This document presents a comprehensive report on information system project management, focusing on the implementation of Big Data within Intelligent Information Inc. It includes a detailed project charter outlining project objectives, purpose, scope, constraints, and exclusions. The report identifies key stakeholders, their roles, and responsibilities, along with a stakeholder register and management strategy. The project aims to enhance operational activities, increase customer loyalty, and reduce churn by leveraging Big Data analytics within the existing IT infrastructure. The document further elaborates on the processes needed for successful stakeholder management, including identifying, classifying, and planning stakeholder communication, culminating in the execution of the stakeholder plan.
Contribute Materials
Your contribution can guide someoneās learning journey. Share your
documents today.

Running head: INFORMATION SYSTEM PROJECT MANAGEMENT
Information System Project Management
Name of Student
Name of the University
Author Note
Information System Project Management
Name of Student
Name of the University
Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

INFORMATION SYSTEM PROJECT MANAGEMENT
Table of Contents
1. Project Charter.............................................................................................................................3
1.1 Project Objectives..................................................................................................................3
1.2 Project Purpose......................................................................................................................3
1.3 Project Scope.........................................................................................................................3
1.4 Constraints.............................................................................................................................4
1.5 Exclusion...............................................................................................................................4
2. Roles and Responsibilities...........................................................................................................4
3. Stakeholder Register....................................................................................................................7
4. Stakeholder Management Strategy............................................................................................10
5. References..................................................................................................................................11
Table of Contents
1. Project Charter.............................................................................................................................3
1.1 Project Objectives..................................................................................................................3
1.2 Project Purpose......................................................................................................................3
1.3 Project Scope.........................................................................................................................3
1.4 Constraints.............................................................................................................................4
1.5 Exclusion...............................................................................................................................4
2. Roles and Responsibilities...........................................................................................................4
3. Stakeholder Register....................................................................................................................7
4. Stakeholder Management Strategy............................................................................................10
5. References..................................................................................................................................11

INFORMATION SYSTEM PROJECT MANAGEMENT
1. Project Charter
1.1 Project Objectives
Following are the objectives for the development of the project for the Intelligent Information
Inc.:
ļ¼ To successfully implement the Big Data within the Intelligent Information Inc
ļ¼ To hire consultant who will be supporting the selection of the analytic packages of Big
Data
ļ¼ To assign roles and responsibilities to the external and internal staffs
ļ¼ To comply business objectives with the project execution
ļ¼ To deliver the project within expected schedule and budget
ļ¼ To deliver Communication with the vendors
ļ¼ Train IT maintenance and business users
1.2 Project Purpose
The purpose of this project charter is to present the aspects related to the project of Big
Data implementation within the existing infrastructure of the Intelligent Information Inc and
boost the operational activities within the organization. Other purpose is to identify the roles and
responsibilities of the stakeholders associated with the organization and this implementation. The
aim of this project is to enhance the number of loyal customers for the organization and reduce
churn.
1. Project Charter
1.1 Project Objectives
Following are the objectives for the development of the project for the Intelligent Information
Inc.:
ļ¼ To successfully implement the Big Data within the Intelligent Information Inc
ļ¼ To hire consultant who will be supporting the selection of the analytic packages of Big
Data
ļ¼ To assign roles and responsibilities to the external and internal staffs
ļ¼ To comply business objectives with the project execution
ļ¼ To deliver the project within expected schedule and budget
ļ¼ To deliver Communication with the vendors
ļ¼ Train IT maintenance and business users
1.2 Project Purpose
The purpose of this project charter is to present the aspects related to the project of Big
Data implementation within the existing infrastructure of the Intelligent Information Inc and
boost the operational activities within the organization. Other purpose is to identify the roles and
responsibilities of the stakeholders associated with the organization and this implementation. The
aim of this project is to enhance the number of loyal customers for the organization and reduce
churn.

INFORMATION SYSTEM PROJECT MANAGEMENT
1.3 Project Scope
The scope of the project can be described as implementation of the Big Data analytics
within the IT infrastructure of the company that can enable the functionality of the 100, 000
employees being employed in this organization. It will be helpful in allowing the
accomplishment of the objectives of the project without any extra effort. It will be allowing the
enhancement in the internal and external operational activities in manner to make sure that the
organizationās performance has been enhanced.
1.4 Constraints
Execute the whole project with the expense of budget $ 1,500,000 for the
accomplishment of the IT infrastructure and networking that can allow the efficient application
of the Big data. The timeline of the project would be six months on which a group of ten
members will be contributing. Choosing the appropriate and suitable analytic package would be
another constraint for the delivery of the project.
1.5 Exclusion
The packages of the Big Data, their services, policies and other aspects have not been
covered in this report.
2. Roles and Responsibilities
The project manager will be playing the most crucial role in the development of the
project, as the manager will be handling the roles of other stakeholders involved in the project.
Sl. No. Stakeholder Roles Responsibilities
1. VP of Operation His role will be monitor and
guide the operations of the
His responsibility will to make
sure that after the
1.3 Project Scope
The scope of the project can be described as implementation of the Big Data analytics
within the IT infrastructure of the company that can enable the functionality of the 100, 000
employees being employed in this organization. It will be helpful in allowing the
accomplishment of the objectives of the project without any extra effort. It will be allowing the
enhancement in the internal and external operational activities in manner to make sure that the
organizationās performance has been enhanced.
1.4 Constraints
Execute the whole project with the expense of budget $ 1,500,000 for the
accomplishment of the IT infrastructure and networking that can allow the efficient application
of the Big data. The timeline of the project would be six months on which a group of ten
members will be contributing. Choosing the appropriate and suitable analytic package would be
another constraint for the delivery of the project.
1.5 Exclusion
The packages of the Big Data, their services, policies and other aspects have not been
covered in this report.
2. Roles and Responsibilities
The project manager will be playing the most crucial role in the development of the
project, as the manager will be handling the roles of other stakeholders involved in the project.
Sl. No. Stakeholder Roles Responsibilities
1. VP of Operation His role will be monitor and
guide the operations of the
His responsibility will to make
sure that after the
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

INFORMATION SYSTEM PROJECT MANAGEMENT
company implementation of the Big Data,
every business objectives are
being delivered of high quality
and better standard
2. VP of Marketing He will be analyzing the
market considering the needs
and requirements of the
customers, competitive
environment and other factors
related to the product and
services1
His responsibility will be to
make sure that the needs and
requirements have been
mentioned clearly
3. Risk Manager He will be identifying the
risks and threats before,
during and after the execution
of the project
His responsibility will be to
ensure that the project is not
affected with high rate due to
risks and identify them at the
prior of the project execution
4. Project Sponsors Provide funding to the project
for the resources and
availability of the needful
resources for the
accomplishment of the project
Their responsibility will be to
ensure that the project lacks in
funding ad enough financial help
will be provided for the
execution of the project2.
5. CIO She will be doing all the hard She will be making sure that the
1 Laudon, Kenneth C., and Jane P. Laudon. Management information system. Pearson Education India, 2016.
2 Schwalbe, Kathy. Information technology project management. Cengage Learning, 2015.
company implementation of the Big Data,
every business objectives are
being delivered of high quality
and better standard
2. VP of Marketing He will be analyzing the
market considering the needs
and requirements of the
customers, competitive
environment and other factors
related to the product and
services1
His responsibility will be to
make sure that the needs and
requirements have been
mentioned clearly
3. Risk Manager He will be identifying the
risks and threats before,
during and after the execution
of the project
His responsibility will be to
ensure that the project is not
affected with high rate due to
risks and identify them at the
prior of the project execution
4. Project Sponsors Provide funding to the project
for the resources and
availability of the needful
resources for the
accomplishment of the project
Their responsibility will be to
ensure that the project lacks in
funding ad enough financial help
will be provided for the
execution of the project2.
5. CIO She will be doing all the hard She will be making sure that the
1 Laudon, Kenneth C., and Jane P. Laudon. Management information system. Pearson Education India, 2016.
2 Schwalbe, Kathy. Information technology project management. Cengage Learning, 2015.

INFORMATION SYSTEM PROJECT MANAGEMENT
decision-makings related to
the transformation being
proposed for the IIIās existing
IT infrastructure
decisions has been taken
considering the beneficial
aspects for the organization and
other employees
6. IS Project
Manager
His or her role will be deliver
the constraints of the project
as per the planning phase
He or she should ensure that the
quality of the project has not
been hampered after the delivery
of the project
7. Customers Their role will be to consume
the products and services
being launched to the market
by III
Their responsibility is to provide
proper and effective response on
the quality and experience on the
services being availed
8. Big Data Vendor They will be providing the
suitable analytic package
suitable according to the
needs and requirements of the
organization3
Their responsibility is to provide
services of high quality and
policy complies with the
organizationās policies
9. IT Department Their role will be to take care
of all the necessary internal
needs for the establishment of
the network and IT
infrastructure
Their responsibility is to make
sure that the activities have been
delivered without any threat,
issues, fault, and glitches
10. Employees Their role will be accomplish
the operational activities of
the organization
Their role will be to make sure
that the organizational goals are
being accomplished through the
contribution made by the
organization4
3 Harrison, Frederick, and Dennis Lock. Advanced project management: a structured approach. Routledge, 2017.
4 Joosten, Dominik, Dirk Basten, and Werner Mellis. "Measurement of information system project success in
decision-makings related to
the transformation being
proposed for the IIIās existing
IT infrastructure
decisions has been taken
considering the beneficial
aspects for the organization and
other employees
6. IS Project
Manager
His or her role will be deliver
the constraints of the project
as per the planning phase
He or she should ensure that the
quality of the project has not
been hampered after the delivery
of the project
7. Customers Their role will be to consume
the products and services
being launched to the market
by III
Their responsibility is to provide
proper and effective response on
the quality and experience on the
services being availed
8. Big Data Vendor They will be providing the
suitable analytic package
suitable according to the
needs and requirements of the
organization3
Their responsibility is to provide
services of high quality and
policy complies with the
organizationās policies
9. IT Department Their role will be to take care
of all the necessary internal
needs for the establishment of
the network and IT
infrastructure
Their responsibility is to make
sure that the activities have been
delivered without any threat,
issues, fault, and glitches
10. Employees Their role will be accomplish
the operational activities of
the organization
Their role will be to make sure
that the organizational goals are
being accomplished through the
contribution made by the
organization4
3 Harrison, Frederick, and Dennis Lock. Advanced project management: a structured approach. Routledge, 2017.
4 Joosten, Dominik, Dirk Basten, and Werner Mellis. "Measurement of information system project success in

INFORMATION SYSTEM PROJECT MANAGEMENT
3. Stakeholder Register
Name Department Title Role on
Project Expectations
Influenc
e Impac
t
Stakeholde
r
Category&
Action
George
Smith
Managemen
t
VP of
Operation
Manage all
operational
activities
His role will be
monitor and
guide the
operations of
the company
High High Manage
clearly
Sam
Johnso
n
Managemen
t
VP of
Marketing
Always
consider the
market for
the personal
developmen
t
He will be
analyzing the
market
considering the
needs and
requirements of
the customers,
competitive
environment
and other
factors related
to the product
and services5
High High Manage
precisely
Vinh
Tran
IST Risk
Manager
Manage the
impact of
the risks at
minimum
level
He will be
identifying the
risks and threats
before, during
and after the
execution of the
project
High Low manage
closely
Jack
Smith
IST Project
Sponsors
Provide
needed
Provide funding
to the project
High High Manage
German organizations." In Project Management: Concepts, Methodologies, Tools, and Applications, pp. 1175-1196.
IGI Global, 2016.
5 Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
3. Stakeholder Register
Name Department Title Role on
Project Expectations
Influenc
e Impac
t
Stakeholde
r
Category&
Action
George
Smith
Managemen
t
VP of
Operation
Manage all
operational
activities
His role will be
monitor and
guide the
operations of
the company
High High Manage
clearly
Sam
Johnso
n
Managemen
t
VP of
Marketing
Always
consider the
market for
the personal
developmen
t
He will be
analyzing the
market
considering the
needs and
requirements of
the customers,
competitive
environment
and other
factors related
to the product
and services5
High High Manage
precisely
Vinh
Tran
IST Risk
Manager
Manage the
impact of
the risks at
minimum
level
He will be
identifying the
risks and threats
before, during
and after the
execution of the
project
High Low manage
closely
Jack
Smith
IST Project
Sponsors
Provide
needed
Provide funding
to the project
High High Manage
German organizations." In Project Management: Concepts, Methodologies, Tools, and Applications, pp. 1175-1196.
IGI Global, 2016.
5 Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

INFORMATION SYSTEM PROJECT MANAGEMENT
Name Department Title Role on
Project Expectations
Influenc
e Impac
t
Stakeholde
r
Category&
Action
funding for the
resources and
availability6 of
the needful
resources for
the
accomplishmen
t of the project
closely
Susan
Wong
Managemen
t
CIO Manage all
the under
executives
She will be
doing all the
hard decision-
makings related
to the
transformation
being proposed
for the IIIās
existing IT
infrastructure
Low High Keep
satisfied
ABC IT IS Project
Manager
Manage
information
security and
technology
His or her role
will be deliver
the constraints
of the project as
per the planning
phase
High High Manage
closely
ABCs - Customers Avail
Services
Their role will
be to consume
the products
and services
being launched
to the market
High Low Keep
informed
6 Li, Yongkui, Yujie Lu, Young Hoon Kwak, and Shuang Dong. "Developing a city-level multi-project management
information system for Chinese urbanization." International Journal of Project Management 33, no. 3 (2015): 510-
527.
Name Department Title Role on
Project Expectations
Influenc
e Impac
t
Stakeholde
r
Category&
Action
funding for the
resources and
availability6 of
the needful
resources for
the
accomplishmen
t of the project
closely
Susan
Wong
Managemen
t
CIO Manage all
the under
executives
She will be
doing all the
hard decision-
makings related
to the
transformation
being proposed
for the IIIās
existing IT
infrastructure
Low High Keep
satisfied
ABC IT IS Project
Manager
Manage
information
security and
technology
His or her role
will be deliver
the constraints
of the project as
per the planning
phase
High High Manage
closely
ABCs - Customers Avail
Services
Their role will
be to consume
the products
and services
being launched
to the market
High Low Keep
informed
6 Li, Yongkui, Yujie Lu, Young Hoon Kwak, and Shuang Dong. "Developing a city-level multi-project management
information system for Chinese urbanization." International Journal of Project Management 33, no. 3 (2015): 510-
527.

INFORMATION SYSTEM PROJECT MANAGEMENT
Name Department Title Role on
Project Expectations
Influenc
e Impac
t
Stakeholde
r
Category&
Action
by III7
ABC IT Big Data
Vendor
Provide
Cloud
Services
They will be
providing the
suitable
analytic
package
suitable
according to the
needs and
requirements of
the organization
Low High Manage
closely
ABCs IT IT
Departmen
t
Manage
Information
technology
Their role will
be to take care
of all the
necessary
internal needs
for the
establishment
of the network
and IT
infrastructure8
High High Keep
satisfied
ABCs IT Employees Accomplish
the
operational
activities9
Their role will
be accomplish
the operational
activities of the
organization
High Low Keep
informed
7 Li, Yongkui, Yujie Lu, Young Hoon Kwak, and Shuang Dong. "Developing a city-level multi-project management
information system for Chinese urbanization." International Journal of Project Management 33, no. 3 (2015): 510-
527.
8 Sligo, Judith, Robin Gauld, Vaughan Roberts, and Luis Villa. "A literature review for large-scale health
information system project planning, implementation and evaluation." International journal of medical
informatics 97 (2017): 86-97.
9 Caniƫls, Marjolein CJ, and Ralph JJM Bakens. "Project Management Information Systems in a Multi-Project
Environment." In Handbook on Project Management and Scheduling Vol. 2, pp. 1355-1383. Springer, Cham, 2015.
Name Department Title Role on
Project Expectations
Influenc
e Impac
t
Stakeholde
r
Category&
Action
by III7
ABC IT Big Data
Vendor
Provide
Cloud
Services
They will be
providing the
suitable
analytic
package
suitable
according to the
needs and
requirements of
the organization
Low High Manage
closely
ABCs IT IT
Departmen
t
Manage
Information
technology
Their role will
be to take care
of all the
necessary
internal needs
for the
establishment
of the network
and IT
infrastructure8
High High Keep
satisfied
ABCs IT Employees Accomplish
the
operational
activities9
Their role will
be accomplish
the operational
activities of the
organization
High Low Keep
informed
7 Li, Yongkui, Yujie Lu, Young Hoon Kwak, and Shuang Dong. "Developing a city-level multi-project management
information system for Chinese urbanization." International Journal of Project Management 33, no. 3 (2015): 510-
527.
8 Sligo, Judith, Robin Gauld, Vaughan Roberts, and Luis Villa. "A literature review for large-scale health
information system project planning, implementation and evaluation." International journal of medical
informatics 97 (2017): 86-97.
9 Caniƫls, Marjolein CJ, and Ralph JJM Bakens. "Project Management Information Systems in a Multi-Project
Environment." In Handbook on Project Management and Scheduling Vol. 2, pp. 1355-1383. Springer, Cham, 2015.

INFORMATION SYSTEM PROJECT MANAGEMENT
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

INFORMATION SYSTEM PROJECT MANAGEMENT
4. Stakeholder Management Strategy
Following are the processes needed for the successful accomplishment of the stakeholder
management:
Identifying Stakeholder: This phase has been completed in the above report that describes the
roles and responsibly of the identified stakeholder. It will be helpful in assigning the different
jobs within the project10.
Classifying Stakeholder: This phase emphasizes on the classification of the stakeholders based
on their roles and responsibilities and put them in different categories.
Developing stakeholder strategy: This stage has been accomplished in the above report.
Planning Stakeholder communication: An effective communication can be helpful in motivating
the stakeholders towards the objectives and goals of the FNU.
Executing Stakeholder plan: The p=final phase states the execution of the strategies those have
been planned.
10 Ptak, Carol A., and Eli Schragenheim. ERP: tools, techniques, and applications for integrating the
supply chain. Crc Press, 2016.
4. Stakeholder Management Strategy
Following are the processes needed for the successful accomplishment of the stakeholder
management:
Identifying Stakeholder: This phase has been completed in the above report that describes the
roles and responsibly of the identified stakeholder. It will be helpful in assigning the different
jobs within the project10.
Classifying Stakeholder: This phase emphasizes on the classification of the stakeholders based
on their roles and responsibilities and put them in different categories.
Developing stakeholder strategy: This stage has been accomplished in the above report.
Planning Stakeholder communication: An effective communication can be helpful in motivating
the stakeholders towards the objectives and goals of the FNU.
Executing Stakeholder plan: The p=final phase states the execution of the strategies those have
been planned.
10 Ptak, Carol A., and Eli Schragenheim. ERP: tools, techniques, and applications for integrating the
supply chain. Crc Press, 2016.

INFORMATION SYSTEM PROJECT MANAGEMENT
5. Bibliography
[1] Ptak, Carol A., and Eli Schragenheim. ERP: tools, techniques, and applications for
integrating the supply chain. Crc Press, 2016.
[2] Kerzner, Harold. Project management best practices: Achieving global excellence. John
Wiley & Sons, 2018.
[3] Caniƫls, Marjolein CJ, and Ralph JJM Bakens. "Project Management Information
Systems in a Multi-Project Environment." In Handbook on Project Management and
Scheduling Vol. 2, pp. 1355-1383. Springer, Cham, 2015.
[4] Sligo, Judith, Robin Gauld, Vaughan Roberts, and Luis Villa. "A literature review for
large-scale health information system project planning, implementation and
evaluation." International journal of medical informatics 97 (2017): 86-97.
[5] Li, Yongkui, Yujie Lu, Young Hoon Kwak, and Shuang Dong. "Developing a city-level
multi-project management information system for Chinese urbanization." International
Journal of Project Management 33, no. 3 (2015): 510-527.
[6] Kerzner, Harold, and Harold R. Kerzner. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons, 2017.
[7] Joosten, Dominik, Dirk Basten, and Werner Mellis. "Measurement of information system
project success in German organizations." In Project Management: Concepts,
Methodologies, Tools, and Applications, pp. 1175-1196. IGI Global, 2016.
[8] Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
[9] Schwalbe, Kathy. Information technology project management. Cengage Learning, 2015.
5. Bibliography
[1] Ptak, Carol A., and Eli Schragenheim. ERP: tools, techniques, and applications for
integrating the supply chain. Crc Press, 2016.
[2] Kerzner, Harold. Project management best practices: Achieving global excellence. John
Wiley & Sons, 2018.
[3] Caniƫls, Marjolein CJ, and Ralph JJM Bakens. "Project Management Information
Systems in a Multi-Project Environment." In Handbook on Project Management and
Scheduling Vol. 2, pp. 1355-1383. Springer, Cham, 2015.
[4] Sligo, Judith, Robin Gauld, Vaughan Roberts, and Luis Villa. "A literature review for
large-scale health information system project planning, implementation and
evaluation." International journal of medical informatics 97 (2017): 86-97.
[5] Li, Yongkui, Yujie Lu, Young Hoon Kwak, and Shuang Dong. "Developing a city-level
multi-project management information system for Chinese urbanization." International
Journal of Project Management 33, no. 3 (2015): 510-527.
[6] Kerzner, Harold, and Harold R. Kerzner. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons, 2017.
[7] Joosten, Dominik, Dirk Basten, and Werner Mellis. "Measurement of information system
project success in German organizations." In Project Management: Concepts,
Methodologies, Tools, and Applications, pp. 1175-1196. IGI Global, 2016.
[8] Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
[9] Schwalbe, Kathy. Information technology project management. Cengage Learning, 2015.

INFORMATION SYSTEM PROJECT MANAGEMENT
[10] Laudon, Kenneth C., and Jane P. Laudon. Management information system.
Pearson Education India, 2016.
[10] Laudon, Kenneth C., and Jane P. Laudon. Management information system.
Pearson Education India, 2016.
1 out of 13
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
Ā +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Ā© 2024 Ā | Ā Zucol Services PVT LTD Ā | Ā All rights reserved.