This project closure report details the implementation of an ERP system within ABC Company, covering aspects from verification plans and postmortem summaries to project status and future enhancements. The report evaluates methodologies used, such as the waterfall method and prototyping, and addresses challenges encountered during deployment, including compatibility issues and budget constraints. Risk mitigation strategies, including identifying and prioritizing risks like budget escalation and cyber threats, are discussed. The system's successful launch and its impact on operational efficiency, along with objectives, issues, and recommendations, are highlighted. Alternative solutions, such as SAP implementation, are considered. The report concludes with implementation support and a maintenance plan, ensuring the system's long-term effectiveness. Desklib provides this and many other solved assignments.

Running head: ADVANCED INFORMATION SYSTEM
Advanced Information System
Project Closure
Name of Student
Name of the University
Author Note
Advanced Information System
Project Closure
Name of Student
Name of the University
Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1
ADVANCED INFORMATION SYSTEM
Table of Contents
I. Project Closure.............................................................................................................................2
a) Introduction.............................................................................................................................2
1. Verification Plan..................................................................................................................2
b) Postmortem Summary.............................................................................................................3
1. Methodologies.....................................................................................................................3
2. Method Evaluation...............................................................................................................4
3. Risk Mitigation....................................................................................................................5
c) Project Status...........................................................................................................................6
1. Objectives:...........................................................................................................................7
2. Issues:..................................................................................................................................7
3. Alternative/Recommendations............................................................................................7
4. Communication....................................................................................................................8
e) Future Enhancements..............................................................................................................8
f) Implementation Support...........................................................................................................9
g) Maintenance Plan....................................................................................................................9
References......................................................................................................................................10
h) Appendix...................................................................................................................................12
ADVANCED INFORMATION SYSTEM
Table of Contents
I. Project Closure.............................................................................................................................2
a) Introduction.............................................................................................................................2
1. Verification Plan..................................................................................................................2
b) Postmortem Summary.............................................................................................................3
1. Methodologies.....................................................................................................................3
2. Method Evaluation...............................................................................................................4
3. Risk Mitigation....................................................................................................................5
c) Project Status...........................................................................................................................6
1. Objectives:...........................................................................................................................7
2. Issues:..................................................................................................................................7
3. Alternative/Recommendations............................................................................................7
4. Communication....................................................................................................................8
e) Future Enhancements..............................................................................................................8
f) Implementation Support...........................................................................................................9
g) Maintenance Plan....................................................................................................................9
References......................................................................................................................................10
h) Appendix...................................................................................................................................12

2
ADVANCED INFORMATION SYSTEM
I. Project Closure
a) Introduction
Project closure is of same importance that other phases involved in the implementation of
the ERP system within the ABC Company as it will declaring the efficiency and effectiveness of
the project being delivered and releasing the stakeholders from their responsibility. The purpose
of the report is to though light on the aspects related to the elements those are related to the
project closure. This report emphasizes on the Postmortem methodology in manner to determine
and evaluate the methodologies and risks associated with the delivery of the project. This report
evaluates the project status including the objectives issues and recommendations those can be
proposed for the successful delivery of the ERP implementation within ABC Company. Future
enhancement, Implementation support, and maintenance plan have also been proposed in this
report considering the fulfillment of the future requirements and upgrade in the current system.
The proposed solution as the implementation of the ERP can be beneficial in addressing the
issues being raised because of the expansion and increased strength of the organization. It will
allow the organization to automate all the operational activities and eliminate the human error in
manner to execute the operational activities in an efficient and effective manner.
1. Verification Plan
Feedback collection: The feedback from the stakeholders will be gathered through the
means of the survey based on the questionnaires distributed among them. It will be helpful in
getting individual responses without any announcements and thus, everyone will freely reply
from their own perspectives.
Feedback Evaluation: Every questionnaire will have certain values and the customers
will be rating as per the satisfaction they received from the services being implemented in the
ADVANCED INFORMATION SYSTEM
I. Project Closure
a) Introduction
Project closure is of same importance that other phases involved in the implementation of
the ERP system within the ABC Company as it will declaring the efficiency and effectiveness of
the project being delivered and releasing the stakeholders from their responsibility. The purpose
of the report is to though light on the aspects related to the elements those are related to the
project closure. This report emphasizes on the Postmortem methodology in manner to determine
and evaluate the methodologies and risks associated with the delivery of the project. This report
evaluates the project status including the objectives issues and recommendations those can be
proposed for the successful delivery of the ERP implementation within ABC Company. Future
enhancement, Implementation support, and maintenance plan have also been proposed in this
report considering the fulfillment of the future requirements and upgrade in the current system.
The proposed solution as the implementation of the ERP can be beneficial in addressing the
issues being raised because of the expansion and increased strength of the organization. It will
allow the organization to automate all the operational activities and eliminate the human error in
manner to execute the operational activities in an efficient and effective manner.
1. Verification Plan
Feedback collection: The feedback from the stakeholders will be gathered through the
means of the survey based on the questionnaires distributed among them. It will be helpful in
getting individual responses without any announcements and thus, everyone will freely reply
from their own perspectives.
Feedback Evaluation: Every questionnaire will have certain values and the customers
will be rating as per the satisfaction they received from the services being implemented in the

3
ADVANCED INFORMATION SYSTEM
existing system. Based on the ratings satisfaction level ca be determined and hence the efficiency
of the implementation.
b) Postmortem Summary
After the deployment of the system, it has been of great use to the Company since the
time used to process different kind of services such as locating employee file, processing of the
pay slips, evaluating business progress in terms of profit and maximizing profit since the number
of the personnel required are minimal (Ramakrishnan, 2015). Despite all these success,
deploying the system had to face some challenges to ensure that it worked as required. At first,
the system went into a failure due to compatibility issues as the hardware available, which was a
32-bit processor, could not run the program that was meant to run on a 63-bit machine. Budget
allocated was minimum, so I had to work under a tight schedule, which proved to be straining.
1. Methodologies
At every stage, different methods were used to analyses whether the system met
requirements and standard. During the Analysis stage, waterfall method was so important to
analyze the resources needed such as work force, finance, software and hardware (Ruparelia,
2010). Prototyping was essential tool in coming up with the replica model of the proposed
system during the design phase. It helped in ensuring that the system was broken into units,
which would be easy to work on. It has five phases that needs to be executed in an efficient and
effective manner for the successful deployment of the ERP for the ABC Company. It includes
requirements, design, implementation, verification, and maintenance those are helpful in
delivering the project efficiently (Pratt, 2018). Firstly, the requirement analysis was carried out
that stated about the necessary and hardware required for the delivery of the project. Analysis
phase resulted in the identification of the business rules and setting the goals and scope for the
ADVANCED INFORMATION SYSTEM
existing system. Based on the ratings satisfaction level ca be determined and hence the efficiency
of the implementation.
b) Postmortem Summary
After the deployment of the system, it has been of great use to the Company since the
time used to process different kind of services such as locating employee file, processing of the
pay slips, evaluating business progress in terms of profit and maximizing profit since the number
of the personnel required are minimal (Ramakrishnan, 2015). Despite all these success,
deploying the system had to face some challenges to ensure that it worked as required. At first,
the system went into a failure due to compatibility issues as the hardware available, which was a
32-bit processor, could not run the program that was meant to run on a 63-bit machine. Budget
allocated was minimum, so I had to work under a tight schedule, which proved to be straining.
1. Methodologies
At every stage, different methods were used to analyses whether the system met
requirements and standard. During the Analysis stage, waterfall method was so important to
analyze the resources needed such as work force, finance, software and hardware (Ruparelia,
2010). Prototyping was essential tool in coming up with the replica model of the proposed
system during the design phase. It helped in ensuring that the system was broken into units,
which would be easy to work on. It has five phases that needs to be executed in an efficient and
effective manner for the successful deployment of the ERP for the ABC Company. It includes
requirements, design, implementation, verification, and maintenance those are helpful in
delivering the project efficiently (Pratt, 2018). Firstly, the requirement analysis was carried out
that stated about the necessary and hardware required for the delivery of the project. Analysis
phase resulted in the identification of the business rules and setting the goals and scope for the
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4
ADVANCED INFORMATION SYSTEM
delivery of the project. It was helpful in focusing towards the ultimate output and deliver, the
necessary contribution in an efficient and effective manner (Kazim, 2017). Next phase was
design and coding that was executed considering the software architecture and integration of the
software within the existing system of the ABC Company. Testing and operations was last phase
that needs to evaluate the functioning of the ERP implementation and whether the system is
capable of fulfilling the needs and requirements of the operational activities or not and the
operation being performed are as per the expectations or not.
In addition, we were able to reuse waterfall approach to test the units of the systems
before compiling them into a single system, testing the acceptance of the system, its interface,
and the wholesome testing of the system functionality. Training of the staff was to be carried out
by the team and some of the staffs who understood well its functionality (Merhout & Kovach,
2017). Training is a necessary element for managing the efficiency at the highest level as new
implementation will definitely be needing the training for the employees and staffs in manner to
introduce them with the features and options available for the successful delivery of the
implementation.
2. Method Evaluation
With the right team, it is easier to work on any system and implement it. Also, when the
right kind of resources are available from the hardware and the software and better understanding
of the system requirements, it makes working on it even much easier. Helping the users
understand what the system implements is the key to ensure that there is no system apathy
among the users. It focuses on whether the existing system and proposed system are compatible
in the sense of the stakeholders application and output of the organization (Alshamrani &
Bahattab, 2015). It will be evaluating the efficiency and effectiveness of the system being
ADVANCED INFORMATION SYSTEM
delivery of the project. It was helpful in focusing towards the ultimate output and deliver, the
necessary contribution in an efficient and effective manner (Kazim, 2017). Next phase was
design and coding that was executed considering the software architecture and integration of the
software within the existing system of the ABC Company. Testing and operations was last phase
that needs to evaluate the functioning of the ERP implementation and whether the system is
capable of fulfilling the needs and requirements of the operational activities or not and the
operation being performed are as per the expectations or not.
In addition, we were able to reuse waterfall approach to test the units of the systems
before compiling them into a single system, testing the acceptance of the system, its interface,
and the wholesome testing of the system functionality. Training of the staff was to be carried out
by the team and some of the staffs who understood well its functionality (Merhout & Kovach,
2017). Training is a necessary element for managing the efficiency at the highest level as new
implementation will definitely be needing the training for the employees and staffs in manner to
introduce them with the features and options available for the successful delivery of the
implementation.
2. Method Evaluation
With the right team, it is easier to work on any system and implement it. Also, when the
right kind of resources are available from the hardware and the software and better understanding
of the system requirements, it makes working on it even much easier. Helping the users
understand what the system implements is the key to ensure that there is no system apathy
among the users. It focuses on whether the existing system and proposed system are compatible
in the sense of the stakeholders application and output of the organization (Alshamrani &
Bahattab, 2015). It will be evaluating the efficiency and effectiveness of the system being

5
ADVANCED INFORMATION SYSTEM
delivered from the implementation of the ERP and ensuring that the software is capable enough
for delivering the necessary output. It will also be considering the changes need to be
implemented for managing the growth and development and assuring that the project will be
delivering the objectives and goals of the project in an efficient and effective manner. Evaluation
is not only the determination of the factors those are contributing in the transformation rather it
also focuses on the identification of the changes those are capable of delivering the project
objectives in an efficient and effective manner.
3. Risk Mitigation
Gargeya & brandy (2005) in the journal Success and failure factors of adopting SAP in
ERP system implementation 501-516 stated that any the success of the project, there are things
that the programmer needs to address before deploying the application. They include:
a. How well are the users familiar with the system?
b. Are the necessary resources available?
c. Future expansion or integration of the system
d. The team works
If the programmer can be able to articulate those issues, all users will be able to work
well with the system thus making the work of deploying easy. With the right resources available,
it makes deploying work even easier and with minimum errors such as compatibility error.
Future expansion is the key as any software should be expandable and able to integrate with
other soft wares that are available in the market. Teamwork is the key in any project, different
personnel are gifted at different areas, which may be another one’s weakness thus, working on
units and later integrating them (Gefen & Lichtenstein, 2008). It will include three phases
including the identification of the risks, risk prioritization, and risk handling. The risks associated
ADVANCED INFORMATION SYSTEM
delivered from the implementation of the ERP and ensuring that the software is capable enough
for delivering the necessary output. It will also be considering the changes need to be
implemented for managing the growth and development and assuring that the project will be
delivering the objectives and goals of the project in an efficient and effective manner. Evaluation
is not only the determination of the factors those are contributing in the transformation rather it
also focuses on the identification of the changes those are capable of delivering the project
objectives in an efficient and effective manner.
3. Risk Mitigation
Gargeya & brandy (2005) in the journal Success and failure factors of adopting SAP in
ERP system implementation 501-516 stated that any the success of the project, there are things
that the programmer needs to address before deploying the application. They include:
a. How well are the users familiar with the system?
b. Are the necessary resources available?
c. Future expansion or integration of the system
d. The team works
If the programmer can be able to articulate those issues, all users will be able to work
well with the system thus making the work of deploying easy. With the right resources available,
it makes deploying work even easier and with minimum errors such as compatibility error.
Future expansion is the key as any software should be expandable and able to integrate with
other soft wares that are available in the market. Teamwork is the key in any project, different
personnel are gifted at different areas, which may be another one’s weakness thus, working on
units and later integrating them (Gefen & Lichtenstein, 2008). It will include three phases
including the identification of the risks, risk prioritization, and risk handling. The risks associated

6
ADVANCED INFORMATION SYSTEM
with this project include the escalation of the budget and schedule, overrun of the resources,
resource lacking, outdated hardware, insecure software, natural calamities, cyber threats and
many more. A risk prioritization matrix can be delivered for the identification of the risks
influencing the project mostly. Thereafter, the final stage comes stating the risk handling that
focuses on many options such as neglecting risk, eliminating risk, and identification of the
opportunities in the risks (Rani, 2017). The risks with highest priority should be eliminated in the
prior of the execution phase of the project in manner to make sure that the implementation will
be delivered successfully and influence of the risks on the project is minimum.
c) Project Status
The system was successfully launched and proved to be a key tool in helping the staff to
do arithmetic calculation fast than previous manual work and timely roll out of the pay slip of the
workers. Back up of the company files was created with ease of retrieving the files. The problem
encountered at first with the infrastructures was well handled by purchasing upgraded systems
that made easy for the installation of the system.
Staff and the board were completely happy with the system as the system maximized the
profit and minimized the work, which forced some staff to work extra time to complete assigned
work in time. It also provides access to the data or information saved in the database and users
can access those data or information from anywhere connecting via internet. The ERP will be
managing all the operational activities at an instance and thus, boosting up the operational
activities’ efficiency and ensuring the accuracy of the mathematical calculations (Kazim, 2017).
This can be alternatively reflected on the overall revenue of the organization considering the
output and profits made through the application of the ERP.
ADVANCED INFORMATION SYSTEM
with this project include the escalation of the budget and schedule, overrun of the resources,
resource lacking, outdated hardware, insecure software, natural calamities, cyber threats and
many more. A risk prioritization matrix can be delivered for the identification of the risks
influencing the project mostly. Thereafter, the final stage comes stating the risk handling that
focuses on many options such as neglecting risk, eliminating risk, and identification of the
opportunities in the risks (Rani, 2017). The risks with highest priority should be eliminated in the
prior of the execution phase of the project in manner to make sure that the implementation will
be delivered successfully and influence of the risks on the project is minimum.
c) Project Status
The system was successfully launched and proved to be a key tool in helping the staff to
do arithmetic calculation fast than previous manual work and timely roll out of the pay slip of the
workers. Back up of the company files was created with ease of retrieving the files. The problem
encountered at first with the infrastructures was well handled by purchasing upgraded systems
that made easy for the installation of the system.
Staff and the board were completely happy with the system as the system maximized the
profit and minimized the work, which forced some staff to work extra time to complete assigned
work in time. It also provides access to the data or information saved in the database and users
can access those data or information from anywhere connecting via internet. The ERP will be
managing all the operational activities at an instance and thus, boosting up the operational
activities’ efficiency and ensuring the accuracy of the mathematical calculations (Kazim, 2017).
This can be alternatively reflected on the overall revenue of the organization considering the
output and profits made through the application of the ERP.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
ADVANCED INFORMATION SYSTEM
1. Objectives:
The primary objective of the project was to identify and propose a solution that can be
utilized for the proper and effective management of the operational activities in an efficient and
effective manner. The project objective was to successfully implement the ERP system within
the existing system of the organization and manage the operational activities in automated
manner. It was successfully identified as the ERP was proposed as the necessary software that
can be utilized for the elimination of the problems needed for the management of the operational
activities and hence, it is applicable for the existing system. Thereafter the requirements
necessary for the implementation of the ERP within the existing system of the ABC Company
that was accomplished in an efficient and effective manner.
2. Issues:
The identified issues were the transformation of the IT infrastructure that needed to be
made for the implementation of the hardware and software identified in this transformation.
Infrastructure transformation was successfully transformed considering the implementation of
the ERP. Thereafter, automating the existing operation was another concern for the delivery of
the project and that was eliminated through the implementation of ERP for managing the
operational activities. Understanding of the individuals utilizing the system about the
functionality and options were necessary for the effective implementation. This was eliminated
through the training that could be provided to the employees considering the information sharing
on how the employees and staff could utilize thee system with complete efficiency.
3. Alternative/Recommendations
The third party can be asked to implement the ERP system and hence, the whole
responsibility can be transferred to that party who taken the responsibility of the project.
ADVANCED INFORMATION SYSTEM
1. Objectives:
The primary objective of the project was to identify and propose a solution that can be
utilized for the proper and effective management of the operational activities in an efficient and
effective manner. The project objective was to successfully implement the ERP system within
the existing system of the organization and manage the operational activities in automated
manner. It was successfully identified as the ERP was proposed as the necessary software that
can be utilized for the elimination of the problems needed for the management of the operational
activities and hence, it is applicable for the existing system. Thereafter the requirements
necessary for the implementation of the ERP within the existing system of the ABC Company
that was accomplished in an efficient and effective manner.
2. Issues:
The identified issues were the transformation of the IT infrastructure that needed to be
made for the implementation of the hardware and software identified in this transformation.
Infrastructure transformation was successfully transformed considering the implementation of
the ERP. Thereafter, automating the existing operation was another concern for the delivery of
the project and that was eliminated through the implementation of ERP for managing the
operational activities. Understanding of the individuals utilizing the system about the
functionality and options were necessary for the effective implementation. This was eliminated
through the training that could be provided to the employees considering the information sharing
on how the employees and staff could utilize thee system with complete efficiency.
3. Alternative/Recommendations
The third party can be asked to implement the ERP system and hence, the whole
responsibility can be transferred to that party who taken the responsibility of the project.

8
ADVANCED INFORMATION SYSTEM
However, the recommended SLDC is applicable for accomplishing all the objectives of the
project if delivered as per the steps mentioned in the above report. Regardless of the budget, SAP
can be recommended for the ABC Company that can be used in place of the ERP for the
management of the operational activity with higher productive and output. SAP is more complex
and thus, can be utilized for accomplishing the current and future needs of the ABC Company
without any drawbacks and issues. It can cost much but is capable of handling the future
expansions those will be introduced in the company for the efficient and effective e
accomplishment of the operational activities. Everything in SAP is stored over the cloud and
thus, the operations can be accomplished from any sector of the world via connecting to the
internet.
4. Communication
Project is at the verge of the completion and all the stakeholders can be informed about
the implementation and changes being transformed for the management of the operational
activities. Regular meetings can be arranged for introducing the stakeholders about the changes,
transformation, elimination, and their benefits in their respective. It also includes the distribution
of the questionnaires identifying the satisfaction of the stakeholders. The stakeholders can also
be asked to feed their suggestion and question in the valet box and suggest the company about
the feedback on the system being implemented. It can also be distributed and customers can be
asked to provide their feedback on the social media web pages and provide their perspective
about the implementations made.
e) Future Enhancements
The system was installed with the prospects that there would be future enhancement of
the system if need be. Since changes are inevitable and technology keeps changing, if the future
ADVANCED INFORMATION SYSTEM
However, the recommended SLDC is applicable for accomplishing all the objectives of the
project if delivered as per the steps mentioned in the above report. Regardless of the budget, SAP
can be recommended for the ABC Company that can be used in place of the ERP for the
management of the operational activity with higher productive and output. SAP is more complex
and thus, can be utilized for accomplishing the current and future needs of the ABC Company
without any drawbacks and issues. It can cost much but is capable of handling the future
expansions those will be introduced in the company for the efficient and effective e
accomplishment of the operational activities. Everything in SAP is stored over the cloud and
thus, the operations can be accomplished from any sector of the world via connecting to the
internet.
4. Communication
Project is at the verge of the completion and all the stakeholders can be informed about
the implementation and changes being transformed for the management of the operational
activities. Regular meetings can be arranged for introducing the stakeholders about the changes,
transformation, elimination, and their benefits in their respective. It also includes the distribution
of the questionnaires identifying the satisfaction of the stakeholders. The stakeholders can also
be asked to feed their suggestion and question in the valet box and suggest the company about
the feedback on the system being implemented. It can also be distributed and customers can be
asked to provide their feedback on the social media web pages and provide their perspective
about the implementations made.
e) Future Enhancements
The system was installed with the prospects that there would be future enhancement of
the system if need be. Since changes are inevitable and technology keeps changing, if the future

9
ADVANCED INFORMATION SYSTEM
upgrade was to be done the system gave a room for it such as connecting to the external sever to
make it a distributed system as the company intends to open branches countrywide hence the
need for a distributed system in future. Security will be more emphasized in the next phase of the
project in manner to secure the data or information being collected and shared on the network.
Encryption can be used on the files in manner to restricting and limiting the data usage that will
alternatively allow the individuals with cryptographic key to access the data or information being
saved in the database.
f) Implementation Support
To make the system successful, it was not without some of the staff who helped in testing
process to ensure that all the requirements are met, as they would be the one to be using the
system. They also helped in training other staff on how to use various functions and be acquitted
with it. Proper training on the usage and functioning of the ERP can be delivered for making the
employees and staffs understandable about the changes being implemented for boosting the
productivity and performance.
g) Maintenance Plan
In case of any setback to the system, the IT staff were to work on it and reach for support
in case the problem seizes. Proper documentation of the system step by stem helped the IT staff
understand the logic fast. The IT team will be responsible for regular audit of the system and
eliminating the bugs and glitches identified during the audit in manner to manage the efficiency
of the project and keep it out from the bugs and glitches.
ADVANCED INFORMATION SYSTEM
upgrade was to be done the system gave a room for it such as connecting to the external sever to
make it a distributed system as the company intends to open branches countrywide hence the
need for a distributed system in future. Security will be more emphasized in the next phase of the
project in manner to secure the data or information being collected and shared on the network.
Encryption can be used on the files in manner to restricting and limiting the data usage that will
alternatively allow the individuals with cryptographic key to access the data or information being
saved in the database.
f) Implementation Support
To make the system successful, it was not without some of the staff who helped in testing
process to ensure that all the requirements are met, as they would be the one to be using the
system. They also helped in training other staff on how to use various functions and be acquitted
with it. Proper training on the usage and functioning of the ERP can be delivered for making the
employees and staffs understandable about the changes being implemented for boosting the
productivity and performance.
g) Maintenance Plan
In case of any setback to the system, the IT staff were to work on it and reach for support
in case the problem seizes. Proper documentation of the system step by stem helped the IT staff
understand the logic fast. The IT team will be responsible for regular audit of the system and
eliminating the bugs and glitches identified during the audit in manner to manage the efficiency
of the project and keep it out from the bugs and glitches.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

10
ADVANCED INFORMATION SYSTEM
References
Alshamrani, A., & Bahattab, A. (2015). A comparison between three SDLC models waterfall
model, spiral model, and Incremental/Iterative model. International Journal of Computer
Science Issues (IJCSI), 12(1), 106.
Chen, S., Osman, N. M., Nunes, J. M. B., & Peng, G. C. (2011). Information systems evaluation
methodologies. In Proceedings of the IADIS International Workshop on Information
Systems Research Trends, Approaches and Methodologies. Sheffield.
Gargeya, V. B., & Brady, C. (2005). Success and failure factors of adopting SAP in ERP system
implementation. Business Process Management Journal, 11(5), 501-516.
Gefen, D., Wyss, S., & Lichtenstein, Y. (2008). Business familiarity as risk mitigation in
software development outsourcing contracts. MIS quarterly, 531-551. Retrieved from
Kang, U., Tsourakakis, C. E., & Faloutsos, C. (2009, December). Pegasus: A peta-scale graph
mining system implementation and observations. In Data Mining, 2009. ICDM'09. Ninth
IEEE International Conference on (pp. 229-238). IEEE.
Kazim, A. (2017). A Study of Software Development Life Cycle Process Models. International
Journal of Advanced Research in Computer Science, 8(1).
Kazim, A. (2017). A Study of Software Development Life Cycle Process Models. International
Journal of Advanced Research in Computer Science, 8(1).
Kazim, A. (2017). A Study of Software Development Life Cycle Process Models. International
Journal of Advanced Research in Computer Science, 8(1).
ADVANCED INFORMATION SYSTEM
References
Alshamrani, A., & Bahattab, A. (2015). A comparison between three SDLC models waterfall
model, spiral model, and Incremental/Iterative model. International Journal of Computer
Science Issues (IJCSI), 12(1), 106.
Chen, S., Osman, N. M., Nunes, J. M. B., & Peng, G. C. (2011). Information systems evaluation
methodologies. In Proceedings of the IADIS International Workshop on Information
Systems Research Trends, Approaches and Methodologies. Sheffield.
Gargeya, V. B., & Brady, C. (2005). Success and failure factors of adopting SAP in ERP system
implementation. Business Process Management Journal, 11(5), 501-516.
Gefen, D., Wyss, S., & Lichtenstein, Y. (2008). Business familiarity as risk mitigation in
software development outsourcing contracts. MIS quarterly, 531-551. Retrieved from
Kang, U., Tsourakakis, C. E., & Faloutsos, C. (2009, December). Pegasus: A peta-scale graph
mining system implementation and observations. In Data Mining, 2009. ICDM'09. Ninth
IEEE International Conference on (pp. 229-238). IEEE.
Kazim, A. (2017). A Study of Software Development Life Cycle Process Models. International
Journal of Advanced Research in Computer Science, 8(1).
Kazim, A. (2017). A Study of Software Development Life Cycle Process Models. International
Journal of Advanced Research in Computer Science, 8(1).
Kazim, A. (2017). A Study of Software Development Life Cycle Process Models. International
Journal of Advanced Research in Computer Science, 8(1).

11
ADVANCED INFORMATION SYSTEM
Merhout, J., & Kovach, M. (2017). Governance Practices over Agile Systems Development
Projects: A Research Agenda.
Morris, M. G., & Venkatesh, V. (2010). Job characteristics and job satisfaction: understanding
the role of enterprise resource planning system implementation. Mis Quarterly, 143-161.
Pratt, M. (2018). Project Closure Document.
Ramakrishnan, R. K. (2015, October). A Business Process view of Software: An effective
measurement model to assess the operations readiness of software under construction.
In INCOSE International Symposium (Vol. 25, No. 1, pp. 903-913).
Rani, S. B. A. S. U. (2017). A detailed study of Software Development Life Cycle (SDLC)
Models. International Journal Of Engineering And Computer Science, 6(7).
Ruparelia, N. B. (2010). Software development lifecycle models. ACM SIGSOFT Software
Engineering Notes, 35(3), 8-13.
ADVANCED INFORMATION SYSTEM
Merhout, J., & Kovach, M. (2017). Governance Practices over Agile Systems Development
Projects: A Research Agenda.
Morris, M. G., & Venkatesh, V. (2010). Job characteristics and job satisfaction: understanding
the role of enterprise resource planning system implementation. Mis Quarterly, 143-161.
Pratt, M. (2018). Project Closure Document.
Ramakrishnan, R. K. (2015, October). A Business Process view of Software: An effective
measurement model to assess the operations readiness of software under construction.
In INCOSE International Symposium (Vol. 25, No. 1, pp. 903-913).
Rani, S. B. A. S. U. (2017). A detailed study of Software Development Life Cycle (SDLC)
Models. International Journal Of Engineering And Computer Science, 6(7).
Ruparelia, N. B. (2010). Software development lifecycle models. ACM SIGSOFT Software
Engineering Notes, 35(3), 8-13.

12
ADVANCED INFORMATION SYSTEM
h) Appendix
Flow chart of the processes after implementation of ERP
Figure 1: Flow chart describing operational activity after implementation of ERP in ABC
(Source: Created by Author)
Waterfall methodology
ADVANCED INFORMATION SYSTEM
h) Appendix
Flow chart of the processes after implementation of ERP
Figure 1: Flow chart describing operational activity after implementation of ERP in ABC
(Source: Created by Author)
Waterfall methodology
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

13
ADVANCED INFORMATION SYSTEM
Figure 2: Waterfall methodology for SDLC
(Source: Created by Author)
Referred Documents
1. Enterprise system for Management
2. ERP Systems and their Effects on Organizations: A Proposed Scheme for ERP Success
Benefits of ERP
ADVANCED INFORMATION SYSTEM
Figure 2: Waterfall methodology for SDLC
(Source: Created by Author)
Referred Documents
1. Enterprise system for Management
2. ERP Systems and their Effects on Organizations: A Proposed Scheme for ERP Success
Benefits of ERP

14
ADVANCED INFORMATION SYSTEM
https://www.youtube.com/watch?v=TVkkHfEeg80
SDLC
https://www.youtube.com/watch?v=LHcpEwvpb-s
ADVANCED INFORMATION SYSTEM
https://www.youtube.com/watch?v=TVkkHfEeg80
SDLC
https://www.youtube.com/watch?v=LHcpEwvpb-s
1 out of 15
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.