This document presents a project evaluation form completed by a student and assessed by a supervisor from As-Sabuur Nig limited. The project involves the installation of UPS systems, focusing on the negotiation of evaluation times considering power outage issues. The form includes self-evaluation and supervisor evaluation of leadership competencies and strategic project implementation approaches. The student's self-evaluation and supervisor's assessment are compared, highlighting strengths in project planning and site design. The document also references PMBOK guides for project management principles. Desklib provides access to similar project reports and evaluation forms for students.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT EVALUATION FORM
Project Evaluation Form
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1PROJECT EVALUATION FORM
Negotiation of a time to meet with their supervisor in which to undertake this
evaluation
The project is about the installation of the UPS Systems in the houses that are to be
done by the organization of As-Sabuur Nigeria Limited to a house in Nigeria. This area is
found to be extremely plagued with the problems of power outages at several times in the
day. Therefore, the time that shall be negotiated with the supervisor to undertake the
evaluation should be negotiated with the supervisor during the day time. It must be negotiated
in the daytime because the negotiation process and evaluation can still be done in the day
time, if there is an occurrence of power outage. If it happens somewhere near the night or the
evening when the power outage happens, it would be extremely difficult to carry on with the
evaluation process with no power in the area.
Document Page
2PROJECT EVALUATION FORM
Completed the evaluation form with 4 competencies specified
Document Page
3PROJECT EVALUATION FORM
Criterion Evaluator
Student Name: Date:
23/05/2019
Organisation Name: As -Sabuur
Nig limited
Supervisor’s
Name:
Very weak
Poor
Average
Good
Outstanding
Constructive
Comments
1 2 3 4 5
1. Project
Leadership
Student’s
self-
evaluation
Goo
d
As a project
manager, it was
found that the
understanding
behind the
project was not
only identified
but all the
associated
planning was
done by the
project manager.
Supervisor
’s
Evaluation
Goo
d
The project
schedule to
design plan and
even the project
closure was
done by the
project manager.
This was a
commendable
act, although, as
per the proper
methodology
defined in
PMBOK, a
specific team
should have
been selected to
handle the
different
department of
the project
works (Project
Management
Institute, 2017a).
2. Strategic
Approach towards
project
implementation
Student’s
self-
evaluation
Goo
d
The site design
was conducted
as per the
requirement of
the house.
Supervisor
’s
Evaluation
Goo
d
The site design
also included the
involvement of
the project
manager
(Project
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4PROJECT EVALUATION FORM
References
Project Management Institute. (2017a). A guide to the project management body
of knowledge (PMBOK guide). (6th ed.). Newton Square, PA: Project Management
Institute.
Project Management Institute. (2017b). Project manager competency framework. (3rd ed.).
Newtown Square, PA: Project Management Institute.
chevron_up_icon
1 out of 5
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]