Comprehensive Summary Statement: Professional Engineering Competencies

Verified

Added on  2020/05/11

|12
|2649
|50
Report
AI Summary
This document presents a summary statement evaluating a student's professional engineering competencies. The statement is structured around three main competency areas: knowledge and skill base (PE1), engineering application ability (PE2), and professional and personal attributes (PE3). Each competency element within these areas is addressed with a brief summary of how the student applied the element, along with references to specific career episodes where these elements are demonstrated. The document provides a detailed overview of the student's application of theoretical knowledge, engineering techniques, and professional conduct within the context of real-world projects, including the installation and configuration of CCTV systems, data network management, and adherence to engineering standards. The student demonstrates proficiency in solving complex engineering problems, applying systematic approaches, and communicating effectively in a professional setting. The summary highlights the student's ability to manage projects, adhere to ethical standards, and demonstrate creative and proactive behavior in various engineering contexts.
Document Page
SUMMARY STATEMENT
SRIKUMAR CHAKKALETHU RAM
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Professional Engineering: Summary Statement
Competency Element A brief summary of how you
have applied the element
Paragraph number in the
career episode(s) where the
element is addressed
PE 1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive,
theory based
understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the
engineering discipline.
I) I was in charge of the team
responsible for the connection of
the system with the main frame
of the organisation.
II) I had specifically requested
my clients for the approval of a
dedicated data stream network
for the CCTV cameras for the
removal of any kind of
interference from the other
network using devices.
III) I indicated in the drawing
RA-714185.001, I installed the 7
Career Episode 1: CE 1.2.1, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.3.1 and
CE 2.3.3
Career Episode 3: CE 3.2.1, CE
3.3.1 and CE 3.3.2
Document Page
STOPWORK push button panel.
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics, and
computer and information
sciences which underpin
the engineering discipline.
I) I had configured the system to
accept 95% of Arabic and 95%
of Latin characters without the
involvement of any other
official.
II) I had helped in the working
of the technical properties of the
project and the following of the
complete timeline of the project
to provide the best quality
project at the designated
deadline.
III) I terminated the
STOPWORK push button cable
in the terminal block and all the
cross connections within the
circuit.
Career Episode 1: CE 1.3.1
Career Episode 2: CE 2.3.2, CE
2.3.3 and CE 2.3.4
Career Episode 3: CE 3.3.2
PE1.3 In-depth
understanding of specialist
bodies of knowledge within
I) I was able to solve majority of
the problems that were faced by
the project.
Career Episode 1: CE 1.3.1
Document Page
the engineering discipline II) I had also configured the IP
CCTV System so that the
camera feeds can be monitored
remotely with the help of Saudi
Aramco corporate network.
III) I strongly emphasized on
adhering to the construction
standards set by the Saudi
Arabian Government as well as
by Saudi Aramco Engineering
Standards.
Career Episode 2: CE 2.3.1, CE
2.3.4, CE 2.2.5 and CE 2.4.2
Career Episode 3: CE 3.3.1,
CE 3.3.3
PE1.4 Discernment of
knowledge development
and research directions
within the engineering
discipline
I) I was also responsible for the
maintenance of the orders that
were being requested and the
management of the vendors and
the manufacture problems.
II) I had also provided the best
quality working procedure of
my telecommunication field
engineer skills for the project to
deliver the best quality project.
Career Episode 1: CE 1.2.5,
CE 1.3.1 and CE 1.4.2
Career Episode 2: CE 2.3.2,
CE 2.3.4 and CE 2.4.1
Career Episode 3: CE 3.3.2, CE
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
III) I performed installation of
the cables that originated from
the paging cabinet terminal
block and connected it to the
push button panel.
3.3.3 and CE 3.4.1
PE1.5 Knowledge of
contextual factors
impacting the engineering
discipline.
I) I had followed the project to
be developed based on the best
applicable Saudi Aramco
Standards.
II) I was responsible for the
system to be connected with a
dedicated network of IP which
will provide the organisation to
monitor the Saudi Aramco
corporation network with ease
III) I also needed to apply
creative design work in order to
address several technical
problems faced during the
course of the project.
Career Episode 1: CE 1.2.1, CE
1.2.2,
Career Episode 2: CE 2.2.1, CE
2.2.2
Career Episode 3: CE 3.2.1,
CE 3.2.3
PE1.6 Understanding of
the scope, principles,
I) I had taken care of any vendor
or manufacture problems related
Career Episode 1: CE 1.2.3, CE
1.3.3, CE 1.3.4 and CE 1.3.2
Document Page
norms, accountabilities
and bounds of
contemporary engineering
practice in the specific
discipline
to the project.
II) I had requested for the use of
two different kind of CCTV
cameras which are both of IP
based working.
III) I also applied for the land
use permits before proceeding
with my work in the project.
Career Episode 2: CE 2.2.3, CE
2.3.1 and CE 2.3.2
Career Episode 3: CE 3.2.3, CE
3.3.1 and CE 3.3.2
PE 2 ENGINEERING APPLICATION ABILITY
Document Page
PE2.1 Application of
established engineering
methods to complex
engineering problem
solving
I) I had helped in the completion
of the connectivity of the main
plate recognition system with
the main frame work of the
organisation.
II) I had used pan tilt zoom
property based cameras for the
outdoor surveillance.
III) I also added my own
technical and creative views to
enhance the quality of the
project.
Career Episode 1: CE 1.2.4,
CE 1.3.1 and CE 1.4.2
Career Episode 2: CE 2.3.3,
CE 2.3.4 and CE 2.4.1, CE
2.4.2
Career Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.4.2
PE2.2 Fluent application of
engineering techniques,
tools and resources.
I) I had helped in the installation
of the temperature monitoring
system into the project to
maintain the best quality
transmission of the signals.
II) I had configured the CCTV
cameras so that they would be
connected to the same IP so that
the video transferring can be
done easily and without any
Career Episode 1: CE 1.3.3, CE
1.3.2 and CE 1.3.1
Career Episode 2: CE 2.3.1, CE
2.3.2 and CE 2.3.3
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
hindrance.
III) I also needed to ensure the
safety and security guidelines of
the project. I strongly
emphasized on adhering to the
construction standards set by the
Saudi Arabian Government as
well as by Saudi Aramco
Engineering Standards.
Career Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design
processes.
I) I had worked with my team
mates for the complete duration
of the project to provide the best
quality of work.
II) I had set up a remote
monitoring centre where all the
camera feeds can be monitored
easily by security personnel.
III) I was assisted by several
other technical associates. In
order to fulfil my work order in
the project.
Career Episode 1: CE 1.2.3, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.3.3 and
CE 2.3.4
Career Episode 3: CE 3.2.5
PE2.4 Application of I) I had implemented the system Career Episode 1: CE 1.3.1 and
Document Page
systematic approaches to
the conduct and
management of
engineering projects
to be set up to constantly
monitor and register incoming
vehicles at the gate entry points
and exit points.
II) I had helped in the working
of the technical properties of the
project and the following of the
complete timeline of the project
to provide the best quality
project at the designated
deadline.
III) I installed the 1
STOPWORK push button panel
in the DCC room within the
administration building.
CE 1.3.2
Career Episode 2: CE 2.2.3, CE
2.3.1, CE 2.3.2 and CE 2.3.3
Career Episode 3: CE 3.3.1 and
CE 3.3.2
PE 3 PROFESSIONAL AND PERSONAL ATTRIBUTES
PE3.1 Ethical conduct and
professional Accountability
I) I had provided the client with
the complete list of all the
products that had been used for
the completion of the project
and the workers that were
related to the working of the
Career Episode 1: CE 1.2.3, CE
1.3.3 and CE 1.4.1
Document Page
project.
II) I was able to provide my
team with the best direction for
the completion of the project
and to complete the project in
time.
III) I worked on the design and
development of the system
architecture of the paging
system.
Career Episode 2: CE 2.2.3, CE
2.3.5 and CE 2.4.2
Career Episode 3: CE 3.3.3, CE
3.4
PE3.2 Effective oral and
written communication in
professional and lay
domains
I) I had helped in the installation
of the cameras and then
connecting the system with the
framework with the help of TCP
/ IP connection protocol.
II) I was working as the
telecommunication field
engineer for the complete
duration of the project.
III) I was able to deliver the
completed project within the
deadline set by the project
Career Episode 1: CE 1.2.3, CE
1.3.3 and CE 1.4.1
Career Episode 2: CE 2.2.3, CE
2.3.5 and CE 2.4.2
Career Episode 3: CE 3.3.3, CE
3.4
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
manager and we received
positive appraisal from the
supervisors.
PE3.3 Creative, innovative
and pro-active demeanor
I) I had completed the working
of the connection of the system
with the frame work with in the
designated time line.
II) I found that the eleven
cameras of the system is storing
the data separately. I improvised
on the videos to collectively
compile the videos of the eleven
cameras and store them under
the daily date folders.
III) I needed to develop the
system architecture of the
proposed system with the help
of my associates in this project.
Career Episode 1: CE 1.3, CE
1.4 and CE 1.4.2
Career Episode 2: CE 2.3.5, CE
2.4, CE 2.2.5 and CE 2.4.2
Career Episode 3: CE 3.2, CE
3.3
PE3.4 Professional use and
management of
information
I) I had also conducted a
detailed report based on the
equipment’s usage.
II) I was able to provide my
Career Episode 1: CE 1.2.3, CE
1.2.5, CE 1.4.2
Document Page
team with the best direction for
the completion of the project
and to complete the project in
time.
III) I also added my own
technical and creative views to
enhance the quality of the
project.
Career Episode 2: CE 2.2.3, CE
2.2.5, CE 2.4.2
Career Episode 3: CE 3.2.3, CE
3.2.5, CE 3.4.2
PE3.5 Orderly
management of self and
professional conduct
I) I had helped in the installation
of the temperature monitoring
system into the project to
maintain the best quality
transmission of the signals.
II) I had helped in the
connection of the complete
system with the organisations
framework for the returning of
the feedback to the data base
and the subsequent
configuration of the system.
III) I needed to learn about and
implement various industry
Career Episode 1: CE 1.4.1, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.4.2, CE
2.3.2, CE 2.3.3 and CE 2.3.4
Career Episode 3: CE 3.4.2, CE
3.3.1 and CE 3.3.2