Project Control Techniques: Analysis, Impact, and Implementation

Verified

Added on  2023/01/19

|5
|659
|21
Report
AI Summary
This report delves into the realm of project control techniques, focusing on their application and impact within engineering projects. The analysis begins by outlining the importance of process control, emphasizing its role in ensuring project success and timely completion. The report explores various techniques, including statistical process control, and evaluates their effectiveness in managing project activities and outcomes. It highlights the significance of controlling project activities, the potential consequences of ineffective control, and the use of data analysis to monitor progress. The report also examines the interrelation of project activities and the need for effective risk management. Through the exploration of different methodologies and case studies, the report provides insights into how these techniques can be implemented to enhance efficiency, reduce risks, and achieve desired project outcomes.
Document Page
Proposal Form Template
Centre Name
Tutor
Proposed Title
Investigate various process
control techniques and its
impact on project
Section One: Title, aims, objectives
Title or working title of plan (in the form of a question, objective or
hypothesis)
Aim – to analyze various process control techniques and its impact on
project.
Objectives –
To identify role of process control technique in project
To evaluate various process control techniques
To analyze impact of process control on project.
Section Two: Reasons for choosing this specific area of
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
engineering
The two reason for selecting this topic are :-
The project will help in finding out best process control techniques that can
be used in project. Also, techniques can be compared on basis of their
efficiency and impact.
Another reason is it can be identified that how ineffective control of
process impact on project and what outcomes are obtained.
Section Three: Information sources searched
According to (Joslin and Müller, 2015) a project consists of several activities
that are performed by members. The manager control and evaluate
activities through several techniques. It is important to control activities so
that project is completed on deadline. However, it helps in keeping project
on track and maintaining quality. It is necessary to control process so that
desired outcomes are attained. Furthermore, the deviations are identified
and removed in effective way. The data is gathered and analyzed to find
out how much time and cost is needed. An effective control on project will
ensure that goals are attained in deadline and quality is maintained. Along
with it, chances of failure are reduced. The risks are also determined and
mitigated.
As said by (Scott and McCann, 2018) there is high impact on outcomes if
manager is not able to control project. This is because activities in project
are interrelated with one another. Moreover, in engineering the project are
of different types. They are related to several fields.
In view of (Fewings and Henjewele, 2019) there are many process control
techniques which are useful in controlling project activity and monitoring it.
The statistical process control enables in maintaining efficiency. In that
several analysis is done to calculate data. However, there is change in
design, documentation, etc.
Document Page
REFERENCES
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology
and project success in different project governance contexts. International Journal of Project
Management, 33(6), pp.1377-1392.
Scott, D.M. and McCann, H., 2018. Process imaging for automatic control. CRC Press.
Fewings, P. and Henjewele, C., 2019. Construction project management: an integrated
approach. Routledge.
Section Four: Activities and timescales
Activity
2
days
5.
days
3
days
2
days
2
days
3
days
3
days
8
days
7
days
2
days
Identify
research topic
Review of
Literature
Drafting
Methodologies
Complete
Proposal
Designing
questionnaire
Collection of
data
Analyzing
How long
will this
take:
Document Page
data and
interpretation
Discussion
and
Conclusion
Submission
Milestone one:
Target date (set by tutor):
Milestone two:
Target date (set by tutor):
Comments and agreement from tutor
Comments (optional):
I confirm that the project is not work that has been or will be submitted for
another qualification and is appropriate:
Agreed: (name) (date
)
Comments and agreement from project proposal checker (if applicable)
Comments (optional):
I confirm that the project is not work that has been or will be submitted for
another qualification and is appropriate:
Agreed: (name) (date
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
)
chevron_up_icon
1 out of 5
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]