Part B: Change Control
PROJ6003 Project Execution and
Control
1
PROJ6003 Project Execution and
Control
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Executive summary
In project management process change control is considered an important aspect. Due to the
change in the pace of today, there are various projects that deal with the demand of change
during their life. It is essential for approving and considering every aspect of change by ensuring
the alignment of project and needs of the business.
2
In project management process change control is considered an important aspect. Due to the
change in the pace of today, there are various projects that deal with the demand of change
during their life. It is essential for approving and considering every aspect of change by ensuring
the alignment of project and needs of the business.
2

Table of Contents
Executive summary.........................................................................................................................2
Introduction......................................................................................................................................4
1. Identify what processes are involved in submitting a request to deal with the changes
necessary from your understanding of the case study.................................................................5
2. Identify and critically analyze changes required and the impacts on scope, time, cost and
quality of the project and the techniques used to manage them..................................................6
3. Identify and discuss options to satisfy each change request and any risks associated with the
options..........................................................................................................................................7
4. Complete the change request/control form provided or one that is used from a workplace.. .8
The flow of overall paper themes....................................................................................................9
Conclusion.....................................................................................................................................10
References......................................................................................................................................11
3
Executive summary.........................................................................................................................2
Introduction......................................................................................................................................4
1. Identify what processes are involved in submitting a request to deal with the changes
necessary from your understanding of the case study.................................................................5
2. Identify and critically analyze changes required and the impacts on scope, time, cost and
quality of the project and the techniques used to manage them..................................................6
3. Identify and discuss options to satisfy each change request and any risks associated with the
options..........................................................................................................................................7
4. Complete the change request/control form provided or one that is used from a workplace.. .8
The flow of overall paper themes....................................................................................................9
Conclusion.....................................................................................................................................10
References......................................................................................................................................11
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Introduction
Projects are having vulnerable to change the right from the planning and initiation phases. It will
be easy to execute the changes at a very early age but once it executed, no changes will be made
after the work breakdown structure, project charter or statements of work. Changes must be
approved by the stakeholders or all the majority with the project sponsor if any changes made on
account of undefined risk. There is a long process for the changes within the project and it must
be recorded according to the change control plan in a change control document. The project is
based on the change control with the case study of Corwin Corporation.
4
Projects are having vulnerable to change the right from the planning and initiation phases. It will
be easy to execute the changes at a very early age but once it executed, no changes will be made
after the work breakdown structure, project charter or statements of work. Changes must be
approved by the stakeholders or all the majority with the project sponsor if any changes made on
account of undefined risk. There is a long process for the changes within the project and it must
be recorded according to the change control plan in a change control document. The project is
based on the change control with the case study of Corwin Corporation.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1. Identify what processes are involved in submitting a request to deal with the
changes necessary from your understanding of the case study.
At the time of the project, a change request may be considered as a risk for the project outcomes.
A change in the request can be explained as the proposal which alters the system or product
which is bought by the client to the other team member. The situation of change in request
occurs when there is a want of a client to make changes in the project. Change in the request is
considered as the benefit for better outcomes for the project. But it is important to manage the
process of making changes in the project (Wu, et. al., 2016). The Corwin Corporation needs to
focus on efficiency, alignment, and internal communication by focusing on overall business
goals. There are some steps that are involved in the process of a change request:
There must be the availability of sufficient documents which is required for a request for
change. The Corwin Corporation relies on 7 R which involves raised, reason, return, risk,
resources, responsibility, and relationship.
There must be a correct evaluation of the effort of changes by considering all the factors.
Impact of makes changes must be addressed and analyzed before implementing the
changes (Harmon, 2019).
There must be the implementation of request for a change in a structured manner by
focusing on the task that includes building the change along with providing a pre-test
change. This is followed by developing a comprehensive plan for the change deployment,
implement the change.
This also helps in providing monitoring during Post-Implementation.
5
changes necessary from your understanding of the case study.
At the time of the project, a change request may be considered as a risk for the project outcomes.
A change in the request can be explained as the proposal which alters the system or product
which is bought by the client to the other team member. The situation of change in request
occurs when there is a want of a client to make changes in the project. Change in the request is
considered as the benefit for better outcomes for the project. But it is important to manage the
process of making changes in the project (Wu, et. al., 2016). The Corwin Corporation needs to
focus on efficiency, alignment, and internal communication by focusing on overall business
goals. There are some steps that are involved in the process of a change request:
There must be the availability of sufficient documents which is required for a request for
change. The Corwin Corporation relies on 7 R which involves raised, reason, return, risk,
resources, responsibility, and relationship.
There must be a correct evaluation of the effort of changes by considering all the factors.
Impact of makes changes must be addressed and analyzed before implementing the
changes (Harmon, 2019).
There must be the implementation of request for a change in a structured manner by
focusing on the task that includes building the change along with providing a pre-test
change. This is followed by developing a comprehensive plan for the change deployment,
implement the change.
This also helps in providing monitoring during Post-Implementation.
5

2. Identify and critically analyze changes required and the impacts on scope, time,
cost and quality of the project and the techniques used to manage them.
Change order request is considered as the central element of the project management process.
The changes of the project are mainly focused on schedule, scope, budget, risk, and quality
which is documented and analysed as the aspect of the change management process. If there is
any change in the project it directly affects the cost, quality, scope and time of project of Corwin
Corporation. Cost of project increases become there will be the addition of people to accomplish
the deadline. This may also remove some products and also change in delivery time (Liptak,
2018).
As there is a push in the final delivery of project there is slightly change in budget and schedule.
People are added for minimizing the disruption to the schedule of a project which leads to the
overall project cost.
6
cost and quality of the project and the techniques used to manage them.
Change order request is considered as the central element of the project management process.
The changes of the project are mainly focused on schedule, scope, budget, risk, and quality
which is documented and analysed as the aspect of the change management process. If there is
any change in the project it directly affects the cost, quality, scope and time of project of Corwin
Corporation. Cost of project increases become there will be the addition of people to accomplish
the deadline. This may also remove some products and also change in delivery time (Liptak,
2018).
As there is a push in the final delivery of project there is slightly change in budget and schedule.
People are added for minimizing the disruption to the schedule of a project which leads to the
overall project cost.
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3. Identify and discuss options to satisfy each change request and any risks
associated with the options.
The project manager of Corwin Corporation needs to identify and analyse the risk, change
request and issues. For this, the company needs to follow the project risk management process
which helps in analysing, communicating, identifying, tracking and planning for the risk. Other
risk responses strategies for satisfying the change request include:
Avoid: This help in focusing on removing the causes and threats.
Mitigate: There is various risk in the project that can’t be eliminated but through their impact
can be reduced with the help of mitigation (Dang, et. al., 2015).
Transfer: To avoid the threat it is necessary to transfer the risk to another party such as
Insurance purchases, warranties, guarantees, etc.
[Source: Rhea, et. al., 2015]
7
associated with the options.
The project manager of Corwin Corporation needs to identify and analyse the risk, change
request and issues. For this, the company needs to follow the project risk management process
which helps in analysing, communicating, identifying, tracking and planning for the risk. Other
risk responses strategies for satisfying the change request include:
Avoid: This help in focusing on removing the causes and threats.
Mitigate: There is various risk in the project that can’t be eliminated but through their impact
can be reduced with the help of mitigation (Dang, et. al., 2015).
Transfer: To avoid the threat it is necessary to transfer the risk to another party such as
Insurance purchases, warranties, guarantees, etc.
[Source: Rhea, et. al., 2015]
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4. Complete the change request/control form provided or one that is used from a
workplace.
Change request form of Corwin Corporation is as follows:
Project Name The Peters Company project Change Number -
Requested By Frank Delia, Gene Frimel and Royce Date of Request -
Presented To Corwin Corporation
Description of Change:
Research & Development group has introduce $250,000 for new rubber President Market
Support Contracts Project Management and the company do not have the available staff to
initiate the project.
Effect on Schedule (including Estimated Completion Date for this change):
The completion of project has been shifted for more 45 days.
Effect of NOT Approving this Change:
Project will not complete with given cost and time and thus company have to bear a heavy loss.
Functional Project Manager
Approved Signature
:
Rejected Title: Date:
The flow of overall paper themes
The overall theme of paper depends upon change control with context to the Corwin Corporation
which had grown into a $950 million-per-year company. During the project execution of the
company, the main aim of the project manager is to ensure the project is completed according to
the project management plan and the other requirements of projects. Required may need some
changes in the project. Changes need to be addressed and implemented effectively and should
8
workplace.
Change request form of Corwin Corporation is as follows:
Project Name The Peters Company project Change Number -
Requested By Frank Delia, Gene Frimel and Royce Date of Request -
Presented To Corwin Corporation
Description of Change:
Research & Development group has introduce $250,000 for new rubber President Market
Support Contracts Project Management and the company do not have the available staff to
initiate the project.
Effect on Schedule (including Estimated Completion Date for this change):
The completion of project has been shifted for more 45 days.
Effect of NOT Approving this Change:
Project will not complete with given cost and time and thus company have to bear a heavy loss.
Functional Project Manager
Approved Signature
:
Rejected Title: Date:
The flow of overall paper themes
The overall theme of paper depends upon change control with context to the Corwin Corporation
which had grown into a $950 million-per-year company. During the project execution of the
company, the main aim of the project manager is to ensure the project is completed according to
the project management plan and the other requirements of projects. Required may need some
changes in the project. Changes need to be addressed and implemented effectively and should
8

ensure that the project is managed according to the existing management plans and project
baselines.
9
baselines.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Conclusion
From the above data and information, it has been concluded that change control is a systematic
process that helps the project sponsor in executing all the changes that are made in the project.
The main of the change control is to verify all the unnecessary changes, and the changes which
are not required to be disrupted or resources are sued efficiently. The report focuses on the
process that is required to address the changes and its impact over the quality, scope and time of
the project. Further on the report also include a change request/control form provided or one that
is used from a workplace.
10
From the above data and information, it has been concluded that change control is a systematic
process that helps the project sponsor in executing all the changes that are made in the project.
The main of the change control is to verify all the unnecessary changes, and the changes which
are not required to be disrupted or resources are sued efficiently. The report focuses on the
process that is required to address the changes and its impact over the quality, scope and time of
the project. Further on the report also include a change request/control form provided or one that
is used from a workplace.
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

References
Dang, R., Wang, J., Li, S. E., & Li, K. (2015). Coordinated adaptive cruise control
system with lane-change assistance. IEEE Transactions on Intelligent Transportation
Systems, 16(5), 2373-2383.
Harmon, P. (2019). Business process change: a business process management guide for
managers and process professionals. Morgan Kaufmann.
Liptak, B. G. (2018). Instrument Engineers' Handbook, Volume Two: Process Control
and Optimization. CRC press.
Rhea, C. K., Kiefer, A. W., Wright, W. G., Raisbeck, L. D., & Haran, F. J. (2015).
Interpretation of postural control may change due to data processing techniques. Gait &
posture, 41(2), 731-735.
Wu, J., Chen, Y., Zhou, S., & Li, X. (2016). Online steady-state detection for process
control using multiple change-point models and particle filters. IEEE Transactions on
Automation Science and Engineering, 13(2), 688-700.
11
Dang, R., Wang, J., Li, S. E., & Li, K. (2015). Coordinated adaptive cruise control
system with lane-change assistance. IEEE Transactions on Intelligent Transportation
Systems, 16(5), 2373-2383.
Harmon, P. (2019). Business process change: a business process management guide for
managers and process professionals. Morgan Kaufmann.
Liptak, B. G. (2018). Instrument Engineers' Handbook, Volume Two: Process Control
and Optimization. CRC press.
Rhea, C. K., Kiefer, A. W., Wright, W. G., Raisbeck, L. D., & Haran, F. J. (2015).
Interpretation of postural control may change due to data processing techniques. Gait &
posture, 41(2), 731-735.
Wu, J., Chen, Y., Zhou, S., & Li, X. (2016). Online steady-state detection for process
control using multiple change-point models and particle filters. IEEE Transactions on
Automation Science and Engineering, 13(2), 688-700.
11
1 out of 11
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.