This document is a project log sheet submitted by Olugbenga Olugbade for the PROJ6016 Project Management Capstone C course at Torrens University. The log sheet details the tasks completed during the first four weeks of an employer-based project at First Age Private School in Abuja, Nigeria. The project involved the installation of a fire pump controller, ATS, remote generator annunciator panel, GRC coupling, and PVC FEM adapter, culminating in the submission of a project draft. The project faced challenges related to a previous failed generator project, highlighting issues in requirement and human resource management. The log sheet also includes the student's reflections on project limitations, such as incorrect load calculations and transportation problems, and proposed solutions. The log sheet is signed and certified by the supervisor/employer, confirming the accuracy of the recorded work. The assignment brief requires a project plan and budget, among other deliverables, to address the challenges faced in the project and improve project management skills.
Document Page
Log Sheet
Employer-Based Project
First Name: Olugbenga Surname: Olugbade
Name of the organization: First Age Private School, Abuja, Nigeria
Week #:1 to 4
Day Date Details of tasks completed during this period
20 12/03/2020 Fire pump controller and ATS installation
In these days the fire Pump Controller and the ATS will be installed. It will give signal
from the pressure switch to initiate the fire pump. In order to maintain the safety of all a
control panel for the fire pump will be installed. It will also help to control and monitor the
fire pumps by fulfilling the requirements those are described in the fire pump controller
benchmark.
23 30/03/2020 Installation of remote generator annunciator panel:
The annunciator panel is installed in these days which are a collection of lights basically
used for warning purposes. The annunciator panel is also defined as centralized warning
panel or a caution advisory panel. With the help of this group of light the school authority
will come to know about the current status of the generator.
34 1/4/2020 GRC coupling:
In this day the GRC coupling will be done because it is interchangeable with the Rigid and
IMC steel conduits and also along with Kwik-couple conduits.
40 16/04/2020 Installation of PVC FEM ADAPTER:
For successfully installing the generator in school PVC FEM ADAPTER is also needed to
be installed because it is rigid PVC which is a connector mainly used for transmitting
threaded metal conduit to PVC conduits.
51 27/04/2020 Project draft:
Submission of final project draft is an important action useful for project success. In order
to make sure that the generator is installed successfully the status of the project needs to be
checked accurately. In this day the final project draft is submitted to the project owner and
school authority as well to let them know that project is ready for further progress.
Certified by the supervisor/employer
I confirm that this is an accurate summary of work performed in this period
Signature: Name: Olugbenga Olugbade
Date: 24.03.2020
Please complete Log Sheet and submit according to the assessment timeframes. The Log Sheet must
be signed by your supervisor/employer at the organisation were you are undertaking your project.