This report delves into the impact of various project delivery methods on construction projects, particularly within the context of school construction. It examines different procurement methods and contract management strategies, focusing on the Design-Bid-Build (DBB) method, as well as Construction Manager at Risk (CM at Risk) and Design-Build (DB) methods. The analysis highlights the importance of stakeholder involvement, including public school administrators and district managers, in influencing project success. The report discusses the characteristics of each method and analyzes the factors affecting project performance, such as cost, scope, and schedule, drawing on data from different states and districts. The conclusion emphasizes the potential of project delivery methods to improve project outcomes, service quality, and overall performance in school construction, allowing project and contract managers to efficiently manage project aspects.
Document Page
Running head: PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
Project Delivery Methods and Contract Management
Name of the Student
Name of the University
Author note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
Table of Contents
1. Introduction..................................................................................................................................2
2. Discussion....................................................................................................................................2
3. Conclusion...................................................................................................................................4
References........................................................................................................................................5
Bibliography....................................................................................................................................6
Document Page
2PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
1. Introduction
The article focuses on the impact of project delivery methods that would be made with
the help of distinctive procedures for the management of the processes based on design and
construction. Based on the discussions of Carpenter and Bausman (2016), the best form of
procurement methods and efficient contract management strategies for the construction in
schools are analysed. The article also focused on a particular method, which is responsible for
producing best form of quality of service and high levels of product.
2. Discussion
The discussion focuses on the various construction projects, which are subjected to an
extensive form of complex risks and issues. There are a vast number of parties involved during
the process of construction projects performed in schools. The project delivery methods also
known as comprehensive management systems have majorly been developed for the purpose of
reducing the risks occurring over projects. The risks made over projects could be reduced after
the assigning of contractual responsibilities to the people who would be involved within the
construction and design process over any project.
The article discusses on the widely used project delivery method, which is used on
construction projects. It is known as Design-Bid-Build (DBB) method. From the understanding
of the readings on the article, it can be understood that in order to offer the promise for better
performance on the projects, the involvement of dedicated stakeholders would be considered as
highly important. In case of construction projects focused on schools, the involvement of public
school administrators and district managers would act as facility owners. They would be further
Document Page
3PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
be guided by the policies framed by the state and district government agencies. They are thus
primarily responsible for analysing the various project delivery methods, which could be a
leading factor for influencing over the factors of project success or failure. The decision-makers
involved in public schools require relevant, current and significant kind of performance data,
which would be further linked with the working knowledge for the factors. These factors would
affect the construction in schools and help decision makers for making constructive decisions.
The article discusses the DBB method and defines the characteristics of this method that
could be helpful for the management of construction project focused on schools. The article also
focuses on the discussion over the characteristics over other forms of project delivery methods
that includes Construction Manager at Risk (CM at Risk) and Design-Build (DB). On further
discussion and understanding on the article, the success factors for the project have been
discussed widely. This discussion analyses the fact that the selections over the project delivery
methods are primarily dependent on the philosophies on organizational purchasing and personal
experiences.
In the current article under discussion, a limitation has been put under the research based
on a direct comparison over the presentation of the various methods of project delivery, which
are used during performing construction in schools. A certain lack of precise information and
data based on the cost, scope and schedule for the construction projects of schools have resulted
in lacking processes and inefficiencies in decision-making. From the data collected and analysed
over the different project delivery methods, it can be discussed that these approaches that are
used in South Carolina and North Carolina resemble the population of the state. Different
districts in Georgia employ the use of DBB. However, districts in Florida mostly make use of
CM at Risk Method. The article further analyses different data over schedule performance,
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
quality performance findings and cost performance findings. These findings further help in
understanding the impact of the proposed DBB method for managing the project delivery aspects
for construction in schools.
3. Conclusion
From the understanding of the article, it can be analysed and concluded that the use of
project delivery methods can have a better impact over the construction projects being used in
schools. With the help of this method, project managers and contract managers would have a
better view over the project outcomes and manage each and every aspect of the concerned
project in an efficient manner. In the concluding part of the article, the authors have focused on
the impact of different methods of project delivery over the use of construction. Thus, these
methods would also have a major impact over the quality of service made from the construction
and also help towards the improvement of performances.
Document Page
5PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
References
Carpenter, N. and Bausman, D.C., 2016. Project delivery method performance for public school
construction: Design-bid-build versus CM at risk. Journal of construction engineering and
management, 142(10), p.05016009.
Document Page
6PROJECT DELIVERY METHODS AND CONTRACT MANAGEMENT
Bibliography
Franz, B., Leicht, R., Molenaar, K. and Messner, J., 2017. Impact of team integration and group
cohesion on project delivery performance. Journal of construction engineering and
management, 143(1), p.04016088.
Hanna, A.S., 2016. Benchmark performance metrics for integrated project delivery. Journal of
Construction Engineering and Management, 142(9), p.04016040.
Koolwijk, J.S.J., van Oel, C.J., Wamelink, J.W.F. and Vrijhoef, R., 2018. Collaboration and
integration in project-based supply chains in the construction industry. Journal of Management
in Engineering, 34(3), p.04018001.
Mesa, H.A., Molenaar, K.R. and Alarcón, L.F., 2016. Exploring performance of the integrated
project delivery process on complex building projects. International Journal of Project
Management, 34(7), pp.1089-1101.
Tran, D.Q. and Molenaar, K.R., 2015. Risk-based project delivery selection model for highway
design and construction. Journal of Construction Engineering and Management, 141(12),
p.04015041.