30
%
3
0
Security is referred to as one of the most frequently asked questions to the
participants and the response shows that, 30% are neutral but 40% of the participants
are agreed that the AIS provides high security to the users.
6. Do you think that the newly implemented system would reduce the everyday
challenges occurring within the industry?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 6
20
%
3
0
Disagr
ee 1
3
%
3
0
Neutra
l 8
27
%
3
0
Agree 6
20
%
3
0
Strong
ly Agree 9
30
%
3
0
You're viewing a preview
Unlock full access by subscribing today!

18PROJECT MANAGEMENT
Around 30% of the total participants agreed to the statement that, the
implementation of AIS reduces the daily technical challenges. However, 27%
participants are not sure about this statement.
7. Do you think that the Accounting Information System require a lot of time for
the training of all the employees?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 1
3
%
3
0
Disagr
ee 3
10
%
3
0
Neutra
l 7
23
%
3
0
Agree
1
4
47
%
3
0
Strong
ly Agree 5
17
%
3
0
Around 30% of the total participants agreed to the statement that, the
implementation of AIS reduces the daily technical challenges. However, 27%
participants are not sure about this statement.
7. Do you think that the Accounting Information System require a lot of time for
the training of all the employees?
Option
s
Fr
equency
Pe
rcentage
T
otal
Strong
ly Disagree 1
3
%
3
0
Disagr
ee 3
10
%
3
0
Neutra
l 7
23
%
3
0
Agree
1
4
47
%
3
0
Strong
ly Agree 5
17
%
3
0
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

19PROJECT MANAGEMENT
As the application of this new system is new therefore training for the participants
are needed and among the total numbers of participants 47% participants agreed to this
statement.
3.2Tools and techniques used for conducting the research (P5, M2, D2)
In order to conduct any research work different tools and techniques are
required. While conducting a small scale research on the current market scenario of
Sage Group different tools and techniques are utilized by the researcher. Testing
approaches (unit, acceptance, integrated testing) are referred to as the most crucial
tools widely used by the researchers to measure the success rate. However, based on
the project complexity, design and administration background the use of these tools
may also vary a lot. Among these available tools the researcher needs to choose the
most suitable research tools and techniques. Before conducting the primary data
collection process the research require to identify their target consumers and audience
as well. Though, they should ensure that the research participants are not violating any
kind of ethical considerations. However, while conducting the interview none of the
participants should be externally influenced or manipulated.
As the application of this new system is new therefore training for the participants
are needed and among the total numbers of participants 47% participants agreed to this
statement.
3.2Tools and techniques used for conducting the research (P5, M2, D2)
In order to conduct any research work different tools and techniques are
required. While conducting a small scale research on the current market scenario of
Sage Group different tools and techniques are utilized by the researcher. Testing
approaches (unit, acceptance, integrated testing) are referred to as the most crucial
tools widely used by the researchers to measure the success rate. However, based on
the project complexity, design and administration background the use of these tools
may also vary a lot. Among these available tools the researcher needs to choose the
most suitable research tools and techniques. Before conducting the primary data
collection process the research require to identify their target consumers and audience
as well. Though, they should ensure that the research participants are not violating any
kind of ethical considerations. However, while conducting the interview none of the
participants should be externally influenced or manipulated.

20PROJECT MANAGEMENT
Two different kinds of data methods are there such as primary data and
secondary data. The primary data are known as real time data and it helps to exploit all
hidden facts associated to product launch project. Though conducting survey, interview
primary data can be collected on the other hand in order to gather secondary data the
sources that are widely used by the researchers are blog, articles, journals, recent
annual reports etc. For this specific research work both primary and secondary data are
utilized. The qualitative method uses data collection methodologies like interview,
survey, observation, discussion and document review etc. Though, for this specific
project for gathering primary data only the interview questions are considered. On the
other hand, for gathering quantitative data the secondary sources are also considered
and these include recent journals, books, articles and blogs.
In order to design and develop the timeframe and cost of the product launching
project of Sage Group the other tool which is used is MS project. It provides a clear
activity list to the project team member. Resources are assigned to each of the activities
based on their skills and knowledge with the help of MS project. For each activity or task
what maximum time can be provided is also developed through this tool.
4. Recommendation for project scenario (P6, M3, D2)
In order to resolve the identified risks project manager and project team
members require following certain specific recommendations accordingly. The
recommendations are enlisted in the below section:
Clear project planning and reporting approach: In order to avoid project risks
the project manager and project team members should always design and develop
clear project plan and reporting approaches. The reporting approaches should be
professionally followed by the project team members in each project development
phases. The members should report to the project manager frequently.
Developing needful security concern: Security of the system is another
important thing that has to be considered by the project manager to ensure that none of
the data from the server is being interrupted or hacked by the unauthorized users. The
Two different kinds of data methods are there such as primary data and
secondary data. The primary data are known as real time data and it helps to exploit all
hidden facts associated to product launch project. Though conducting survey, interview
primary data can be collected on the other hand in order to gather secondary data the
sources that are widely used by the researchers are blog, articles, journals, recent
annual reports etc. For this specific research work both primary and secondary data are
utilized. The qualitative method uses data collection methodologies like interview,
survey, observation, discussion and document review etc. Though, for this specific
project for gathering primary data only the interview questions are considered. On the
other hand, for gathering quantitative data the secondary sources are also considered
and these include recent journals, books, articles and blogs.
In order to design and develop the timeframe and cost of the product launching
project of Sage Group the other tool which is used is MS project. It provides a clear
activity list to the project team member. Resources are assigned to each of the activities
based on their skills and knowledge with the help of MS project. For each activity or task
what maximum time can be provided is also developed through this tool.
4. Recommendation for project scenario (P6, M3, D2)
In order to resolve the identified risks project manager and project team
members require following certain specific recommendations accordingly. The
recommendations are enlisted in the below section:
Clear project planning and reporting approach: In order to avoid project risks
the project manager and project team members should always design and develop
clear project plan and reporting approaches. The reporting approaches should be
professionally followed by the project team members in each project development
phases. The members should report to the project manager frequently.
Developing needful security concern: Security of the system is another
important thing that has to be considered by the project manager to ensure that none of
the data from the server is being interrupted or hacked by the unauthorized users. The
You're viewing a preview
Unlock full access by subscribing today!

21PROJECT MANAGEMENT
security aspects that are to be utilized by the project manager while conducting this
project include encryption, firewall, DMZ etc. The developers must make that all the
financial and personnel information stored in the server cannot be accessed by the
unwanted external users without permission.
Development of professional training session: In order to increase and
spread the marketing awareness among the project team members the HR manager of
the company is required to arrange professional on job technical and no technical
training program. The members should attend the training programs while required. It is
expected that professional involvement of project team members will surely improve the
status of the project and also improve their skills and knowledge.
Assign roles and responsibilities: Based on the skills and knowledge project
team manager should assign roles and responsibilities to the project team members.
After assigning the roles it becomes the responsibilities of the members to accomplish
the assigned roles within estimated time and budget.
Reflection (P7, M4)
It has been determined that United Kingdom based Sage Group offer one of the
most inclusive suites of accounting information system or accounting software tool to
both the medium and large scale organizations. From the overall discussion it can be
highlighted that, accounting software system is referred to as one of the most widely
used supporting technologies that helps equally the large and medium sized companies
to avoid financial damage. I think this software is best suited for both desktop users and
online service users. The employees working for such organizations can successfully
analyze, manage the invoice, VAT, stock market payroll, budget details and cash flow
as well. I also realized that based on changing requirements the businesses can choose
from a range of different software packages the most suited one. They company
executives has planned to launched their product to United States and Australia as well.
However, at a time the product launch will not be possible in both the countries.
Therefore, initially the launch action will be conducted in Australia. Australia is one of
the most well-known accounting software system product developing companies.
security aspects that are to be utilized by the project manager while conducting this
project include encryption, firewall, DMZ etc. The developers must make that all the
financial and personnel information stored in the server cannot be accessed by the
unwanted external users without permission.
Development of professional training session: In order to increase and
spread the marketing awareness among the project team members the HR manager of
the company is required to arrange professional on job technical and no technical
training program. The members should attend the training programs while required. It is
expected that professional involvement of project team members will surely improve the
status of the project and also improve their skills and knowledge.
Assign roles and responsibilities: Based on the skills and knowledge project
team manager should assign roles and responsibilities to the project team members.
After assigning the roles it becomes the responsibilities of the members to accomplish
the assigned roles within estimated time and budget.
Reflection (P7, M4)
It has been determined that United Kingdom based Sage Group offer one of the
most inclusive suites of accounting information system or accounting software tool to
both the medium and large scale organizations. From the overall discussion it can be
highlighted that, accounting software system is referred to as one of the most widely
used supporting technologies that helps equally the large and medium sized companies
to avoid financial damage. I think this software is best suited for both desktop users and
online service users. The employees working for such organizations can successfully
analyze, manage the invoice, VAT, stock market payroll, budget details and cash flow
as well. I also realized that based on changing requirements the businesses can choose
from a range of different software packages the most suited one. They company
executives has planned to launched their product to United States and Australia as well.
However, at a time the product launch will not be possible in both the countries.
Therefore, initially the launch action will be conducted in Australia. Australia is one of
the most well-known accounting software system product developing companies.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

22PROJECT MANAGEMENT
Though, it is much challenging for Sage Group but due to advanced product features it
is expected that the product will help them to gain competitive advantages. I think that if
all product design and development phases are professionally followed and maintained
by the project manager and the project team members then the project will be
accomplished within the estimated budget and time.
Conclusion
From the above discussion it can be concluded that this project has analyze the
impact of project management prcatices while launching an accounting software
package developed by Sage Group in a complete separate country. Before launching
this new product the current market condition of Australia is also being analyzed and the
analysis resultant shows that though, it is a threat to launch this product but still the
features of the new Accounting Information system software package are much different
and advanced from the products developed by Saasu, Reckon, MYOB etc. A small
scale research is also conducted to gather both quantitative and qualitative information
from the indentified resources. An interview questionnaire is also developed to collect
primary data and a literature review is demonstrated to gather secondary information
regarding globalization and its impact in business success. At the end of the report a
reflection is also illustrated containing the role of project management processes.
Project logbook (g)
List of activities Week
1
Week 2
to 3
Week 4
to 6
Week 7
to 8
Week
9
Week
10
Developing project scope,
aim and objectives
Selection of product and
location where to be launched
Conducting small scale research
Interview question setting
Though, it is much challenging for Sage Group but due to advanced product features it
is expected that the product will help them to gain competitive advantages. I think that if
all product design and development phases are professionally followed and maintained
by the project manager and the project team members then the project will be
accomplished within the estimated budget and time.
Conclusion
From the above discussion it can be concluded that this project has analyze the
impact of project management prcatices while launching an accounting software
package developed by Sage Group in a complete separate country. Before launching
this new product the current market condition of Australia is also being analyzed and the
analysis resultant shows that though, it is a threat to launch this product but still the
features of the new Accounting Information system software package are much different
and advanced from the products developed by Saasu, Reckon, MYOB etc. A small
scale research is also conducted to gather both quantitative and qualitative information
from the indentified resources. An interview questionnaire is also developed to collect
primary data and a literature review is demonstrated to gather secondary information
regarding globalization and its impact in business success. At the end of the report a
reflection is also illustrated containing the role of project management processes.
Project logbook (g)
List of activities Week
1
Week 2
to 3
Week 4
to 6
Week 7
to 8
Week
9
Week
10
Developing project scope,
aim and objectives
Selection of product and
location where to be launched
Conducting small scale research
Interview question setting

23PROJECT MANAGEMENT
Both quantitative and
Qualitative data collection
Secondary data collection
Selecting appropriate tools
and techniques
Analysis of the collected data
Reflecting proper
recommendations
Submission of final report
Both quantitative and
Qualitative data collection
Secondary data collection
Selecting appropriate tools
and techniques
Analysis of the collected data
Reflecting proper
recommendations
Submission of final report
You're viewing a preview
Unlock full access by subscribing today!

24PROJECT MANAGEMENT
References
Ahern, T., Leavy, B., & Byrne, P. J. (2014). Complex project management as complex problem
solving: A distributed knowledge management perspective. International Journal of
Project Management, 32(8), 1371-1381.
Azhar, S., Khalfan, M., & Maqsood, T. (2015). Building information modelling (BIM): now &
beyond. Construction Economics & Building, 12(4), 15-28.
Cagliano, A. C., Grimaldi, S., & Rafele, C. (2015). Choosing project risk management
techniques. A theoretical framework. Journal of Risk Research, 18(2), 232-248.
Cohen-Vogel, L., Tichnor-Wagner, A., Allen, D., Harrison, C., Kainz, K., Socol, A. R., &
Wang, Q. (2015). Implementing educational innovations at scale: Transforming
researchers into continuous improvement scientists. Educational Policy, 29(1), 257-277.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014). Can
agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Conger, S. (2015). Six sigma & business process management. In H&book on Business Process
Management 1 (pp. 127-146). Springer, Berlin, Heidelberg.
Costantino, F., Di Gravio, G., & Nonino, F. (2015). Project selection in project portfolio
management: An artificial neural network model based on critical success
factors. International Journal of Project Management, 33(8), 1744-1754.
First, M. B. (2016). Adopting a continuous improvement model for future DSM revisions. World
Psychiatry, 15(3), 223-224.
Fleming, Q. W., & Koppelman, J. M. ((2016), December). Earned value project management.
Project Management Institute.
Heldman, K. (2015). PMP project management professional exam deluxe study guide: updated
for the (2015) Exam. John Wiley & Sons.
References
Ahern, T., Leavy, B., & Byrne, P. J. (2014). Complex project management as complex problem
solving: A distributed knowledge management perspective. International Journal of
Project Management, 32(8), 1371-1381.
Azhar, S., Khalfan, M., & Maqsood, T. (2015). Building information modelling (BIM): now &
beyond. Construction Economics & Building, 12(4), 15-28.
Cagliano, A. C., Grimaldi, S., & Rafele, C. (2015). Choosing project risk management
techniques. A theoretical framework. Journal of Risk Research, 18(2), 232-248.
Cohen-Vogel, L., Tichnor-Wagner, A., Allen, D., Harrison, C., Kainz, K., Socol, A. R., &
Wang, Q. (2015). Implementing educational innovations at scale: Transforming
researchers into continuous improvement scientists. Educational Policy, 29(1), 257-277.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014). Can
agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Conger, S. (2015). Six sigma & business process management. In H&book on Business Process
Management 1 (pp. 127-146). Springer, Berlin, Heidelberg.
Costantino, F., Di Gravio, G., & Nonino, F. (2015). Project selection in project portfolio
management: An artificial neural network model based on critical success
factors. International Journal of Project Management, 33(8), 1744-1754.
First, M. B. (2016). Adopting a continuous improvement model for future DSM revisions. World
Psychiatry, 15(3), 223-224.
Fleming, Q. W., & Koppelman, J. M. ((2016), December). Earned value project management.
Project Management Institute.
Heldman, K. (2015). PMP project management professional exam deluxe study guide: updated
for the (2015) Exam. John Wiley & Sons.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

25PROJECT MANAGEMENT
Hornstein, H. A. (2015). The integration of project management & organizational change
management is now a necessity. International Journal of Project Management, 33(2),
291-298.
Hughes, W., Champion, R., & Murdoch, J. (2015). Construction contracts: law & management.
Routledge.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology &
project success in different project governance contexts. International Journal of Project
Management, 33(6), 1377-1392.
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management
beyond project selection techniques: Underst&ing the role of structural
alignment. International Journal of Project Management, 33(1), 126-139.
Kendrick, T. (2015). Identifying & managing project risk: essential tools for failure-proofing
your project. Amacom.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, & controlling. John Wiley & Sons.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A. M. E., & Villanueva, P. (2014). Project
risk management methodology for small firms. International Journal of Project
Management, 32(2), 327-340.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance & project success. International journal of project
management, 32(2), 202-217.
Sanchez, M. A. (2015). Integrating sustainability issues into project management. Journal of
Cleaner Production, 96, 319-330.
Todorovic, M. L., Petrović, D. Č., Mihic, M. M., Obradovic, V. L., & Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783
Hornstein, H. A. (2015). The integration of project management & organizational change
management is now a necessity. International Journal of Project Management, 33(2),
291-298.
Hughes, W., Champion, R., & Murdoch, J. (2015). Construction contracts: law & management.
Routledge.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology &
project success in different project governance contexts. International Journal of Project
Management, 33(6), 1377-1392.
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management
beyond project selection techniques: Underst&ing the role of structural
alignment. International Journal of Project Management, 33(1), 126-139.
Kendrick, T. (2015). Identifying & managing project risk: essential tools for failure-proofing
your project. Amacom.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, & controlling. John Wiley & Sons.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A. M. E., & Villanueva, P. (2014). Project
risk management methodology for small firms. International Journal of Project
Management, 32(2), 327-340.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance & project success. International journal of project
management, 32(2), 202-217.
Sanchez, M. A. (2015). Integrating sustainability issues into project management. Journal of
Cleaner Production, 96, 319-330.
Todorovic, M. L., Petrović, D. Č., Mihic, M. M., Obradovic, V. L., & Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783
1 out of 26
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.