This report provides a comprehensive analysis of project authorization and scope management, covering key aspects such as project authorization processes, requirements, and the roles of various stakeholders like project sponsors and managers. It includes a sample project authorization for a mobile application development, detailing project scope, intended outcomes, strategic alignment, approved schedules, key milestones, and budget. The report further explores project boundaries, benefits, outcomes, and outputs, along with relevant stakeholders and scope management plans. It also delves into scope management procedures, constraints, change control, and potential issues. The report emphasizes the importance of clear project boundaries, effective change management, and stakeholder engagement for successful project execution. It also provides insights into how to improve various aspects of scope management, such as time planning, risk assessment, and budget estimation. The report concludes by highlighting the components of a scope management plan and the importance of these elements for project success. This report serves as an excellent resource for students studying project management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Running head: DIPLOMA IN PROJECT MANAGEMENT
DIPLOMA IN PROJECT MANAGEMENT
Name
Institution
Course
data
DIPLOMA IN PROJECT MANAGEMENT
Name
Institution
Course
data
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

DIPLOMA IN PROJECT MANAGEMENT 2
Activity 1A
i) What is project authorization; the process of granting permission for the initially proposed
project to be put into implementation. As a project is proposed and planned, it has to seek the viable
permission to start its operation. This is usually done by the project sponsor, who solely provides or
funds all the necessary requirements for the project execution with an intended goal of achieving,
developing, initiating a particular project or addressing an identified problem in an organization.
Before a project sponsor approves the project, there are a series of things they consider/ review
ii) What does project authorization include;
The process of project authorization has a series of activities involved in,
including
Reviewing of the project methodologies
Assessment of the project goals and objectives
Analysis of the roles and responsivities
Reviewing of the project budget
Assessing of the project timeline and budget
iii) Who may the appropriate authority be?In a project execution, there are
significantly many people who may be deemed responsible for the project authorization.
Among the many may include; the project sponsor, project manager, and authorities
controlling the ethical codes of conduct, to ensure that the project does not breach the pre-
established codes of conduct
iv) Decide on an example of a projectFirstly, it is important to note that there is no one
unified way of developing a project authorization. This is evident by the fact that different project
managers have different views about the approach of project authorization. Holding such a view, a
draft of a project authorization is premeditated subsequently
Activity 1A
i) What is project authorization; the process of granting permission for the initially proposed
project to be put into implementation. As a project is proposed and planned, it has to seek the viable
permission to start its operation. This is usually done by the project sponsor, who solely provides or
funds all the necessary requirements for the project execution with an intended goal of achieving,
developing, initiating a particular project or addressing an identified problem in an organization.
Before a project sponsor approves the project, there are a series of things they consider/ review
ii) What does project authorization include;
The process of project authorization has a series of activities involved in,
including
Reviewing of the project methodologies
Assessment of the project goals and objectives
Analysis of the roles and responsivities
Reviewing of the project budget
Assessing of the project timeline and budget
iii) Who may the appropriate authority be?In a project execution, there are
significantly many people who may be deemed responsible for the project authorization.
Among the many may include; the project sponsor, project manager, and authorities
controlling the ethical codes of conduct, to ensure that the project does not breach the pre-
established codes of conduct
iv) Decide on an example of a projectFirstly, it is important to note that there is no one
unified way of developing a project authorization. This is evident by the fact that different project
managers have different views about the approach of project authorization. Holding such a view, a
draft of a project authorization is premeditated subsequently

DIPLOMA IN PROJECT MANAGEMENT 3
Sample project authorization
Project Name: Mobile application development and implementation
Project Manager: Maximillian Davis Orinado
Project Sponsor: UBER
a). PROJECT SCOPE
Developing a new mobile application for UBER
Training the UBER employees on the usage of the app
Scope exclusions
No clear intended exclusins
b). INTENDED OUTCOMES
The mobile app will;
improve communication efficiency among UBER employees
advance customer satsfaction
reduce on communication cost
c). STRATEGIC ALIGNMENT
The strategic goals of the organisation that the preceding outcomes are aligned to
UBER aims at reducing its long-term operational costs
Sample project authorization
Project Name: Mobile application development and implementation
Project Manager: Maximillian Davis Orinado
Project Sponsor: UBER
a). PROJECT SCOPE
Developing a new mobile application for UBER
Training the UBER employees on the usage of the app
Scope exclusions
No clear intended exclusins
b). INTENDED OUTCOMES
The mobile app will;
improve communication efficiency among UBER employees
advance customer satsfaction
reduce on communication cost
c). STRATEGIC ALIGNMENT
The strategic goals of the organisation that the preceding outcomes are aligned to
UBER aims at reducing its long-term operational costs

DIPLOMA IN PROJECT MANAGEMENT 4
Improving on the competitive advantage over its competitors
Improve on customer experience
d). APPROVED SCHEDULE
Planning commence: Thu 8/9/12 Planning complete: Fri 8/17/12
Delivery commence: 9/11/12 Delivery complete: Continuous/ service
e). Key milestones
Task Name Duration Start Finish Predecessors
project planning 7 days Thu 8/9/12 Fri 8/17/12
project scope planning 3 days Thu 8/9/12 Mon 8/13/12
stakeholder identification 4 days Tue 8/14/12 Fri 8/17/12 2
stakeholder training and procurement of
required equipment
0 days Fri 8/17/12 Fri 8/17/12 3
project implementation 9 days Mon 8/20/12 Thu 8/30/12
application development 3 days Mon 8/20/12 Wed 8/22/12 4
testing of output 4 days Thu 8/23/12 Tue 8/28/12 6
finalization and effecting identified issues 2 days Wed 8/29/12 Thu 8/30/12 7
Summary #2 Complete 0 days Thu 8/30/12 Thu 8/30/12 8
project review, evaluation and closing 7 days Sat 9/1/12 Tue 9/11/12
review of the project process 3 days Sat 9/1/12 Tue 9/4/12 9
correction and ammendment 2 days Wed 9/5/12 Thu 9/6/12
Improving on the competitive advantage over its competitors
Improve on customer experience
d). APPROVED SCHEDULE
Planning commence: Thu 8/9/12 Planning complete: Fri 8/17/12
Delivery commence: 9/11/12 Delivery complete: Continuous/ service
e). Key milestones
Task Name Duration Start Finish Predecessors
project planning 7 days Thu 8/9/12 Fri 8/17/12
project scope planning 3 days Thu 8/9/12 Mon 8/13/12
stakeholder identification 4 days Tue 8/14/12 Fri 8/17/12 2
stakeholder training and procurement of
required equipment
0 days Fri 8/17/12 Fri 8/17/12 3
project implementation 9 days Mon 8/20/12 Thu 8/30/12
application development 3 days Mon 8/20/12 Wed 8/22/12 4
testing of output 4 days Thu 8/23/12 Tue 8/28/12 6
finalization and effecting identified issues 2 days Wed 8/29/12 Thu 8/30/12 7
Summary #2 Complete 0 days Thu 8/30/12 Thu 8/30/12 8
project review, evaluation and closing 7 days Sat 9/1/12 Tue 9/11/12
review of the project process 3 days Sat 9/1/12 Tue 9/4/12 9
correction and ammendment 2 days Wed 9/5/12 Thu 9/6/12
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

DIPLOMA IN PROJECT MANAGEMENT 5
project closure and handover 3 days Sat 9/8/12 Tue 9/11/12
f. APPROVED BUDGET
The total cost of planning all the project activities (the planning phase expenses) $ 1000
Total expenses to be incurred for the Capital purchase (delivery) $ 5000
Operational expenditure (all planned expenses to be incurred during execution)
(delivery)
$ 4000
Contingency (all unplanned shortcomings during project execution) 20% $ 2000
Total $ 12000
g). CRITICAL SUCCESS FACTORS
close monitoring of all the project activities
project closure and handover 3 days Sat 9/8/12 Tue 9/11/12
f. APPROVED BUDGET
The total cost of planning all the project activities (the planning phase expenses) $ 1000
Total expenses to be incurred for the Capital purchase (delivery) $ 5000
Operational expenditure (all planned expenses to be incurred during execution)
(delivery)
$ 4000
Contingency (all unplanned shortcomings during project execution) 20% $ 2000
Total $ 12000
g). CRITICAL SUCCESS FACTORS
close monitoring of all the project activities

DIPLOMA IN PROJECT MANAGEMENT 6
flexibility to change (effective change management)
effective communication skills
close stakeholders’ engagement
f). AUTHORISATION TO PROCEED TO DETAILED PLANNING
SIGNATURE signed (project sponsor) Name & Title UBER
Activity 1B
i) Requirements to get project authorization; there are a series of requirements that
need to be presented before gaining project authorization. Among the many, includes; project
budget, project scope, project life cycle, project
ii) Business case; A business case refers to all the relevant information required
before the authorization of a project. it details all the project expected deliveries, how the
deliveries will be done and the time period of the project (Saunders, 2015, p.37)
iii) to person to gain authority from; in my organization, the project sponsor is solely
the right person to gain authority from. They are the owners of the project and dictate on the
final deliveries of the project
iv) the required resources; just like any other projects, there will be the need for
financial resource, human resource and physical resource. The human resource will include
flexibility to change (effective change management)
effective communication skills
close stakeholders’ engagement
f). AUTHORISATION TO PROCEED TO DETAILED PLANNING
SIGNATURE signed (project sponsor) Name & Title UBER
Activity 1B
i) Requirements to get project authorization; there are a series of requirements that
need to be presented before gaining project authorization. Among the many, includes; project
budget, project scope, project life cycle, project
ii) Business case; A business case refers to all the relevant information required
before the authorization of a project. it details all the project expected deliveries, how the
deliveries will be done and the time period of the project (Saunders, 2015, p.37)
iii) to person to gain authority from; in my organization, the project sponsor is solely
the right person to gain authority from. They are the owners of the project and dictate on the
final deliveries of the project
iv) the required resources; just like any other projects, there will be the need for
financial resource, human resource and physical resource. The human resource will include

DIPLOMA IN PROJECT MANAGEMENT 7
project team members while the physical resource will include the equipment needed for the
designing such as computers and software platforms
Activity 1C
i) a governance framework refers to the pre-established rules and regulations that need
to be followed when running a project. it equally applies as the codes of conduct of running a
project management activity (Goo, et al., 2017)
ii) the appropriate delegation and authorities vary from project to project. in most
cases however, the project delegation and authorities include the project sponsors as the
overall head, the ethical codes of conduct authorities, and the project manager.
iii) responsibility refers to a situation where a project stakeholder takes charge of a
particular task assigned, and is accountable for all the activities within the assigned tasks
iv) authority; in project management, authority refers to the power to direct or give
orders, enforce obedience and make decisions in particular contexts regarding the operation
of a particular project (Todorović et al., 2015, 783)
v) accountability is a process through which an individual or a group of people are
answerable to a particular authority regarding all the activities that prevail in their area
vi) delegation process refers to the logical procedures taken or followed when
assigning different tasks to different stakeholders, whom of which become responsible for all
the tasks that are assigned to them
vii) from the sample project authorization, the project manager is granted authority as
he undertakes the powers of assigning tasks to the project team players while the project team
project team members while the physical resource will include the equipment needed for the
designing such as computers and software platforms
Activity 1C
i) a governance framework refers to the pre-established rules and regulations that need
to be followed when running a project. it equally applies as the codes of conduct of running a
project management activity (Goo, et al., 2017)
ii) the appropriate delegation and authorities vary from project to project. in most
cases however, the project delegation and authorities include the project sponsors as the
overall head, the ethical codes of conduct authorities, and the project manager.
iii) responsibility refers to a situation where a project stakeholder takes charge of a
particular task assigned, and is accountable for all the activities within the assigned tasks
iv) authority; in project management, authority refers to the power to direct or give
orders, enforce obedience and make decisions in particular contexts regarding the operation
of a particular project (Todorović et al., 2015, 783)
v) accountability is a process through which an individual or a group of people are
answerable to a particular authority regarding all the activities that prevail in their area
vi) delegation process refers to the logical procedures taken or followed when
assigning different tasks to different stakeholders, whom of which become responsible for all
the tasks that are assigned to them
vii) from the sample project authorization, the project manager is granted authority as
he undertakes the powers of assigning tasks to the project team players while the project team
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

DIPLOMA IN PROJECT MANAGEMENT 8
members are granted the responsibility and held accountable for the project that they are
assigned to undertake (Kovess et al., 2015, p.113)
Activity 2A
i) A project boundary is a tools for the identification of all the things which will be
included in the Project and those that will not be included in the project. the project boundary
is a part of the project scope
ii) example of project boundary in the previous project can be; the application will be
developed to work only in the Unites States of America.
iii) when identifying project boundaries, it is important to consider the available
resources, the available time, the maximum available time for project execution and project
manager expertise.
iv) benefits of identifying project boundary include; clearly identifying the project
limits, knowing what is expected of the project manager. It also helps in conflict resoluions in
case of misunderstandings at the time of project closure.
v) in the sample project, the uber app will be designed to work only in the USA.
Activity 2B
i) project benefits are the paybacks and profits arising as a result of undertaking a
project. in other words, they are rewards accruing as a resulting of the project management
activity being undertaken
ii) project outcomes are the final deliverables of a project. it also implies all the
outputs that are intended to be achieved at the end of the project execution
members are granted the responsibility and held accountable for the project that they are
assigned to undertake (Kovess et al., 2015, p.113)
Activity 2A
i) A project boundary is a tools for the identification of all the things which will be
included in the Project and those that will not be included in the project. the project boundary
is a part of the project scope
ii) example of project boundary in the previous project can be; the application will be
developed to work only in the Unites States of America.
iii) when identifying project boundaries, it is important to consider the available
resources, the available time, the maximum available time for project execution and project
manager expertise.
iv) benefits of identifying project boundary include; clearly identifying the project
limits, knowing what is expected of the project manager. It also helps in conflict resoluions in
case of misunderstandings at the time of project closure.
v) in the sample project, the uber app will be designed to work only in the USA.
Activity 2B
i) project benefits are the paybacks and profits arising as a result of undertaking a
project. in other words, they are rewards accruing as a resulting of the project management
activity being undertaken
ii) project outcomes are the final deliverables of a project. it also implies all the
outputs that are intended to be achieved at the end of the project execution

DIPLOMA IN PROJECT MANAGEMENT 9
iii) project outputs are closely related to project outcome. However, output are the
final realized remedies. In simple terms, it implies the achieved project objectives and aims
iv) in the example, project benefits, outputs and outcomes include the mobile
application, improved communication among the stakeholders and reduction of costs as a
result of the project
Activity 2C
i) relevant stakeholders are all the individuals who have an impact on the success or
failure of the project. this is true irrespective of whether they are external or internal
stakeholders
ii) when developing project outcomes, it is important to consider the identified project
aims, objectives and available resources. The resources may include times, funds, and
equipment among others (Rice et al., 2015, p.275)
iii) in the example project, the relevant stakeholders include but not limited to; the
UBER top management, the application project manager, the client of the company and the
drivers among others.
Activity 2D
i) a scope management plan is a document that clearly highlights the extent to which
the project will cover, including the time, resources and project deliverables
ii) with the help of a scope, it is simple to define the project boundaries, the amount of
resources needed for the project completion and the expected time to be used. This is
constituted in the time scope, resource scope and boundaries.
iii) example scope of the project
iii) project outputs are closely related to project outcome. However, output are the
final realized remedies. In simple terms, it implies the achieved project objectives and aims
iv) in the example, project benefits, outputs and outcomes include the mobile
application, improved communication among the stakeholders and reduction of costs as a
result of the project
Activity 2C
i) relevant stakeholders are all the individuals who have an impact on the success or
failure of the project. this is true irrespective of whether they are external or internal
stakeholders
ii) when developing project outcomes, it is important to consider the identified project
aims, objectives and available resources. The resources may include times, funds, and
equipment among others (Rice et al., 2015, p.275)
iii) in the example project, the relevant stakeholders include but not limited to; the
UBER top management, the application project manager, the client of the company and the
drivers among others.
Activity 2D
i) a scope management plan is a document that clearly highlights the extent to which
the project will cover, including the time, resources and project deliverables
ii) with the help of a scope, it is simple to define the project boundaries, the amount of
resources needed for the project completion and the expected time to be used. This is
constituted in the time scope, resource scope and boundaries.
iii) example scope of the project

DIPLOMA IN PROJECT MANAGEMENT
10
the company will secure the necessary project requirements
training of the project team members will be catered by the company
the project will take a period of seven months
Activity 3A
i) scope management may include, product description, acceptance criterion,
justification of the project, project objectives and deliverable, project constraints,
assumptions made and cost estimations among many others
ii) scope management procedures refer to the logical steps followed when designing a
project scope. It is important to note that when designing a scope, one variable leads to
another and thence, it becomes typically significant to follow the right flow of activities
Activity 3b
i) firstly, it is important to note that constraints are limitation to the project. the
limitation may be time shortage, low funds, less skills of the project members (quality
constraint) and environmental constraints among others.
ii) scope change is best effected if the project manager is much responsive to change.
In other words, the project manager should have adequate skills in change management in
order to easily adopt to the change in the project budget, deadline and quality requirements.
iii) change control procedures refers to the logical steps involved when adopting to
change in a project. it is important to follow the right procedures when adopting to a new
change, else, may lead to project failures (Kerzner, 2017)
10
the company will secure the necessary project requirements
training of the project team members will be catered by the company
the project will take a period of seven months
Activity 3A
i) scope management may include, product description, acceptance criterion,
justification of the project, project objectives and deliverable, project constraints,
assumptions made and cost estimations among many others
ii) scope management procedures refer to the logical steps followed when designing a
project scope. It is important to note that when designing a scope, one variable leads to
another and thence, it becomes typically significant to follow the right flow of activities
Activity 3b
i) firstly, it is important to note that constraints are limitation to the project. the
limitation may be time shortage, low funds, less skills of the project members (quality
constraint) and environmental constraints among others.
ii) scope change is best effected if the project manager is much responsive to change.
In other words, the project manager should have adequate skills in change management in
order to easily adopt to the change in the project budget, deadline and quality requirements.
iii) change control procedures refers to the logical steps involved when adopting to
change in a project. it is important to follow the right procedures when adopting to a new
change, else, may lead to project failures (Kerzner, 2017)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

DIPLOMA IN PROJECT MANAGEMENT
11
iv) there is no unified right way in change control procedure. However, the project
manage can begin by identifying the need for the change, how the change will be adopted, the
maximum time needed, the available resources required, and train the personnel on change
management. The change can thereafter be implemented or adapted
v) the change control procedure may include; the estimation of the total time required,
resources to be used, the training of stakeholders, and the total expenses to be incurred in the
change management (Tomanek, & Juricek, 2015, p.39)
Activity 3C
i) possible example of scope management issues includes;
poor/ wrong assumptions made
exaggeration of deliverables
poor time planning
poor risk assessment
poor budget estimates
ii) the above can be improved by;
poor time planning can be improved by the use of improved computerized
project management software packages such as MS project
risk assessment can also be improved through the deployment of expert
personnel in risk assessment.
Clearly following the project goals and objectives befor making the project
assumptions
11
iv) there is no unified right way in change control procedure. However, the project
manage can begin by identifying the need for the change, how the change will be adopted, the
maximum time needed, the available resources required, and train the personnel on change
management. The change can thereafter be implemented or adapted
v) the change control procedure may include; the estimation of the total time required,
resources to be used, the training of stakeholders, and the total expenses to be incurred in the
change management (Tomanek, & Juricek, 2015, p.39)
Activity 3C
i) possible example of scope management issues includes;
poor/ wrong assumptions made
exaggeration of deliverables
poor time planning
poor risk assessment
poor budget estimates
ii) the above can be improved by;
poor time planning can be improved by the use of improved computerized
project management software packages such as MS project
risk assessment can also be improved through the deployment of expert
personnel in risk assessment.
Clearly following the project goals and objectives befor making the project
assumptions

DIPLOMA IN PROJECT MANAGEMENT
12
Before drawing a budget, it is important to clearly identify te project activities
which could help in clearing estimation of costs.
project assumptions can be improved by clearly analysing the project’
expected
Assessment 2
1. The components of scope management plan include; project requirements, the
stakeholders to be engaged in the project, the deliverables of the project, the
sponsor acceptance, scope control, scope statement, and work breakdown
structure
2. There are several challenges faced in scope management among which include
constraints related to time management, poor stakeholder engagement, and
hardship in allocation of tasks and responsibilities
3. The critical ways of addressing the issues of scope management include the
referring to past projects of the same/ related case, holding of project workshops
to merge ideas from different stakeholders and conducting of product analysis.
4. The most appropriate ways of controlling scope include; evaluation of the impact
of change, determining the magnitude of variance, measuring the project
performance against the scope baseline, and application of corrective/ preventive
measures to issues or challenges.
5. Responding to potential and actual changes requires planning with high level of
flexibility. This is important as it allows the integration and application of most
12
Before drawing a budget, it is important to clearly identify te project activities
which could help in clearing estimation of costs.
project assumptions can be improved by clearly analysing the project’
expected
Assessment 2
1. The components of scope management plan include; project requirements, the
stakeholders to be engaged in the project, the deliverables of the project, the
sponsor acceptance, scope control, scope statement, and work breakdown
structure
2. There are several challenges faced in scope management among which include
constraints related to time management, poor stakeholder engagement, and
hardship in allocation of tasks and responsibilities
3. The critical ways of addressing the issues of scope management include the
referring to past projects of the same/ related case, holding of project workshops
to merge ideas from different stakeholders and conducting of product analysis.
4. The most appropriate ways of controlling scope include; evaluation of the impact
of change, determining the magnitude of variance, measuring the project
performance against the scope baseline, and application of corrective/ preventive
measures to issues or challenges.
5. Responding to potential and actual changes requires planning with high level of
flexibility. This is important as it allows the integration and application of most

DIPLOMA IN PROJECT MANAGEMENT
13
appropriate change management techniques to ensure high performance during
change.
6. Project scope is mostly impacted on by the constraints, among which include;
regulatory constraints, managerial constraints, time constraints, variability in the
resource levels and risks both internal and external
7. There is no one direct change control procedures, however, the following can
apply
The proposed change
Why the change is important
Expected outcomes of the change
The time needed to implement the change
Other factors that ma affect the change process
Estimation of the total cost
Stakeholders of the change implementation
8. When measuring project outcomes against the original plans, it is important to
consider the total unit/ percentage of the project completed, the total increment of
the milestone from the proposed, the start-finish time, and cost ratio among others.
9. Work breakdown structure visualizes the logical procedures in which the project
will be executed. The segment therefore follows phases in which the project is
executed or implemented. For example, the basic follows the planning phase,
execution and project completion (Rice et al., 2015, p.275)
10. The procedure that could be used for reporting scope change include assessment
of the work activities, identification of progress and filing final findings
13
appropriate change management techniques to ensure high performance during
change.
6. Project scope is mostly impacted on by the constraints, among which include;
regulatory constraints, managerial constraints, time constraints, variability in the
resource levels and risks both internal and external
7. There is no one direct change control procedures, however, the following can
apply
The proposed change
Why the change is important
Expected outcomes of the change
The time needed to implement the change
Other factors that ma affect the change process
Estimation of the total cost
Stakeholders of the change implementation
8. When measuring project outcomes against the original plans, it is important to
consider the total unit/ percentage of the project completed, the total increment of
the milestone from the proposed, the start-finish time, and cost ratio among others.
9. Work breakdown structure visualizes the logical procedures in which the project
will be executed. The segment therefore follows phases in which the project is
executed or implemented. For example, the basic follows the planning phase,
execution and project completion (Rice et al., 2015, p.275)
10. The procedure that could be used for reporting scope change include assessment
of the work activities, identification of progress and filing final findings
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

DIPLOMA IN PROJECT MANAGEMENT
14
11. Project management tools that can be applied in scope management include work-
based breakdown structure, Gantt charts, pert charts, project status reports, and
resource workload view among many others.
12. The project manager is the overall foreseer of any project. in this essence, the
project manager plays a role of coordinating all the project activities, reporting to
the project sponsors, and assigning of responsibilities to the project stakeholders
13. Project initiation documentation entails the project goals, the business case, scope
of the project, risk assessment, project stakeholders, constraints and project
control among others (Goo, et al., 2017)
Assessment three
1. the procedures for project authorization follow a logical procedure which include
a detailed breakdown of the project sope
intended outcomes of the project
strategic alignment of the project activities
well structed project schedule
project milestone
an approved project budgets
the critical success factors and finally
the authorization
2. the authorization to expend the available resources involved a critical assessment of
the project scope, all the expected project deliveries, the time available for project
14
11. Project management tools that can be applied in scope management include work-
based breakdown structure, Gantt charts, pert charts, project status reports, and
resource workload view among many others.
12. The project manager is the overall foreseer of any project. in this essence, the
project manager plays a role of coordinating all the project activities, reporting to
the project sponsors, and assigning of responsibilities to the project stakeholders
13. Project initiation documentation entails the project goals, the business case, scope
of the project, risk assessment, project stakeholders, constraints and project
control among others (Goo, et al., 2017)
Assessment three
1. the procedures for project authorization follow a logical procedure which include
a detailed breakdown of the project sope
intended outcomes of the project
strategic alignment of the project activities
well structed project schedule
project milestone
an approved project budgets
the critical success factors and finally
the authorization
2. the authorization to expend the available resources involved a critical assessment of
the project scope, all the expected project deliveries, the time available for project

DIPLOMA IN PROJECT MANAGEMENT
15
execution and the possible risks assesses. Based on the summary of these, the expend
was drawn (Kovess et al., 2015, p.113)
3. project delegation and authorities were confirmed after the analysis and review of
the project plan by the project sponsor, project manager and the ethical body of
authority
4. the project boundaries of the project included not creating user agreement for the
application, no update development for the app after its outdate
5. the project benefits included all the positive outcomes of the project. included
improving company stakeholder engagement, improving company brand image and
improving competitive advantage. The benefits, outcomes and output were measured
by establishing the extent to which the project objectives were achieved (Kerzner,
2017)
6. the shared project outcome involved all the company stakeholders. This is due to
the fact that all the company stakeholders shared a common goal of improving the
firm’s operation and improving communication and engagement among all the
shareholders
7. the processes involved in scope management plan are;
15
execution and the possible risks assesses. Based on the summary of these, the expend
was drawn (Kovess et al., 2015, p.113)
3. project delegation and authorities were confirmed after the analysis and review of
the project plan by the project sponsor, project manager and the ethical body of
authority
4. the project boundaries of the project included not creating user agreement for the
application, no update development for the app after its outdate
5. the project benefits included all the positive outcomes of the project. included
improving company stakeholder engagement, improving company brand image and
improving competitive advantage. The benefits, outcomes and output were measured
by establishing the extent to which the project objectives were achieved (Kerzner,
2017)
6. the shared project outcome involved all the company stakeholders. This is due to
the fact that all the company stakeholders shared a common goal of improving the
firm’s operation and improving communication and engagement among all the
shareholders
7. the processes involved in scope management plan are;

DIPLOMA IN PROJECT MANAGEMENT
16
8. the implementation of scope management procedures involvement and consultation
of the relevant stakeholders while considering their interests and powers in the
project. additionally, relating the scope plan with other past related projects to get the
possible outcomes from specific implementation
9. the impact of scope management requires flexibility and adjusting according to the
outcome of the plan. In addition, the integration of new tools and techniquest to assist
in solving issues that may lead to project lagging or failure (Saunders, 2015, p.37)
10. scope management has been one of the most challenging issue in project
management. Issues that were identified in the scope included time constraints and
managerial constraints. The best way of handling such was improving planning and
resource evaluation and ensuring high level of stakeholder engagement.
16
8. the implementation of scope management procedures involvement and consultation
of the relevant stakeholders while considering their interests and powers in the
project. additionally, relating the scope plan with other past related projects to get the
possible outcomes from specific implementation
9. the impact of scope management requires flexibility and adjusting according to the
outcome of the plan. In addition, the integration of new tools and techniquest to assist
in solving issues that may lead to project lagging or failure (Saunders, 2015, p.37)
10. scope management has been one of the most challenging issue in project
management. Issues that were identified in the scope included time constraints and
managerial constraints. The best way of handling such was improving planning and
resource evaluation and ensuring high level of stakeholder engagement.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

DIPLOMA IN PROJECT MANAGEMENT
17
References
Goo, J. J., Rahman, A., Nabilah, N., Cavallini, A., El-Yamany, Y., Azmily, A. H., ... & Haziq, A.
(2017, May). Multiwell Operational Performance Benchmarking: A Continuous Drilling
Optimization Approach for a Brownfield Drilling Project in Malaysia. In SPE Intelligent Oil
and Gas Symposium. Society of Petroleum Engineers.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to measuring and
monitoring project performance. John Wiley & Sons.
Kovess, V., Carta, M. G., Pez, O., Bitfoi, A., Koç, C., Goelitz, D., ... & Otten, R. (2015). The school
children mental health in Europe (SCMHE) project: Design and first results. Clinical practice
and epidemiology in mental health: CP & EMH, 11(Suppl 1 M7), 113.
Rice, J., Bradford, M. J., Clarke, K. D., Koops, M. A., Randall, R. G., & Wysocki, R. (2015). The
science framework for implementing the fisheries protection provisions of Canada's fisheries
Act. Fisheries, 40(6), 268-275.
Rusk, D. (2018). Memo Requesting Authorization for Export-Import Bank Guarantees for
Romania. Box 203 National Security File Country File Romania.
Saunders, F. C. (2015). Toward high reliability project organizing in safety‐Critical projects. Project
Management Journal, 46(3), 25-35.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project
success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Tomanek, M., & Juricek, J. (2015). Project risk management model based on PRINCE2 and SCRUM
frameworks. arXiv preprint arXiv:1502.03595.
17
References
Goo, J. J., Rahman, A., Nabilah, N., Cavallini, A., El-Yamany, Y., Azmily, A. H., ... & Haziq, A.
(2017, May). Multiwell Operational Performance Benchmarking: A Continuous Drilling
Optimization Approach for a Brownfield Drilling Project in Malaysia. In SPE Intelligent Oil
and Gas Symposium. Society of Petroleum Engineers.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to measuring and
monitoring project performance. John Wiley & Sons.
Kovess, V., Carta, M. G., Pez, O., Bitfoi, A., Koç, C., Goelitz, D., ... & Otten, R. (2015). The school
children mental health in Europe (SCMHE) project: Design and first results. Clinical practice
and epidemiology in mental health: CP & EMH, 11(Suppl 1 M7), 113.
Rice, J., Bradford, M. J., Clarke, K. D., Koops, M. A., Randall, R. G., & Wysocki, R. (2015). The
science framework for implementing the fisheries protection provisions of Canada's fisheries
Act. Fisheries, 40(6), 268-275.
Rusk, D. (2018). Memo Requesting Authorization for Export-Import Bank Guarantees for
Romania. Box 203 National Security File Country File Romania.
Saunders, F. C. (2015). Toward high reliability project organizing in safety‐Critical projects. Project
Management Journal, 46(3), 25-35.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project
success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Tomanek, M., & Juricek, J. (2015). Project risk management model based on PRINCE2 and SCRUM
frameworks. arXiv preprint arXiv:1502.03595.
1 out of 17
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.