AI Summary
This report, prepared for the Queensland Health Payroll Program (PPMP20011), analyzes negotiation and conflict within the context of various projects related to payroll system development and governance. It examines four key projects: forward strategy for the payroll system, governance and decision-making, people and change, and funding. The report identifies the roles and potential conflicts of stakeholders, including owners, designers, and contractors, within each project. It further explores the negotiation interaction process, outlining structural, strategic, and behavioral approaches to conflict resolution. The report emphasizes the importance of understanding stakeholder positions, government policies, and the impact of negotiation strategies on project outcomes, providing insights into effective conflict management within a complex organizational setting.

Running head: NEGOTIATION AND CONFLICT REPORT 1
PPMP20011ProjectsNegotiationandConflictReport
1 PROGRAM INFORMATION
Program Name: Queensland Health Payroll Program
Date:
Project Ownership:
Prepared by:
PPMP20011ProjectsNegotiationandConflictReport
1 PROGRAM INFORMATION
Program Name: Queensland Health Payroll Program
Date:
Project Ownership:
Prepared by:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

NEGOTIATION AND CONFLICT REPORT 2
2 THE PROJECTS
2.1 Project 1: Forward strategy for payroll system
The project required different components such as acknowledgment of the
undertaking, its primary worry about the activities and documentation
which reaches for the future projections about how the organization will
deal with the administrations like to course the facilitations to the
representatives and afterward outfit the structure utilized by QH.
Notwithstanding, it must be remembered to take a shot at the fundamental
need of the model is to control the issues worried about workers who are
getting compensation are dealt with by engraving such methods.
The justifications for these characteristics are….
To defeat the issue of excess charges it must be important to give quick
endorsement to expel the suspension so it very well may be practiced with
the procedure and recuperate the additional expense.
It should likewise be possible by executing the adjustments in date of
facilitation by the organization.
Indeed, it very well may be recouped by diminishing the proportion of
proactive estimates which is a boost in execution to change the program
fundamentally.
What's more, the principle worry to step up ventures to execute such
strategy is to speak to the prerequisites of future estimation, where
different elements like hazard, cost and advantages are additionally
connected with it (Alfredson & Cungu, 2008). Besides, it is chiefly
founded on the versatility and capacity of the venture for long time
freedom of the gainful business.
2 THE PROJECTS
2.1 Project 1: Forward strategy for payroll system
The project required different components such as acknowledgment of the
undertaking, its primary worry about the activities and documentation
which reaches for the future projections about how the organization will
deal with the administrations like to course the facilitations to the
representatives and afterward outfit the structure utilized by QH.
Notwithstanding, it must be remembered to take a shot at the fundamental
need of the model is to control the issues worried about workers who are
getting compensation are dealt with by engraving such methods.
The justifications for these characteristics are….
To defeat the issue of excess charges it must be important to give quick
endorsement to expel the suspension so it very well may be practiced with
the procedure and recuperate the additional expense.
It should likewise be possible by executing the adjustments in date of
facilitation by the organization.
Indeed, it very well may be recouped by diminishing the proportion of
proactive estimates which is a boost in execution to change the program
fundamentally.
What's more, the principle worry to step up ventures to execute such
strategy is to speak to the prerequisites of future estimation, where
different elements like hazard, cost and advantages are additionally
connected with it (Alfredson & Cungu, 2008). Besides, it is chiefly
founded on the versatility and capacity of the venture for long time
freedom of the gainful business.

NEGOTIATION AND CONFLICT REPORT 3
2.2 Project 2: Governance and decision-making
Rolling out conceivable improvements on present worry about business,
settle on choice to achieve the objective precisely, within the deadline,
and decrease in insignificant information passage. These are the primary
point of concerns of the task qualities.
The justifications for these characteristics are….
The system which is set out by the administration for the financial
disbursement procedure of wages for workers, structure of advisory group
and its individuals related with it and clearly show the job and obligations
of the venture, to accomplish the abnormal state of the administration. In
any case, it is the obligation of government to guarantee the substance and
specialized organization which stays in a place, pursue the unmistakable
rules of the endeavours for salaries discharge technique and treatment
money related framework overhaul. It additionally draws in the
administration of a third party who is independent of affirmation for
prescription facilitation strategy.
2.3 Project 3: People and change
It is the best approach to polarize the partners request and guarantee them
about the venture in subtleties and there must be straightforwardness
which is the best way to hold the client to pull in towards the idea of
finance and it must give the unmistakable advantages to the organization
too.
The justifications for these characteristics are….
2.2 Project 2: Governance and decision-making
Rolling out conceivable improvements on present worry about business,
settle on choice to achieve the objective precisely, within the deadline,
and decrease in insignificant information passage. These are the primary
point of concerns of the task qualities.
The justifications for these characteristics are….
The system which is set out by the administration for the financial
disbursement procedure of wages for workers, structure of advisory group
and its individuals related with it and clearly show the job and obligations
of the venture, to accomplish the abnormal state of the administration. In
any case, it is the obligation of government to guarantee the substance and
specialized organization which stays in a place, pursue the unmistakable
rules of the endeavours for salaries discharge technique and treatment
money related framework overhaul. It additionally draws in the
administration of a third party who is independent of affirmation for
prescription facilitation strategy.
2.3 Project 3: People and change
It is the best approach to polarize the partners request and guarantee them
about the venture in subtleties and there must be straightforwardness
which is the best way to hold the client to pull in towards the idea of
finance and it must give the unmistakable advantages to the organization
too.
The justifications for these characteristics are….
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

NEGOTIATION AND CONFLICT REPORT 4
The advantages of the financing will be to persevere, it must guarantee the
effect of changes among staff and different procedures in the executives
and correspondence approaches. In the event that there is and obstacles
and changes in the method of finance framework it must be put off. It
must imperative to start the work via seeking distinctive chances to make
simple the honour structure crosswise across the board. What's more, it
adds to the authoritative expense and framework customization.
2.4 Project 4: Funding
In view of various procedures which demonstrates the base necessities
joined with the upgrade of finance framework, its support, place it into
exact path by discovering deficiencies, upgrade and enhancement of the
undertaking reports.
The justifications for these characteristics are….
The framework execution must be upgraded by enhancement in the
speculation, add up to cost incurred on the present framework necessity
which incorporates subsidized and unfunded parts.
Which eventually benefits the partners to get the assets which manages
the anticipated spending and its valuation
3 THE PARTICIPANTS
3.1 Project 1: Forward strategy for payroll system
The position of the negotiation and clashes seeing someone of the
members of the project are as described.
The advantages of the financing will be to persevere, it must guarantee the
effect of changes among staff and different procedures in the executives
and correspondence approaches. In the event that there is and obstacles
and changes in the method of finance framework it must be put off. It
must imperative to start the work via seeking distinctive chances to make
simple the honour structure crosswise across the board. What's more, it
adds to the authoritative expense and framework customization.
2.4 Project 4: Funding
In view of various procedures which demonstrates the base necessities
joined with the upgrade of finance framework, its support, place it into
exact path by discovering deficiencies, upgrade and enhancement of the
undertaking reports.
The justifications for these characteristics are….
The framework execution must be upgraded by enhancement in the
speculation, add up to cost incurred on the present framework necessity
which incorporates subsidized and unfunded parts.
Which eventually benefits the partners to get the assets which manages
the anticipated spending and its valuation
3 THE PARTICIPANTS
3.1 Project 1: Forward strategy for payroll system
The position of the negotiation and clashes seeing someone of the
members of the project are as described.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

NEGOTIATION AND CONFLICT REPORT 5
It very well may be characterized as primary members which incorporates
the proprietor design contractual worker development chief which plays
the fundamental intrigue, position and frame of mind of the finance
framework to forward the new execution of principles and methodologies.
3.1.1 Owner
The primary individual of those involved who assumes the key job for this
situation through which every one of the funds and support to the task.
The private proprietor is the person who works uniquely in contrast to the
administration works in any sector. It incorporates an individual,
organization of business and collaboration of various aspects of the
society. It takes a shot at benefit and advantage procedures where the
proprietor can do anything to way out to get the advantages.
In any case, people in general public have a few liabilities, condition and
terms where the individual can be limited with that. There may not be
authorization on conveyance strategies and methods (Brown, Gordon &
Rose, 2012). Also, there might be state law against the individuals who
fabricate and stooped structures what not.
3.1.2 Designers
It involves the different positions and the condescended for whom it tends
to be appointed for. It is a piece of the proprietors’ organization where the
modeler architect can be worked for. The account specialist can get the
agreement by the proprietor for both the development and structured.
It very well may be characterized as primary members which incorporates
the proprietor design contractual worker development chief which plays
the fundamental intrigue, position and frame of mind of the finance
framework to forward the new execution of principles and methodologies.
3.1.1 Owner
The primary individual of those involved who assumes the key job for this
situation through which every one of the funds and support to the task.
The private proprietor is the person who works uniquely in contrast to the
administration works in any sector. It incorporates an individual,
organization of business and collaboration of various aspects of the
society. It takes a shot at benefit and advantage procedures where the
proprietor can do anything to way out to get the advantages.
In any case, people in general public have a few liabilities, condition and
terms where the individual can be limited with that. There may not be
authorization on conveyance strategies and methods (Brown, Gordon &
Rose, 2012). Also, there might be state law against the individuals who
fabricate and stooped structures what not.
3.1.2 Designers
It involves the different positions and the condescended for whom it tends
to be appointed for. It is a piece of the proprietors’ organization where the
modeler architect can be worked for. The account specialist can get the
agreement by the proprietor for both the development and structured.

NEGOTIATION AND CONFLICT REPORT 6
As it is clear condescended may take different positions and as it is
identified with both for proprietor and temporary worker.
Notwithstanding, a portion of the individual intrigue can't be changed
which can be the principle struggle in connection to the architect.
3.1.3 Contractors
To decide the systems, and different strategies to achieve the development
procedure, and direct the principle development exercises.
The potential misunderstanding seeing someone that the temporary
workers may have are hazard factors in connection to various contracts, if
on the off chance that it couldn't have the capacity to achieve there might
be ascend in conflicts identified with advantages and their results.
3.2 Project 2: Governance and decision-making
It must be essential for the temporary workers to think about the
administration approaches of the government which is rely on the
subsidizing and credits accessible by the legislature. So, one must
remember about the results and principle to reside with the approach
executed by the legislature for the temporary workers.
As it is clear condescended may take different positions and as it is
identified with both for proprietor and temporary worker.
Notwithstanding, a portion of the individual intrigue can't be changed
which can be the principle struggle in connection to the architect.
3.1.3 Contractors
To decide the systems, and different strategies to achieve the development
procedure, and direct the principle development exercises.
The potential misunderstanding seeing someone that the temporary
workers may have are hazard factors in connection to various contracts, if
on the off chance that it couldn't have the capacity to achieve there might
be ascend in conflicts identified with advantages and their results.
3.2 Project 2: Governance and decision-making
It must be essential for the temporary workers to think about the
administration approaches of the government which is rely on the
subsidizing and credits accessible by the legislature. So, one must
remember about the results and principle to reside with the approach
executed by the legislature for the temporary workers.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

NEGOTIATION AND CONFLICT REPORT 7
3.2.1 Owner
The proprietor must consider the estimations of administration and tenets
of the administration which is executed for people in general, the
proprietor ought to have rights to take choice at its very own to make
things yet there must be a few standards which one ought to need to
pursue according to the administration strategies structured (Peña-Mora &
Tamaki, 2001).
The potential clashes seeing someone that the proprietor may have are
some time the polices of government are so troublesome for the individual
or an agent to conceal on time which rises the contention between them.
3.2.2 Designers
The creator must have prepared information and experience to assemble
the structure of the structures and idea of the new task which would be
planned without the assistance of any agreement of general director. He
should keep up his own structures and actualize it into the edges of
various undertaking
The primary disagreement of designer is the administration's tenets and
directions which can obstruct crafted by architect, and originator couldn't
be ready to actualize the structure without the consent of the
administration policies.
3.2.3 Contractors
Temporary worker must take distinctive contracts which are passed by
various government strategies, tenders and different terms.
3.2.1 Owner
The proprietor must consider the estimations of administration and tenets
of the administration which is executed for people in general, the
proprietor ought to have rights to take choice at its very own to make
things yet there must be a few standards which one ought to need to
pursue according to the administration strategies structured (Peña-Mora &
Tamaki, 2001).
The potential clashes seeing someone that the proprietor may have are
some time the polices of government are so troublesome for the individual
or an agent to conceal on time which rises the contention between them.
3.2.2 Designers
The creator must have prepared information and experience to assemble
the structure of the structures and idea of the new task which would be
planned without the assistance of any agreement of general director. He
should keep up his own structures and actualize it into the edges of
various undertaking
The primary disagreement of designer is the administration's tenets and
directions which can obstruct crafted by architect, and originator couldn't
be ready to actualize the structure without the consent of the
administration policies.
3.2.3 Contractors
Temporary worker must take distinctive contracts which are passed by
various government strategies, tenders and different terms.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

NEGOTIATION AND CONFLICT REPORT 8
Principle struggle is the tenders and contract couldn't achieve on time
some time which is fundamental disadvantage to an organization.
3.3 Project 3: People and change
The position of negotiation and the disagreement seeing someone of the
stakeholders of the project are depicted as follows.
There must be the transparencies of government polices so the general
population can get held for the organization.
3.3.1 Owner
The proprietors must have capacity to implement the idea for individuals
change polices so the client and proprietor must have great comprehension
of what is done.
The potential disagreements seeing someone that the proprietor may have
are the primary reason of contention is that if the client won't get
contended or not content with polices of the organization it is again the
disadvantages.
3.3.2 Designers
Specialist must think about the planning of the project so that it must hold
the client, and there may not be an issue for the client.
The potential disagreement showing someone that the architects may have
are explanation behind clash is the general population won't some time
hold because of various plan and not appropriate for the correct polices of
the administration.
3.3.3 Contractors
Contractual workers will have such contracts close by which can be
gainful for the two clients and the organization.
Principle struggle is the tenders and contract couldn't achieve on time
some time which is fundamental disadvantage to an organization.
3.3 Project 3: People and change
The position of negotiation and the disagreement seeing someone of the
stakeholders of the project are depicted as follows.
There must be the transparencies of government polices so the general
population can get held for the organization.
3.3.1 Owner
The proprietors must have capacity to implement the idea for individuals
change polices so the client and proprietor must have great comprehension
of what is done.
The potential disagreements seeing someone that the proprietor may have
are the primary reason of contention is that if the client won't get
contended or not content with polices of the organization it is again the
disadvantages.
3.3.2 Designers
Specialist must think about the planning of the project so that it must hold
the client, and there may not be an issue for the client.
The potential disagreement showing someone that the architects may have
are explanation behind clash is the general population won't some time
hold because of various plan and not appropriate for the correct polices of
the administration.
3.3.3 Contractors
Contractual workers will have such contracts close by which can be
gainful for the two clients and the organization.

NEGOTIATION AND CONFLICT REPORT 9
The purpose behind the principle strife is that some time the contractual
workers contracts can't manage to finish on time which results the
objective not accomplished on time which results the loss on organization.
3.4 Project 4: Funding
The position of the negotiations and disagreements seeing some of the
stakeholders of this undertaking are portrayed as follows. Subsidizing to
the task is especially helpful generally all will endure because of less
supports accessible to them.
3.4.1 Owner
The assets which are the fundamental assets which couldn't be
overwhelmed by the assistance of government polices to general society
to finish the objective within the deadline.
The explanation for the contention between proprietors that because of the
hard polices of the administration which can decreases the time length of
the undertaking.
3.4.2 Designers
The innovator must work and finish the undertaking anyway without the
assets and bolster it is very troublesome for the specialist to execute the
administration arrangements and principles.
3.4.3 Contractors
There must be an arrangement in the venture which is contracted and gone
by the proprietor. They must have their time limit to cover the assignment
and well comfortable with them
There is a contention of government arrangements which isn't turned out
to be practical because of appropriate time limit.
The purpose behind the principle strife is that some time the contractual
workers contracts can't manage to finish on time which results the
objective not accomplished on time which results the loss on organization.
3.4 Project 4: Funding
The position of the negotiations and disagreements seeing some of the
stakeholders of this undertaking are portrayed as follows. Subsidizing to
the task is especially helpful generally all will endure because of less
supports accessible to them.
3.4.1 Owner
The assets which are the fundamental assets which couldn't be
overwhelmed by the assistance of government polices to general society
to finish the objective within the deadline.
The explanation for the contention between proprietors that because of the
hard polices of the administration which can decreases the time length of
the undertaking.
3.4.2 Designers
The innovator must work and finish the undertaking anyway without the
assets and bolster it is very troublesome for the specialist to execute the
administration arrangements and principles.
3.4.3 Contractors
There must be an arrangement in the venture which is contracted and gone
by the proprietor. They must have their time limit to cover the assignment
and well comfortable with them
There is a contention of government arrangements which isn't turned out
to be practical because of appropriate time limit.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

NEGOTIATION AND CONFLICT REPORT 10
4 THE NEGOTIATION INTERACTION PROCESS
4.1 Project 1: Forward strategy for payroll system
Involves five unique dimensions of investigation and centre ways to deal
with them for example basic, key, processual social and integrative
methodologies. These all depend on the fundamental rule presumptions,
ideas and hypotheses related with one another however some of them
utilize different techniques to acquire the distinctive territories as a major
aspect of arrangement.
Structural approach
It speaks to the explicit transaction, it incorporates the accumulation of
various gatherings, their issues engaged with arrangement and their
objectives. There is additionally a contention some time in light of
contrariness to accomplish the objective by various gathering. It must be
win with the assistance of capacity to accomplish the objective. It stresses
on the job, which assumes the key job to develop the arrangement, aside
from that the other disadvantage is position since it isn't so visit once in
time it occurs and extraordinary and results the fulfillment of different
gatherings.
4.2 Project 2: Governance and decision-making
Strategic approach
4 THE NEGOTIATION INTERACTION PROCESS
4.1 Project 1: Forward strategy for payroll system
Involves five unique dimensions of investigation and centre ways to deal
with them for example basic, key, processual social and integrative
methodologies. These all depend on the fundamental rule presumptions,
ideas and hypotheses related with one another however some of them
utilize different techniques to acquire the distinctive territories as a major
aspect of arrangement.
Structural approach
It speaks to the explicit transaction, it incorporates the accumulation of
various gatherings, their issues engaged with arrangement and their
objectives. There is additionally a contention some time in light of
contrariness to accomplish the objective by various gathering. It must be
win with the assistance of capacity to accomplish the objective. It stresses
on the job, which assumes the key job to develop the arrangement, aside
from that the other disadvantage is position since it isn't so visit once in
time it occurs and extraordinary and results the fulfillment of different
gatherings.
4.2 Project 2: Governance and decision-making
Strategic approach
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

NEGOTIATION AND CONFLICT REPORT 11
It is a hypothesis which depends on arithmetic, choice and judicious
decision which relies upon calculation to amplify the limit of advantages
which accomplishes the results. It is the foundation of arrangement
hypothesis like diversion, basic hazard like, anyway the moderator tangle
confronts similar difficulties so as to improve their additions. What's
more, everything relies upon the dimension of trust between the two
unique gatherings.
4.3 Project 3: People and change
Behavioural approach
It for the most part features the job and specific qualities of a moderator
which exhibits the result of the understanding, it especially demonstrates
the cooperation between the businesspeople, not just it features the human
propensities, feelings and abilities yet in addition accentuated on the
individual inspiration in transaction results. There are different
perceptions and literary works which reflects how the brain research of
the human in arrangement changes and works.
Also, another factor is confining, which unmistakably mirrors the people
reaction to who has an issue in arranging the things.
4.4 Project 4: Funding
Concessions exchange
It is the cooperation of both power and results of the vital and basic
methodology, which shows the different sorts of strategies to comprehend
the idea of arrangement of things and energize the development among
other individuals
It is a hypothesis which depends on arithmetic, choice and judicious
decision which relies upon calculation to amplify the limit of advantages
which accomplishes the results. It is the foundation of arrangement
hypothesis like diversion, basic hazard like, anyway the moderator tangle
confronts similar difficulties so as to improve their additions. What's
more, everything relies upon the dimension of trust between the two
unique gatherings.
4.3 Project 3: People and change
Behavioural approach
It for the most part features the job and specific qualities of a moderator
which exhibits the result of the understanding, it especially demonstrates
the cooperation between the businesspeople, not just it features the human
propensities, feelings and abilities yet in addition accentuated on the
individual inspiration in transaction results. There are different
perceptions and literary works which reflects how the brain research of
the human in arrangement changes and works.
Also, another factor is confining, which unmistakably mirrors the people
reaction to who has an issue in arranging the things.
4.4 Project 4: Funding
Concessions exchange
It is the cooperation of both power and results of the vital and basic
methodology, which shows the different sorts of strategies to comprehend
the idea of arrangement of things and energize the development among
other individuals

NEGOTIATION AND CONFLICT REPORT 12
5 THE NEGOTIATION METHODS
5.1 Project 1: Forward strategy for payroll system
The financing and wages framework must be flawless so the less
transaction have to be considered for the client.
5.2 Project 2: Governance and decision-making
The arrangement polices for the new actualized principles for general
society must be clear and one must be basic leadership who make stride as
ahead of schedule as could be expected under the circumstances.
5.3 Project 3: People and change
The arrangement must be considered to influence the general population
to hold for the organization by giving them an unmistakable picture so
both can inspire the organization
5.4 Project 4: Funding
Transaction of subsidizing must be explicit it must be by government
where the assets are for explicit regions. Anyway, it must keep up the
unmistakable parity.
6 THE OUTCOME
6.1 Project 1: Forward strategy for payroll system
It very well may be utilized some elective approaches to decrease to focus
to be finished and they should change the structure with no proactive
cases and there is again the issue of payment-making which can be
oversee by the group of the organization.
5 THE NEGOTIATION METHODS
5.1 Project 1: Forward strategy for payroll system
The financing and wages framework must be flawless so the less
transaction have to be considered for the client.
5.2 Project 2: Governance and decision-making
The arrangement polices for the new actualized principles for general
society must be clear and one must be basic leadership who make stride as
ahead of schedule as could be expected under the circumstances.
5.3 Project 3: People and change
The arrangement must be considered to influence the general population
to hold for the organization by giving them an unmistakable picture so
both can inspire the organization
5.4 Project 4: Funding
Transaction of subsidizing must be explicit it must be by government
where the assets are for explicit regions. Anyway, it must keep up the
unmistakable parity.
6 THE OUTCOME
6.1 Project 1: Forward strategy for payroll system
It very well may be utilized some elective approaches to decrease to focus
to be finished and they should change the structure with no proactive
cases and there is again the issue of payment-making which can be
oversee by the group of the organization.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 14
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.