This case study examines the Brampton Civic Hospital infrastructure project, focusing on the implementation and decommissioning phases. It delves into the project's lifecycle, asset management, operational security, safety, and overall project performance. The report provides a background of the hospital, discussing its aim to provide enhanced healthcare through advanced technology and medical equipment. Key areas explored include infrastructure project lifecycle phases (pre-investment, investment, and post-investment), managing project performance by defining clear objectives and procurement plans, and ensuring asset management and sustainability through lifecycle cost analysis and effective supply chain management. The study also addresses security and safety considerations, including risk assessment and data protection, and concludes with a reflection on the challenges, risks, and opportunities presented by the project.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: INFRASTRUCTURE PROJECT CASE STUDY
Infrastructure Project Case Study – Performance and
Sustainability
On
Brampton Civic Hospital
PROJ6011: Integrated Infrastructure Project Management
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
INFRASTRUCTURE PROJECT CASE STUDY
Executive summary
The aim of report is to discuss about Brampton Civic hospital case study. This hospital aims
at providing better treatment towards their patient. The report will discuss about the
implementation and decommissioning phases. The aim is to develop a report that will focus
on managing analytical skills and knowledge that are associated with each phase of the
project life cycle. The report aims at focusing on project life cycle, asset management,
operational security, safety and project performance. The report will discuss about the
background of the civic hospital and lastly will provide a reflection based on this case study.
Document Page
2
INFRASTRUCTURE PROJECT CASE STUDY
Table of Contents
Introduction...........................................................................................................................................3
About the Brampton Civic Hospital......................................................................................................3
Discussion.............................................................................................................................................4
3.1. Infrastructure project life cycle...................................................................................................4
3.2 Managing infrastructure project performance:.............................................................................5
3.3 Asset management and sustainability..........................................................................................6
3.4. Infrastructure project security and safety....................................................................................7
Reflection..............................................................................................................................................8
Conclusion.............................................................................................................................................9
References...........................................................................................................................................10
Document Page
3
INFRASTRUCTURE PROJECT CASE STUDY
Introduction
The report aim is to implement better project life cycle model for Brampton Civic
hospital. Brampton civic hospital is a public hospital and provides facility that is accessible
for all. The hospital developed its infrastructure with advanced technology and medic al
equipment’s. The aim behind implementing new technology is to provide better health
facility towards the community people. The project is being executed in Brampton city
located in Canada. The area required for developing this project is around 1.2 million sq. ft.
and includes 108 rooms and 608 beds for operation. The paper will develop a proper
infrastructure strategy for building the hospital. The report is going to be distributed into four
major parts that will includes project life cycle of infrastructure, management of asset and
sustainability managing infrastructure project performance, and finally the last part will
include safety and security associated with the project infrastructure.
About the Brampton Civic Hospital
Brampton Civic hospital is a hospital that aims in providing free services to their
patient. This is an acute care hospital located in the Brampton city. The hospital was designed
by Parkin Architects limited in joint venture with Adamson Associates. The hospital was
started with 608 beds. This is the first public hospital developed in Canada and maintained
under private public partnership. This hospital started working from 2007 and replaced the
Peel memorial hospital (Goodman & Hastak, 2006). The hospital servers around 500,000
residents of Brampton and the people from different areas. The hospital can give
accommodation to 80000 patient in time of emergency. The employees associated with the
organization are around 4100 (Guo & Skitmore, 2010).
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4
INFRASTRUCTURE PROJECT CASE STUDY
Discussion
The report aims at discussing the phases related to decommissioning and
implementation. For this report the chosen case study is of Brampton Civic Hospital and this
is important to determine each step associated with hospital. The requirements needed
throughout the development of this project is needed to understand. This becomes important
to understand the process controlling phase and also there is a need to determine the quality
management (Krohe, 2008). Apart from these it is essential to maintain the supply
management chain. Thus, it is necessary to develop a project plan that will be beneficial for
the hospital.
3.1. Infrastructure project life cycle
Every project needs to be understand well before planning. The Brampton civic
hospital needs to develop an infrastructure project life cycle before planning. This will help
the hospital to understand the phases and the working of infrastructure life cycle (Marlow,
Beale & Burn, 2010). With better approach towards the infrastructure project life cycle better
quality of service can be provided towards the customer. Apart from this, there are several
risks that are associated with the infrastructure. Thus it becomes essential to mitigate this
risks. In the project development cycle it becomes essential to encourage the role that every
stakeholders plays in private sector participation (Martland, 2012). The key risks related with
the implementation of Brampton project is with the handling of new equipment’s.
This becomes essential to recognise the project lifecycle of organisation so that the
processing lifecycle can be improved. However it is necessary to have trained employees and
staffs who will be able to handle every instrument well (Ormazabal, Viñolas & Aguado,
2008). Getting a good knowledge of infrastructure development entails assessment in project
development and acknowledge depths of the project.
Document Page
5
INFRASTRUCTURE PROJECT CASE STUDY
Figure1: Infrastructure project life cycle
Source: (Martland, 2012)
The phases of project life cycle includes:
Pre-investment phase: this includes project identification, preparation of the project,
feasibility study of project and approval of the project and finally the need for good
finance.
Investment phase: this phase includes detailed engineering and designing of the
project. The implementation of project also comes under this phase.
Post investment phase: this phase includes project operations, monitoring of the
project in mid-term and ex post evaluation.
Document Page
6
INFRASTRUCTURE PROJECT CASE STUDY
The cycle as shown below:
Figure2: components of project cycle
Source: (Ormazabal, Viñolas & Aguado, 2008)
3.2 Managing infrastructure project performance:
The aim behind developing Brampton civic hospital was to provide better facility to
everyone. The report focuses on the performance definition. Brampton civic hospital should
be aware about the effects of implementing new technology within the hospital (Penn &
Parker, 2012). The procurement plan includes planning the contract and metric that will be
helpful to regulate performance of the contract.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
INFRASTRUCTURE PROJECT CASE STUDY
The responsibility of the project manager is to set a deadline and finish the project
within the time. The services and product offered by the hospital needs a standard document
to continue the procurement plan. Public infrastructure projects are important for every
country. This helps in driving country’s economic success and also has the capability to grow
and become more feasible in the competitive market (PwC 2014). This is essential to manage
the project performance so that the newly implemented technology can be used properly to
achieve maximum benefits.
With the implementation of a better public infrastructure with newly implemented
technologies creates a positive impact on the community and also helps in providing better
land a healthy life style. Managing the infrastructure is necessary to maintain a good balance
in country. Brampton civic hospital is the first civic hospital of Brampton, thus it is essential
to manage infrastructure well so that maximum support can be provided to the customers
(Chen et al. 2009). The main benefit of a civic hospital that it chooses project wisely and
always takes responsibility to fulfil the needs of the people associated with the hospital
(Rahman & Kumaraswamy, 2008). This ensures that the project chosen are beneficial for the
hospital and also ensures that better project can be developed with less amount of money.
Ideal project initiates growth and allocate the right resources and raw material that ensures on
budget and on time completion of the project without changing the surroundings.
3.3 Asset management and sustainability
Asset management and sustainability are introduced with the purpose of improving
the work and pronouncement making. The decision is made with the aim to manage the assets
affectively that are needed in present and also aims at managing the assets that will be needed
in the future. It becomes important to make decision correctly that will be beneficial for the
hospital and the staffs associated with the hospital. to successfully complete the commission
steps , the hospital and the management team needs to monitor some basic phases that
Document Page
8
INFRASTRUCTURE PROJECT CASE STUDY
comprises start, meet often, determined training and lastly the management team of the
hospital needs to keep commissioning involved (Rodgers, 2005). After the completion of
contract the organization can start with implementation of this project. Before starting the
project it is important to verify each documents and get the permission from the government.
As Brampton hospital is a public hospital, thus it needs to be approved by the government.
The challenges that are supposed to be faced while implementing this project are also needed
to be addressed and to be mitigated in time. Life cycle cost analyses is used to manage the
asset efficiently and also enables long duration cost optimization (Accenture, 2012). It is the
responsibility of the project leader to manage the resources accordingly and organize them in
a proper manner so that they can evaluate based project. The responsibility of project leader
is to look after the stakeholders and check the supply chain management. With a proper
Supply chain management the project lead can get a 360 degree visibility into the ecosystem
of the suppliers. Effective SCM system helps in accomplishing the following goal this
includes managing contractual obligations to ensure continuous supply of resources and also
avoids service delivery disruptions. This cycle includes evaluating the costs after analysing
them by determining the assets used and also offers least cost solution.
Document Page
9
INFRASTRUCTURE PROJECT CASE STUDY
Figure3: Asset management and sustainability
Source: (Sánchez Soliño & Vassallo, 2009).
3.4. Infrastructure project security and safety
This is important to conduct a comprehensive risk assessment that will determine the
potential security risks and will involve strategies to mitigate the risks involved in deigning
phase. This is essential of develop a better security plan that will ensure safety of each
patients associated with the hospital (Sánchez Soliño & Vassallo, 2009). Moreover the data
stored within the documents of the company needs to be maintained with highest security.
Every data associated with the patient needs to be maintained with highest security, as no
third party can be allowed to access the information about any employee or patients. IAHSS
security design guidelines for healthcare facilities ensure developing security design with the
Brampton civic hospital. Apart from these, the pharmacies hired by the organization needs to
be knowledgeable enough so that they can provide better facility. There are several threats
associated with the use of new instruments.
The report evaluates in detail the functioning issues that are most likely to be faced
with the application of these project. There are some issues related to safety and security
issues that are identified and mitigation techniques are also provided. With the
implementation of new technology and equipment it becomes essential to hire highly
technical staffs that can operate this equipment properly (Song, Mohamed & AbouRizk,
2009). With proper use of the technology efficiency can be achieved. Apart from these
disease control and prevention publishes guidelines are designed to manage the impact of
construction activities on health.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10
INFRASTRUCTURE PROJECT CASE STUDY
Reflection
The case study of Brampton civic hospital includes implementing new facility for
hospital that is used to serve the community people to cure several health issues with the help
of advanced technologies. The first part of the report has described about the key challenges
that are faced while developing this project. Moreover, the strategies to overcome these
challenges are described. Apart from the challenges there are some risks that are needed to be
mitigated. This becomes important for the Brampton civic hospital too work in a way that
will increase the efficiency and service provided towards the patients. Safety of the patient is
also an important aspect. According to me apart from the implementation of new
technologies it is necessary to develop proper guidelines that will ensure safety of the people
associated with the hospital. With new technologies there are chances of new opportunities.
This will bring success towards the hospital. The partnership followed by the hospital public
private partnership. This ensures job opportunity within the society and also creates a
constructive impact on community. The developed project will ensure benefits for
government.
For completing the project within time hospital has implemented several financial
stability. Moreover government body has also helped the hospital by providing fund. Part b of
these assignment has discussed about the need for infrastructure feasibility. Thus, from the
above report it can be concluded that managing the infrastructure with proper security
strategies will be beneficial for the project. Apart from managing the infrastructure it is
necessary to develop proper security guidelines that will ensure better safety towards the
people associated with the civic hospital. According to me managing infrastructure properly
and developing each step with care and safety will be helpful for the project.
Document Page
11
INFRASTRUCTURE PROJECT CASE STUDY
Conclusion
From the report it can be said that there is a need to emphasis on decommissioning
phase and implementation phases apart from determining the opportunities, challenges and
stakeholders associated with the project. Before implementing any project it is important to
learn about the infrastructure of the organization. Thus, it is important to learn the
infrastructure and life cycle followed. After understanding the infrastructure, it becomes
necessary to manage the performance of the infrastructure. This includes a procurement plan
that ensures delivering a proper set of requirements needed for developing the project. Asset
sustainability and management involves managing the asset required by the hospital while
developing the project. This phase includes getting permission from every stakeholders and
government body. Brampton civic hospital can start working only after the project is being
approved. After analysing all the needs and getting approved by community people, the
hospital needs to assess the risks that are likely to be faced by the hospital while developing
the project. After assessing the risks, it is needed to develop a proper strategy plan that will
help in mitigating tis risks. The report has included every possible risks management
strategies. Thus, the developed report will be beneficial for understanding the implementation
and decommissioning phases.
Document Page
12
INFRASTRUCTURE PROJECT CASE STUDY
References
Accenture (2012). Intelligent Urban Infrastructure: High Performance Platform for Urban
Development. Retrieved from
https://www.accenture.com/t20150523T043119__w__/us-en/_acnmedia/Accenture/
Conversion-Assets/DotCom/Documents/Global/PDF/Industries_4/Accenture-
Intelligent-Urban-Infrastructure.pdf#zoom=50
Chen, P., Scown, C., Matthews, H. S., Garrett, J. H., Jr., & Hendrickson, C. (2009).
Managing critical infrastructure interdependence through economic input/output
methods. Journal of Infrastructure Systems, 15(3), 200–210. Reprinted by permission
of the American Society of Civil Engineers via the Copyright Clearance Center.
Gil, N. (2009). Developing cooperative project client-supplier relationships: How much to expect
from relational contracts. California Management Review, 51(2), 144–169. Reprinted by
permission of the University of California Press via the Copyright Clearance Center. [PDF]
Goodman, A. S., & Hastak, M. (2006). Infrastructure planning handbook: Planning, engineering, and
economics. Chapters 6 and 11, Reprinted by permission of American Society of Civil
Engineers via the Copyright Clearance Center.
Guo, H. L., Li, H., & Skitmore, M. (2010). Life-cycle management of construction projects based on
virtual prototyping technology. Journal of Management in Engineering, 26(1), 41–47.
Reprinted by permission of American Society of Civil Engineers via the Copyright Clearance
Center.
Krohe, J., Jr. (2008). Our daunting to-do list: When it comes to infrastructure, we know the
problems. What are we going to do about them? Planning, 74(9), 6–13. From TUA
library
databases. http://ezproxy.laureate.net.au/login?url=http://search.ebscohost.com/
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13
INFRASTRUCTURE PROJECT CASE STUDY
login.aspx?direct=true&AuthType=ip,url,uid&db=a9h&AN=34692084&site=eds-
live&scope=site
Marlow, D. R., Beale, D. J., & Burn, S. (2010). A pathway to a more sustainable water
sector: Sustainability-based asset management. Water Science & Technology, 61(5),
1245–1255. From TUA library databases: http://ezproxy.laureate.net.au/login?
url=http://search.ebscohost.com/login.aspx?
direct=true&AuthType=ip,url,uid&db=cmedm&AN=20220247&site=eds-
live&scope=site
Martland, C. D. (2012). Chapter 5 (Sec 5.1)
Ormazabal, G., Viñolas, B., & Aguado, A. (2008). Enhancing value in crucial decisions: Line
9 of the Barcelona subway. Journal of Management in Engineering, 24(4), 265–272.
From TUA library databases.
http://ezproxy.laureate.net.au/login?url=http://search.ebscohost.com/login.aspx?
direct=true&AuthType=ip,url,uid&db=edsgao&AN=edsgcl.186516397&site=eds-
live&scope=site
Sánchez Soliño, A., & Vassallo, J. M. (2009). Using public-private partnerships to expand
subways: Madrid-Barajas International Airport case study. Journal of Management in
Engineering, 25(1), 21–28. From TUA library databases.
http://ezproxy.laureate.net.au/login?url=http://search.ebscohost.com/login.aspx?
direct=true&AuthType=ip,url,uid&db=bth&AN=35745912&site=eds-
live&scope=site
Song, L., Mohamed, Y., & AbouRizk, S. M. (2009). Early contractor involvement in design
and its impact on construction schedule performance. Journal of Management in
Engineering, 25(1), 12–20. From TUA library databases.
Document Page
14
INFRASTRUCTURE PROJECT CASE STUDY
http://ezproxy.laureate.net.au/login?url=http://search.ebscohost.com/login.aspx?
direct=true&AuthType=ip,url,uid&db=edsgao&AN=edsgcl.191855321&site=eds-
live&scope=site
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]