This report provides a detailed analysis of project management principles and their application within the context of ACME Products PLC. It begins by outlining the core principles of project management, including project structure, clear goals, transparency, and risk recognition, and links them to the project life cycle. The report then explores suitable success and failure criteria for a new project, considering factors such as user involvement, resource management, and clear requirements. It also delves into project management systems and procedures, highlighting the importance of time, cost, and quality objectives, and discusses the principles behind effective coordination, communication, and visibility. Furthermore, the report examines the management of project human resources, including organizational structures, roles, responsibilities, and skills assessment. It includes a work breakdown structure and explores project processes and procedures, such as Gantt charts, resource histograms, and methods for managing changes. The report also analyzes cost and time performance, methods for closing projects, and evaluating overall project success, providing a comprehensive overview of project management practices.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Project Management in Business
1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
INTRODUCTION ...............................................................................................................................3
TASK 1 Understand Project Management Principles (LO1)...............................................................3
(a) 1.1 Describe the main principles of project management process and linked to the project life
cycle.................................................................................................................................................3
(b) 1.2 Suitable success and failure criteria for the new project .....................................................5
(c)1.3 Principles behind project management systems and procedures...........................................6
(d)1.4 Key elements involved in terminating projects and conducting post-project appraisals......7
TASK 2 Be able to manage a project’s human resources (LO2)..........................................................8
(a) 2.1Most appropriate organizational structures, roles and responsibilities of participants within
a project ...........................................................................................................................................8
(c) 2.3 Assessment of skills and qualities in project leader of ACME project .............................10
(d) 2.4 Planning and specifications of human resources and requirements for a project .............11
(e)2.2 Work Breakdown structure of ACME project ....................................................................13
TASK 3 Be able to apply project processes and procedures (LO3) ..................................................15
(a) 3.2 Final duration of project ....................................................................................................15
(b) 3.1/3.2 Delays in the activities ................................................................................................15
(c) 3.1 Use of Gantt chart and Resource histogram in order to improve the management of
ACME project................................................................................................................................15
(c) 3.2 Crash some activities in project to complete it more quickly ...........................................16
(d) 3.2 Analysis of cost and time performance for ACME project ...............................................16
(e) 3.4 Methods of managing changes that are likely to be required during the life of ACME
project............................................................................................................................................17
(f) 3.1 Ways to close the project ...................................................................................................18
(g) 3.3/3.4 Evaluation of complete project ...................................................................................18
CONCLUSION..................................................................................................................................19
References..........................................................................................................................................20
2
Document Page
INTRODUCTION
Project management is mainly related to the planning and managing changes within the
organization. The common areas of where it is used are: staffing and management of people,
manufacturing and production, quality management, new business development purchasing etc.
Project management can be considered as an art or science where the different components of the
project has organized in the right manner (Boud, Cohen and Sampson, 2014). It has never taken as a
part of normal business operations. It is the application of skills, knowledge, techniques and tools to
project activities which help in meeting the requirements of the project. The following research has
related to the project management and to determined its importance in the business, ACME
Products PLC organization has taken into consideration. The areas which will be covered under the
following study are project management principles, ways to manage project human resources and
applications of project process and procedures (Heagney, 2012).
TASK 1 UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (LO1)
(a) 1.1 Describe the main principles of project management process and linked to the project life
cycle
As per the given case study, it has been identified that during implementation of ACME's
new facility, it has important to considered project management process and project life cycle
(Kshama, 2012). The main principles of project management process and its relationship with the
project life cycle is as follows.
Project structure: During creating the structure for proposed ACME project, the three aspects have
to be considered: project goal, project timeline & order and project milestones (Kshama, 2012).
Under this stage, a goal has prepared as well as the various junctures have developed which defined
the different phase of ACME project in the respect of costs and outcomes.
Definition phase: In this principle, there are many kinds of inputs giving by the stakeholders of
ACME Company. Therefore, by involving the all the stakeholders in every stage of project, the
project manager can show his own commitment towards the project work.
Clear goals: Here, it is important for the project manager of External Project Management
Consultants to achieve the goals of ACME project. In this regards, the SMART objectives should be
develop. Along with this, the project manager has clearly define the goals of the proposed project
between the team members.
Transparency about project status: Under this principle of project management process, the
project manager of ACME has required to develop a short report on the status of project at every
3
Document Page
stage of plan (Kshama, 2012). By organizing the meetings, the project manager can give short
overview regarding the costs, meet deliverables and remaining time of completion of project.
Risk recognition: ACME project has contained the different types of risk. Therefore, it has project
manager responsibilities to determine the included risk in the project plan. By early identification of
the risk, it becomes easy to resolve it and complete ACME project within the give constrains.
Managing project disturbances: During implementation of ACME project as per the plan, some
changes have always occurred in the pre decided plan. Therefore, the project manager has to
identify the major disturbances in the work activities and try to manage them. This help in
achieving the objectives of ACME project.
Responsibility of the project manager: There are various kinds of roles and responsibilities
playing by project manager of ACME project during different phases of project management. For
the proposed project, the roles of project manager have managing changes, integration of several
project management systems, proper reporting of the status of the plan, deliver the ACME project
within time and costs etc.
Project success: For the proposed ACME project, the project manage has decided some project
success criteria so the deliverables have achieve or not can be easily measure (Kshama, 2012).
Along with this, the various kinds of methods have used for assessment of the success of ACME
project plan.
Commitment: The team members of project team of ACME should be committed towards their
work (Boulmetis and Dutwin, 2014). They must show the adequate level of commitment regarding
goals, quality, time duration, overall cost of the project etc.
Tetrad-Trafe off: This principles has simply defined the quality, cost, scope and time which should
he attainable and must be in a balanced state (Tohidi, 2011). It help the project manager of ACME
project to achieve the objectives of the project plan and meet the success level.
Primary communication channels: It has more important to develop a communication between
project manager and the client. It helps in sharing the important information about the project of
ACME between the team members.
Cultural environment: The selection of management has depended on type of project. The present
status of ACME project defines the outcomes of the work (Tran and et.al., 2013). Therefore, with
the help of effective team management strategy, project manager can achieve the deliverables of
work of ACME project.
Process: As per this principle, the project manager of ACME project should decided the process of
implementation of the plan. Along with this, the roles and responsibilities of the team members
should be clearly define and documented.
4
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Life cycle: This principle defines the different stages of project of ACME project and ensure the
project manager to determined the major and important milestones in the project plan (Schwalbe,
2013). It has provided the clear picture of starting and sending of the work.
(b) 1.2 Suitable success and failure criteria for the new project
The proposed project has related to implementation of ACME new facility. In this context,
the success and failure criteria has needed to be set by the project manager (Burke, 2013). It has
helped in determine whether the project has developed according to the requirement of the client or
not. Some criteria for measuring the success and failure of project are as follows.
Success and failure criteria
User involvement: If the project team members have not involve the client in decision making
process then it will directly made the impact on the implementation of project. The reason is the
lack of user involvement in the decision making process will not help the project manager to
determine the needs (Caniëls and Bakens, 2012). This will be a failure criteria for the project. But,
if the project manager has taken the suggestions of the users then it will assist in meeting the
objectives of the plan which can be considered as a success criteria.
Resource management: If the project manager has not able to manage the resources such as under
or over utilization of the different resources then it will be impossible to provide the deliverables on
give time (Holzmann, 2013). This can be considered as a failure criteria for the proposed project.
But if the project manager has the capabilities to manage the resources in more effective and
efficient manner then it will be easy to meet the deadlines of the project .
Cleat statement of requirements: If ACME Company is not clearly stated the requirements related
to the project then the project manager will not deliver the required things. It will entirely affect the
project and considered as failure criteria for the new project. But if the company knows what they
are want from the projects then as per the requirements of the client, project manager will able to
deliver the project.
Other aspects: Time, budget, scheduling and planning can be include in success or failure criteria
for the proposed project (Gido and Clements, 2014). If the new project has unable to any out of the
these elements then it will be considered as a failure criteria of the project .
On the other hand, there are many other project success and failure criteria for ACME
project which are as follows .
Scope: It is combination of fundamental elements and features which are achieving after
completion of project in the form of deliverables (Cheng and Teizer, 2013).
Resources: Cost and budget of ACME project can be considered in resources. If these are
5
Document Page
effectively utilized then it will considered as a success criteria for the work otherwise it will count
in failure criteria.
Schedules: It is actual time duration which are estimating for complete the project (Davenport,
2013). In the case of ACME project, if it has completed within a given time duration then it will
count as a success criteria for the project otherwise considered as failure criteria.
Other factors that can be count as success and failure criteria are as follows.
Project success factors Project failure factors
Effective leadership Poor leadership
Dedicated commitment of team members Underutilized resources
Clear vision (Wright and Adviser-Gottwald,
2013)
Unclear goals and objectives
Effective distribution of information Improper communication (Kerzner, 2013)
Motivation Lack of motivation
Support of top management Unsupportive top management
(c)1.3 Principles behind project management systems and procedures
In the case of ACME project, there are three objectives: time, cost and quality. For achieving
these objectives, the project management process and systems have played an important role which
can be understood from the examples (Killen and et.al, 2012).
Time cost: For allocating time and cost for the proposed project, resource levelling and activity
based costing method have used. With the help of these techniques, the project manager will able to
easily and effectively utilized and allocating the time and cost at every stage of project plan.
Quality: In the terms of quality, before converting the project plan into the action, some quality
standards have already set (Mir and Pinnington, 2014). When the new facility has completed then
project manager can compare the actual quality outcomes with the set standards.
The principles behind project management system are as follows.
ï‚· Effective coordination between multiple projects
ï‚· Provide clear visibility of the work (Reed and Knight, 2013).
ï‚· Develop clear communication between the project manager and its team members as well as
increase their participation (Garton and McCulloch, 2012).
The procedure of project management system for ACME project has included the various
functions which are as follows.
6
Document Page
ï‚· Develop a project plan and make its scheduling with the use of software.
ï‚· Project manager has to allocate the tasks and deadlines for the various activities (Boulmetis
and Dutwin, 2014).
ï‚· Prepare the documents which include the various information about ACME project and
share it with the stakeholders.
ï‚· Schedule the calendar which include the meeting, activities date etc. regarding the project.
Along with this, by updating the contacts of different stakeholders of ACME project, it can
be easy to share the information with them.
ï‚· Under this step, the project manager has taken action against the bugs and errors in the
project and take the required actions to resolve them (Tohidi, 2011).
ï‚· The last step of project management system is tracking time in which project manager has
needed to track time for all activities and maintained records of entire work.
(d)1.4 Key elements involved in terminating projects and conducting post-project appraisals
Key elements of project termination process:
Project termination is an hard and complex decision for the every project team. The project
termination process can be taken place during the implementation of the project plan and after
completing the project. In the case of ACME project, the project termination key elements are
complete all the legal requirements, closing the contract with the different suppliers and contractors,
payment of the remaining bills, auditing, transferring the roles and responsibilities, sharing of
information of the project and other supportive things (Meredith and Mantel, 2011). The major
reasons in which a project manager can take the decisions of ACME project termination are
technical issues, project cost is high as compare to estimated budget, existing method has not
supported the new strategies for work, unexpected loss of human capital, working capital and other
resources and the deliverables of the project are not according to the set objectives (Tran and et.al.,
2013). Specific examples from the case ACME
Post project appraisals:
Post project appraisal is an evaluation of the project that help in determining the extent
where the project has accomplished the objectives of the company. The items which will involve in
post project appraisal are as follows.
Variance analysis: Here, the comparison between the expected outcomes and actual results from
the proposed project has calculated.
Benefit analysis: In this, the initial investment for ACME Company will be high but in the near
future it will be improve the production process capabilities which will beneficial for the firm.
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Risk analysis and its review: Under this method, the project manager will analyse and identified
the risks before handover the project to client. It will help in solving the post implementation risks
changes (Patanakul and Shenhar, 2012).
Post project appraisal procedure:
Step 1- Planning of post project appraisal: The different crucial part of ACME project plan has
included. The scheduling of post project appraisal has planed after implementation of the project
where the strengths and weaknesses information of the work has gathered.
Step 2- Review of elements: Review all the activities so that the require tasks can be included in
post project appraisal.
Step 3- Review key documents: Gather all the data by reviewing the documents so that project
manager of ACME project can develop post project report. The elements which included in report
are methodology, key findings, recommendations and conclusion.
Step 3- Sharing of key findings and recommendations: Here, the findings during post project
appraisal has shared between the team members of ACME project and owner of ACME Company.
It help in implementation of the recommendations as per the guidance.
TASK 2 BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES (LO2)
(a) 2.1Most appropriate organizational structures, roles and responsibilities of participants within a
project
Main participants and their roles and responsibilities in the ACME project
The list of main participants as well as their roles and responsibilities in the ACME project
are as follows.
Participants for
ACME project
Roles and responsibilities in the form of job description ACME Project
specific
Project manager Capable to develop and implement the plan for new facility.
Able to manage the risk and resources (Schwalbe, 2013).
Ensure the quality of project deliverables
Able to meet the deadlines of the project plan (Turner, 2014).
Managing and leading the team for ACME project.
Recruitment of the staff members.
Managing the outcomes of the entire project of ACME.
Monitoring the progress and performance of plan (Cheng and Teizer, 2013).
Architecture To able to develop the design of construction of building with the complete
8
Document Page
details.
Able to pay environmental and sustainable issues as well as promote energy
saving technology in the building specifications of ACME project.
Quality analyst Responsible for provide the review on the designs of plan.
Able to find out the issues in the new facility (Söderlund and Geraldi,
2012).
Mechanical engineer Able to design and implement the cost effective equipment’s in the plant.
Monitoring and commissioning plant and systems.
Planning and designing the new production process.
Project team
members
Working with subordinates to meet the needs of ACME project.
Identification of information needs (Davenport, 2013).
Project sponsor Review the solution of issues which has given by project manager.
Approve budget.
Taking the major decisions regarding the ACME project.
Project board Approve strategies and plan of a project (Wright and Adviser-Gottwald,
2013).
Managing changes within the team.
Priorities the tasks and communicate the required information.
Steering committee Giving advice on key technical aspects of ACME project (Kerzner, 2013)
Monitor the progress and deliverables of current project plan
System administrator Managing and support different internal and external environment for this
ACME project.
Managing database (Reed and Knight, 2013).
Appropriate organizational structure of ACME Project
The organization structure of ACME Company is matrix in which firm has followed more
than two kinds of organization structure. The best possible benefits of the following organization
structure are effective use of resources, coordination between the different departments, easy flow
of information, improve communication process etc. (Teller and et.al. 2012).
9
Document Page
(c) 2.3 Assessment of skills and qualities in project leader of ACME project
The project manager of ACME project, there are various kinds of skills and qualities are
require. The justification of needed skills and qualities in project manager are follows.
Problem solver: The creative problem solving quality is a sign of good project manager. If the
project manager of ACEM project has able to resolve the problems related to the project then he can
easily manage the work and complete the allotted task within given time (Barry, 2015).
Time management style: A project manager of ACME project should know the techniques of
managing the time, without managing the time, he cannot able to complete his work.
Team building skills: Project manager is a person who is holding and lead the team for the
achieving the common goal. To increase the performance of the team, project manager of ACME
project should know about the team building skills. He should know the appropriate use of
leadership skills and under the working styles of the team members (Barry, 2015).
Work under pressure: The project manager of ACME project should know how to work under the
pressure. Because sometimes, some problems with the proposed project may be created which can
affect the entire project.
Good communicator: A project manage should of ACME project be a good communicator because
he is responsible for clear communication about objectives, aims, performance of the project,
responsibilities of the different team members etc. He is creating a link of his team members direct
10
ACME Project
Manufacturing
Production
manager Y
Marketing R&D
Production
manager X
HR FinanceProcurement
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
to the organization. Therefore, to ensure the success of the project, the project manager of ACME
project should be a good communicator (Barry, 2015).
Vision: The vision of project leader of ACME project should be clear. Vision of ACME project is
developing a facility which can help in production, supply of raw material, manufacturing and
delivery of finished goods and services in effective manner.
Integrity: Project leader of ACME project should be honest and loyal because this attitude has
created the examples for his team members (Boulmetis and Dutwin, 2014).
Empathy: Project leader of ACME project should understand the needs of its team members. For
this, he has to give proper attention at the workplace and develop the personal relationship with the
different project team members.
Competence: The project manager of ACME project must have the ability of accepting the
challenges and resolve the conflicts between the team members (Tohidi, 2011).
(d) 2.4 Planning and specifications of human resources and requirements for a project
For the proposed project, the major required human resources are 4: project manager,
architecture, quality analyst and mechanical engineer. Rather than these, the 30 people will be more
required which will help in implementing the plan into the action.
1. Project manager:
Personal characteristic
Good communicator: Project manager of ACME project has responsible for communicating the
goals, objectives and responsibilities within the team which decided the probability of success of
project plan.
Technical characteristic
Knowledge about the different project management tools: Project manager of ACME project has the
wide knowledge about the various project management tools because he is responsible for manage
the entire project activities (Reiss, 2013).
Other characteristics
Along with personal and technical characteristics, the project manager of ACME project has
also having the ability to recruit the staff members, know the techniques to meet the deadlines of
plan as well as develop a plan to monitor the progress of project plan.
2. Architecture
Personal characteristic
Creative thinking: With the help of the creative thinking, the architecture can bring the new
innovation in the designing of the building. It helps in delivering the expected outcomes as per the
11
Document Page
requirements of the clients.
Technical characteristic
Having the knowledge about designing of construction: This characteristic has helped in developing
the effective design of new facility so the new energy saving techniques can be used in building
(Leach, 2014).
Other characteristics
Architecture of ACME project has also the knowledge about various environmental and
sustainable issues. Along with this, he has complete information about energy saving technologies
to overcome environmental issues.
3. Quality analyst
Personal characteristic
Work under pressure: During the implementation phase of ACME project, the workload on the
quality analyst has increased with the time. Therefore, it is important for him to work under the
pressure.
Technical characteristic
Technical expertise: Quality analyst must know about the different techniques of analyzing the
quality and specifications of new facility. It has assisted him to determined whether the ACME
project able to meet the requirements of company or not (Kerzner, 2013).
4. Mechanical engineer
Personal characteristic
Good management style: Mechanical engineer have to know about how to manage the time and
complete the task within given time frame. Along with this, he has to be able to design and
implement the cost effective machines in the plant.
Technical characteristic
Designing of machines: Mechanical engineer has required the enough knowledge about the
designing of machines. The reason is he is responsible for integrated the new facility production
system with existing factories (Pemsel and Wiewiora, 2013).
(e)2.2 Work Breakdown structure of ACME project
12
Document Page
ACME project can be divided into three sections: planning, implementation and project end.
Planning section included the various sub activities like prepare requirements statements, designing
of production machinery and development of architecture of new building. In the second section,
13
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
implementation has included build production machinery, construction of building, testing of
production machinery, installation of machine in building, sourcing of raw material and creation of
distribution mechanism. On the other hand, third section is related to ending of project. The sub
activities of this section are designing of advertisement campaigning, creating sales force, testing of
manufacturing capabilities and start new production process.
TASK 3 BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES
(LO3)
(a) 3.2 Final duration of project
The final duration of ACME project is = S–A–B–D–F–K–L = 8+12+10+25+3+8+0=66
Weeks
It is a critical path for this project which shows the longest path and maximum duration for
completing ACME project in effective manner.
(b) 3.1/3.2 Delays in the activities
As per the give information if, construction of the production machinery will take longer that
planned duration by eight weeks than it will not affect the total duration of the project because this
activity is not included in the critical path and its slack time is 15 weeks. So, it has a scope of 15
weeks to delay.
But on the other hand, if supply of raw material also affected by 6 weeks as compare to
planned duration that it will affect the total duration of the project (Nishadha, 2012). This activity is
not included in the critical path but still its slack time is 4 weeks only so, if project manager delay
this activity by 6 weeks than it may postpone its predeceasing activities which are included in the
critical path. So, in this situation total duration of this project will increase by 2 weeks and become
68 weeks.
14
Document Page
(c) 3.1 Use of Gantt chart and Resource histogram in order to improve the management of ACME
project
There are two methods by which the improvements in ACME project can be bring. These
techniques are as follows.
Gantt Chart: Gantt chart is a series of horizontal lines which defines the amount of work done in a
given time period with respect to the amount planned for those time frame (Garton and McCulloch,
2012). This tool has become more productive and help the project manager of ACME project to
forecast the short and long term results. The contribution in improving the management of then
proposed project, it can be understood by an example. In the project plan, it has found that in some
activities, the resources are underutilized. It has affected the cost of the project and for other tasks,
the project manager has required to arrange the new resources. To solve this problem, Gantt Chart
will help in identified those activities where the resources are under or over utilized. With the help
of this, it will be easy to allocate the resources in effective manner (Nishadha, 2012).
Resources Histogram: It is a bat chart which is showing the availability of resources over a period
of time (Tran and et.al., 2013). It is technique which has used in project management because it has
provided the visual representation of the different resources. The role of the following method in
improving the management of ACME project which can be understood by an example. In the
project plan, the human resources has allocated at every stage of plan. To know about the use of
their skills and capabilities in the project, resources histogram can be used. With the use of it,
project manager will identify that which human resource under used and which one is doing extra
work (Pinto,2014).
(c) 3.2 Crash some activities in project to complete it more quickly
15
Document Page
By crashing some activities which are not a part of critical path, the project will be finished
more quickly as compare to the given time duration (Bourdeau and Barki, 2013).
(d) 3.2 Analysis of cost and time performance for ACME project
For determining the cost and time performance form ACME project, the different methods
can be used which are as follows.
Cost performance index: It defines the amount of work being accomplished on a project plan for
every unit of cost spent. In the context of ACME project, CPI can be calculated by Earned
value/Actual cost. If the calculated value of CPI is more than 1 that it defines that project is doing
well as compare to against the prepared budget. With the help of this, the cost performance of
project plan can be easily determined (Boud, Cohen and Sampson, 2014).
For example, ACME project has to be completed within 12 months and budget for this is
about to $100000. During the period of 6 month, $ 60000 has been spent. From the review, it has
determined that only 50% work has been done. With the help of CPI, it has calculated and found
that value of CPI is 0.67 and it is less than on. It has defined that ACME project is over budget.
Time performance: For identification of the time performance of ACME project, the project
manager can compare the actual time duration for ever activity with the estimated duration. By
doing this, it can be easy to determined the lacking areas and manage the remaining project plan in
effective manner (Heagney, 2012). For this, the project manager needs to compare the actual time
with the estimated time period. The variance from the expected values defines that whether the
project completed within a given time frame or not (Schwalbe, 2013).
(e) 3.4 Methods of managing changes that are likely to be required during the life of ACME project
For managing the changes which are more likely to be required during the life of ACME
project, Project change control method has most suitable. It has conducted after the implementation
and monitoring of the project plan.
16
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
ï‚· The first step is known the difficulty in the existing facility and enlist it. Under this step, the
project manager has monitor and control project work (Cheng and Teizer, 2013). It helps
him to understand and notice the various problems in the existing work which required the
changes to make the task more effective and beneficial for the company.
ï‚· A panel has prepared in which the management team of ACME and other responsible
persons will included (Davenport, 2013). The project manager has prepared the report which
involved the changes in the project plan and its work. Now, the entire change request report
has sent to the change control board (CCB).
ï‚· Under this step, the requests regrading the change will evaluate in Change Request meetings
17
Illustration 1: Project change control procedures for the
existing plan
(Source: Manage changes in your project, 2012)
Document Page
and take the decision for approving or reject the modifications by the panel of CCB.
ï‚· If new changes requests accepted then it will go for development department where the new
project plan will developed and the execution will take place.
ï‚· This is the final step where the existing system will updated as per the new modifications
(Manage changes in your project, 2012). The implementation of new modifications will take
place as per the new guidance and new methods.
(f) 3.1 Ways to close the project
After completing the whole project according to the project plan, a post project appraisal
will be conducted. Here, the different activities will be taken place such as audit, payment of
remaining bills, post implementation risks assessment, transferring roles and responsibilities and
hand over the project and its related information to ACME Company.
After completing the different tasks in the proposed project as a project manager, the new
facility will be handover to ACME Company. After this, the new production facility will be ready to
use by organization (Gido and Clements, 2014).
But in the case of if the project goals and objectives has not achieved then with he help of
extinction, the project may be closed out. On the other hand, project inclusion is a simple form of
closing out the project (Wright and Adviser-Gottwald, 2013). In this context, the project manager
has hand off the project deliverables to the company by itself.
Once the project manager of ACME project has completed his own tasks, ACME Company
can open the new building and begin the production line of plastic tableware. After this, firm can
integrate its new building with existing plants across the world with the purpose of managing the
production process as well as business operations.
(g) 3.3/3.4 Evaluation of complete project
For evaluating the ACME project after its completion, the different kinds of Key
Performance Indicators can be used. KPI is used for the evaluation of those factors which are
playing essential roles in meeting the success of the project. For proposed project, the KPI's are
outcomes, resource utilization, benefits to the resorts and effectiveness of new facility (Caniëls and
Bakens, 2012). The methods used for measuring the performance of the plan are as follows.
Budgeted cost for work scheduled: The total cost of the project has assessed with the help of this
tool. By comparing the actual budget with the the planned budget on each milestone of project, the
performance of the plan can be determined.
Budgeted cost for work performed: It is used in determining the performance gap which assist in
setting up the failure or success rate of ACME project. By including the calculation of the real cost
18
Document Page
of the proposed project, the performance can be easily measured (Killen and et.al., 2012).
CONCLUSION
From the above report, it can be concluded that project manager has required to developed
some success and failure criteria for ACME project to assess the performance. Co-ordination and
control are the most important factors affect the plan in positive and negative way. For proposed
project scheduling, cost and time estimation techniques have affected the entire project plan. By
setting up the different key indicators, the performance of the ACME project has evaluated.
19
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Books and Journals
Boud, D., Cohen, R. and Sampson, J., 2014. Peer learning in higher education: Learning from and
with each other. Routledge.
Boulmetis, J. and Dutwin, P., 2014. The ABCs of evaluation: Timeless techniques for program and
project managers. John Wiley & Sons.
Bourdeau, S. and Barki, H., 2013. Toward a Typological Theory of Information System Project
Team Management Styles. 8th Pre-ICIS International Research Workshop on Information
Technology Project Management. pp. 125.
Burke, R., 2013. Project management: planning and control techniques. New Jersey, USA.
Caniëls, M. C. and Bakens, R. J., 2012. The effects of Project Management Information Systems on
decision making in a multi project environment. International Journal of Project
Management. 30(2). pp. 162-175.
Cheng, T. and Teizer, J., 2013. Real-time resource location data collection and visualization
technology for construction safety and activity monitoring applications. Automation in
Construction. 34. pp.3-15.
Davenport, T.H., 2013. Process innovation: reengineering work through information technology.
Harvard Business Press.
Garton, C. and McCulloch, E., 2012. Fundamentals of technology project management. MC Press,
LLC.
Gido, J. and Clements, J., 2014. Successful project management. Cengage Learning.
Heagney, J., 2012. Fundamentals of project management. AMACOM Div American Mgmt Assn.
Holzmann, V., 2013. A meta-analysis of brokering knowledge in project management. International
Journal of Project Management. 31(1). pp. 2-13.
Kerzner, H. R., 2013. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley and Sons.
Killen, C. P. and et.al., 2012. Advancing project and portfolio management research: Applying
strategic management theories. International Journal of Project Management. 30(5). pp. 525-
538.
Leach, L. P., 2014. Critical chain project management. Artech House.
Meredith, J. R. and Mantel, S. J., 2011. Project management: a managerial approach. John Wiley
and Sons.
Mir, F. A. and Pinnington, A. H., 2014. Exploring the value of project management: linking project
management performance and project success. International Journal of Project Management.
32(2). pp. 202-217.
Patanakul, P. and Shenhar, A. J., 2012. What project strategy really is: The fundamental building
block in strategic project management. Project Management Journal. 43(1). pp. 4-20.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in project-based
organisations. International Journal of Project Management. 31(1). pp. 31-42.
20
Document Page
Pinto, J. K., 2014. Project management, governance, and the normalization of deviance.
International Journal of Project Management. 32(3). pp. 376-387.
Reed, A.H. and Knight, L.V., 2013. Exploring the role of communication media in the informing
science model: an information technology project management perspective. Informing
Science: The International Journal of an Emerging Transdiscipline. 16.
Reiss, G., 2013. Project management demystified: Today's tools and techniques. Routledge.
Schwalbe, K., 2013. Information technology project management. Cengage Learning.
Söderlund, J. and Geraldi, J., 2012. Classics in project management: revisiting the past, creating the
future. International Journal of Managing Projects in Business. 5(4). pp. 559-577.
Teller, J. and et.al., 2012. Formalization of project portfolio management: the moderating role of
project portfolio complexity. International Journal of Project Management. 30(5). pp. 596-
607.
Tohidi, H., 2011. Review the benefits of using value engineering in information technology project
management. Procedia Computer Science. 3. pp.917-924.
Tran, S.T. and et.al., 2013. Introduction to information technology. Massachusetts Institute of
Technology and Harvard University, MA, US: Proceedings of the 9th International CDIO
Conference: June.
Turner, J. R., 2014. The handbook of project-based management. McGraw-hill.
Walker, A., 2015. Project management in construction. John Wiley and Sons.
Wright, G.P. and Adviser-Gottwald, W.D., 2013. Success rates by software development
methodology in information technology project management: a quantitative analysis.
Online
Barry, T., 2015. TOP 10 QUALITIES OF A PROJECT MANAGER. [Online]. Available
through:<https://www.projectsmart.co.uk/top-10-qualities-project-manager.php>. [Accessed
on: 3rd December, 2015 ].
Kshama, 2012. Basic Principles Of Project Management. [Online]. Available
through:<http://www.simplilearn.com/project-management-basic-principles-article>.
[Accessed on: 3rd December, 2015 ].
Manage changes in your project, 2012. [Online]. Available
through:<http://satheespractice.blogspot.in/2012/02/manage-changes-in-your-project.html>.
[Accessed on: 3rd December, 2015].
Nishadha, 2012. 5 Reasons to Use Gantt Charts. [Online]. Available
through:<http://creately.com/blog/diagrams/5-reasons-to-use-gantt-charts/>. [Accessed on:
3rd December, 2015 ].
21
Document Page
22
chevron_up_icon
1 out of 22
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]