Summary Statement for Professional Engineer: Electrical Engineering

Verified

Added on  2021/05/31

|10
|2045
|156
Report
AI Summary
This document presents a Professional Engineer summary, detailing competency units and elements within the field of electrical engineering. It covers various aspects, including knowledge and skill base, engineering application ability, and professional attributes. The summary provides a comprehensive overview of how the engineer has applied these elements through different career episodes. It highlights the application of engineering methods, techniques, tools, and resources. Furthermore, it addresses ethical conduct, communication skills, and professional demeanor. The report showcases the ability to manage information, conduct professional conduct, and work effectively in teams. The document demonstrates the engineer's expertise in project management, design processes, and the ability to deliver efficient and effective solutions. The summary references specific career episodes to support each competency element, illustrating practical application and problem-solving capabilities.
Document Page
PROFESSIONAL ENGINEER
Summary Statement
These are the competency Units and Elements.
Competency Element A brief summary of how you
have applied the element
Paragraph number
in the career
episode(s) where the
element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-
based understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the engineering
discipline
I had to analyse the whole
scenario for the design and
installation of the system’s
component that is capable of
fulfilling the needs and
requirements of the rural
communities suffering from lack
of electricity
I installed the control circuit will
be used to charge the battery, the
charge battery will be supplying
power to the motor of the water
pump
I identified that the systems those
have been available at the present
time lags in the accuracy and
precision and thus, is not effective
for managing the voltage
Career Episode 1: CE
1.2.1, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.1 and CE 2.3.3
Career Episode 3: CE
3.2.1, CE 3.3.1 and
CE 3.3.2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
differences and protecting the
electrical appliances
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics and
computer and information
sciences which underpin the
engineering discipline
I had done the mathematical
calculations considering every
factor of the electric supply
including the resistance, wire
length, type of material,
transformer’s factors, electric
discharge, and different losses for
laying out the cables in between
the stations
I implemented the moisture
sensing circuit in the field where
the crops will be cultivated
I analysed these factors that will
be helpful in understanding the
short comings of the voltage
difference
Career Episode 1: CE
1.3.1
Career Episode 2: CE
2.3.2, CE 2.3.3 and
CE 2.3.4
Career Episode 3: CE
3.3.2
PE1.3 In-depth understanding
of specialist bodies of
knowledge within the
engineering discipline
I selected SSVT in the place of the
simple step-down voltage in
manner to ensure that the
government at low price can
utilize the project and it can be
established in less area
I adjusted the connection of this
sensing circuit in manner to allow
the farmers to adjust the moisture
level as per the condition of the
Career Episode 1: CE
1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.4, CE
2.2.5 and CE 2.4.2
Document Page
corps
I had to develop and present a
sophisticated design for the overall
system and present a layout that
can be followed for the
accomplishment of the objectives
of the project
Career Episode 3: CE
3.3.1, CE 3.3.3
PE1.4 Discernment of
knowledge development and
research directions within the
engineering discipline
I was responsible for developing
the technical designs and drawings
related to the electrical wiring
systems through analysing the
measurements and calculations
gathered for theoretical knowledge
or asked by the architect or
manager
I implemented the moisture
sensing circuit in the field where
the crops will be cultivated
It was my decision to execute the
overall experiment in 12 V supply
for which I had utilized the step
down transformer for managing
the voltage output
Career Episode 1: CE
1.2.5, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.2, CE 2.3.4 and
CE 2.4.1
Career Episode 3: CE
3.3.2, CE 3.3.3 and
CE 3.4.1
PE1.5 Knowledge of contextual
factors impacting the
engineering discipline
I executed a successful project that
was an attempt of transferring the
electricity to the rural areas using
the SSVT Station Service Voltage
Transformer in between the high
Career Episode 1: CE
1.2.1, CE 1.2.2,
Document Page
voltage grids and the rural
communities
I had implemented a control signal
to the stepper motor and adjusted
the rotational angle as per the
voltage difference between the
circuit and the ground
I modelled the comparator circuit
through using the LM324 that will
be helpful in identifying and
compare g the voltage difference
and fluctuations
Career Episode 2: CE
2.2.1, CE 2.2.2
Career Episode 3: CE
3.2.1, CE 3.2.3
PE1.6 Understanding of the
scope, principles, norms,
accountabilities and bounds of
contemporary engineering
practice in the specific
discipline
I had to look after the machines
functionality and their inspection
for the determination of the factors
how effective can be the solution
through incorporating them within
the project
I was leading the team as I was
assigned as a leader of the team
and manage all the activities
related to the development of this
project
I was also responsible for the
development of the design for
laying the circuit in manner to dig
out the necessary and efficient
Career Episode 1: CE
1.2.3, CE 1.3.3, CE
1.3.4 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1 and
CE 2.3.2
Career Episode 3: CE
3.2.3, CE 3.3.1 and
CE 3.3.2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
output from the experimental
setup
PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem solving
I was assigned to communicate
with the contractors and suppliers
for managing and maintaining the
quality of the resources being
supplied them and approve for the
incorporation of those resources
within the project
I designed the inverter that was
capable of converting the 230 V
input voltage to 12 V D.C through
the application of the boost
converter
I Was responsible for doing all the
mathematical calculations
involved for the establishment of
the designed model for managing
the voltage fluctuations
Career Episode 1: CE
1.2.4, CE 1.3.1 and
CE 1.4.2
Career Episode 2: CE
2.3.3, CE 2.3.4 and
CE 2.4.1, CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.4.2
PE2.2 Fluent application of
engineering techniques, tools
and resources
I had to test the electrical
components and systems before
and after the installation and my
confirmations were needed for
proceeding with next activity of
the project
I had also designed the automatic
Valve Regulation, I used the
Career Episode 1: CE
1.3.3, CE 1.3.2 and
CE 1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.2 and
Document Page
stepper motor in manner to
establish the automatic valve
control, and it was connected to
the tank’s outlet valve
I managed the teamwork activities
and effectively incorporated
within the team to accomplish the
objectives and goals of the project
CE 2.3.3
Career Episode 3: CE
3.3.1, CE 3.3.2 and
CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design processes
I had to ensure that all the
components and systems are well
functioning and capable of
delivering the necessary output
I managed the shopping for the
electronic components considering
the budget and quality of the
component being utilized within
the project
I accomplished all the necessary
testing and evaluation regarding
the input and output voltage values
Career Episode 1: CE
1.2.3, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.2.5
PE2.4 Application of
systematic approaches to the
conduct and management of
engineering projects
I had to accommodate my
objectives with the overall goal
and objectives of the organization
in manner to deliver my 100%
work
I developed the design of the
circuit, the electrical components
Career Episode 1: CE
1.3.1 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1, CE
Document Page
were established accordingly, and
rest of the team members executed
the activities as per the developed
design
I had evaluated the overall
functioning of the project
2.3.2 and CE 2.3.3
Career Episode 3: CE
3.3.1 and CE 3.3.2
PE3 ENGINEERING APPLICATION ABILITY
PE3.1 Ethical conduct and
professional accountability
I was enrolled in the team to
accomplish the activities related to
the electrical drafter and I had to
accomplish all work of my sector
in an efficient manner considering
the efficiency of the project
I performed the calculations and
based on that electrical
components were bought from the
market and the electrical
components were fixed
accordingly
I performed the experiments
regarding this aspect and collected
the necessary values
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.2 Effective oral and
written communication in
professional and lay domains
I had to test the electrical
components and systems before
and after the installation and my
confirmations were needed for
proceeding with next activity of
the project
Career Episode 1: CE
1.2.3, CE 1.3.3 and
CE 1.4.1
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
I managed the project as the leader
and tried to motivate the team
members towards accomplishing
the objectives of the project
I identified that voltage
fluctuations and variations could
possibly affect the electrical
appliances being operated in that
supply and it is necessary to
develop the experiments those will
be ensuring the safety of the
electrical appliances
Career Episode 2: CE
2.2.3, CE 2.3.5 and
CE 2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.3 Creative innovative and
proactive demeanour
I had done all the calculations
necessary in the context of the
power supply and made sure that
the losses could be minimized at
the extent level and output reaches
near to 100%
I identified that efficiency of the
system needs to be managed
effectively in manner to assure
that the power collected from the
solar energy is capable of
providing necessary input power
to the water motor
I collected the values of the output
developed through the designed
Career Episode 1: CE
1.3, CE 1.4 and CE
1.4.2
Career Episode 2: CE
2.3.5, CE 2.4, CE
2.2.5 and CE 2.4.2
Career Episode 3: CE
3.2, CE 3.3
Document Page
model in manner to assure that the
voltage regulations does not affect
the electrical appliances and
manage them within the range of
the supply
PE3.4 Professional use and
management of information
I evaluated the insulator and it was
necessary to manage the insulation
property and considering the much
efficient insulator that can be
utilized for supporting the cables
at the poles
I implemented the soil moisture
sensor probe in manner to assure
that the water level of the water
released by the stepper motor is
according to the need of the soil
and ground
I evaluated every electronic and
electrical components and fixed
the electrical components as per
the calculated values done through
the mathematical calculation
Career Episode 1: CE
1.2.3, CE 1.2.5, CE
1.4.2
Career Episode 2: CE
2.2.3, CE 2.2.5, CE
2.4.2
Career Episode 3: CE
3.2.3, CE 3.2.5, CE
3.4.2
PE3.5 Orderly management of
self, and professional conduct
I proposed a cost effective solution
that can be utilized at minimal
budget and capable of delivering
the necessary output
I used the PMW technique in
manner to generate the electricity
Career Episode 1: CE
1.4.1, CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE
2.4.2, CE 2.3.2, CE
Document Page
efficient for the motor
I performed the relay selection test
that was described in the above
selection that helped in selecting
the relays of proper rated values in
manner to assure the safety and
auto switching of the voltage in
the proposed project
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.4.2, CE 3.3.1 and
CE 3.3.2
PE3.6 Effective team
membership and team
leadership
I managed the electrical workers
and provided them simple design
those can show them path for the
installation of the electrical
components
I contributed in the identification
of this topic for the project and
executing the respective activities
those could be utilized for the
growth and development of
system that can automatically
irrigate the ground without any
manual command
I managed the team members
however; they had also
successfully and efficiently
contributed in the development
and growth of the project
Career Episode 1: CE
1.4.1, CE 1.4.2
Career Episode 2: CE
2.4.1 and CE 2.4.2
Career Episode 3: CE
3.4.1 and CE 3.4.2
chevron_up_icon
1 out of 10
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]