Project Management Capstone: Weekly Log Sheet - Torrens University
VerifiedAdded on  2023/05/29
|7
|1180
|287
Project
AI Summary
This document presents a Project Management Capstone project status report and weekly log sheet focusing on the implementation of a corporate database at First National Bank. The report details the tasks completed between October 29th and December 12th, including database design, security implementation, data analysis, system integration, re-budgeting, and implementation planning. It highlights the use of project management and design thinking principles in selecting a secure corporate database structure. The report concludes with a discussion of the benefits of the integrated information system for First National Bank and reflections on the documentation and post-project analysis processes. References to relevant project management literature are also included.

Project Management Capstone
Hassan Mustafa
00161426T
Project status reports and weekly log sheet
Torrens University
Hassan Mustafa
00161426T
Project status reports and weekly log sheet
Torrens University
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Log Sheet
First Name: Hassan Surname:Mustafa
Name of the organisation:First National Bank
Week #:
Day Date Details of tasks completed during this period
Monday 29-10-2018 The interface for the corporate database was designed in this
period. The corporate data base was selected for the First
National Bank and it was secured that the information
extraction would be eased with the compilation of the work
development. The CDB database has the required securityFriday 02-11-2018 The consolidation of the manual system has been the primary
motive for the development of the effective work
development. The manual information management would be
implied with the implication of the works and listing the
formation of the work development. The department
Monday 05-11-2018 The information analysis and the flow of departmental data
would be selected and executed in this phase for the project.
The First National Bank would be able to generate the
specific implication management works for their data and
information. The user controlled report would be effectively
implied with the management of the successful management
Friday 09-11-2018 The data base developed was integrated with the functions
required in the First National Bank. The invoice
development, bills of payable, purchase accounts, and smart
management. The integration has been integrated with the
First Name: Hassan Surname:Mustafa
Name of the organisation:First National Bank
Week #:
Day Date Details of tasks completed during this period
Monday 29-10-2018 The interface for the corporate database was designed in this
period. The corporate data base was selected for the First
National Bank and it was secured that the information
extraction would be eased with the compilation of the work
development. The CDB database has the required securityFriday 02-11-2018 The consolidation of the manual system has been the primary
motive for the development of the effective work
development. The manual information management would be
implied with the implication of the works and listing the
formation of the work development. The department
Monday 05-11-2018 The information analysis and the flow of departmental data
would be selected and executed in this phase for the project.
The First National Bank would be able to generate the
specific implication management works for their data and
information. The user controlled report would be effectively
implied with the management of the successful management
Friday 09-11-2018 The data base developed was integrated with the functions
required in the First National Bank. The invoice
development, bills of payable, purchase accounts, and smart
management. The integration has been integrated with the

Monday 12-11-2018 The re-budgeting of the project activities was done for
ensuring that the resources are effectively aligned with the
works and the management of the successful integration
management works. The alignment has also been successful
for forming the listing of the works and the alignment of the
Friday 16-11-2018 Jim Gunn was trying for obtaining the analyst for the project
performance analysis. The completion of the works has been
effectively managed and implied with the evolvement of the
smart works. Although none of the managers were available
for the analysis of the work and taking care of the improved
Monday 19-11-2018 The manual information management would be implied with
the implication of the works and listing the formation of the
work development. The user controlled report would be
effectively implied with the management of the successful
Friday 23-11-2018 The listing of the works has been implied with the formation
of the smart work development. The completion of the works
has been effectively managed and implied with the
evolvement of the smart works. The integration has been
integrated with the works and formed with the undergoing
Monday 26-11-2018 The implementation plan was developed and executed in this
phase. The implication of the works was highly responsible
with the formation of the effective implication development.
The step by step implementation of the new database system
was formed for making sure that the implication of the works
would be effective with the formation management. The
listing of the probable work management has been implied
ensuring that the resources are effectively aligned with the
works and the management of the successful integration
management works. The alignment has also been successful
for forming the listing of the works and the alignment of the
Friday 16-11-2018 Jim Gunn was trying for obtaining the analyst for the project
performance analysis. The completion of the works has been
effectively managed and implied with the evolvement of the
smart works. Although none of the managers were available
for the analysis of the work and taking care of the improved
Monday 19-11-2018 The manual information management would be implied with
the implication of the works and listing the formation of the
work development. The user controlled report would be
effectively implied with the management of the successful
Friday 23-11-2018 The listing of the works has been implied with the formation
of the smart work development. The completion of the works
has been effectively managed and implied with the
evolvement of the smart works. The integration has been
integrated with the works and formed with the undergoing
Monday 26-11-2018 The implementation plan was developed and executed in this
phase. The implication of the works was highly responsible
with the formation of the effective implication development.
The step by step implementation of the new database system
was formed for making sure that the implication of the works
would be effective with the formation management. The
listing of the probable work management has been implied
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Friday 30-11-2018 The implementation plan continued and the system was
implemented with the smart project formation. The
compilation of the works with the implication development
has been successful with the formation of the smart
management factors. The analysis of the work of First
Monday 03-12-2018 The analysis of the outputs were done for ensuring that the
management would be implied for taking care of the smart
information management. The outputs would be supportive of
the implication works.Friday 07-12-2018 The final documents were made and the testing reports were
considered in this phase. The final documents developed
would be helpful for taking care of the work and aligning the
management of the work. The final documents would be
developed for future prospects
Wednesday 12-12-2018 The post project meetings and review was carried on this
phase. The final project meetings are developed for ensuring
the implication of the works and listing probable
acknowledgment for future works.
Certified by the supervisor/employer
I confirm that this is an
accurate summary of work
performed in this period
implemented with the smart project formation. The
compilation of the works with the implication development
has been successful with the formation of the smart
management factors. The analysis of the work of First
Monday 03-12-2018 The analysis of the outputs were done for ensuring that the
management would be implied for taking care of the smart
information management. The outputs would be supportive of
the implication works.Friday 07-12-2018 The final documents were made and the testing reports were
considered in this phase. The final documents developed
would be helpful for taking care of the work and aligning the
management of the work. The final documents would be
developed for future prospects
Wednesday 12-12-2018 The post project meetings and review was carried on this
phase. The final project meetings are developed for ensuring
the implication of the works and listing probable
acknowledgment for future works.
Certified by the supervisor/employer
I confirm that this is an
accurate summary of work
performed in this period
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Signature:
Name:
Date:
Report
Introduction: The final date for the completion of the project was 12th December, 2018 by
which the project was scheduled to be completed. On this day the final meeting for the post
project review was undertaken and it involved the implication of the analysis and evaluation of
the project progress.
Discussion: The time period of 29th October to 12th December was utilized for the development
of the database aligning the work and synthesis of the smart work development. The last phase
date was 26th October and it marked with the identification of the database for aligning with the
continuation management. The database of corporate style has been selected for the listing of the
information and forming the improved services for the First National Bank. The integrated
database would be helpful for accessing information for all the activities of the bank.
Conclusion: The implication of the new database had been implied with the continuation of the
works defining the implication management works. The First National Bank
had got the benefit of improving the work with the help of their integrated information system.
Supportive Commentary and Reflection
Name:
Date:
Report
Introduction: The final date for the completion of the project was 12th December, 2018 by
which the project was scheduled to be completed. On this day the final meeting for the post
project review was undertaken and it involved the implication of the analysis and evaluation of
the project progress.
Discussion: The time period of 29th October to 12th December was utilized for the development
of the database aligning the work and synthesis of the smart work development. The last phase
date was 26th October and it marked with the identification of the database for aligning with the
continuation management. The database of corporate style has been selected for the listing of the
information and forming the improved services for the First National Bank. The integrated
database would be helpful for accessing information for all the activities of the bank.
Conclusion: The implication of the new database had been implied with the continuation of the
works defining the implication management works. The First National Bank
had got the benefit of improving the work with the help of their integrated information system.
Supportive Commentary and Reflection

I had been using the concept of project management and design thinking for the development of
the database for the First National Bank. It helped me in selection of the corporate type of
database structure which has the improved security structure for keeping the information
protected. I also learnt about the documentation process for taking care of the implication works.
The analysis has been implied with the successful management process. I had been responsible
for taking care of the works and listing the works for implying the effective work development
facilities. I have also considered the aspect of post project analysis process for making sure that
the work is implied cohesively.
the database for the First National Bank. It helped me in selection of the corporate type of
database structure which has the improved security structure for keeping the information
protected. I also learnt about the documentation process for taking care of the implication works.
The analysis has been implied with the successful management process. I had been responsible
for taking care of the works and listing the works for implying the effective work development
facilities. I have also considered the aspect of post project analysis process for making sure that
the work is implied cohesively.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Bibliography
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini, D. (2014). Project management:
The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.
Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.
Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), pp.202-217.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini, D. (2014). Project management:
The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.
Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.
Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), pp.202-217.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
1 out of 7
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.