This project report outlines the development of an exotic car storage and transportation business. It includes a network information chart created using MS-Project and Excel, detailing activities, predecessors, and durations. The report presents a network diagram and forward/backward pass analyses to identify the critical path. A risk assessment form and risk response matrix are provided to address potential issues like delays, over budget situations, and procurement problems. The report recommends a time management plan, a cost budget provision, design-build procurement, and a work alignment method. The project concludes with a bibliography of relevant project management resources and appendices containing the project and Excel files used for analysis.

Running head: PROJECT INFORMATION REPORT
Project Information Report: Exotic Car Storage and Transportation
<<Group Name>>
<<Name of the Group Members>>
<<Name of the Group Members>>
<<Name of the Group Members>>
<<Name of the Group Members>>
<<University Name>>
Project Information Report: Exotic Car Storage and Transportation
<<Group Name>>
<<Name of the Group Members>>
<<Name of the Group Members>>
<<Name of the Group Members>>
<<Name of the Group Members>>
<<University Name>>
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT INFORMATION REPORT
Table of Contents
Network Information Chart.............................................................................................................2
Project Network Diagram................................................................................................................5
Forward Pass................................................................................................................................5
Backward Pass.............................................................................................................................6
Critical Path.................................................................................................................................7
Risk Assessment Form....................................................................................................................7
Risk Response Matrix......................................................................................................................8
Recommendation.............................................................................................................................8
Bibliography..................................................................................................................................10
Appendix-Project and Excel File...................................................................................................11
Table of Contents
Network Information Chart.............................................................................................................2
Project Network Diagram................................................................................................................5
Forward Pass................................................................................................................................5
Backward Pass.............................................................................................................................6
Critical Path.................................................................................................................................7
Risk Assessment Form....................................................................................................................7
Risk Response Matrix......................................................................................................................8
Recommendation.............................................................................................................................8
Bibliography..................................................................................................................................10
Appendix-Project and Excel File...................................................................................................11

2PROJECT INFORMATION REPORT
Network Information Chart
The network information chart has been developed using the Ms-Project file and excel
sheet. The completion of the report would be implied with the implication of the work
development. The network information chart is implied with the implication of the works and
listing the management of the work and integrating the alignment development. The
development of the network information chart would be implied with the continuation of the
works. The integration would be implied with the formation of the activities in a smart work
development.
Activity Description Preceding Activity
2 Requirement Analysis None
3 Charter Documentation 2
4 Project Initiation document 2
5 Submission of document 3,4
6 Sign off 5
8 Activity Scheduling 2
9 Identification of precedence 8
10 Complete Plan Development 8
11 Plan Approval 9,10
14 Cars Storage Area is developed 11
15 Tested for required space 14
16 Completion of storage sector 11
17 Storage Developed 15,16
19 Hiring of the 2 Transportation Contractors 11
20 Buy a used 5 ton truck 19
21 Forming the effective development of the works 11
22 Completion of transportation works 20,21
24 Car Wash section is developed 17,5
25 Car Dry section is developed 17
26 Integration of the three sections 22,24,25
27 Completion of the construction and development 26
29 Final Documentation 27
30 Post Project Works 27
31 Review of the system 29
Network Information Chart
The network information chart has been developed using the Ms-Project file and excel
sheet. The completion of the report would be implied with the implication of the work
development. The network information chart is implied with the implication of the works and
listing the management of the work and integrating the alignment development. The
development of the network information chart would be implied with the continuation of the
works. The integration would be implied with the formation of the activities in a smart work
development.
Activity Description Preceding Activity
2 Requirement Analysis None
3 Charter Documentation 2
4 Project Initiation document 2
5 Submission of document 3,4
6 Sign off 5
8 Activity Scheduling 2
9 Identification of precedence 8
10 Complete Plan Development 8
11 Plan Approval 9,10
14 Cars Storage Area is developed 11
15 Tested for required space 14
16 Completion of storage sector 11
17 Storage Developed 15,16
19 Hiring of the 2 Transportation Contractors 11
20 Buy a used 5 ton truck 19
21 Forming the effective development of the works 11
22 Completion of transportation works 20,21
24 Car Wash section is developed 17,5
25 Car Dry section is developed 17
26 Integration of the three sections 22,24,25
27 Completion of the construction and development 26
29 Final Documentation 27
30 Post Project Works 27
31 Review of the system 29
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT INFORMATION REPORT
32 Implementation 31
33 Closed 30,32
The following is the network diagram for the project,
32 Implementation 31
33 Closed 30,32
The following is the network diagram for the project,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT INFORMATION REPORT
2 3 5 5 5 7 7 6 7
1 1 1
3 3 6 6 2 8 8 0 14
2 4 6 13 25 17 21 29 23 23 31 25 25 32 29
1 1 1 1 1
3 3 6 14 4 18 22 2 24 24 2 26 26 4 30
0 2 2 2 8 4 4 10 7 7 11 7 7 14 10 10 15 13 13 17 13 13 24 18 18 26 21 21 27 21 21 30 30 30 33 30
0 0 0 0 0 0 0 0 0 0 0 0
0 2 2 2 2 4 4 3 7 7 0 7 7 3 10 10 3 13 13 0 13 13 5 18 18 3 21 21 0 21 21 9 30 30 0 30
4 9 7 7 16 12
0 1
4 3 7 8 5 13
ES ID EF 7 19 9 9 20 12 12 22 12
SL 18 18 18
LS Dur LF 25 2 27 27 3 30 30 0 30
7 21 12
18
25 5 30
Buy a used 5 ton
truck
Completion of
transportation
works
Forming the
effective
development of the
works
Car Dry section is
developed
Review of the
system Implementation
Tested for required
space
Completion of
storage sector
Storage Developed
Completion of the
construction and
development
Post Project Works Closed
Final
Documentation
Integration of the
three sections
Plan Approval
Sign off
Cars Storage Area
is developed
Hiring of the 2
Transportation
Contractors
Car Wash section is
developed
Description
Requirement
Analysis
Charter
Documentation
Project Initiation
document
Activity Scheduling
Submission of
document
Complete Plan
Development
Identification of
precedence
Figure 1: Network Information Diagram
(Source: Crated by the author in Excel)
2 3 5 5 5 7 7 6 7
1 1 1
3 3 6 6 2 8 8 0 14
2 4 6 13 25 17 21 29 23 23 31 25 25 32 29
1 1 1 1 1
3 3 6 14 4 18 22 2 24 24 2 26 26 4 30
0 2 2 2 8 4 4 10 7 7 11 7 7 14 10 10 15 13 13 17 13 13 24 18 18 26 21 21 27 21 21 30 30 30 33 30
0 0 0 0 0 0 0 0 0 0 0 0
0 2 2 2 2 4 4 3 7 7 0 7 7 3 10 10 3 13 13 0 13 13 5 18 18 3 21 21 0 21 21 9 30 30 0 30
4 9 7 7 16 12
0 1
4 3 7 8 5 13
ES ID EF 7 19 9 9 20 12 12 22 12
SL 18 18 18
LS Dur LF 25 2 27 27 3 30 30 0 30
7 21 12
18
25 5 30
Buy a used 5 ton
truck
Completion of
transportation
works
Forming the
effective
development of the
works
Car Dry section is
developed
Review of the
system Implementation
Tested for required
space
Completion of
storage sector
Storage Developed
Completion of the
construction and
development
Post Project Works Closed
Final
Documentation
Integration of the
three sections
Plan Approval
Sign off
Cars Storage Area
is developed
Hiring of the 2
Transportation
Contractors
Car Wash section is
developed
Description
Requirement
Analysis
Charter
Documentation
Project Initiation
document
Activity Scheduling
Submission of
document
Complete Plan
Development
Identification of
precedence
Figure 1: Network Information Diagram
(Source: Crated by the author in Excel)

5PROJECT INFORMATION REPORT
The network diagram has been developed considering the implication development. It is crucial
for the management of the work packages and listing of the specific work development. The Ms-
Excel has been used for creating the network diagram. The legend entries of the network diagram
is given below,
Early
Start ID Early
Finish
Slack Description (task
name)
Late
Start Dur Late
Finish
Project Network Diagram
Forward Pass
The forward passes of the project of Exotic Car Storage and Transportation are given below,
1. Requirement Analysis Activity Scheduling Complete Plan Development Plan
Approval Cars Storage Area is developed Tested for required space Hiring of the 2
Transportation Contractors Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
2. Requirement Analysis Project Initiation document Submission of document Sign off
Car Dry section is developed Car Wash section is developed Integration of the three
sections Completion of the construction and development Post Project Works Closed
The network diagram has been developed considering the implication development. It is crucial
for the management of the work packages and listing of the specific work development. The Ms-
Excel has been used for creating the network diagram. The legend entries of the network diagram
is given below,
Early
Start ID Early
Finish
Slack Description (task
name)
Late
Start Dur Late
Finish
Project Network Diagram
Forward Pass
The forward passes of the project of Exotic Car Storage and Transportation are given below,
1. Requirement Analysis Activity Scheduling Complete Plan Development Plan
Approval Cars Storage Area is developed Tested for required space Hiring of the 2
Transportation Contractors Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
2. Requirement Analysis Project Initiation document Submission of document Sign off
Car Dry section is developed Car Wash section is developed Integration of the three
sections Completion of the construction and development Post Project Works Closed
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT INFORMATION REPORT
3. Requirement Analysis Project Charter Submission of document Sign off Car Dry
section is developed Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
4. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Completion of storage sector Car Dry section is developed Car
Wash section is developed Integration of the three sections Completion of the construction
and development Post Project Works Closed
5. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Storage Developed Buy a used 5 ton truck Completion of
transportation works Integration of the three sections Completion of the construction and
development Post Project Works Closed
Backward Pass
1. Requirement Analysis Activity Scheduling Complete Plan Development Plan
Approval Cars Storage Area is developed Tested for required space Hiring of the 2
Transportation Contractors Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
2. Requirement Analysis Project Initiation document Submission of document Sign off
Car Dry section is developed Car Wash section is developed Integration of the three
sections Completion of the construction and development Post Project Works Closed
3. Requirement Analysis Project Charter Submission of document Sign off Car Dry
section is developed Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
3. Requirement Analysis Project Charter Submission of document Sign off Car Dry
section is developed Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
4. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Completion of storage sector Car Dry section is developed Car
Wash section is developed Integration of the three sections Completion of the construction
and development Post Project Works Closed
5. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Storage Developed Buy a used 5 ton truck Completion of
transportation works Integration of the three sections Completion of the construction and
development Post Project Works Closed
Backward Pass
1. Requirement Analysis Activity Scheduling Complete Plan Development Plan
Approval Cars Storage Area is developed Tested for required space Hiring of the 2
Transportation Contractors Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
2. Requirement Analysis Project Initiation document Submission of document Sign off
Car Dry section is developed Car Wash section is developed Integration of the three
sections Completion of the construction and development Post Project Works Closed
3. Requirement Analysis Project Charter Submission of document Sign off Car Dry
section is developed Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT INFORMATION REPORT
4. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Completion of storage sector Car Dry section is developed Car
Wash section is developed Integration of the three sections Completion of the construction
and development Post Project Works Closed
5. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Storage Developed Buy a used 5 ton truck Completion of
transportation works Integration of the three sections Completion of the construction and
development Post Project Works Closed
Critical Path
The identified critical path of the project is
Requirement Analysis Activity Scheduling Complete Plan Development Plan Approval
Cars Storage Area is developed Tested for required space Hiring of the 2
Transportation Contractors Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
Risk Assessment Form
Risk Event Likelihood Impact Detection
Difficulty
Risk
Rating
When
Delay in
Completion
Very Likely Low Low 3 Initial Phase
Over budget Likely Medium Medium 2 Third Phase
4. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Completion of storage sector Car Dry section is developed Car
Wash section is developed Integration of the three sections Completion of the construction
and development Post Project Works Closed
5. Requirement Analysis Project Charter Identification of precedence Submission of
document Sign off Storage Developed Buy a used 5 ton truck Completion of
transportation works Integration of the three sections Completion of the construction and
development Post Project Works Closed
Critical Path
The identified critical path of the project is
Requirement Analysis Activity Scheduling Complete Plan Development Plan Approval
Cars Storage Area is developed Tested for required space Hiring of the 2
Transportation Contractors Car Wash section is developed Integration of the three sections
Completion of the construction and development Post Project Works Closed
Risk Assessment Form
Risk Event Likelihood Impact Detection
Difficulty
Risk
Rating
When
Delay in
Completion
Very Likely Low Low 3 Initial Phase
Over budget Likely Medium Medium 2 Third Phase

8PROJECT INFORMATION REPORT
Procurement
Issue
Possible High High 4 Last Phase
Client
Disagreement
Unlikely High Medium 5 Second
Phase
Risk Response Matrix
Event Response Contingency Trigger Responsibilit
y
1.
Delay in
Completion
Mitigate: Time
Management Plan
Calendar software
can be used
Work
requirement
s
Planner
2.
Over budget
Transfer:
Cost Budget
Provision
Provisional
Budget should be
implied
Lack of
resources
Budgeter
3.
Procurement
Issue
Avoid: Design build
procurement
Effective Design
development
Change in
work
definition
HR management
4.
Client
Disagreement
Retain: Work
Alignment Method
Disagreement
would require
negotiation
Client
having
second
thoughts
Client/Project
Manager
Recommendation
Procurement
Issue
Possible High High 4 Last Phase
Client
Disagreement
Unlikely High Medium 5 Second
Phase
Risk Response Matrix
Event Response Contingency Trigger Responsibilit
y
1.
Delay in
Completion
Mitigate: Time
Management Plan
Calendar software
can be used
Work
requirement
s
Planner
2.
Over budget
Transfer:
Cost Budget
Provision
Provisional
Budget should be
implied
Lack of
resources
Budgeter
3.
Procurement
Issue
Avoid: Design build
procurement
Effective Design
development
Change in
work
definition
HR management
4.
Client
Disagreement
Retain: Work
Alignment Method
Disagreement
would require
negotiation
Client
having
second
thoughts
Client/Project
Manager
Recommendation
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT INFORMATION REPORT
Time Management Plan: The time management plan is very effective with the implication of the
smart work development. The time considered for the implication works would be effectively
implied with the listing of the improved work development. The time management would be
effectively developed with the consideration of the smart analysis works.
Cost Budget Provision: The provisional budget development has been developed for the listing
of the works and formation of the improved listing management works. The effective cost budget
estimation has been defined with the formation of the effective work alignment. The budget
development has been implied with the consideration management.
Design build procurement: The design build procurement has been developed for the listing of
the successful management processing. The improved design build procurement has been
improved with the consideration management. The proper design development has been implied
for successful completion of the work.
Work Alignment Method: The negotiation of the works has been implied with the consideration
of the factors and limitation of the improved work development. The negotiation of the works
would be effectively developed with the consideration of the work development.
Time Management Plan: The time management plan is very effective with the implication of the
smart work development. The time considered for the implication works would be effectively
implied with the listing of the improved work development. The time management would be
effectively developed with the consideration of the smart analysis works.
Cost Budget Provision: The provisional budget development has been developed for the listing
of the works and formation of the improved listing management works. The effective cost budget
estimation has been defined with the formation of the effective work alignment. The budget
development has been implied with the consideration management.
Design build procurement: The design build procurement has been developed for the listing of
the successful management processing. The improved design build procurement has been
improved with the consideration management. The proper design development has been implied
for successful completion of the work.
Work Alignment Method: The negotiation of the works has been implied with the consideration
of the factors and limitation of the improved work development. The negotiation of the works
would be effectively developed with the consideration of the work development.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT INFORMATION REPORT
Bibliography
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Heagney, J., 2016. Fundamentals of project management. Amacom.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
Larson, E.W., Gray, C.F., Danlin, U., Honig, B. and Bacarini, D., 2014. Project management:
The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.
Marchewka, J.T., 2014. Information technology project management. John Wiley & Sons.
Bibliography
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Heagney, J., 2016. Fundamentals of project management. Amacom.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
Larson, E.W., Gray, C.F., Danlin, U., Honig, B. and Bacarini, D., 2014. Project management:
The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.
Marchewka, J.T., 2014. Information technology project management. John Wiley & Sons.

11PROJECT INFORMATION REPORT
Appendix-Project and Excel File
Appendix-Project and Excel File
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 12
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.