This document presents a professional engineering competency summary, detailing the application of various engineering principles and skills across three distinct projects. The first project focused on FM0 and Manchester Encoding using SOLS Technique with Clock Gating and Power Gating Methods. The second project involved designing a Smart Security System for Children using Arduino, emphasizing IoT and microcontroller applications. The third project concentrated on the Implementation of an Intrusion Detection System (IDS) with Canary Tokens. The summary meticulously outlines the application of key competency elements, including knowledge and skill base, engineering application ability, and professional and personal attributes, referencing specific career episodes within the projects. The report showcases the student's ability to apply theoretical knowledge, utilize engineering techniques and tools, and demonstrate ethical conduct, communication skills, and team leadership. The projects highlight the student's proficiency in areas such as circuit design, numerical analysis, IoT, and IDS implementation, with an emphasis on problem-solving, systematic design processes, and effective project management.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Professional Engineering: Summary Statement
Competency Element
A brief summary of how
you have applied the
element
Paragraph number in the
career episode(s) where the
element is addressed
PE 1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive,
theory based
understanding of the
underpinning natural
and physical sciences
and the engineering
fundamentals applicable
to the engineering
discipline.
1. The project report was
for FM0 and Manchester
Encoding using SOLS
Technique with Clock Gating
and Power Gating Methods.
2. The second project report
was for Designing Smart
Security System for Children
using Arduino.
3. The third project report was
for Implementation of an
Intrusion Detection System or
IDS with Canary Tokens.
Career Episode 1.1, Career
Episode 1.2, Career Episode
1.3, Career Episode 1.4.
Career Episode 2.2.1, 2.2.2,
2.2.3, 2.2.4 and 2.3.1, 2.3.2
and 2.3.3
Career Episode 3.1, Career
Episode 3.2, Career Episode
3.3 and Career Episode 3.4
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics, and
computer and
information sciences,
which underpin the
engineering discipline.
I comprise of the core
capabilities related to critical
thinking power as well as
problem solving that I had to
successfully apply in these
projects. In the 3 electronics
and communications
engineering projects, I
ensured that my knowledge of
circuit designing and
numerical analysis is being
applied.
Career Episode 1.3.1,
2.3.1and 3.3.1
PE1.3 In-depth
understanding of
specialist bodies of
knowledge within the
engineering discipline
1. For this project of FM0 and
Manchester Encoding using
SOLS Technique with Clock
Gating and Power Gating
Methods, I comprised of the
in depth familiarity of FM0
and Manchester encoding
methods and SOLS technique.
2. For the project of
Designing Smart Security
System for Children using
Arduino, I had applied the in
depth familiarity of IoT and
Career Episode 1.3.1, 1.3.2
and Career Episode 1.3.3
CE 2.3.3, 2.3.2 and 2.3.1
CE 3.3.3, 3.3.2 and 3.3.1
Document Page
Arduino micro controller.
3. For the project of
Implementation of an
Intrusion Detection System or
IDS with Canary Tokens, I
had applied my knowledge of
IDS and Canary Tokens.
PE1.4 Discernment of
knowledge development
and research directions
within the engineering
discipline
I had tested and customized
the products. Moreover, I
even had to perform various
testing using experimental
methods. Since these were
electronics and
communications engineering
projects, I had to ensure that
the results are accurate and
error free.
CE 1.3.3, 1.3.4 and 1.3.5
CE 2.3.4, 2.3.3 and 2.3.5
CE 3.3.4, 3.3.3 and 3.3.5
PE1.5 Knowledge of
contextual factors
impacting the
engineering discipline.
The fault stimulations were
identified in the project and
proper efficient outputs were
obtained.
CE 1.3.1 and 1.3.2
CE 2.3.1 and 2.3.2
CE 3.3.1 and 3.3.2
PE1.6 Understanding of I had to maintain good CE 1.3.1 and 1.3.2
Document Page
the scope, principles,
norms, accountabilities
and bounds of
contemporary
engineering practice in
the specific discipline
relations with my team
members and this was helpful
in diminishing the problems
of projects. I undertook the
contemporary engineering
practice within my project.
CE 2.1.1, 2.3.1 and 2.3.2
CE 3.1.1, 3.3.1 and 3.3.2
PE 2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem
solving
I provided proper solutions
after solving the issues faced
in first attempt. I have applied
various techniques and
methodologies for executing
the three projects.
CE 1.3.2, 1.3.3, 2.3.2, 2.3.3,
3.3.2 and 3.3.3
PE2.2 Fluent application
of engineering
techniques, tools and
resources.
Few important electronics and
communications engineering
techniques like IoT, SOLS
technique that I have to utilize
in these projects was being
enumerated with incredible
articulacy.
CE 1.3.5, 1.3.2, 2.3.2, 2.3.5,
3.3.2 and 3.3.5
PE2.3 Application of
systematic engineering
synthesis and design
processes.
I have used my acute
familiarity of systematic
engineering synthesis. Hence,
the designing of the projects
CE 1.3.1, 2.3.1 and 3.3.1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
were done easily.
PE2.4 Application of
systematic approaches to
the conduct and
management of
engineering projects
The three projects required
the considerations of few
destructive operation
conditions that were needed
for the applications.
CE 1.3.3, 1.3.1, 2.3.3, 2.3.1,
3.3.3 and 3.2.1
PE 3 PROFESSIONAL AND PERSONAL ATTRIBUTES
PE3.1 Ethical conduct
and professional
Accountability
1. I had to ensure that I was
being logical and ethical in
every project, thus my ethics
related conduct as well as
professional accountability
was eventually maintained.
2. The codes of conduct were
being followed by me for
executing this project
properly and hence I was
successful in completing my
work.
3. I have maintained work
ethics and made sure that I
have also maintained them in
this project.
Career Episode 1.3.2, 1.3.3,
2.3.2, Career Episode 2.3.3,
Career Episode 3.3.2 and
Career Episode 3.3.3
Document Page
PE3.2 Effective oral and
written communication
in professional and lay
domains
I have fluency in few major
languages and have excellent
written communication skills
for the professional fields.
CE 1.3.2, 1.3.3, 1.3.4, 1.3.5,
2.3.2, 2.3.3, 2.3.4, 2.3.5,
3.3.2, 3.3.3, 3.3.4 and 3.3.5
PE3.3 Creative,
innovative and pro-
active demeanour
I being quite inventive
eventually provided advanced
ideas for project execution.
CE 1.1, 1.3.3, 2.1, 2.3.3, 3.1
and 3.3.3
PE3.4 Professional use
and management of
information
1. Although I had to come
through several issues, I used
my subsequent professional
skill as well as intellect to
solve them, hence was being
successful to achieve them.
2. As I had managerial skills,
I have the ability to manage
the entire team and in absence
of my supervisor, I showed
my managerial skills here.
3. I am successfully using my
professional and management
skills to manage the
confidential information.
CE 1.3.3, 1.3.4.1, 1.3.4.2,
1.3.5, 2.3.3, 2.3.4.1, 2.3.4.2,
2.3.5, 3.3.3, 3.3.4.1, 3.3.4.2
and 3.3.5
PE3.5 Orderly 1. I managed the professional CE 1.3.3, 1.3.4, 1.3.5, 2.3.3,
Document Page
management of self and
professional conduct
conduct and managed myself
and ensured that the project is
gaining proper results.
2. With the help of work
ethics and managerial skills, I
had managed myself in this
project properly and given
work progress report to my
supervisor.
3. I took regular follow ups of
the project for checking
whether the project was being
executed as per planning or
not.
2.3.4, 2.3.5, 3.3.3, 3.3.4, and
3.3.5
PE3.6 Effective team
membership and team
leadership
1. This project was completed
with proper working
collaboration with supervisor
and team members.
2. I have excellent leadership
skills; and in the absence of
my project supervisor, I
managed my team.
3. Being a responsible team
Career Episode 1.4.4, 1.4.5,
1.4.6, 1.5, Career Episode
2.4.4, 2.4.5, 2.4.6, 2.5 and
Career Episode 3.4.4, 3.4.5,
3.4.6, 3.5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
member, I had completed the
work by understanding
different details related to
canary tokens.
chevron_up_icon
1 out of 8
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]