This project delivery system report examines the implementation of green building practices, focusing on the business case, project background, and scope. It analyzes BDM group's involvement in LEED-certified buildings, reviews literature on best practice delivery models, and develops a methodology for project delivery. The report covers assumptions, constraints, and the use of WBS. It also includes a discussion of stakeholder analysis, risk assessment, and feasibility, concluding with recommendations for project governance and implementation. The analysis emphasizes the importance of sustainability, waste reduction, and energy efficiency in green building projects.
Document Page
Running head: PROJECT DELIVERY SYSTEM
PROJECT DELIVERY SYSTEM
Name of the Student
Name of the University
Author Note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT DELIVERY SYSTEM
Table of Contents
Introduction......................................................................................................................................2
Business Case..................................................................................................................................2
Business case of BDM group......................................................................................................2
Project background......................................................................................................................2
Project analysis............................................................................................................................2
Assumption and constraints.........................................................................................................2
Assumption..............................................................................................................................2
Constraints...............................................................................................................................2
Project scope................................................................................................................................2
Scope statement.......................................................................................................................2
High level WBS.......................................................................................................................2
Literature review..........................................................................................................................2
Best practice delivery models..................................................................................................2
Summary related to project topic.............................................................................................2
Selected project delivery method.................................................................................................2
Phases in project delivery system................................................................................................2
Advantage of project delivery system.....................................................................................2
Disadvantage of project delivery system.................................................................................2
Management plan and implementation of delivery system.........................................................2
Analysis of stakeholders and communication plan.....................................................................2
Analysis of Risk.......................................................................................................................2
Analysis of feasibility..................................................................................................................2
Governance of project..................................................................................................................3
Conclusion.......................................................................................................................................3
Document Page
2PROJECT DELIVERY SYSTEM
Introduction
Green building can be defined as the practice for increasing the efficiency with which
building and their sites can easily make use of energy, water and various kinds of materials. This
focuses on reducing or minimizing of building impact on human health and environment, by
making use of siting, design, construction, operation, maintenance and removal throughout
complete cycle of life (Ma et al., 2016). In last few years green building movement has gained
huge amount of movement while its origin can be easily traced in the late centuries of nineteen.
The amount of energy consumption has resulted in the ability for viability tenable and
dependency upon the available cost and other kinds of parameters. During the span of time
various architectures, ecologists have resulted in growing of environmental movement and
higher fuel cost where encountered which ultimately resulted in green building movement. The
idea of green building has ultimately resulted in creation of immense kind of importance in the
various kinds of importance in many of developing countries (Kibert, 2016). Green building
focus on fact of reducing of waste and cost of construction. With increase in the concept of
urbanization the natural resources were ultimately used in implementation of green building and
this idea has led to making use of natural resource. The concept of green building is totally based
on three basic rules that is Reduce, Reuse and recycle.
In the coming pages of the report a literature review has been done on green building
which is inclusive of delivery models and various kinds of context. It has ultimately led to
development of methodology for this green building idea. The report also focuses on making use
of methodology from the idea from implementation of green building.
Document Page
3PROJECT DELIVERY SYSTEM
Business Case
The idea of green building is used on large scale for sustainability for large number of
ideas. Sustainability can be defined as a proper concept which focus on economic, social,
institutional and various kinds of concept which are related to economic and environment aspects
of various human society (Zuo & Zhao, 2014). It generally focuses on means for configuration of
civilization and human activity for society and its various kinds of members for its economics for
meeting needs and providing potential for it. It also focuses on preserving of biodiversity and
natural ecosystem for maintaining ideality for a longer period of time. Sustainability also affects
the various levels of an organization which ranges from local neighborhood to the entire kind of
planet (Ye et al., 2015). At present green building can be defined as a one of the rapidly growing
idea in terms of concepts of building and design. Architecture, designers and homeowners have
mostly become infatuated with the various kinds of possibilities of energy saving emphasis. It
also focuses on nature of green building processes.
USGBC stands for United States Green Building Council is considered to be foremost
leader and educator within the idea of green building. USGBC is mainly created for promotion of
design and construction of building which are responsible environmentally, profitable and
providing healthy place for living and work (Olubunmi, Xia & Skitmore, 2016). It is much
focused on providing on providing integrated building industry sectors and leading a proper
market for transformation towards greener kind of construction. The organization is much on
various kinds of trade of associations, architecture and designers and various kinds of individual
for greening in construction industry.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT DELIVERY SYSTEM
Business case of BDM group
BDM group is a well-known Australian construction organization which is based in
Brisbane Australia. This particular organization includes a large number group of organization
which ranges from BDM construction, BMD industry and lastly empower (Ahmad, Thaheem &
Anwar, 2016). This organization is much focused in building roads and various kinds of bridges
for state government.
Project background
BDM group is mainly associated with building of LEED standard buildings. LEED
stands for leadership in energy and environmental design is nothing but a system which is used
for designing, construction and certification of green buildings. Building are generally classified
as Platinum, silver, Gold varying on number of points which is acquired in six number of
building components that is suitable sites, efficiency of water, various materials and resources,
energy and atmosphere, indoor quality of environment, various design process and innovation
(Olubunmi, Xia & Skitmore, 2016). With this kind of categories there are specific number of
credits which are available for many kinds of subcategories. LEED ratings are rapidly becoming
boasting points for large number of property owners round the globe. It is considered to be
important parameter for property value for LEED certified building skyrocketing.
Fig 1: Number of Increased Green building trend
Document Page
5PROJECT DELIVERY SYSTEM
(Source: Gibbs & O’Neill, 2015, pp-138
Project analysis
LEED is mainly used for assistance of success in early kind of adaptation in various
kinds of government agencies (Alias et al., 2015). It is generally considered to be used in various
kinds of LEED based projects which is growing on early basis. There are large number of
characteristics of LEED buildings like
Site of a building which has a close kind of proximity sensor for various kinds of
commuter rail or bus lanes which is used for reducing pollution and various kinds
of land development which impacts are associated with usage of automobile.
Establishment of specifications which can be used for maintaining the present
level of water from storm run off or it also decreases the amount of
imperviousness which generally exists during a particular kind of onsite.
It focuses on the development of a number of site with a minimum amount of
density of area sixty square feet in the acre. Channeling kinds of development
focus on development of urban areas along with existing kind of infrastructure
which protects the green spaces and also preserves the various kinds of natural
habitats and many kinds of resources.
Assumption and constraints
Assumption
Assumption is considered to be an important tool for development of proper risk
management plan (Alias et al. 2015). In project delivery system it is the duty of manager to
identify all the assumption which can be made for successful delivery of project.
Document Page
6PROJECT DELIVERY SYSTEM
Constraints
Constraints can be defined as a limitation which is generally imposed on a project. It can
be in terms of various domains like resources, cost and schedule (Darko et al. 2017). Various
kinds of projects come up with constraint which are mainly identified in the beginning phase of
any project. There are mainly six kind of project constraints namely quality, schedule, resource
and lastly budget (Gibbs, D., & O’Neill, 2015). In general constraint are of two type in project
delivery models like business constraints, technical constraints. Technical constraint in general
provides a limit of choice.
Project scope
Scope of project mainly focus on details of deliverable features of a project. The required
deliverables are mainly derived from the requirements of a project. There are mainly phase of
project scope management that are planning, controlling and lastly closing (Gou & Xie, 2017).
Planning can be defined as an attempt which is made for capturing and defining the work which
is need to be done. While controlling and monitoring process focus on tracking of various kinds
of documents. The last phase is all about closing which focus on auditing of various deliverables
of project and along with it provides an outcome of origin plan of the report.
Scope statement
Scope statement of a project can be defined as an essential of a project. Project managers
makes use of scope statement for providing written confirmation of various outputs of a project
(Green & Haines, 2015). A scope statement is mainly inclusive of following things like proper
justification, description of scope definition, deliverable of a project and lastly any kind of
assumption made in the project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT DELIVERY SYSTEM
High level WBS
WBS or work breakdown is considered to mainly manages team work into proper kind of
manageable sections (Huo, Ann & Wu, 2017). WBS is considered to be an important parameter
for understanding the various aspects of project delivery system. WBS has large number of
benefits like defining and organizing of project. The budget of project delivery is generally
placed on the top of work breakdown structure. By providing proper time and cost the schedule
of project and budget can be easily developed.
Fig 1: WBS for Green Building
(Source: Created by Author)
Literature review
Best practice delivery models
SB TOOL
Document Page
8PROJECT DELIVERY SYSTEM
The SB method is nothing but a framework which is used for rating of suitable
performance on various kinds of building and projects (Gibbs & O’Neill, 2015). It also focuses
on certain number of toolkit which can be used for development of SB tool rating system. This
tool is mainly used by authorized kind of third parties for establishment of adapted SB tool as a
kind of rating system for suiting their own kinds of region and various kinds of building types.
Fig 2: Water Supply System for current portable water system
(Source : Gou & Xie, 2017, pp-605)
It is also used by various kinds of owners and managers of large organization for building
portfolios for expressing details of the way in which their suitability requirements for internal
kinds of staff and beneficial materials for large number of competitors (Zuo et al., 2017). The
system generally covers a large number of systematic issues which not only has issues of
sustainability but with green buildings (Yang, Zou & Wang, 2016). SB methods generally takes
into account region specific and site specific related factors which is used for context factors and
which are used for switch off and reducing of certain number of weights and providing details
related to information for all the parties which are available.
Document Page
9PROJECT DELIVERY SYSTEM
Various kinds of resources for material and selection of right products
Making use of building materials and certain number of products which generally
contains post cycle contents.
Providing right amount of regional support for products which are being
manufacture.
Encouraging of various kinds of environment based forest by making use of wood
or wood based materials which makes use of forest stewardship which is used for
various kinds of woods based building concepts.
Green building focus on various kinds of renewable materials like bamboo
flooring, wool carpets, strawboard or popular kind of oriented strand boards.
Construction and demolition of waste management
It focuses on development of waste management plan which mainly diverts a
sustainable amount of construction, demolition and clearing of landfills for
recycling of products (Gou & Xie, 2017).
It aims in reducing a certain percentage of salvage which can be obtained from
construction, demolition or clearing of land as a method of building material.
Energy and working atmosphere
Generation of various kinds of electricity site from list of renewable resources like
solar, geothermal or any kind of biogas source.
Elimination of resources by making use of CFCs in various kinds of heating
ventilation, air conditioning and various kinds of refrigerator system. It also
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PROJECT DELIVERY SYSTEM
focuses on elimination of use of CFCs for reducing the ozone depletion (Roh et
al., 2016).
It also contracts with green power provider for purchasing of building electricity
which is generated from renewable resources like wind, solar, biomass or low
impact on various kinds of hydro resources.
It focuses on optimization of various kinds of energy resources.
Water Management
It focuses on installation of water efficient or low flow kinds of equipment’s and
various kinds of appliances in kitchen and various bathroom for reduction of
water consumption.
Making use of water efficient irrigation which is captured from rain or site cycled
which is used for onsite kind of landscaping.
Making use of innovative wastewater technologies like treating of waste water on
site for decreasing the significant amount of portable water for sewage.
Indoor Environment
Design of HVAC system for enveloping of building for providing most optimal kind of
delivery and mixing with fresh kind of air. It also focuses on effective kind of air
exchange which supports safety, comfort and wellbeing of large number of components
(Roh et al., 2016).
It also addresses the number of indoor air contamination by proper kinds of selection of
paints and various kinds of coatings and composite kind of material which emits low
VOCs.
Document Page
11PROJECT DELIVERY SYSTEM
It focuses on segregation of areas for various kinds of chemical use of operations which
have separate or exhaust kind of air circulation.
It focuses on maximization of day lighting and viewing of large number of opportunities.
It also addresses day lighting and increasing the view kinds of opportunities’ which
focus on saving of cost on energy and improvisation of productivity of worker.
Summary related to project topic
With the growth in the influence of green building it is generally considered to be
imperative to various kinds of natural resources industry as it can do a list of thing for
positioning of a product which is being ecofriendly (Roh et al., 2016). Much of the issues mainly
arises from misconception of natural stone which addresses strip mining which is environment
devastating practice. Under the classification of LEED natural stone stands to be in the origin
product. A major kind of issue with green community is the support of local products and
business. LEED points are generally available for large number of products which can be used
for building site. It is manufactured on regional basis and various kinds of materials are extracted
for emittance of greenhouse. SWOT analysis is a method which is used for identification of
strength, weakness, opportunities and various kinds of threats (Li et al., 2014). It gives a scan on
internal and external environmental condition for a particular organization which can be used for
analysing strength or weakness and external issues in the firm can be classified as opportunities
or threats. The strength of green building is LCLL that is low carbon living lab, GBES that is
Unique Green Building Evaluation standard, Strong kind of support from governmental side,
skilled expertise. Low carbon living lab focus on testing bed and demonstration of green building
technologies, practical and low cost kind of environment, provides an excellent opportunity for
organization for tapping into various kinds of world market (Hwang et al., 2015). GBES aims in
chevron_up_icon
1 out of 27
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]