PROFESSIONAL ENGINEER
Summary Statement
These are the competency Units and Elements.
Competency Element A brief summary of how you have
applied the element
Paragraph number in
the career episode(s)
where the element is
addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-
based understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the engineering
discipline
I set the standard and quality of the
services being delivered at the most
crucial factor for the satisfaction of
the end users
I had to analyse all the existing
information relayed to the previously
designed and working of the oil
refinery and analysed them efficiently
in manner to discuss the
modifications those could bring into
the light for accomplishing the better
environment for the refinery
I was assigned as the project engineer
for the implementation of the
necessary amendments those were
necessary for the delivery of the
project
Career Episode 1: CE
1.2.1, CE 1.3.1 and CE
1.3.2
Career Episode 2: CE
2.3.1 and CE 2.3.3
Career Episode 3: CE
3.2.1, CE 3.3.1 and CE
3.3.2
PE1.2 Conceptual understanding
of the mathematics, numerical
I had to accomplish every
responsibility as mentioned above in
Career Episode 1: CE
1.3.1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
analysis, statistics and computer
and information sciences which
underpin the engineering
discipline
an efficient and effective manner
I prepared a Check Sheet for Field
Instruments to survey the existing
condition of the field Instruments and
sent the check sheet for End-user
approval
I evaluated End-user requirements
and grouped it into “general design
inputs” in line with their technical
specifications
Career Episode 2: CE
2.3.2, CE 2.3.3 and CE
2.3.4
Career Episode 3: CE
3.3.2
PE1.3 In-depth understanding of
specialist bodies of knowledge
within the engineering discipline
I had to prepare a project schedule
along with the planning Engineer to
explain the customer about the critical
milestones of the project during the
Customer Kickoff Meeting
I had to analyse all the existing
information relayed to the previously
designed and working of the oil
refinery and analysed them efficiently
in manner to discuss the
modifications those could bring into
the light for accomplishing the better
environment for the refinery
I was appreciated by the specialist for
promoting company’s technology and
my suggestion of going with wireless
technology was approved by the
specialist
Career Episode 1: CE
1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.4, CE 2.2.5
and CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.3
PE1.4 Discernment of knowledge
development and research
I had to accomplish every
responsibility as mentioned above in
Career Episode 1: CE
1.2.5, CE 1.3.1 and CE
Document Page
directions within the engineering
discipline
an efficient and effective manner
For Pneumatic transmitter, I propose
to replace / Install new transmitter
(HART/SMART)
I managed to convince the End-user
about long lasting advantages of
wireless technology, cost savings, and
the reduced time period of the project
1.4.2
Career Episode 2: CE
2.3.2, CE 2.3.4 and CE
2.4.1
Career Episode 3: CE
3.3.2, CE 3.3.3 and CE
3.4.1
PE1.5 Knowledge of contextual
factors impacting the engineering
discipline
I set the objectives and goals for the
successful delivery of the project
I delivered the project considering the
advancements those could be gained
through researching the existing
refineries and analyzing the market
for proposing the best and effective
options those could be gathered
through effective and efficient
amendments and modifications
I had to execute the engineering
design, assembly and testing of the
developed system and make sure that
the proposed system is capable of
providing more than the expected
outcome
Career Episode 1: CE
1.2.1, CE 1.2.2,
Career Episode 2: CE
2.2.1, CE 2.2.2
Career Episode 3: CE
3.2.1, CE 3.2.3
PE1.6 Understanding of the scope,
principles, norms, accountabilities
and bounds of contemporary
I developed a well strategic and
explained project plan that helped in
motivating every other individual to
Career Episode 1: CE
1.2.3, CE 1.3.3, CE 1.3.4
and CE 1.3.2
Document Page
engineering practice in the
specific discipline
be specific and targeted towards the
set goals and objectives
I delivered the project in manner to
understand the existing environment
of the old refineries and implement
the modifications those could bring
revolution and enhance the services
and products being delivered to the
consumers
I was given the responsibility to lead
the project due to the successful
completion of earlier projects by me
Career Episode 2: CE
2.2.3, CE 2.3.1 and CE
2.3.2
Career Episode 3: CE
3.2.3, CE 3.3.1 and CE
3.3.2
PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of established
engineering methods to complex
engineering problem solving
I developed a detailed project plan
explaining every necessary activity
and involved stakeholder in manner
to make sure that every stakeholder is
dedicated and concentric towards
accomplishing the same activity
I prepared a Check Sheet for Junction
Boxes to survey the existing
condition of the Junction Boxes and
sent the check sheet for End-user
approval
I started my work by preparing
detailed “Responsibility Assignment
Matrix” which clearly defined the
participation and responsibilities of
internal departments, vendors and
Career Episode 1: CE
1.2.4, CE 1.3.1 and CE
1.4.2
Career Episode 2: CE
2.3.3, CE 2.3.4 and CE
2.4.1, CE 2.4.2
Career Episode 3: CE
3.3.1, CE 3.3.2 and CE
3.4.2
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
sub-contractors in completing tasks
for a project in a given time span
PE2.2 Fluent application of
engineering techniques, tools and
resources
I was able to have an overall 10-15
percent cost reduction of Control
system Hardware due to the reuse of
existing System and Marshalling
cabinets
I prepared a Check Sheet for Control
Systems to survey the existing
condition of the related Panels and
sent the check sheet for End-user
approval
I also made “Project Execution Plan”
demonstrating each and every step,
clearly showing the objectives of the
project and how they will be
accomplished as per site conditions
Career Episode 1: CE
1.3.3, CE 1.3.2 and CE
1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.2 and CE
2.3.3
Career Episode 3: CE
3.3.1, CE 3.3.2 and CE
3.3.3
PE2.3 Application of systematic
engineering synthesis and design
processes
I took the next step to prepare and
submit “Critical Design review”
(CDR) report which consisted mostly
of the software parts and the control
logics created as per the project
control narrative
I prepared a Check Sheet for Junction
Boxes to survey the existing
condition of the Junction Boxes and
sent the check sheet for End-user
approval
I started this project as a ‘Project
Engineer’ in November 2015 and
Career Episode 1: CE
1.2.3, CE 1.3.1 and CE
1.3.2
Career Episode 2: CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.2.5
Document Page
completed successfully in March
2016
PE2.4 Application of systematic
approaches to the conduct and
management of engineering
projects
I delivered the following deliverables
including PDR are I/O Database in
MS-EXCEL/MS-Access format
containing DCS/ SIS / FGS / I/O
details – Final for CDR (for software
freeze), Mapping list in MS-EXCEL
containing Sub-system I/O details
I checked the condition of all Control
valves including actuators,
accessories, and evaluate requirement
for overhauling or complete
replacement of valve
I also made “Project Execution Plan”
demonstrating each and every step,
clearly showing the objectives of the
project and how they will be
accomplished as per site conditions
Career Episode 1: CE
1.3.1 and CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.1, CE 2.3.2
and CE 2.3.3
Career Episode 3: CE
3.3.1 and CE 3.3.2
PE3 ENGINEERING APPLICATION ABILITY
PE3.1 Ethical conduct and
professional accountability
I managed to reduce the cost of the
project by closely communicating
with the End-user project team and
tried to convince them about the
deviations from the project
specifications
I contributed in leading the survey
and developing the management plan
that can allow specific roles and
responsibilities for every individual
involved in the project
Career Episode 1: CE
1.2.3, CE 1.3.3 and CE
1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and CE
2.4.2
Document Page
I full filled their expectations by
reporting each and every aspect of the
project on daily basis
Career Episode 3: CE
3.3.3, CE 3.4
PE3.2 Effective oral and written
communication in professional
and lay domains
I was very much aware of the given
timelines for the completion of
project as per management
instructions, budget allocations and
fulfilling the customer satisfaction by
complying with the standards for
Yokogawa product
I made sure that every objective and
activity of the project lead us towards
certain results and output of the
survey that can alternatively
contribute in implementing the
modernization within the old oil
refineries
I lead this project from the front foot
and managed all the teams of design
consultant, vendors, and engineers for
successful completion of this highly
strategic project
Career Episode 1: CE
1.2.3, CE 1.3.3 and CE
1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and CE
2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.3 Creative innovative and
proactive demeanour
I started my work by preparing
detailed “Responsibility Assignment
Matrix” which clearly defined the
participation and responsibilities of
internal departments, vendors and
sub-contractors in completing tasks
for a project in a given time span
I managed the entire team on how to
Career Episode 1: CE
1.3, CE 1.4 and CE 1.4.2
Career Episode 2: CE
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
execute the survey within specified
timeline
I had to install the control system and
evaluate it at every stage of the
execution of operational activities
through the established control
system
2.3.5, CE 2.4, CE 2.2.5
and CE 2.4.2
Career Episode 3: CE
3.2, CE 3.3
PE3.4 Professional use and
management of information
I was responsible for the successful
and smooth implementation of
control system revamp project from
Design till Commissioning as per
project specifications and SABIC
Standards
I was responsible for effectively and
efficiently survey the old refinery
through personally visiting and
reviewing the machines and the ways
in which the operations were being
delivered
I had to assure that the develop
project is capable of assuring better
benefits for the organization and
better services can be delivered to the
end-users without altering the
standard and quality of the output
Career Episode 1: CE
1.2.3, CE 1.2.5, CE 1.4.2
Career Episode 2: CE
2.2.3, CE 2.2.5, CE 2.4.2
Career Episode 3: CE
3.2.3, CE 3.2.5, CE 3.4.2
PE3.5 Orderly management of
self, and professional conduct
I set the standard and quality of the
services being delivered at the most
crucial factor for the satisfaction of
the end users
Career Episode 1: CE
1.4.1, CE 1.3.1 and CE
1.3.2
Document Page
I thoroughly surveyed the old refinery
and collected the existing
documentation about the entire
operational activities
I analyzed the possibility of
implementing Yokogawa’s wireless
technology and discussed the project
scope with the wireless product
specialist
Career Episode 2: CE
2.4.2, CE 2.3.2, CE 2.3.3
and CE 2.3.4
Career Episode 3: CE
3.4.2, CE 3.3.1 and CE
3.3.2
PE3.6 Effective team membership
and team leadership
I organized a meeting of both End-
user project team and Yokogawa
Project team for a review meeting to
further clarify any expectations of
End-users. Following this, the Design
was finalized to start procuring the
hardware
I used the system backup to retrieve
the hard IO’s which were coming
from Field Instruments and I
revalidated the Instrument Index
I instructed the procurement team to
procure installation related material
locally to meet project timeline
Career Episode 1: CE
1.4.1, CE 1.4.2
Career Episode 2: CE
2.4.1 and CE 2.4.2
Career Episode 3: CE
3.4.1 and CE 3.4.2
chevron_up_icon
1 out of 9
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]